- Prior art keywords
- barricade
- inner support
- foundation ditch
- pile body
- pile
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/02—Foundation pits
- E02D17/04—Bordering surfacing or stiffening the sides of foundation pits
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/02—Retaining or protecting walls
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Environmental & Geological Engineering (AREA)
- Piles And Underground Anchors (AREA)
Abstract
A kind of deep basal pit underground space structure of the present invention, including:Foundation ditch, the foundation ditch is drum-shaped;Some pile bodies, are circular layout along the crater wall of foundation ditch, and are mutually twisted together, form circumferentially closed barricade;Inner support structure, is circular layout along barricade inwall, and support is formed to the barricade from the inside of foundation ditch to the soil body;The bottom of the pile body is supported on the bottom surface of the foundation ditch.Using this design, be by pile body as just block body medium, pile body does not produce reaction force to absorb the lateral pressure that the soil body of an outside applies pile body by the soil body being anchored in below foundation ditch bottom surface in itself, but by the way that the lateral pressure is passed into inner support ring beam, more lateral pressures are undertaken by inner support structure, " supportting weak stake by force " effect is reached.The material required for the lateral pressure of the soil body is absorbed by setting up inner support ring beam few more than the material required for the part that pile body is inserted to foundation ditch.
Description
Technical field
The present invention relates to foundation pit supporting construction and construction method, and in particular to a kind of deep basal pit underground space structure and its applies
Work method.
Background technology
At present, with the development of society, urban land resource is more and more rare, building can not meet people more than ground
When demand, increasing underground space utilization demand is may result in, the current underground space is wanted to expand utilization rate, only
It can be the horizontal expansion region of its own, or longitudinally increase the depth of the underground space, in modern city, horizontal expansion underground
The region in space is clearly unlikely, can influence other urban architectures, and this depth for allowing for longitudinally increasing the underground space is obtained
To the concern of increasing building scholars.At present, most deep basal pits is both designed to square, or irregular shape,
During being constructed to the underground space, when particularly carrying out the construction of deep basal pit barricade, although the barricade having is employed
Interlocking pile design to realize earth-retaining and the purpose of sealing simultaneously, however, the earth-retaining for realizing deep basal pit is ensured that, anchor pole warp
Often be used, to strengthen the earth-retaining anti-pressure ability of pile body, the pressure of the deeper soil body of foundation ditch it is bigger, it is necessary to the anchor pole used more
It is many, or, the pile body for making barricade can be all changed into concrete pile body, to improve fold resistance, however, both approaches are all
Higher cost can be caused, furthermore, the degree of packing of its occlusion of the design of above-mentioned interlocking pile barricade when pile body is poured just
Determine, once the degree of packing goes wrong, the later stage is difficult to change, so as to water-stagnating effect can be caused not good.Chinese patent literature
CN103726496A discloses a kind of circular deep foundation ditch hole-drilling interlocking pile supporting and applies formula method, it is proposed that replaced using Circular Pit
Square foundation ditch, is coordinated to realize gear using the occlusion pile body and ring lining structure that are inserted into bottom of foundation ditch and are circular layout
Soil and sealing.Obtained in order that obtaining barricade than larger earth-retaining ability, those skilled in the art would generally use following several sides
Method:1st, increase the diameter of pile body, 2, muscle quantity in increase, 3, increase pile body insert the depth of pile body, 4, increase the quantity of liner
Or diameter;In fact, increase pile body diameter and interior muscle quantity are to improve pile body fold resistance, it is not broken or bending in pile body
In the case of, really play mainly above-mentioned third and fourth way for improving earth-retaining ability.Either use in the prior art
3rd or the 4th way, all it is built upon under the premise of one kind, that is, pile body inserts the soil body of bottom of foundation ditch, with pile body
Main earth-retaining power is provided, and has been Auxiliary support effect using inner lining structure.However, in order to improve identical earth-retaining energy
Increase inner lining structure institute will be far longer than by increasing the material of body of a pile used required for power, the pile body depth that the soil body is inserted by increasing
The material needed to use.Therefore, pile body is inserted into the barrier wall structure below the bottom of foundation ditch soil body in the prior art, is a kind of consumption
The high barrier wall structure of many costs of material.
The content of the invention
Therefore, the technical problem to be solved in the present invention is the deep basal pit underground space knot for proposing that a kind of few cost of consumptive material is low
Structure and its construction method.
Therefore, the invention discloses a kind of deep basal pit underground space structure, including:Foundation ditch, the foundation ditch is drum-shaped;If
Dry pile body, is circular layout along the crater wall of the foundation ditch, and is mutually twisted together, forms circumferentially closed barricade;Inner support knot
Structure, is circular layout along the barricade inwall, and support is formed to the barricade from the inside of the foundation ditch to the soil body;The pile body
Bottom is supported on the bottom surface of the foundation ditch.
Above-mentioned deep basal pit underground space structure, wherein, including:The inner support structure includes at least one inner support ring beam,
Interior wall circular of at least one inner support ring beam along the barricade is set.
Above-mentioned deep basal pit underground space structure, wherein, including:Stake top ring beam, annular is fixed on the gear coping.
Above-mentioned deep basal pit underground space structure, wherein, the inner support ring beam is reinforced beam or girder steel;The stake
Body is mixing pile or prefabricated pile.
Above-mentioned deep basal pit underground space structure, wherein, the inside of the stirring pile body is longitudinally inserted with reinforcing bar or shaped steel.
Above-mentioned deep basal pit underground space structure, wherein, if including inner support ring beam described in arterial highway, the inner support ring beam is in institute
Foundation ditch top to arranged for interval on the direction of the bottom of foundation ditch, and spacing is stated to be gradually reduced.
Above-mentioned deep basal pit underground space structure, wherein, the cross section of the foundation ditch is circular.
The present invention discloses a kind of construction method of deep basal pit underground space structure again, comprises the following steps:A. smooth
The stake position being mutually twisted on construction site afterwards is set, wherein, the stake position is circular arrangement;B. it is enterprising in stake position
Row drilling forms stake holes, concrete or soil cement is poured into some pile bodies being mutually twisted together are formed in the stake holes,
The pile body is circular layout to form circumferentially closed barricade;C. the soil excavation surrounded to the barricade to projected depth, and
Be circular layout inner support structure along the inwall of the barricade, wherein, the inner support structure in the barricade the lateral soil body to institute
Barricade formation support is stated, and the projected depth is located at more than the bottom of the pile body;D. the position that the barricade is surrounded is excavated
The soil body more than the bottom of the pile body, forms foundation ditch, and the bottom of the pile body is supported on the bottom surface of the foundation ditch.
Above-mentioned construction method, wherein, the inner support structure includes at least one inner support ring beam, and make it is described at least one
Interior wall circular of the inner support ring beam along the barricade is set.
Above-mentioned construction method, wherein, the inner support ring beam is reinforced beam or girder steel.
Above-mentioned construction method, wherein, the inside of the stirring pile body is longitudinally inserted with reinforcing bar or shaped steel.
Above-mentioned construction method, wherein, if along inner support ring beam described in barricade inwall annular space arrangement arterial highway, and
Away from being gradually reduced.
Above-mentioned construction method, the cross section of the foundation ditch is circular.
The invention also discloses a kind of construction method of deep basal pit underground space structure, comprise the following steps:A. smooth
The stake position being mutually twisted on construction site afterwards is set, wherein, the stake position is circular arrangement;B. inserted on stake position
Enter some prefabricated piles with occlusion structure, the prefabricated pile is mutually twisted together by the occlusion structure, described pre-
Stake processed is circular layout, and forms closing barricade;C. the soil excavation surrounded to the barricade is to projected depth, and along the gear
The inwall of wall is circular layout inner support structure, wherein, the inner support structure in the barricade the lateral soil body to the barricade shape
Into support, wherein, the projected depth is located at more than the bottom of the pile body;D. being located at of excavating that the barricade surrounded is described
The soil body of the bottom above section of pile body, forms foundation ditch, and the bottom of the pile body is supported on the bottom surface of the foundation ditch.
Above-mentioned construction method, wherein, the inner support structure includes at least one inner support ring beam, and makes described at least one
Interior wall circular of the inner support ring beam along the barricade is set.
Above-mentioned construction method, wherein, the inner support ring beam is reinforced beam or girder steel.
Above-mentioned construction method, wherein, the prefabricated pile is concrete pile body or steel sheet pile, and the occlusion structure is grafting
Structure.
Above-mentioned construction method, wherein, if along inner support ring beam described in barricade inwall annular space arrangement arterial highway, and
Away from being gradually reduced.
Above-mentioned construction method, wherein, the cross section of the foundation ditch is circular.
Above-mentioned construction method, wherein, the connected structure is included along the prefabricated pile longitudinally disposed fin and slot.
The above-mentioned technical proposal of the present invention has the following technical effect that relative to prior art:
1. a kind of deep basal pit underground space structure of the present invention, by by pile body snap-fit arrangement and the wall circular cloth along along foundation ditch
Put to form circumferentially closed barricade, and be circular layout inner support structure in barricade inwall, at the same the bottom of the pile body be located at it is described
It is that pile body is not in itself by being anchored in foundation ditch bottom as just the medium of block body by pile body using this design on foundation ditch bottom surface
The reaction force of the soil body absorbs the lateral pressure that the soil body of an outside applies to pile body.In addition, by set up inner support structure come
Material required for undertaking the lateral pressure of the soil body is few more than the material required for the part that pile body is inserted to foundation ditch.Therefore, this hair
Bright above-mentioned this design is on the premise of identical earth-retaining ability is realized, consumptive material is few, and cost is lower.Importantly, existing
In technology, those skilled in the art have certain technology prejudice, think that pile body must be inserted into below the bottom surface of foundation ditch,
Lateral pressure of the soil body into foundation ditch at pile body is resisted by the reaction force of the soil body below the bottom surface of foundation ditch, this is one
The earth-retaining concept of the strong weak beam of stake is planted, the present invention exactly in the case of foundation depth identical, employs shorter pile body and set up
Inner support structure, preferably such as inner support ring beam, realizes earth-retaining.
2. the stake top ring beam of the present invention, annular is fixed on the gear coping, in addition to:Stake top ring beam, annular is fixed
In the gear coping;More than design can be combined by stake top ring beam by each pile body is more firm so that by
The barricade that many pile bodies are combined is more integrated.
3. the stake top ring beam of the present invention, wherein, the inner support ring beam is at the top of the foundation ditch to the side of the bottom of foundation ditch
Upward arranged for interval, and spacing is gradually reduced.Design may insure that the ring beam positioned at foundation ditch bottom can undertake bigger above
Lateral pressure, so as to preferably go barricade to be supported, it is ensured that barricade it is firm.
4. the present invention's, deep basal pit underground space structure, wherein, the cross section of the foundation ditch is circular.Design above,
Can be by controlling the effect of shape structure by the pile body together of occlusion so that the side that the soil body on the outside of barricade applies to barricade
To pressure to make a concerted effort be zero, the support force requirement to inner support structure can be reduced so that, further ensure the firm of barricade.
5. the construction method of the deep basal pit underground space structure of the present invention, comprises the following steps:A. the construction after smooth
The stake position being mutually twisted on place is set, wherein, the stake position is circular arrangement;B. drilling shape is carried out on stake position
Into stake holes, concrete or soil cement are poured into some pile bodies being mutually twisted together, the pile body are formed in the stake holes
It is circular layout to form circumferentially closed barricade;C. the soil excavation surrounded to the barricade is to projected depth, and along the gear
The inwall of wall is circular layout inner support structure, wherein, the inner support structure in the barricade the lateral soil body to the barricade shape
Into support, and the projected depth is more than the bottom of the pile body;That d. excavates that the barricade surrounded is located at the stake
The soil body more than bottom of body, forms foundation ditch, and the bottom of the pile body is supported on the bottom surface of the foundation ditch.Set above
Meter, is that pile body is not in itself by being anchored in the anti-of foundation ditch subsoil body as just the medium of block body by pile body using this design
Active force absorbs the lateral pressure that the soil body of an outside applies to pile body.In addition, undertaking the soil body by setting up inner support structure
Lateral pressure required for material more than by pile body insert foundation ditch part required for material it is few.Therefore, it is of the invention above-mentioned
This design is on the premise of identical earth-retaining ability is realized, consumptive material is few, and cost is lower.Importantly, in the prior art, this
Art personnel have certain technology prejudice, think that pile body must be inserted into below the bottom surface of foundation ditch, by positioned at
The reaction force of the soil body below the bottom surface of foundation ditch resists lateral pressure of the soil body into foundation ditch at pile body, and this is that a kind of strong stake is weak
The earth-retaining concept of beam, the present invention exactly in the case of foundation depth identical, employs shorter pile body and sets up inner support structure,
Preferably such as inner support ring beam, earth-retaining is realized.
6. invention also discloses a kind of construction method of deep basal pit underground space structure, comprise the following steps:A. smooth
The stake position being mutually twisted on construction site afterwards is set, wherein, the stake position is circular arrangement;B. inserted on stake position
Enter some prefabricated piles with occlusion structure, the prefabricated pile is mutually twisted together by the occlusion structure, described pre-
Stake processed is circular layout, and forms closing barricade;C. the soil excavation surrounded to the barricade is to projected depth, and along the gear
The inwall of wall is circular layout inner support structure, wherein, the inner support structure in the barricade the lateral soil body to the barricade shape
Into support, wherein, the projected depth is located at more than the bottom of the pile body;D. being located at of excavating that the barricade surrounded is described
The soil body of the bottom above section of pile body, forms foundation ditch.
7. a kind of construction method of deep basal pit underground space structure of the present invention, comprises the following steps:A. after smooth
The stake position being mutually twisted on construction site is set, wherein, the stake position is circular arrangement;If b. being inserted on stake position
Dry root has the prefabricated pile of occlusion structure, and the prefabricated pile is mutually twisted together by the occlusion structure, the prefabricated pile
It is circular layout, and forms closing barricade;C. the soil excavation surrounded to the barricade is to projected depth, and along the barricade
Inwall is circular layout inner support structure, wherein, the inner support structure lateral soil body in the barricade forms branch to the barricade
Support, wherein, the projected depth is located at more than the bottom of the pile body;That d. excavates that the barricade surrounded is located at the pile body
Bottom above section the soil body, form foundation ditch, and the bottom of the pile body is supported on the bottom surface of the foundation ditch.Using this
Kind design, is that pile body is not in itself by the reaction force for being anchored in foundation ditch subsoil body as just the medium of block body by pile body
Absorb the lateral pressure that the soil body of stake outside applies to pile body.In addition, undertaking the lateral pressure of the soil body by setting up inner support structure
Required material is few more than the material required for the part that pile body is inserted to foundation ditch.Therefore, above-mentioned this design of the invention
On the premise of identical earth-retaining ability is realized, consumptive material is few, and cost is lower.Importantly, in the prior art, art technology
Personnel have certain technology prejudice, think that pile body must be inserted into below the bottom surface of foundation ditch, by positioned at the bottom of foundation ditch
The reaction force of the soil body below face resists lateral pressure of the soil body into foundation ditch at pile body, and this is a kind of earth-retaining of the weak beam of strong stake
Concept, the present invention exactly in the case of foundation depth identical, employs shorter pile body and sets up inner support structure, preferably such as
Inner support ring beam, realizes earth-retaining.
Brief description of the drawings
, below will be to specific in order to illustrate more clearly of the specific embodiment of the invention or technical scheme of the prior art
The accompanying drawing used required in embodiment or description of the prior art is briefly described, it should be apparent that, in describing below
Accompanying drawing is some embodiments of the present invention, for those of ordinary skill in the art, before creative work is not paid
Put, other accompanying drawings can also be obtained according to these accompanying drawings.
Fig. 1 is the top view of the one of which embodiment of deep basal pit underground space structure of the present invention;
Fig. 2 is longitudinal schematic diagram of deep basal pit underground space structure of the present invention;
Fig. 3 is longitudinal schematic diagram of the another embodiment of deep basal pit underground space structure of the present invention.
Reference:
1- foundation ditches;2- soil stirs pile body;3- barricades;4- inner support ring beams;5- stake top ring beams;6- reinforcing bars;7- is vertically constructed
Post.
Embodiment
Technical scheme is clearly and completely described below in conjunction with accompanying drawing, it is clear that described implementation
Example is a part of embodiment of the invention, rather than whole embodiments.Based on the embodiment in the present invention, ordinary skill
The every other embodiment that personnel are obtained under the premise of creative work is not made, belongs to the scope of protection of the invention.
As long as in addition, technical characteristic involved in invention described below different embodiments non-structure each other
It can just be combined with each other into conflict.
Embodiment 1
As shown in figure 1, a kind of deep basal pit underground space structure, including:Foundation ditch 1, the foundation ditch is drum-shaped;Some piles
Body 2, is circular layout along the crater wall of the foundation ditch 1, and is mutually twisted together, forms circumferentially closed barricade 3;Inner support structure 4,
It is circular layout along the inwall of barricade 3, lateral soil body A forms support to the barricade 3 in the barricade 3;The pile body 2
Bottom be located at the foundation ditch 1 bottom surface on.
The deep basal pit underground space structure of the present embodiment, be preferably, including:The inner support structure 4 includes at least interior together
Pushing out ring beam, interior wall circular of at least one inner support ring beam along the barricade 3 is set.
The deep basal pit underground space structure of the present embodiment, be preferably, including:Stake top ring beam 5, annular is fixed on the barricade
Top.
The deep basal pit underground space structure of the present embodiment, is preferably that the inner support ring beam is reinforced beam or girder steel;
The pile body can be cast-in-place concrete pile or cement mixing method, or prefabricated pile, can be above-mentioned three kinds of pile bodies again
In at least two combination.
The deep basal pit underground space structure of the present embodiment, is preferably that the inside of the stirring pile body is longitudinally inserted with reinforcing bar 6
Or shaped steel.
The underground space structure of the present embodiment, it is preferable that also including in the foundation ditch 1 and with the barricade 3 or it is described in
The vertical constructional column 7 that pushing out ring beam 4 is fitted.
As shown in Fig. 2 the deep basal pit underground space structure of present embodiment, is preferably, if including interior pushing out ring described in arterial highway
Beam, the inner support ring beam is to arranged for interval on the direction of the bottom of foundation ditch at the top of the foundation ditch, and spacing is gradually reduced.
The deep basal pit underground space structure of the present embodiment, is preferably that the cross section of the foundation ditch is circular.
As shown in figure 3, the deep basal pit underground space structure of present embodiment and the difference of Fig. 2 embodiments are, foundation ditch
Bottom surface not plan, i.e., whole bottom is the bottom surface of non-rectilinear plane, wherein, it is of a relatively high that pile body is superposed on both sides
Plane for providing support force straight up from pile body bottom, this plane is also considered as the bottom surface of foundation ditch, i.e. bottom
Face B and bottom surface B ' are considered as the bottom surface of foundation ditch.For it is other be similarly used for from pile body bottom provide prop up straight up
The plane of support force is considered as the bottom surface of foundation ditch.
Embodiment 2
Present embodiment discloses a kind of construction method of deep basal pit underground space structure, comprise the following steps:A. smooth
The stake position being mutually twisted on construction site afterwards is set, wherein, the stake position is circular arrangement;B. it is enterprising in stake position
Row drilling forms stake holes, concrete or soil cement is poured into some pile bodies being mutually twisted together are formed in the stake holes,
The pile body is circular layout to form circumferentially closed barricade;C. the soil excavation surrounded to the barricade to projected depth, and
Be circular layout inner support structure along the inwall of the barricade, wherein, the inner support structure in the barricade the lateral soil body to institute
Barricade formation support is stated, and the projected depth is located at more than the bottom of the pile body;D. the position that the barricade is surrounded is excavated
The soil body more than the bottom of the pile body, forms foundation ditch, and the bottom of the pile body is supported on the bottom surface of the foundation ditch.
The construction method of the present embodiment, wherein, the inner support structure includes at least one inner support ring beam, and make it is described at least
Interior wall circular of one inner support ring beam along the barricade is set.
The construction method of the present embodiment, wherein, the inner support ring beam is reinforced beam or girder steel.
The construction method of the present embodiment, wherein, the inside of the stirring pile body is longitudinally inserted with reinforcing bar or shaped steel.
The construction method of the present embodiment, wherein, if arranging inner support ring beam described in arterial highway along the barricade inwall annular space,
And spacing is gradually reduced.
The construction method of the present embodiment, the cross section of the foundation ditch is circular.
Embodiment 3
The present embodiment also discloses a kind of construction method of deep basal pit underground space structure, comprises the following steps:A. flat
The stake position being mutually twisted on construction site after whole is set, wherein, the stake position is circular arrangement;B. on stake position
Some of insertion has the prefabricated pile of occlusion structure, and the prefabricated pile is mutually twisted together by the occlusion structure, described
Prefabricated pile is circular layout, and forms closing barricade;C. the soil excavation surrounded to the barricade is to projected depth, and along described
The inwall of barricade is circular layout inner support structure, wherein, the inner support structure in the barricade the lateral soil body to the barricade
Support is formed, wherein, the projected depth is located at more than the bottom of the pile body;That d. excavates that the barricade surrounded is located at institute
The soil body of the bottom above section of pile body is stated, foundation ditch is formed, and the bottom of the pile body is supported on the bottom surface of the foundation ditch.
The construction method of the present embodiment, wherein, the inner support structure includes at least one inner support ring beam, and make it is described at least
Interior wall circular of one of inner support ring beam along the barricade is set.
The construction method of the present embodiment, wherein, the inner support ring beam is reinforced beam or girder steel.
The construction method of the present embodiment, wherein, the prefabricated pile is concrete pile body or steel sheet pile, and the occlusion structure is
Connected structure.
The construction method of the present embodiment, wherein, if arranging inner support ring beam described in arterial highway along the barricade inwall annular space,
And spacing is gradually reduced.
The construction method of the present embodiment, wherein, the cross section of the foundation ditch is circular.
The construction method of the present embodiment, wherein, the connected structure include along the longitudinally disposed fin of the prefabricated pile and
Slot.
Obviously, above-described embodiment is only intended to clearly illustrate example, and the not restriction to embodiment.It is right
For those of ordinary skill in the art, can also make on the basis of the above description it is other it is various forms of change or
Change.There is no necessity and possibility to exhaust all the enbodiments.And the obvious change thus extended out or
Among changing still in the protection domain of the invention.
Claims (10)
1. a kind of deep basal pit underground space structure, including:
Foundation ditch, the foundation ditch is drum-shaped;
Some pile bodies, are circular layout along the crater wall of the foundation ditch, and are mutually twisted together, form circumferentially closed barricade;
Inner support structure, is circular layout along the inwall of the barricade, and the lateral soil body forms branch to the barricade in the barricade
Support;
It is characterized in that:The bottom of the pile body is supported on the bottom surface of the foundation ditch.
2. deep basal pit underground space structure according to claim 1, it is characterised in that including:The inner support structure is included extremely
Few one of inner support ring beam, interior wall circular of at least one inner support ring beam along the barricade is set.
3. deep basal pit underground space structure according to claim 2, it is characterised in that if including inner support ring beam described in arterial highway,
The inner support ring beam is to arranged for interval on the direction of the bottom of foundation ditch at the top of the foundation ditch, and spacing is gradually reduced.
4. a kind of construction method of deep basal pit underground space structure, it is characterised in that comprise the following steps:
A. the stake position being mutually twisted on the construction site after smooth is set, wherein, the stake position is circular arrangement;
B. carry out drilling on stake position and form stake holes, concrete or soil cement are poured into some phases are formed in the stake holes
The pile body being mutually interlocked, the pile body is circular layout to form circumferentially closed barricade;
C. the soil excavation surrounded to the barricade is circular layout inner support knot to projected depth, and along the inwall of the barricade
Structure, wherein, the inner support structure lateral soil body in the barricade forms support, and projected depth position to the barricade
More than the bottom of the pile body;
D. excavate the soil body more than the bottom of the pile body that the barricade is surrounded, form foundation ditch, and cause the stake
The bottom of body is supported on the bottom surface of the foundation ditch.
5. construction method according to claim 4, it is characterised in that:The inner support structure includes pushing out ring at least one
Beam, and interior wall circular of at least one the described inner support ring beam along the barricade is set.
6. construction method according to claim 4, it is characterised in that:If arranging arterial highway along the barricade inwall annular space
The inner support ring beam, and spacing is gradually reduced.
7. a kind of construction method of deep basal pit underground space structure, it is characterised in that comprise the following steps:
A. the stake position being mutually twisted on the construction site after smooth is set, wherein, the stake position is circular arrangement;
B. some prefabricated piles with occlusion structure are inserted on stake position, the prefabricated pile passes through
The occlusion structure is mutually twisted together, and the prefabricated pile is circular layout, and forms closing barricade;
C. the soil excavation surrounded to the barricade is circular layout inner support knot to projected depth, and along the inwall of the barricade
Structure, wherein, the inner support structure forms support from the inside of the foundation ditch to the soil body to the barricade, wherein, the design is deep
Degree is more than the bottom of the pile body;
D. excavate the soil body for the bottom above section positioned at the pile body that the barricade is surrounded, form foundation ditch, and cause institute
The bottom for stating pile body is supported on the bottom surface of the foundation ditch.
8. construction method according to claim 7, it is characterised in that:The inner support structure includes pushing out ring at least one
Beam, and interior wall circular of at least one inner support ring beam along the barricade is set.
9. construction method according to claim 7, it is characterised in that:If arranging arterial highway along the barricade inwall annular space
The inner support ring beam, and spacing is gradually reduced.
10. construction method according to claim 7, it is characterised in that:The cross section of the foundation ditch is circular.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710699570.8A CN107313433A (en) | 2017-08-15 | 2017-08-15 | A kind of deep basal pit underground space structure and its construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710699570.8A CN107313433A (en) | 2017-08-15 | 2017-08-15 | A kind of deep basal pit underground space structure and its construction method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107313433A true CN107313433A (en) | 2017-11-03 |
Family
ID=60176233
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710699570.8A Pending CN107313433A (en) | 2017-08-15 | 2017-08-15 | A kind of deep basal pit underground space structure and its construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107313433A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108517874A (en) * | 2018-04-11 | 2018-09-11 | 浙江桐砚建筑规划设计有限公司 | A kind of construction method of foundation pit enclosure |
CN112343059A (en) * | 2020-11-30 | 2021-02-09 | 江西基业科技集团有限公司 | Forward and reverse composite construction method for cylindrical foundation pit structure |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU1260451A1 (en) * | 1985-02-28 | 1986-09-30 | Ордена Трудового Красного Знамени Научно-Исследовательский Институт Оснований И Подземных Сооружений Им.Н.М.Герсеванова | Method of protecting a structure against frost-induced swelling |
SU1434034A1 (en) * | 1987-03-23 | 1988-10-30 | Уфимский Нефтяной Институт | Method of constructing a foundation of a circular tank |
CN202064361U (en) * | 2011-03-29 | 2011-12-07 | 浙江华铁建筑安全科技股份有限公司 | External rib strengthened type steel support |
CN102635120A (en) * | 2012-05-04 | 2012-08-15 | 张全胜 | Supportless construction structure and supportless construction method for round deep base pit |
CN103726496A (en) * | 2013-12-27 | 2014-04-16 | 中铁大桥局集团第一工程有限公司 | Circular deep foundation pit bored secant pile wall supporting construction method |
CN105239586A (en) * | 2015-11-05 | 2016-01-13 | 云南建工集团有限公司 | Support structure for supporting foundation pit and method for supporting foundation pit |
CN205999900U (en) * | 2016-08-30 | 2017-03-08 | 中国建筑西南勘察设计研究院有限公司 | Annular occlusion campshed section steel beam inner support type foundation pit supporting construction |
-
2017
- 2017-08-15 CN CN201710699570.8A patent/CN107313433A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU1260451A1 (en) * | 1985-02-28 | 1986-09-30 | Ордена Трудового Красного Знамени Научно-Исследовательский Институт Оснований И Подземных Сооружений Им.Н.М.Герсеванова | Method of protecting a structure against frost-induced swelling |
SU1434034A1 (en) * | 1987-03-23 | 1988-10-30 | Уфимский Нефтяной Институт | Method of constructing a foundation of a circular tank |
CN202064361U (en) * | 2011-03-29 | 2011-12-07 | 浙江华铁建筑安全科技股份有限公司 | External rib strengthened type steel support |
CN102635120A (en) * | 2012-05-04 | 2012-08-15 | 张全胜 | Supportless construction structure and supportless construction method for round deep base pit |
CN103726496A (en) * | 2013-12-27 | 2014-04-16 | 中铁大桥局集团第一工程有限公司 | Circular deep foundation pit bored secant pile wall supporting construction method |
CN105239586A (en) * | 2015-11-05 | 2016-01-13 | 云南建工集团有限公司 | Support structure for supporting foundation pit and method for supporting foundation pit |
CN205999900U (en) * | 2016-08-30 | 2017-03-08 | 中国建筑西南勘察设计研究院有限公司 | Annular occlusion campshed section steel beam inner support type foundation pit supporting construction |
Non-Patent Citations (1)
Title |
---|
刘丽萍等: "《基础工程》", 31 July 2016, 中国电力出版社 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108517874A (en) * | 2018-04-11 | 2018-09-11 | 浙江桐砚建筑规划设计有限公司 | A kind of construction method of foundation pit enclosure |
CN112343059A (en) * | 2020-11-30 | 2021-02-09 | 江西基业科技集团有限公司 | Forward and reverse composite construction method for cylindrical foundation pit structure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104612160B (en) | A kind of next-door neighbour's existing building pit maintenance soil structure and construction method | |
CN108868778B (en) | Non-excavation construction method for large underground structure | |
CN104264688B (en) | Manually digging hole non-uniform pile support construction process | |
CN102966108B (en) | Construction method of deep foundation pit close to building and adopting underground structure as internal support | |
CN112127900B (en) | Construction method for hidden half-wall and half-arch protection structure of exposed arch of shallow-buried bias tunnel penetrating through accumulation body | |
CN101519880A (en) | Method of using rotational multiaxial borehole pouring concrete occluding pile wall for enclosing deep foundation pit and slope protection project | |
CN104612143A (en) | Bored composite pile structure under karst cave/soil cave geological condition | |
CN203729308U (en) | Double-row pile supporting system of reinforced concrete pile combined structural steel cement mixing pile wall | |
CN105649090A (en) | Construction method for support combining steel sheet piles and stirring piles | |
CN105178327A (en) | Composite retaining structure of foundation pit project and construction method thereof | |
CN105239578B (en) | Water-rich sand layer deep foundation pit underwater construction method | |
CN102864780A (en) | Supporting structure and supporting method of foundation pit | |
CN107012871B (en) | A kind of suspension type goes along with sb. to guard him the deep reversed construction method for greatly enhancing foundation pit fabricated construction | |
CN110387889A (en) | A kind of multi-arch type foundation pit supporting method for strip deep basal pit | |
KR101021915B1 (en) | A method for constructing cut-off temporary structure for sheathing work | |
CN113898348A (en) | Ultra-shallow-buried large-span underground excavation subway station tunnel construction method | |
CN104131566B (en) | A kind of basement is without the construction method of horizontal support foundation ditch | |
CN105113513B (en) | Anti-seepage foundation pit supporting structure and construction method | |
CN107313433A (en) | A kind of deep basal pit underground space structure and its construction method | |
CN203729309U (en) | Support system with combined double-row piles combined with vertical prestressed anchor bolts | |
CN107313434A (en) | A kind of deep basal pit oil cellar and its construction method | |
CN108035360A (en) | A kind of method for pattern foundation pit supporting structure | |
CN204326080U (en) | A kind of next-door neighbour's existing building pit maintenance soil structure | |
CN107476312A (en) | A kind of barricade and its construction method for pattern foundation pit supporting structure | |
CN107178088A (en) | A kind of basement waterproofing foundation pit structure and its construction method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20171103 |
|
RJ01 | Rejection of invention patent application after publication |