CN205475252U - Compound snap -in stake retaining wall structure - Google Patents

Compound snap -in stake retaining wall structure Download PDF

Info

Publication number
CN205475252U
CN205475252U CN201620026455.5U CN201620026455U CN205475252U CN 205475252 U CN205475252 U CN 205475252U CN 201620026455 U CN201620026455 U CN 201620026455U CN 205475252 U CN205475252 U CN 205475252U
Authority
CN
China
Prior art keywords
pile body
anchor cable
soil
drilling
grouting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620026455.5U
Other languages
Chinese (zh)
Inventor
刘献刚
付豫楹
乐平
刘斌
熊新华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangxi Jiye Technology Group Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Application granted granted Critical
Publication of CN205475252U publication Critical patent/CN205475252U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/02Retaining or protecting walls
    • E02D29/0225Retaining or protecting walls comprising retention means in the backfill
    • E02D29/0233Retaining or protecting walls comprising retention means in the backfill the retention means being anchors
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/02Retaining or protecting walls
    • E02D29/0258Retaining or protecting walls characterised by constructional features
    • E02D29/0275Retaining or protecting walls characterised by constructional features cast in situ
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/74Means for anchoring structural elements or bulkheads
    • E02D5/76Anchorings for bulkheads or sections thereof in as much as specially adapted therefor
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/30Miscellaneous comprising anchoring details

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses a compound snap -in stake retaining wall structure, include: a plurality of cement mixing method bodies, it irritates the pile body, per two to include still that the drilling of a plurality of anchor ropes is pressed anchor rope drilling is pressed to irritate and has been arranged the at least cement mixing method body between the pile body, anchor rope drilling press irritate the pile body with the interlock of each other of the cement mixing method body is arranged, anchor rope drilling is pressed and is irritated the pile body including bearing down on one the roof beam, the roof beam that bears down on one is located the top of irritating the pile body is pressed in anchor rope drilling, anchor rope drilling is equipped with steel reinforcement cage and prestressed anchorage cable in pressing and irritating the pile body, wherein, the one end of prestressed anchorage cable is fixed the steel reinforcement cage is close to anchor rope drilling is pressed and is irritated the pile body serve one of bottom, the other end of prestressed anchorage cable passes through the anchoring body anchor and is in bear down on one on the roof beam.

Description

Compound snap-in stake barrier wall structure
Technical field
This utility model relates to a kind of compound snap-in stake barrier wall structure.
Background technology
At present, in the design of China's foundation pit stope support and construction, arrangement and method for construction and engineering method is often used to have soil nail wall, campshed, cement-soil gravity type retaining wall, diaphram wall etc..1. soil nail wall: this engineering method construction equipment is simple, and construction method is easy.Soil nailing passes through soil layer ability relatively by force, can prevent subsoil water and the erosion of rainwater and soil erosion, better economy.But the soft formations such as this engineering method, is only applicable to more than level of ground water or through artificial gravelly sand and boulder bed, mud are the most inapplicable, need to take the outer underground space in hole big for soil nailing simultaneously.2. campshed supporting construction method: though it is simple to have construction machinery and technique, adapts to the advantage that the scope of soil layer is wide, but it is high to there is cost, long in time limit, there is additionally required the defect arranging waterproof tent antiseepage.3. cement-soil gravity type retaining wall engineering method: there is construction equipment and simple for process, the reliable advantage of water isolating, but it is big to still suffer from cement consumption, uneconomical, structure takes up room greatly, is normally only applicable to soft soil foundation pit, cutting depth is less than 7M, the shortcoming big on surrounding enviroment impact of constructing.4, diaphram wall engineering method: wall stiffness is big, there is " gear soil " and " water proof " dual function, Supporting Structure deformation is little, but there is spoir and waste mud is many, cement, steel consumption big, cost is high, shortcoming long in time limit, meet powder soil horizon easily causes landslip of the sides of the trench to seep water simultaneously, and wall body and seam crossing are also easily generated infiltration phenomenon.
In a word, above conventional pattern foundation pit supporting structure barrier wall structure, owing to supporting cost is high, the construction period is long, or is limited the factor restrictive function on (level of ground water, neighboring buildings basis and cannot the outer draining of wall etc.) by on-the-spot site condition, it is difficult to meet the requirement designed with construction unit.
Utility model content
It is low that the technical problems to be solved in the utility model is to propose a kind of cost, and the duration is short, energy-saving material, mechanization degree high and safety is high, and has the compound snap-in stake barrier wall structure of the effect of good pattern foundation pit supporting structure.
To this end, compound snap-in stake barrier wall structure of the present utility model, including: some Soil-cement pile bodies;Also include some anchor cable drilling & grouting piling pile bodies, between every two described anchor cable drilling & grouting piling pile bodies, be disposed with at least Soil-cement pile body;Described anchor cable drilling & grouting piling pile body and the described engaged layout of Soil-cement pile body;Described anchor cable drilling & grouting piling pile body includes that capping beam, described capping beam are located at the top of described anchor cable drilling & grouting piling pile body;It is provided with steel reinforcement cage and prestress anchorage cable in described anchor cable drilled press-grouting pile body, wherein, one end of described prestress anchorage cable is fixed on described steel reinforcement cage on one end of the described bottom of described anchor cable drilling & grouting piling pile body, and the other end of described prestress anchorage cable is anchored on described capping beam by anchoring body.
Above-mentioned compound snap-in stake barrier wall structure, also include: anchor pole, described anchor pole one end is fixing with anchor cable drilling & grouting piling pile body to be connected, and the other end is adapted for insertion in the soil body, and described anchor pole coordinates with described anchor cable drilling & grouting piling pile body to stop described anchor cable drilling & grouting piling pile body to be shifted over.
Above-mentioned compound snap-in stake barrier wall structure, described anchor pole is base expanding and base expanding anchor pole, and described base expanding and base expanding anchor support one end in the soil body has radially protruding part.
Above-mentioned compound snap-in stake barrier wall structure, is disposed with three described Soil-cement pile bodies between two described anchor cable drilling & grouting piling pile bodies, wherein, described anchor cable drilling & grouting piling pile body and described cement mixing method body form continuous snap-fit arrangement.
This utility model has the following technical effect that with for prior art
Barrier wall structure the most of the present utility model is by being disposed with at least Soil-cement pile body between every two described anchor cable drilling & grouting piling pile bodies;Described anchor cable drilling & grouting piling pile body and described soil cement stir and block the engaged layout of pile body.For above design, anchor cable drilling & grouting piling pile body primarily serves the effect of block body and dash, and primarily serve sealing effect with the Soil-cement pile body of its snap-fit arrangement, and assist the effect playing gear soil, so, with in prior art with prior art uses two campshed bodies arrange compared with, i.e., one row's concrete drill hole guncreting pile body, one row's cement mixing method body, for same construction environment, the Soil-cement pile body of employing part substitutes used concrete drill hole guncreting pile body, the quantity making relatively costly and baroque concrete drill hole guncreting pile body decreases, structure also becomes relatively easy, thus greatly reduce the engineering time, reduce construction costs.Additionally;Described anchor cable drilling & grouting piling pile body in this utility model includes that capping beam, described capping beam are located at the top of described anchor cable drilling & grouting piling pile body;It is provided with steel reinforcement cage and prestress anchorage cable in described anchor cable drilled press-grouting pile body, wherein, one end of described prestress anchorage cable is fixed on described steel reinforcement cage on one end of the described bottom of described body, and the other end of described prestress anchorage cable is anchored on described capping beam by anchoring body;This structure designs, and by increasing prestress anchorage cable at anchor cable drilling & grouting piling pile body, such that it is able to allow pile body have good anti-floating and resistance to plucking, and then just can play preferably gear soil effect using this anchor cable drilling & grouting piling pile body of lesser amt.
Barrier wall structure the most of the present utility model also includes anchor pole, described anchor pole one end is fixing with anchor cable drilling & grouting piling pile body to be connected, the other end is adapted for insertion in the soil body, described anchor pole coordinates the described anchor cable drilling & grouting piling pile body of prevention to be shifted over described anchor cable drilling & grouting piling pile body, the anchor pole inserted by use is so that anchor cable drilling & grouting piling pile body has preferable flexing resistance, thus is effectively improved the gear soil nature energy that barrier wall structure is overall.
Described anchor pole the most of the present utility model is base expanding and base expanding anchor pole, and described base expanding and base expanding anchor support one end in the soil body has enlarged footing.Anchor pole uses the design with enlarged footing can improve anchor pole pull resistance in soil, thus further increases the gear soil nature energy of this utility model barrier wall structure.
Accompanying drawing explanation
Below in conjunction with Figure of description, embodiment of the present utility model is specifically introduced
Fig. 1 is the structural representation that this utility model is combined snap-in stake barrier wall structure;
Fig. 2 is the structural representation of this utility model anchor cable drilling & grouting piling pile body;
Fig. 3 is the top view of steel reinforcement cage in this utility model anchor cable drilling & grouting piling pile body;
Fig. 4 is the structural representation of the preferred implementation of this utility model anchor cable drilling & grouting piling pile body;
1-Soil-cement pile body;2-anchor cable drilling & grouting piling pile body;3-capping beam;4-steel reinforcement cage;5-prestress anchorage cable;6-anchoring body;7-anchor pole;8-radially protruding part;
Detailed description of the invention
Embodiment 1
As it is shown in figure 1, one of the present utility model is combined snap-in stake barrier wall structure, including: some Soil-cement pile bodies 1;Also include some anchor cable drilling & grouting piling pile bodies 2, between every two described anchor cable drilling & grouting piling pile bodies 2, be disposed with at least Soil-cement pile body 1;Described anchor cable drilling & grouting piling pile body 2 and the described engaged layout of Soil-cement pile body 1;As shown in Figures 2 and 3, described anchor cable drilling & grouting piling pile body 2 includes that capping beam 3, described capping beam 3 are located at the top of described anchor cable drilling & grouting piling pile body 2;It is provided with steel reinforcement cage 4 and prestress anchorage cable 5 in described anchor cable drilling & grouting piling pile body 2, wherein, one end of described prestress anchorage cable 5 is fixed on described steel reinforcement cage 4 on one end of the bottom of described anchor cable drilling & grouting piling pile body 2, and the other end of described prestress anchorage cable 5 is anchored on described capping beam 3 by anchoring body 6.
As one preferred embodiment, as shown in Figure 2, described compound snap-in stake barrier wall structure also includes: anchor pole 7, described anchor pole 7 one end is fixing with anchor cable drilling & grouting piling pile body 2 to be connected, the other end is adapted for insertion in the soil body, and described anchor pole 7 coordinates with described anchor cable drilling & grouting piling pile body 2 to stop described anchor cable drilling & grouting piling pile body 2 to be shifted over.Wherein, described displacement refers to the pile body change that position occurs on its any direction, also includes pile body fracture and change in location that the part pile body that causes occurs.
As another kind of preferred implementation, as shown in Figure 4, described anchor pole 7 is base expanding and base expanding anchor pole, and described base expanding and base expanding anchor support one end in the soil body has radially protruding part 8.
As another kind of preferred implementation, described compound snap-in stake barrier wall structure, wherein, is disposed with three described Soil-cement pile bodies 1 between two described anchor cable drilling & grouting piling pile bodies 2, wherein, described anchor cable drilling & grouting piling pile body 2 forms continuous snap-fit arrangement with described Soil-cement pile body 1.
Obviously, above-described embodiment is only for clearly demonstrating example, and not restriction to embodiment.For those of ordinary skill in the field, can also make other changes in different forms on the basis of the above description.Here without also cannot all of embodiment be given exhaustive.And among the protection domain that the obvious change thus extended out or variation are created still in this utility model.

Claims (4)

1. a compound snap-in stake barrier wall structure, including:
Some Soil-cement pile bodies;
Characterized by further comprising:
Some anchor cable drilling & grouting piling pile bodies, are disposed with at least one between every two described anchor cable drilling & grouting piling pile bodies Root Soil-cement pile body;
Described anchor cable drilling & grouting piling pile body and the described engaged layout of Soil-cement pile body;
Described anchor cable drilling & grouting piling pile body includes that capping beam, described capping beam are located at described anchor cable drilled press-grouting pile The top of body;Steel reinforcement cage and prestress anchorage cable it is provided with in described anchor cable drilled press-grouting pile body, wherein, described pre- One end of stress anchor cable is fixed on described steel reinforcement cage one end near the bottom of described anchor cable drilling & grouting piling pile body On, the other end of described prestress anchorage cable is anchored on described capping beam by anchoring body.
Compound snap-in stake barrier wall structure the most according to claim 1, it is characterised in that also include:
Anchor pole, described anchor pole one end is fixing with anchor cable drilling & grouting piling pile body to be connected, and the other end is adapted for insertion in soil In body, described anchor pole coordinates with described anchor cable drilling & grouting piling pile body to stop described anchor cable drilling & grouting piling pile body to be sent out Raw displacement.
Compound snap-in stake barrier wall structure the most according to claim 2, it is characterised in that: described anchor pole is Base expanding and base expanding anchor pole, described base expanding and base expanding anchor support one end in the soil body has radially protruding part.
Compound snap-in stake barrier wall structure the most according to claim 3, it is characterised in that: described in each two Three described Soil-cement pile bodies, wherein, described anchor cable boring pressure it are disposed with between anchor cable drilling & grouting piling pile body Fill pile body and form continuous snap-fit arrangement with described cement mixing method body.
CN201620026455.5U 2015-01-16 2016-01-12 Compound snap -in stake retaining wall structure Active CN205475252U (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201510021150 2015-01-16
CN2015100211505 2015-01-16

Publications (1)

Publication Number Publication Date
CN205475252U true CN205475252U (en) 2016-08-17

Family

ID=55926858

Family Applications (2)

Application Number Title Priority Date Filing Date
CN201610018445.1A Pending CN105586973A (en) 2015-01-16 2016-01-12 Composite snap-in pile retaining wall construction method and a composite snap-in pile retaining wall structure
CN201620026455.5U Active CN205475252U (en) 2015-01-16 2016-01-12 Compound snap -in stake retaining wall structure

Family Applications Before (1)

Application Number Title Priority Date Filing Date
CN201610018445.1A Pending CN105586973A (en) 2015-01-16 2016-01-12 Composite snap-in pile retaining wall construction method and a composite snap-in pile retaining wall structure

Country Status (1)

Country Link
CN (2) CN105586973A (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108517874A (en) * 2018-04-11 2018-09-11 浙江桐砚建筑规划设计有限公司 A kind of construction method of foundation pit enclosure

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100535263C (en) * 2007-12-28 2009-09-02 中国科学院水利部成都山地灾害与环境研究所 Construction method for vertical prestressed anchor rope friction pile slope-sliding prevention and treatment
CN202577316U (en) * 2012-03-19 2012-12-05 江苏江中集团有限公司 Structure of miniature piles in combination with composite soil nailing wall
CN202626978U (en) * 2012-04-10 2012-12-26 中冶建筑研究总院有限公司 Cemented soil secant pile group, diaphragm wall constituted by same and building foundation pit support system constituted by cemented soil secant pile group
JP6110156B2 (en) * 2013-02-15 2017-04-05 鹿島建設株式会社 Construction method of high bearing capacity pile
CN103195069B (en) * 2013-04-01 2016-01-20 北京工业大学 Pre-stress type double-row pile strong constraint method for supporting deep foundation pit
CN203741830U (en) * 2014-01-24 2014-07-30 刘献刚 Concrete comprehensive acting pile

Also Published As

Publication number Publication date
CN105586973A (en) 2016-05-18

Similar Documents

Publication Publication Date Title
CN104612143B (en) Composite pile constructed in drilled hole structure under a kind of solution cavity/soil cave geological conditions
CN105064397B (en) Open excavation construction method for expanding excavation of station on metro interzone shield tunnel foundation
CN201137148Y (en) Double rows bamboo pile composite soil nail defending system
CN101560770B (en) Novel deep building foundation pit supporting system
CN101139839B (en) Setting arrangement for high artesian area ultra-deep foundation pit
CN101270579B (en) Foundation pit guard method for expansion construction from deep foundation pit to shallow foundation pit
CN106498953A (en) Cut slope composite supporting construction and its construction method
CN207109475U (en) It is close to mountain high-filled subgrade stabilization and Deformation control structure
CN101725155A (en) Multi-direction rotary jetting stirring grouting reinforcement construction method for constructing underground structure and soil body by cover excavation and underground excavation and supporting structure thereof
CN102116030A (en) Combined bracing structure for foundation pit and construction method thereof
CN206034454U (en) Supporting construction
CN108385715A (en) A kind of assembled stake arch combination retaining wall and its construction method
CN204311456U (en) Foundation ditch strengthening structure
CN207211158U (en) Assembled pile board wall foundation pit supporting construction
CN109403349A (en) A kind of upper flexible and lower rigid system of deep foundation pit support and its construction method
CN105040707A (en) Combined densely-arrayed pile deep foundation pit supporting and enclosure structure used as basement external wall
CN205475252U (en) Compound snap -in stake retaining wall structure
CN208533542U (en) A kind of foundation pit supporting construction using three-level echelon joint system
CN202543946U (en) Supporting structure for drainage type fender posts in soft soil area
CN213625605U (en) Dig deep basal pit structure of stake anchor and hanging net injection concrete soon
CN212612517U (en) Micro steel pipe pile composite supporting structure for deep foundation pit in limited space
CN114032932A (en) Construction method of mixed retaining structure
CN212316951U (en) Roadbed structure for side slope
CN211816394U (en) Retaining wall structure without drainage in bedrock area
CN209323534U (en) A kind of upper flexible and lower rigid system of deep foundation pit support

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20180408

Address after: 330200 Jiangxi city in Nanchang Province Economic Development Zone Shandong blue Fu Road No. 1211

Patentee after: Jiangxi Jiye Science & Technology Co., Ltd.

Address before: 330025 No. 1211 Fu Shandong Road, Xiaolan Economic Development Zone, Jiangxi, Nanchang

Patentee before: Liu Xiangang

CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 330200 Jiangxi city in Nanchang Province Economic Development Zone Shandong blue Fu Road No. 1211

Patentee after: Jiangxi Jiye Technology Group Co.,Ltd.

Address before: 330200 Jiangxi city in Nanchang Province Economic Development Zone Shandong blue Fu Road No. 1211

Patentee before: JIANGXI JIYE SCIENCE AND TECHNOLOGY Co.,Ltd.