CN108517874A - A kind of construction method of foundation pit enclosure - Google Patents

A kind of construction method of foundation pit enclosure Download PDF

Info

Publication number
CN108517874A
CN108517874A CN201810318850.4A CN201810318850A CN108517874A CN 108517874 A CN108517874 A CN 108517874A CN 201810318850 A CN201810318850 A CN 201810318850A CN 108517874 A CN108517874 A CN 108517874A
Authority
CN
China
Prior art keywords
wall
construction
foundation pit
stake holes
diaphragm wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810318850.4A
Other languages
Chinese (zh)
Inventor
高志杰
唐明芳
郁海超
沈丽佳
王佳栋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Tongyan Building Planning Design Co Ltd
Original Assignee
Zhejiang Tongyan Building Planning Design Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Tongyan Building Planning Design Co Ltd filed Critical Zhejiang Tongyan Building Planning Design Co Ltd
Priority to CN201810318850.4A priority Critical patent/CN108517874A/en
Publication of CN108517874A publication Critical patent/CN108517874A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/20Bulkheads or similar walls made of prefabricated parts and concrete, including reinforced concrete, in situ

Abstract

The invention discloses a kind of construction methods of foundation pit enclosure, include the following steps:The first step, is arranged stake position on the inside of the diaphragm wall for drafting construction and drilling forms stake holes, and stake holes inner wall sticks multilayer glass fiber reticular cloth, concrete is then poured into a mould in stake holes, and be mutually twisted molding pile body to form barricade;Second step, diaphragm wall is performed on the outside of diaphragm wall leads wall;Third walks, and according to design requirement, slot section framing is carried out trenching construction, until catching rock stratum with hydraulic grab bucket grooving machine.The construction method construction cost of the foundation pit enclosure is low, securely and reliably.

Description

A kind of construction method of foundation pit enclosure
Technical field:
The present invention relates to building field, the construction method of specifically a kind of foundation pit enclosure.
Background technology:
The situation that geological condition complexity is often met in Urban Building Construction, as stratum is respectively from top to bottom:It is miscellaneous to fill out It is soil, plain fill, old city miscellaneous fill, sandy silt, dauk, clay (swelled ground), completely decomposed calcareous shale, severely-weathered calcareous Shale, middle weathering and gentle breeze calcareous shale, there is also solution cavities for part.
This kind of soil layer influences structure construction big, it is necessary to use suitable method, the engineering measures such as strengthening supporting, waterproof. Swell deformation of expansive soil encountered with water, dehydration shrinkage easily cause side slope craze and transfiguration to excavation of foundation pit and destroy, generated to protection works such as reinforcings Squeeze destruction etc.;Decomposed rock;Formation composition is uneven, after construction disturbance or seeps water, intensity is substantially reduced, and is unfavorable for foundation pit country rock Stablize.There is uncertainty in the size of solution cavity, the concrete poured when such as taking no action to going along with sb. to guard him construction will cause very big wave Take, moreover, current foundation pit foundation pit enclosure during practice of construction is in a more weak state, the day deformation gone along with sb. to guard him It is larger, the more difficult assurance of control to foundation pit enclosure structure deformation, and then generate security risk.
Invention content:
The technical problem to be solved by the invention is to provide a kind of effective stable foundation pit structures, are allowed to be unlikely to deform, and drop The construction method of the foundation pit enclosure of low construction cost.
Technical solution of the invention is to provide a kind of construction method of foundation pit enclosure, includes the following steps:
The first step, is arranged stake position on the inside of the diaphragm wall for drafting construction and drilling forms stake holes, and stake holes inner wall sticks multilayer Then glass fiber reticular cloth pours into a mould concrete in stake holes, and is mutually twisted molding pile body to form barricade;
Second step, diaphragm wall is performed on the outside of diaphragm wall leads wall,;
Third walks, and according to design requirement, slot section framing is carried out trenching construction, catching rock stratum with hydraulic grab bucket grooving machine is Only;
4th step carries out rotary digging to rock stratum and is crushed, drill out boring mud, until design is deep using rotary drilling rig and percussive drill Degree;
5th step picks up rock disintegrating slag, is inserted into shaped steel positioning as required in slot section, and pour into a mould coagulation in shaped steel lower part Soil is fixed, and then prefabricated ground walls is guided to hang in grooving;
6th step, over the ground wall spliced, form width ground wall, and steel plate, steel plate are bonded in the stitching portion for being adjacent to wall Both ends are fastened on expandable nail on ground wall respectively, are then transferred to lower width construction, until the completion of entire foundation pit diaphragm wall, and to pre- Secondary grouting in the hole of system ground wall, makes shaped steel and prefabricated ground walls be integrated.
The beneficial effects of the invention are as follows:Difficulty of construction is reduced with prefabricated ground walls, improves construction quality, shortens work When, cost has been saved, working security is increased, meanwhile, mechanical modification improves mixing pile performance, and reduces expense throwing Enter.
Specific implementation mode:
The invention will be further described With reference to embodiment:
A kind of construction method of foundation pit enclosure, includes the following steps:
The first step, is arranged stake position on the inside of the diaphragm wall for drafting construction and drilling forms stake holes, and stake holes inner wall sticks multilayer Then glass fiber reticular cloth pours into a mould concrete in stake holes, and is mutually twisted molding pile body to form barricade;
Second step, diaphragm wall is performed on the outside of diaphragm wall leads wall,;
Third walks, and according to design requirement, slot section framing is carried out trenching construction, catching rock stratum with hydraulic grab bucket grooving machine is Only;
4th step carries out rotary digging to rock stratum and is crushed, drill out boring mud, until design is deep using rotary drilling rig and percussive drill Degree;
5th step picks up rock disintegrating slag, is inserted into shaped steel positioning as required in slot section, and pour into a mould coagulation in shaped steel lower part Soil is fixed, and then prefabricated ground walls is guided to hang in grooving;
6th step, over the ground wall spliced, form width ground wall, and steel plate, steel plate are bonded in the stitching portion for being adjacent to wall Both ends are fastened on expandable nail on ground wall respectively, are then transferred to lower width construction, until the completion of entire foundation pit diaphragm wall, and to pre- Secondary grouting in the hole of system ground wall, makes shaped steel and prefabricated ground walls be integrated.

Claims (1)

1. a kind of construction method of foundation pit enclosure, which is characterized in that include the following steps:
The first step, is arranged stake position on the inside of the diaphragm wall for drafting construction and drilling forms stake holes, and stake holes inner wall sticks multilayer glass Then grid cloth pours into a mould concrete in stake holes, and is mutually twisted molding pile body to form barricade;
Second step, diaphragm wall is performed on the outside of diaphragm wall leads wall;
Third walks, and according to design requirement, slot section framing is carried out trenching construction, until catching rock stratum with hydraulic grab bucket grooving machine;
4th step is carried out rotary digging to rock stratum and is crushed, boring mud is drilled out, until projected depth using rotary drilling rig and percussive drill;
5th step picks up rock disintegrating slag, be inserted into as required in slot section shaped steel positioning, and shaped steel lower part pour into a mould concrete into Row is fixed, and then prefabricated ground walls is guided to hang in grooving;
6th step, over the ground wall spliced, form width ground wall, and steel plate, steel plate both ends are bonded in the stitching portion for being adjacent to wall It is fastened on ground wall with expandable nail respectively, is then transferred to lower width construction, until the completion of entire foundation pit diaphragm wall, and to prefabricated Secondary grouting in the hole of wall makes shaped steel and prefabricated ground walls be integrated.
CN201810318850.4A 2018-04-11 2018-04-11 A kind of construction method of foundation pit enclosure Pending CN108517874A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810318850.4A CN108517874A (en) 2018-04-11 2018-04-11 A kind of construction method of foundation pit enclosure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810318850.4A CN108517874A (en) 2018-04-11 2018-04-11 A kind of construction method of foundation pit enclosure

Publications (1)

Publication Number Publication Date
CN108517874A true CN108517874A (en) 2018-09-11

Family

ID=63431990

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810318850.4A Pending CN108517874A (en) 2018-04-11 2018-04-11 A kind of construction method of foundation pit enclosure

Country Status (1)

Country Link
CN (1) CN108517874A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202194148U (en) * 2011-07-15 2012-04-18 深圳市鸿荣轩建设工程有限公司 Waterproof curtain
CN104963346A (en) * 2015-06-30 2015-10-07 中国二十冶集团有限公司 Support construction method for deep foundation pit in complex geological condition
CN105442614A (en) * 2015-11-19 2016-03-30 浙江桐砚建筑规划设计有限公司 Construction method for foundation pit support
CN105586973A (en) * 2015-01-16 2016-05-18 刘献刚 Composite snap-in pile retaining wall construction method and a composite snap-in pile retaining wall structure
CN107313433A (en) * 2017-08-15 2017-11-03 江西基业科技有限公司 A kind of deep basal pit underground space structure and its construction method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202194148U (en) * 2011-07-15 2012-04-18 深圳市鸿荣轩建设工程有限公司 Waterproof curtain
CN105586973A (en) * 2015-01-16 2016-05-18 刘献刚 Composite snap-in pile retaining wall construction method and a composite snap-in pile retaining wall structure
CN104963346A (en) * 2015-06-30 2015-10-07 中国二十冶集团有限公司 Support construction method for deep foundation pit in complex geological condition
CN105442614A (en) * 2015-11-19 2016-03-30 浙江桐砚建筑规划设计有限公司 Construction method for foundation pit support
CN107313433A (en) * 2017-08-15 2017-11-03 江西基业科技有限公司 A kind of deep basal pit underground space structure and its construction method

Similar Documents

Publication Publication Date Title
CN101139838B (en) Construction method for high artesian area ultra-deep foundation pit
CN104264688B (en) Manually digging hole non-uniform pile support construction process
CN101139839B (en) Setting arrangement for high artesian area ultra-deep foundation pit
KR101051965B1 (en) Panel joint for underground continuous wall construction and underground continuous wall construction method
CN105714772B (en) Karst area embedded rock pile pore-forming bores concrete dado method again
CN104963346A (en) Support construction method for deep foundation pit in complex geological condition
CN104612143A (en) Bored composite pile structure under karst cave/soil cave geological condition
CN106939609A (en) Lattice girder slope construction is continuous to become control construction method
CN105442605B (en) Extract PHC and be reused in deep foundation pit supporting construction method
CN105442614A (en) Construction method for foundation pit support
CN106545007A (en) The method of pile in stratum of the bottom for hard rock stratum
CN109403333A (en) A kind of soft lower hard water rich strata deep basal pit reversed construction method
CN110284885A (en) Shield inspection-pit construction method
CN110159294A (en) A kind of high steep landform tunnel immediately adjacent to bridge section spreading open cut tunnel construction method
CN105714748A (en) Excavating construction method for surge shaft in gravel and sandy soil layer
KR100803921B1 (en) Pit working method forr undergrund floor railroad operation of elevator
CN106049467A (en) Method for treating slurry leakage of bored pile through percussion drill under complex geology
JP2003147782A (en) Foundation structure for constructing new building on existing basement and its construction method
CN108517874A (en) A kind of construction method of foundation pit enclosure
CN108570979A (en) A kind of construction method for building antiseepage composite foundation on dolomite stratigraph
CN213625605U (en) Dig deep basal pit structure of stake anchor and hanging net injection concrete soon
CN113605380A (en) Construction method of cast-in-situ bored pile
CN103306291B (en) Oblique pull concrete pile solid protection wide-angle abrupt slope device
CN100593052C (en) Open cut foundation pit supporting and protecting method
CN113482028A (en) Construction method for breaking pile blocking of open caisson

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: 314500 133, room 4, 288 development avenue, Tongxiang Economic Development Zone, Tongxiang, Jiaxing, Zhejiang

Applicant after: Tongyan design (Zhejiang) Co., Ltd

Address before: 314500 133, room 4, 288 development avenue, Tongxiang Economic Development Zone, Tongxiang, Jiaxing, Zhejiang

Applicant before: ZHEJIANG TONGYAN BUILDING PLANNING DESIGN Co.,Ltd.

RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180911