CN206107821U - Modular trays with two -way shovel arm chamber - Google Patents

Modular trays with two -way shovel arm chamber Download PDF

Info

Publication number
CN206107821U
CN206107821U CN201621124350.XU CN201621124350U CN206107821U CN 206107821 U CN206107821 U CN 206107821U CN 201621124350 U CN201621124350 U CN 201621124350U CN 206107821 U CN206107821 U CN 206107821U
Authority
CN
China
Prior art keywords
tray body
cushion block
chamber
reinforcement bracket
lower panel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201621124350.XU
Other languages
Chinese (zh)
Inventor
肖志林
邱建成
秦超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou Tongda Machinery Co Ltd
Original Assignee
Suzhou Tongda Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou Tongda Machinery Co Ltd filed Critical Suzhou Tongda Machinery Co Ltd
Priority to CN201621124350.XU priority Critical patent/CN206107821U/en
Application granted granted Critical
Publication of CN206107821U publication Critical patent/CN206107821U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Pallets (AREA)

Abstract

The utility model provides a modular trays with two -way shovel arm chamber, is including the tray body who comprises the upper and lower panel of tray body of blowing, the backboard is established below tray body to one side of tray body top panel to a set of reinforcement bracket, and should organize and construct for horizontal shovel arm chamber between the panel under reinforcement bracket and the tray body, should organize space between the reinforcement bracket double -phase adjacent in the reinforcement bracket and construct and be vertical shovel arm chamber, characteristics: tray body intracavity inlay has a tray body metal reinforcement frame, and each constitutes and has cushion gomphosis chamber cofferdam the backboard to one side of tray body top panel below the tray body, and regional this cushion gomphosis chamber cofferdam in constructs and be cushion gomphosis chamber, establishes the reinforcement bracket cushion that soars in the position corresponding to cushion gomphosis chamber, and front end, middle part and rear end and the tray body of a set of reinforcement bracket are connected, and the reinforcement bracket intracavity of a set of reinforcement bracket has reinforcement bracket metal reinforcement frame. The intensity of promoting tray body, increase of service life, the cost is lowered.

Description

Built-up pallet with two-way shovel arm chamber
Technical field
The utility model belongs to stacking and packing material technical field, and in particular to a kind of combined type with two-way shovel arm chamber Pallet.
Background technology
Aforesaid pallet generally by industry be referred to as pallet or claim Underpan for package, be widely used in industrial and mining enterprises production line, The industries such as stacking, storage and logistics.Widely used Underpan for package is pallet by base plate, cushion block and for connecting in prior art The liner plate composition of each cushion block, cushion block is located between base plate and liner plate, packed article is kept with ground by the effect of cushion block A certain distance, the phase takes and obtains effect moistureproof, beneficial to forklift carrying etc.However, cushion block mostly adopts log material, according to need Suitable size is processed into, shape has cylinder and rectangle, makees cushion block with log material and valuable natural resources timber is brought Serious waste, and, if packing products export foreign countries or from external import with the Underpan for package of this material, then quarantine will Seeking Truth is very harsh, the temporal agility to outlet/import(Clearance speed)Bring impact.The people processed using Jing Making chock manufacture Underpan for package can both save timber resources, and can meet with customs's clearance requirement during import and export of goods, as in State's patent CN2536528Y(Structure improved artificial skid)、CN2536529Y(The improved artificial skid of structure)With CN2536530Y(Structure improved artificial skid)Etc..But have that cost of manufacture is big, efficiency is low and heavy etc owes Lack.High molecular weight high density polychlorostyrene Class B is particularly using polyvinyl chloride(English abbreviation is:HMWHDPE)And by plastics machinery The pallet of blow molding both can reduces cost, mitigate deadweight, make efficiency can be improved again.
The pallet of the material for plastics of aforementioned blow molding can be seen in disclosed Chinese patent literature, such as CN102407967B(Pallet)、CN103253422B(Pallet)、CN103552737B(The improved pallet of structure)With CN105253423A(Pallet with two-way shovel arm chamber), etc..Although these patent formulas for being not limited to enumerate respectively have solely The length of special technology achievement, but due to showing as monolithic construction, thus when tray body is in a state of use towards upper Side or the side towards under can only integrally scrap when damaging, so as to being unfavorable for economizing on resources and also while causing using support The industry industrial and mining enterprises as the aforementioned of disk, warehouse logisticses industry increase cost.Comparatively speaking, " the support that CN102009774B recommends The structure of disk " is relatively easy, is collectively formed by tray body and one group of reinforcement bracket, and one group of reinforcement bracket makes with tray body Fixed by adhesive with the side under state towards under(See the row of inverse the 2nd of the embodiment 1 of the patent), the patent it is positive Meaning is:The intensity of tray body is promoted by one group of reinforcement bracket, it is to avoid tray body is in the state of stacking goods by shoveling There is flexion and extends the service life of tray body when scooping up in the shovel arm of car.But because one group of reinforcement bracket is by gluing Finally monolithic construction is still shown as after agent and tray body cementation, whether in tray body damage or one group of reinforcement bracket Arbitrary reinforcement bracket damage be both needed to make it is overall scrap process, then equally exist aforementioned patent be unfavorable for save resources and It is unfavorable for the drawbacks of reducing customer using cost.
It is that this applicant has made positive and beneficial design for above-mentioned prior art, it is necessary to rational modification in addition With experiment repeatedly(Experiment is carried out under confidential state), define technical scheme described below.
The content of the invention
Task of the present utility model is to provide a kind of intensity for contributing to significantly enhancing tray body and use and avoid support Disk body produces in a state of use amount of deflection and ensures preferable service life, is conducive to embodying good building block system assembling effect Fruit and use the part met to damaging and carry out specific aim and replace requirement and can both economize on resources and can reduce making for user With the built-up pallet with two-way shovel arm chamber of cost.
What task of the present utility model was performed by, a kind of built-up pallet with two-way shovel arm chamber, including blowing System it is being made up of tray body top panel and tray body lower panel and constituted between tray body upper and lower panel One tray body in the tray body chamber of one surrounding side-closed;Be similarly blowing and it is formed with hollow reinforcement bracket chamber One group of reinforcement bracket, this group of reinforcement bracket be not only spaced but also be arranged on parallel to each other the tray body lower panel back to Space of soaring is maintained between the side of the tray body top panel, and this group of reinforcement bracket and tray body lower panel, It is configured to laterally shovel arm chamber by the space of soaring, and the space structure between in this group of reinforcement bracket two adjacent reinforcement brackets Become longitudinal direction shovel arm chamber, be characterised by being bumped into a tray body metal reinforcing frame in the tray body chamber, in the support Disk body lower panel back to the tray body top panel side and corresponding to one group of described reinforcement bracket front end, The position of middle part and rear end respectively constitutes the chimeric chamber cofferdam of cushion block for having a surface for being raised in tray body lower panel, the cushion block Region in chimeric chamber cofferdam is configured to the chimeric chamber of cushion block, the position corresponding to the chimeric chamber of cushion block be provided with a blowing and The reinforcement bracket for being formed with the cushion block chamber of closing soars cushion block, and the front end of described one group of reinforcement bracket, middle part and rear end are right Should be fixedly connected with the tray body together with the reinforcement bracket cushion block that soars in the soar position of cushion block of reinforcement bracket, in one group of benefit Length direction in the reinforcement bracket chamber of strong bracket and along reinforcement bracket chamber has respectively been bumped into reinforcement bracket metal to be strengthened Frame.
In a specific embodiment of the present utility model, on the tray body lower panel of the tray body and The position of longitudinal front end, middle part and rear end for shoveling arm chamber is being corresponded to respectively to have been constituted tray body with paired form The horizontal reinforcement groove of lower panel, groove roof and the tray body top panel direction of the horizontal reinforcement groove of the tray body lower panel are held in the palm The side of disk body lower panel links, and on tray body lower panel and in the position corresponding to the horizontal shovel arm chamber certainly Laterally left side to the right side interval composition in shovel arm chamber has tray body lower panel longitudinal strengthening groove, the tray body lower panel longitudinal direction The groove roof of reinforcement groove equally links with the tray body top panel towards the side of tray body lower panel.
In another specific embodiment of the present utility model, the horizontal reinforcement groove of described tray body lower panel and The shape of cross section of tray body lower panel longitudinal strengthening groove is in the shape of the letter V.
In another specific embodiment of the present utility model, on described tray body lower panel and surrounding The location interval of the edge in the chimeric chamber cofferdam of the cushion block is constituted has lower panel to strengthen frustum, and the lower panel strengthens frustum Frustum roof links with the tray body top panel towards the side of tray body lower panel.
In another specific embodiment of the present utility model, on described tray body lower panel and in correspondence Constituting in the middle position in the chimeric chamber of the cushion block has a lower panel screw rod resigning hole, and on the tray body top panel simultaneously And have top panel screw rod resigning hole in the position composition corresponding to lower panel screw rod resigning hole, in one group of described reinforcement bracket court Front end, middle part and rear end to the side of the tray body and in the position that cushion block is soared corresponding to the reinforcement bracket Each composition has a cushion block lower convex platform be fitted together to chamber, has a pad towards the composition that the cushion block is fitted together to chamber in the reinforcement bracket cushion block that soars Block convex platform, and reinforcement bracket soar cushion block towards the chimeric chamber of cushion block lower convex platform side and corresponding to cushion block lower convex platform The position in chimeric chamber is constituted a cushion block lower convex platform, cushion block convex platform chamber scarf chimeric with cushion block, and cushion block lower convex platform and cushion block Lower convex platform is fitted together to chamber scarf.
It is of the present utility model also have a specific embodiment in, the reinforcement bracket soar cushion block central authorities and Constituting in the position corresponding to the lower panel screw rod resigning hole has a cushion block load-bearing boss, in the cushion block of the cushion block load-bearing boss The upper and lower in load-bearing boss chamber is each provided with a screw sleeve, in the central of the chimeric chamber of the cushion block lower convex platform and in correspondence Constituting in the position in cushion block load-bearing boss chamber has a screw lock nut cavity, and in the screw lock nut cavity screw rod is provided with Lock nut, sequentially passes through by screw rod and passes through after the top panel screw rod resigning hole, lower panel screw rod resigning hole and screw sleeve The lock nut locks and one group of described reinforcement bracket is soared into cushion block corresponding to the pad together with the reinforcement bracket The position in the chimeric chamber cofferdam of block is fixedly connected with the tray body, and the screw head of the base portion of screw rod is located at the top panel In screw rod resigning hole.
Of the present utility model more and in a specific embodiment, the cushion block load-bearing boss chamber the top and Constituting between bottom has a diaphragm, and in the middle position of the diaphragm screw hole is offered, and the screw rod passes through the screw hole.
In an of the present utility model and then specific embodiment, the quantity of one group of described reinforcement bracket has three, Described respectively has a pair and a pair horizontal shovel arm chambers with a pair of longitudinal directions shovel arm chamber in cross to shovel arm chamber and longitudinal direction shovel arm chamber False relation, the soar quantity of cushion block of the reinforcement bracket has nine;The rectangular body of described tray body or square.
Of the present utility model and more and in a specific embodiment, described tray body metal reinforcing frame is by longitudinal direction Rectangular metal pipe and horizontal rectangular metal pipe are constituted, and longitudinal rectangular metal pipe is connected to each other and shape with horizontal rectangular metal pipe Into the construction of groined type.
It is of the present utility model and and then a specific embodiment in, described reinforcement bracket metal reinforcing frame is by first Metal tube and the second metal tube are constituted, and first, second metal tube keeps parallel in length direction each other, and first metal The shape of cross section of pipe and the second metal tube is square.
The technique effect of the technical scheme that the utility model is provided is as follows:First, due to being bumped in tray body chamber Tray body metal reinforcing frame, and it is connected to one group of reinforcement back to the side of tray body top panel in tray body lower panel Bracket and reinforcement bracket metal reinforcing frame is bumped in reinforcement bracket chamber, thus the strong of tray body can have been significantly enhanced Degree, it is to avoid tray body produces amount of deflection under stacking and forklift scraper state and can significantly increase the service life;Second, by Soar in one group of reinforcement bracket, reinforcement bracket and cordwood assembly and connection pass is shown as between pad and tray body three System, thus the part that the ground of pin dynamic role one replaces damage can be met, not only improve and economize on resources, contribute to reducing user again Cost.
Description of the drawings
Fig. 1 is example structure figure of the present utility model.
Specific embodiment
Refer to Fig. 1, applicant it should be noted that;State shown in Fig. 1 just with actually used state conversely, That is state shown in Fig. 1 has overturn 180 ° with actually used state.
Figure 1 illustrates the i.e. blow molding blown by mould by blow molding machine by tray body top panel 11 And tray body lower panel 12 constitute and between tray body upper and lower panel 11,12 constitute have a surrounding side seal Why one tray body 1 in the tray body chamber 13 closed, applicant is referred to as the panel on the top shown in Fig. 1 under tray body Panel 12, and the panel of bottom is referred to as into tray body top panel 11, this is because it has been observed that diagram and actually used upset 180 °, thus this definition be by real use state as a example by, as follows example;Show being similarly blowing and be formed with One group of reinforcement bracket 2 in hollow reinforcement bracket chamber 21, before this group of reinforcement bracket 2 had not only been spaced but also is arranged on parallel to each other Tray body lower panel 12 is stated back to the side of aforementioned tray body top panel 11, and this group of reinforcement bracket 2 and tray body Space of soaring is maintained between lower panel 12, is configured to laterally shovel arm chamber 3 by the space of soaring, and in this group of reinforcement bracket 2 Two adjacent reinforcement brackets between space be configured to longitudinal direction shovel arm chamber 4.According to professional general knowledge, above aforesaid tray body Plate 11 is essentially the stacking platform for stacking goods.
The technical essential of the technical scheme provided as the utility model:A support has been bumped in aforementioned tray body chamber 13 Disk base metal reinforcing frame 131, aforementioned tray body lower panel 12 back to the side of aforementioned tray body top panel 11 and Respectively constituting in the position of front end, middle part and rear end corresponding to aforesaid one group of reinforcement bracket 2 has one to be raised in tray body The chimeric chamber cofferdam 14 of the cushion block on the surface of lower panel 12(Totally nine), the region in the chimeric chamber cofferdam 14 of the cushion block is configured to cushion block Chimeric chamber 141, the position corresponding to the chimeric chamber 141 of cushion block be provided with a blowing and the cushion block chamber 51 that is formed with closing Reinforcement bracket soars cushion block 5, and the front end of aforesaid one group of reinforcement bracket 2, middle part and rear end are being soared pad corresponding to reinforcement bracket The position of block 5 forms with aforementioned tray body 1 and is removably fixedly connected together with the reinforcement bracket cushion block 5 that soars, in one group of reinforcement The aforementioned reinforcement bracket chamber 21 of bracket 2 is interior and the length direction along reinforcement bracket chamber 21 has respectively been bumped into the increasing of reinforcement bracket metal Strong frame 211.
On the tray body lower panel 12 of aforementioned tray body 1 and the front end corresponding to aforementioned longitudinal direction shovel arm chamber 4, The position of middle part and rear end with paired form respectively having been constituted the horizontal reinforcement groove 121 of tray body lower panel, the pallet sheet The groove roof of the horizontal reinforcement groove 121 of body lower panel(It is as follows by taking use state as an example)With the aforementioned court of tray body top panel 11 Link to the side of tray body lower panel 12, and on tray body lower panel 12 and corresponding to aforementioned lateral shovel arm chamber There are tray body lower panel longitudinal strengthening groove 122, the pallet in 3 position from left side to the right side interval composition in laterally shovel arm chamber 3 The groove roof of body lower panel longitudinal strengthening groove 122 is equally with aforementioned tray body top panel 11 towards tray body lower panel 12 Side link.
In order that the horizontal reinforcement groove 121 of aforementioned tray body lower panel and tray body lower panel longitudinal strengthening groove 122 Intensity be able to ultimate attainment performance, thus by the horizontal reinforcement groove 121 of tray body lower panel and tray body longitudinal strengthening groove 122 Shape of cross section be set to V-shaped.
On aforesaid tray body lower panel 12 and in the edge around the chimeric chamber cofferdam 14 of aforementioned cushion block Location interval is constituted has lower panel to strengthen frustum 123, and the lower panel strengthens the frustum roof of frustum 123(It is in tray body 1 As a example by use state)Link towards the side of tray body lower panel 12 with aforementioned tray body top panel 11.
Continue to see Fig. 1, on aforesaid tray body lower panel 12 and in the residence corresponding to the chimeric chamber 141 of aforementioned cushion block Middle position is constituted a lower panel screw rod resigning hole 124, and on aforementioned tray body top panel 11 and corresponding to following The position of plate screw rod resigning hole 124 is constituted top panel screw rod resigning hole 111, in aforesaid one group of reinforcement bracket 2 towards aforementioned The front end of the side of tray body 1, middle part and rear end and in each structure in position of cushion block 5 that soars corresponding to aforementioned reinforcement bracket Cheng Youyi cushion blocks lower convex platform is fitted together to chamber 22, has one towards a composition in the chimeric chamber 141 of aforementioned cushion block in the reinforcement bracket cushion block 5 that soars Cushion block convex platform 52, and reinforcement bracket soar cushion block 5 towards the chimeric chamber 22 of cushion block lower convex platform side and corresponding to pad The position in the chimeric chamber 22 of block lower convex platform is constituted a cushion block lower convex platform 53, the scarf of chamber 141 chimeric with cushion block of cushion block convex platform 52, and The scarf of chamber 22 chimeric with cushion block lower convex platform of cushion block lower convex platform 53.
Aforementioned reinforcement bracket soar cushion block 5 central authorities and corresponding to aforementioned lower panel screw rod resigning hole 124 position Putting composition has a cushion block load-bearing boss 54, each in the upper and lower in the cushion block load-bearing boss chamber 541 of the cushion block load-bearing boss 54 A screw sleeve 5411 is provided with, in the central of the chimeric chamber 22 of aforementioned cushion block lower convex platform and corresponding to cushion block load-bearing boss chamber 541 position is constituted a screw lock nut cavity 221, and in the screw lock nut cavity 221 a screw lock spiral shell is provided with Female 2211, sequentially pass through aforementioned top panel screw rod resigning hole 111, lower panel screw rod resigning hole 124 and screw sleeve by screw rod 6 Locked by aforementioned lock nut 2211 after 5411 and aforesaid one group of reinforcement bracket 2 soars cushion block together with aforementioned reinforcement bracket 5 are fixedly connected in the position corresponding to the chimeric chamber cofferdam 14 of aforementioned cushion block with aforementioned tray body 1, and the base portion of screw rod 6 Screw head 61 is located in aforementioned top panel screw rod resigning hole 111.
Used as preferred scheme, constituting between the aforementioned upper and lower in aforementioned cushion block load-bearing boss chamber 541 has a diaphragm 5412, a screw hole 54121 is offered in the middle position of the diaphragm 5412, aforesaid screw rod 6 passes through the screw hole 54121.
As shown in Figure 1, the quantity of aforesaid one group of reinforcement bracket 2 has three, aforesaid to shovel arm chamber 3 and longitudinal direction shovel arm Chamber 4 respectively has a pair and a pair laterally shovels arm chamber 3 and a pair of longitudinal directions shovel arm chambers 4 in cross false relation, and aforementioned reinforcement bracket is risen The quantity of empty cushion block 5 has nine.In the present embodiment, the rectangular body of aforesaid tray body 1 is but it is also possible to be square.
Continue to see Fig. 1, aforesaid tray body metal reinforcing frame 131 is by longitudinal rectangular metal pipe 1311 and horizontal rectangle gold Category pipe 1312 is constituted, and longitudinal rectangular metal pipe 1311 is connected to each other with horizontal rectangular metal pipe 1312 and forms groined type Construction;Aforesaid reinforcement bracket metal reinforcing frame 211 is made up of the first metal tube 2111 and the second metal tube 2112, this first, Second metal tube 2111,2112 keeps parallel in length direction each other, and the metal tube of the first metal tube 2111 and second 2112 shape of cross section is square.
By the superincumbent explanation of applicant;1, one group of reinforcement bracket 2 of tray body and nine pieces of reinforcement brackets soar Cushion block 5 is fabricated separately, and is combined by assembling, and assembling process is described above, no longer multiple State.In use, if tray body 1 damage or one group of reinforcement bracket 2 in any one reinforcement bracket damage, that Only by the whiz of screw lock nut 2211 in screw rod 6, or screw rod 6 need to counterclockwise be operated, release tray body 1, reinforcement Bracket 2 and reinforcement bracket soar the annexation of the three of cushion block 5, implement assembling again after the corresponding component for replacing damage.
Because the using method and the mechanism of action of pallet belong to prior art, the superincumbent back of the body of applicant is see, for example, The patent specification referred in scape technology hurdle, thus repeat no more.
In sum, the technical scheme that the utility model is provided compensate for the shortcoming in prior art, favorably accomplish Invention task, has faithfully cashed the technique effect referred in the superincumbent technique effect hurdle of applicant.

Claims (10)

1. a kind of built-up pallet with two-way shovel arm chamber, including blowing by tray body top panel (11) and pallet sheet It is that body lower panel (12) is constituted and constitute between tray body upper and lower panel (11,12) and have the support of a surrounding side-closed One tray body (1) of disk body cavity (13);Be similarly blowing and it is formed with one group of hollow reinforcement bracket chamber (21) Reinforcement bracket (2), this group of reinforcement bracket (2) had not only been spaced but also had been arranged on parallel to each other the tray body lower panel (12) Back between the side of the tray body top panel (11), and this group of reinforcement bracket (2) and tray body lower panel (12) Space of soaring is maintained, is configured to laterally shovel arm chamber (3) by the space of soaring, and in this group of reinforcement bracket (2) two is adjacent Reinforcement bracket between space be configured to longitudinal direction shovel arm chamber (4), it is characterised in that be bumped in the tray body chamber (13) There is tray body metal reinforcing frame (131), in the tray body lower panel (12) back to the tray body top panel (11) side and each composition the in position in front end, middle part and rear end corresponding to one group of described reinforcement bracket (2) has The cushion block on one surface for being raised in tray body lower panel (12) is chimeric chamber cofferdam (14), in the cushion block chimeric chamber cofferdam (14) Region is configured to cushion block chimeric chamber (141), the position corresponding to cushion block chimeric chamber (141) be provided with a blowing and formed The reinforcement bracket for having the cushion block chamber (51) of closing soars cushion block (5), the front end of described one group of reinforcement bracket (2), middle part and after Hold corresponding to reinforcement bracket soar cushion block (5) position it is solid together with soar cushion block (5) and the tray body (1) of reinforcement bracket Fixed connection, in the reinforcement bracket chamber (21) of one group of reinforcement bracket (2) and along the length side in reinforcement bracket chamber (21) To being respectively bumped into reinforcement bracket metal reinforcing frame (211).
2. the built-up pallet with two-way shovel arm chamber according to claim 1, it is characterised in that in the tray body (1) on tray body lower panel (12) and in the position of front end, middle part and rear end corresponding to longitudinal direction shovel arm chamber (4) Put respectively to have been constituted the horizontal reinforcement groove (121) of tray body lower panel with paired form, the tray body lower panel is laterally mended The groove roof of strong groove (121) links with the tray body top panel (11) towards the side of tray body lower panel (12), and From a left side for laterally shovel arm chamber (3) on tray body lower panel (12) and in the position corresponding to horizontal shovel arm chamber (3) Side to right side interval composition has tray body lower panel longitudinal strengthening groove (122), the tray body lower panel longitudinal strengthening groove (122) groove roof equally links with the tray body top panel (11) towards the side of tray body lower panel (12).
3. the built-up pallet with two-way shovel arm chamber according to claim 2, it is characterised in that described tray body The shape of cross section of the horizontal reinforcement groove (121) of lower panel and tray body lower panel longitudinal strengthening groove (122) is in the shape of the letter V.
4. the built-up pallet with two-way shovel arm chamber according to claim 1, it is characterised in that in described pallet sheet Constituting on body lower panel (12) and in the location interval around the edge of the cushion block chimeric chamber cofferdam (14) has following Plate strengthens frustum (123), and the lower panel strengthens the frustum roof of frustum (123) and the tray body top panel (11) direction is held in the palm The side of disk body lower panel (12) links.
5. the built-up pallet with two-way shovel arm chamber according to claim 1, it is characterised in that in described pallet sheet Constituting on body lower panel (12) and in the middle position corresponding to the cushion block chimeric chamber (141) has lower panel screw rod resigning Hole (124), and on the tray body top panel (11) and in the position structure corresponding to lower panel screw rod resigning hole (124) Into there is top panel screw rod resigning hole (111), one group of described reinforcement bracket (2) towards the tray body (1) side Front end, middle part and rear end and respectively constitute in the position of the cushion block (5) that soars corresponding to the reinforcement bracket and have convex under a cushion block Platform is fitted together to chamber (22), has a cushion block convex towards a composition of the cushion block chimeric chamber (141) in the reinforcement bracket cushion block (5) that soars Platform (52), and reinforcement bracket soar cushion block (5) towards cushion block lower convex platform chimeric chamber (22) side and corresponding to cushion block Lower convex platform is fitted together to the position in chamber (22) and constitutes a cushion block lower convex platform (53), cushion block convex platform (52) chamber (141) chimeric with cushion block Scarf, and cushion block lower convex platform (53) chamber (22) scarf chimeric with cushion block lower convex platform.
6. the built-up pallet with two-way shovel arm chamber according to claim 5, it is characterised in that in the reinforcement bracket Soar cushion block (5) central authorities and corresponding to the lower panel screw rod resigning hole (124) position constitute have a cushion block load-bearing Boss (54), in the upper and lower of cushion block load-bearing boss chamber (541) of cushion block load-bearing boss (54) screw rod is each provided with Set (5411), in the central authorities of the cushion block lower convex platform chimeric chamber (22) and in the position corresponding to cushion block load-bearing boss chamber (541) Putting composition has a screw lock nut cavity (221), and in the screw lock nut cavity (221) a screw lock nut is provided with (2211), the top panel screw rod resigning hole (111), lower panel screw rod resigning hole (124) and spiral shell are sequentially passed through by screw rod (6) Rod set (5411) is afterwards by the lock nut (2211) locking by one group of described reinforcement bracket (2) together with the reinforcement support The frame cushion block (5) that soars is fixedly connected in the position corresponding to the cushion block chimeric chamber cofferdam (14) with the tray body (1), and And the screw head (61) of the base portion of screw rod (6) is in the top panel screw rod resigning hole (111).
7. the built-up pallet with two-way shovel arm chamber according to claim 6, it is characterised in that in the cushion block load-bearing Constituting between the upper and lower in boss chamber (541) has a diaphragm (5412), offers in the middle position of the diaphragm (5412) One screw hole (54121), the screw rod (6) is through the screw hole (54121).
8. the built-up pallet with two-way shovel arm chamber according to claim 1, it is characterised in that one group of described reinforcement The quantity of bracket (2) has three, and described respectively has a pair and a pair laterally shovels to shovel arm chamber (3) and longitudinal direction shovel arm chamber (4) With a pair of longitudinal directions shovel arms chamber (4) in cross false relation, the soar quantity of cushion block (5) of the reinforcement bracket has nine in arm chamber (3); The described rectangular body of tray body (1) or square.
9. the built-up pallet with two-way shovel arm chamber according to claim 1, it is characterised in that described tray body Metal reinforcing frame (131) is made up of longitudinal rectangular metal pipe (1311) and horizontal rectangular metal pipe (1312), longitudinal rectangle gold Category pipe (1311) is connected to each other with horizontal rectangular metal pipe (1312) and forms the construction of groined type.
10. the built-up pallet with two-way shovel arm chamber according to claim 1, it is characterised in that described reinforcement bracket Metal reinforcing frame (211) is made up of the first metal tube (2111) and the second metal tube (2112), first, second metal tube (2111,2112) keep parallel in length direction each other, and first metal tube (2111) and the second metal tube (2112) Shape of cross section it is square.
CN201621124350.XU 2016-10-14 2016-10-14 Modular trays with two -way shovel arm chamber Withdrawn - After Issue CN206107821U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621124350.XU CN206107821U (en) 2016-10-14 2016-10-14 Modular trays with two -way shovel arm chamber

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621124350.XU CN206107821U (en) 2016-10-14 2016-10-14 Modular trays with two -way shovel arm chamber

Publications (1)

Publication Number Publication Date
CN206107821U true CN206107821U (en) 2017-04-19

Family

ID=58528744

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621124350.XU Withdrawn - After Issue CN206107821U (en) 2016-10-14 2016-10-14 Modular trays with two -way shovel arm chamber

Country Status (1)

Country Link
CN (1) CN206107821U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106275726A (en) * 2016-10-14 2017-01-04 苏州同大机械有限公司 There is the built-up pallet in two-way shovel arm chamber

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106275726A (en) * 2016-10-14 2017-01-04 苏州同大机械有限公司 There is the built-up pallet in two-way shovel arm chamber

Similar Documents

Publication Publication Date Title
CN205770707U (en) A kind of pallet for logistics transportation
CN206107821U (en) Modular trays with two -way shovel arm chamber
CN208278566U (en) A kind of EPS packing case for inner guard board of automobile door
CN106428904B (en) Two-way shovel arm chamber assembly type pallet
CN206068396U (en) Two-way shovel arm chamber assembled pallet
CN106275726B (en) Built-up pallet with two-way shovel arm chamber
CN206068398U (en) Two-way shovel arm chamber pallet
CN207030855U (en) A kind of safety-type building site hydraulic car
CN105253423A (en) Tray with shovel arm cavities in two directions
CN202670379U (en) Support for loading and transportation of mineral water barrel
CN108528919A (en) The selectable Modular assembled pallet of cargo branch mode
CN200951817Y (en) Front forks for bicycle
CN206598880U (en) A kind of reinforced underlying ingot beam assembly
CN206068389U (en) Pallet
CN207374484U (en) A kind of subframe
CN206720663U (en) A kind of hydraulic carrier body frame structure for automotive
CN103552737B (en) Pallet with improved structure
CN202642520U (en) Motorcycle transport packing box
CN207417385U (en) Distortion-free battery turnover box outline border
CN201842147U (en) Rolling high-strength container side board structure of engineering truck
CN101811169A (en) Subtype self-locking structure of blade mould and subtype design method
CN205872721U (en) Simple packing box of repeatedly usable and dismouting
CN200989215Y (en) Underground support conveyer wagon
CN205444007U (en) Isolation pier
CN206645252U (en) A kind of Turnover Box of bottom discharge

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
AV01 Patent right actively abandoned
AV01 Patent right actively abandoned

Granted publication date: 20170419

Effective date of abandoning: 20171117