CN106275726B - Built-up pallet with two-way shovel arm chamber - Google Patents

Built-up pallet with two-way shovel arm chamber Download PDF

Info

Publication number
CN106275726B
CN106275726B CN201610898417.3A CN201610898417A CN106275726B CN 106275726 B CN106275726 B CN 106275726B CN 201610898417 A CN201610898417 A CN 201610898417A CN 106275726 B CN106275726 B CN 106275726B
Authority
CN
China
Prior art keywords
tray body
cushion block
chamber
reinforcement bracket
lower panel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610898417.3A
Other languages
Chinese (zh)
Other versions
CN106275726A (en
Inventor
肖志林
邱建成
秦超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou Tongda Machinery Co Ltd
Original Assignee
Suzhou Tongda Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou Tongda Machinery Co Ltd filed Critical Suzhou Tongda Machinery Co Ltd
Priority to CN201610898417.3A priority Critical patent/CN106275726B/en
Publication of CN106275726A publication Critical patent/CN106275726A/en
Application granted granted Critical
Publication of CN106275726B publication Critical patent/CN106275726B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65DCONTAINERS FOR STORAGE OR TRANSPORT OF ARTICLES OR MATERIALS, e.g. BAGS, BARRELS, BOTTLES, BOXES, CANS, CARTONS, CRATES, DRUMS, JARS, TANKS, HOPPERS, FORWARDING CONTAINERS; ACCESSORIES, CLOSURES, OR FITTINGS THEREFOR; PACKAGING ELEMENTS; PACKAGES
    • B65D19/00Pallets or like platforms, with or without side walls, for supporting loads to be lifted or lowered
    • B65D19/0004Rigid pallets without side walls
    • B65D19/0006Rigid pallets without side walls the load supporting surface being made of a single element
    • B65D19/003Rigid pallets without side walls the load supporting surface being made of a single element forming discontinuous or non-planar contact surfaces
    • B65D19/0032Rigid pallets without side walls the load supporting surface being made of a single element forming discontinuous or non-planar contact surfaces the base surface being made of a single element
    • B65D19/0036Rigid pallets without side walls the load supporting surface being made of a single element forming discontinuous or non-planar contact surfaces the base surface being made of a single element forming discontinuous or non-planar contact surfaces
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65DCONTAINERS FOR STORAGE OR TRANSPORT OF ARTICLES OR MATERIALS, e.g. BAGS, BARRELS, BOTTLES, BOXES, CANS, CARTONS, CRATES, DRUMS, JARS, TANKS, HOPPERS, FORWARDING CONTAINERS; ACCESSORIES, CLOSURES, OR FITTINGS THEREFOR; PACKAGING ELEMENTS; PACKAGES
    • B65D19/00Pallets or like platforms, with or without side walls, for supporting loads to be lifted or lowered
    • B65D19/38Details or accessories
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65DCONTAINERS FOR STORAGE OR TRANSPORT OF ARTICLES OR MATERIALS, e.g. BAGS, BARRELS, BOTTLES, BOXES, CANS, CARTONS, CRATES, DRUMS, JARS, TANKS, HOPPERS, FORWARDING CONTAINERS; ACCESSORIES, CLOSURES, OR FITTINGS THEREFOR; PACKAGING ELEMENTS; PACKAGES
    • B65D2519/00Pallets or like platforms, with or without side walls, for supporting loads to be lifted or lowered
    • B65D2519/00004Details relating to pallets
    • B65D2519/00009Materials
    • B65D2519/00014Materials for the load supporting surface
    • B65D2519/00034Plastic
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65DCONTAINERS FOR STORAGE OR TRANSPORT OF ARTICLES OR MATERIALS, e.g. BAGS, BARRELS, BOTTLES, BOXES, CANS, CARTONS, CRATES, DRUMS, JARS, TANKS, HOPPERS, FORWARDING CONTAINERS; ACCESSORIES, CLOSURES, OR FITTINGS THEREFOR; PACKAGING ELEMENTS; PACKAGES
    • B65D2519/00Pallets or like platforms, with or without side walls, for supporting loads to be lifted or lowered
    • B65D2519/00004Details relating to pallets
    • B65D2519/00009Materials
    • B65D2519/00049Materials for the base surface
    • B65D2519/00069Plastic
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65DCONTAINERS FOR STORAGE OR TRANSPORT OF ARTICLES OR MATERIALS, e.g. BAGS, BARRELS, BOTTLES, BOXES, CANS, CARTONS, CRATES, DRUMS, JARS, TANKS, HOPPERS, FORWARDING CONTAINERS; ACCESSORIES, CLOSURES, OR FITTINGS THEREFOR; PACKAGING ELEMENTS; PACKAGES
    • B65D2519/00Pallets or like platforms, with or without side walls, for supporting loads to be lifted or lowered
    • B65D2519/00004Details relating to pallets
    • B65D2519/00009Materials
    • B65D2519/00119Materials for the construction of the reinforcements
    • B65D2519/00129Metal
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65DCONTAINERS FOR STORAGE OR TRANSPORT OF ARTICLES OR MATERIALS, e.g. BAGS, BARRELS, BOTTLES, BOXES, CANS, CARTONS, CRATES, DRUMS, JARS, TANKS, HOPPERS, FORWARDING CONTAINERS; ACCESSORIES, CLOSURES, OR FITTINGS THEREFOR; PACKAGING ELEMENTS; PACKAGES
    • B65D2519/00Pallets or like platforms, with or without side walls, for supporting loads to be lifted or lowered
    • B65D2519/00004Details relating to pallets
    • B65D2519/00258Overall construction
    • B65D2519/00263Overall construction of the pallet
    • B65D2519/00273Overall construction of the pallet made of more than one piece
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65DCONTAINERS FOR STORAGE OR TRANSPORT OF ARTICLES OR MATERIALS, e.g. BAGS, BARRELS, BOTTLES, BOXES, CANS, CARTONS, CRATES, DRUMS, JARS, TANKS, HOPPERS, FORWARDING CONTAINERS; ACCESSORIES, CLOSURES, OR FITTINGS THEREFOR; PACKAGING ELEMENTS; PACKAGES
    • B65D2519/00Pallets or like platforms, with or without side walls, for supporting loads to be lifted or lowered
    • B65D2519/00004Details relating to pallets
    • B65D2519/00547Connections
    • B65D2519/00552Structures connecting the constitutive elements of the pallet to each other, i.e. load supporting surface, base surface and/or separate spacer
    • B65D2519/00572Structures connecting the constitutive elements of the pallet to each other, i.e. load supporting surface, base surface and/or separate spacer with separate auxiliary element, e.g. screws, nails, bayonets

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Pallets (AREA)

Abstract

A kind of built-up pallet with two-way shovel arm chamber, include the tray body being made up of tray body upper and lower panel of blowing;One group of reinforcement bracket, tray body lower panel is located at back to the side of tray body top panel, and structure is laterally to shovel arm chamber between this group of reinforcement bracket and tray body lower panel, the space structure between two adjacent reinforcement brackets in this group of reinforcement bracket shovels arm chamber, feature for longitudinal direction:Tray body intracavitary has been bumped into a tray body metal reinforcing frame, tray body lower panel is respectively formed back to the side of tray body top panel has cushion block to be fitted together to chamber cofferdam, the region structure that the cushion block is fitted together in chamber cofferdam is fitted together to chamber for cushion block, reinforcement bracket is set in the position for being fitted together to chamber corresponding to cushion block to soar cushion block, front end, middle part and the rear end of one group of reinforcement bracket are connected with tray body, and the reinforcement bracket intracavitary of one group of reinforcement bracket has reinforcement bracket metal reinforcing frame.Promote the intensity of tray body, increase the service life;Reduce cost.

Description

Built-up pallet with two-way shovel arm chamber
Technical field
The invention belongs to stacking and packing material technical field, and in particular to a kind of combined type support with two-way shovel arm chamber Disk.
Background technology
Foregoing pallet is generally referred to as pallet or Underpan for package by industry, be widely used in industrial and mining enterprises production line, The industries such as stacking, storage and logistics.Widely used Underpan for package is pallet by bottom plate, cushion block and for connecting in prior art The liner plate composition of each cushion block, cushion block make packed article be kept with ground between bottom plate and liner plate by the effect of cushion block A certain distance, the phase, which takes, obtains effect moistureproof, beneficial to forklift carrying etc.However, cushion block mostly uses log material, according to need Suitable size is processed into, shape has cylinder and rectangle, makees cushion block with log material and the natural resources timber of preciousness is brought Serious waste, if moreover, to pack products export with the Underpan for package of this material external or from external import, then quarantine will Seeking Truth is very harsh, to the temporal agility of outlet/import(Clearance speed)Bring influence.Using through treated people Timber resources can both be saved by making chock manufacture Underpan for package, and and can meets with customs's clearance requirement during import and export of goods, as in State patent CN2536528Y(Structure improved artificial skid)、CN2536529Y(The improved artificial skid of structure)With CN2536530Y(Structure improved artificial skid)Etc..But have that cost of manufacture is big, efficiency is low and heavy etc owe Lack.Using polyvinyl chloride particularly high molecular weight high density polychlorostyrene Class B(English abbreviation is:HMWHDPE)And by plastics machinery The pallet of blow molding can both reduce cost, mitigate deadweight, and and can improves producing efficiency.
The material that foregoing blow molding can be seen in disclosed Chinese patent literature is the pallet of plastics, such as CN102407967B(Pallet)、CN103253422B(Pallet)、CN103552737B(The improved pallet of structure)With CN105253423A(Pallet with two-way shovel arm chamber), etc..Although these patent formulas for being not limited to enumerate respectively have solely The length of special technology achievement, but due to showing as monolithic construction, thus when tray body is in a state of use towards upper Side or the side under can only integrally be scrapped when damaging, and be held in the palm so as to be unfavorable for economizing on resources and go back while cause to use The industry industrial and mining enterprises as the aforementioned of disk, warehouse logisticses industry increase cost.Comparatively speaking, " the support that CN102009774B recommends The structure of disk " is relatively easy, is collectively formed by tray body and one group of reinforcement bracket, and one group of reinforcement bracket makes with tray body Fixed with the side under state under by adhesive(See the row of inverse the 2nd of the embodiment 1 of the patent), the patent it is positive Meaning is:Promote the intensity of tray body by one group of reinforcement bracket, avoid tray body in the state of stacking goods by shoveling There is flexion when scooping up and extends the service life of tray body in the shovel arm of car.But due to one group of reinforcement bracket pass through it is gluing Finally still show as monolithic construction after agent and tray body cementation, whether tray body damage or one group of reinforcement bracket in The damage of any reinforcement bracket be both needed to make it is overall scrap processing, then equally exist aforementioned patent be unfavorable for saving resource and The drawbacks of being unfavorable for reducing customer using cost.
For above-mentioned prior art, it is necessary to be subject to rational modification, the applicant has made positive and beneficial design for this With experiment repeatedly(Experiment is carried out under confidential state), form technical scheme described below.
The content of the invention
The task of the present invention is to provide a kind of intensity for helping to significantly enhance tray body and use and avoid pallet sheet Body produces amount of deflection and ensures preferable service life in a state of use, be advantageous to embody good building block system assembling effect and Use meet to carry out the part of damage specific aim replace the and can that requires and can both economize on resources reduce the use of user into This built-up pallet with two-way shovel arm chamber.
What the task of the present invention was performed by, a kind of built-up pallet with two-way shovel arm chamber, including blowing It is being made up of tray body top panel and tray body lower panel and formed one or four between tray body upper and lower panel One tray body of the tray body chamber of all side-closeds;Be similarly blowing and formed with the one of hollow reinforcement bracket chamber Group reinforcement bracket, this group of reinforcement bracket be not only spaced but also be arranged on the tray body lower panel parallel to each other back to described The side of tray body top panel, and space of soaring is maintained between this group of reinforcement bracket and tray body lower panel, by The space of soaring is configured to laterally shovel arm chamber, and the space between two adjacent reinforcement brackets in this group of reinforcement bracket is configured to Longitudinal direction shovel arm chamber, is characterised by being bumped into a tray body metal reinforcing frame in the tray body intracavitary, in the pallet sheet Body lower panel is back to the side of the tray body top panel and at front end, the middle part corresponding to one group of described reinforcement bracket And the position of rear end respectively forms the cushion block for having a surface for being raised in tray body lower panel and is fitted together to chamber cofferdam, the cushion block is fitted together to Region in chamber cofferdam is configured to cushion block and is fitted together to chamber, be provided with the position that chamber is fitted together to corresponding to cushion block a blowing and is formed The reinforcement bracket for having the cushion block chamber of closing soars cushion block, front end, middle part and the rear end of described one group of reinforcement bracket corresponding to The soar position of cushion block of reinforcement bracket is fixedly connected together with the reinforcement bracket cushion block that soars with the tray body, in one group of reinforcement support The reinforcement bracket intracavitary of frame and length direction along reinforcement bracket chamber has respectively been bumped into reinforcement bracket metal reinforcing frame.
In the specific embodiment of the present invention, on the tray body lower panel of the tray body and right The position of the front end of arm chamber, middle part and rear end is longitudinally shoveled described in Ying Yu respectively by with having been formed below tray body in the form of paired Plate transverse direction reinforcement groove, the groove top wall of the tray body lower panel transverse direction reinforcement groove and the tray body top panel are towards pallet sheet The side of body lower panel links, and on tray body lower panel and certainly horizontal corresponding to the position for laterally shoveling arm chamber Left side to the right side interval composition of shovel arm chamber has tray body lower panel longitudinal strengthening groove, the tray body lower panel longitudinal strengthening The groove top wall of groove equally links with the tray body top panel towards the side of tray body lower panel.
In another specific embodiment of the present invention, described tray body lower panel transverse direction reinforcement groove and pallet The shape of cross section of body lower panel longitudinal strengthening groove is in the shape of the letter V.
In another specific embodiment of the present invention, on described tray body lower panel and around described The location interval composition that cushion block is fitted together to the edge in chamber cofferdam has lower panel to strengthen frustum, and the lower panel strengthens the frustum of frustum Roof links with the tray body top panel towards the side of tray body lower panel.
In another specific embodiment of the present invention, on described tray body lower panel and corresponding to institute State cushion block and be fitted together to the middle position of chamber and form and have a lower panel screw rod resigning hole, and on the tray body top panel and Form corresponding to the position of lower panel screw rod resigning hole and have top panel screw rod resigning hole, in one group of described reinforcement bracket towards institute State front end, middle part and the rear end of the side of tray body and in each structure in position for the cushion block that soared corresponding to the reinforcement bracket Cheng Youyi cushion blocks lower convex platform is fitted together to chamber, reinforcement bracket soar cushion block towards the cushion block be fitted together to chamber a composition have on a cushion block Boss, and soar cushion block towards the side of the chimeric chamber of cushion block lower convex platform in reinforcement bracket and be fitted together to corresponding to cushion block lower convex platform The position of chamber, which is formed, a cushion block lower convex platform, cushion block convex platform chamber scarf chimeric with cushion block, and cushion block lower convex platform with it is convex under cushion block Platform is fitted together to chamber scarf.
The present invention also have a specific embodiment in, the reinforcement bracket soar cushion block center and right The position of lower panel screw rod resigning hole described in Ying Yu, which is formed, a cushion block load-bearing boss, in the cushion block load-bearing of the cushion block load-bearing boss The upper and lower part of boss chamber is each provided with a screw sleeve, and the center of chamber is fitted together to and corresponding to pad in the cushion block lower convex platform The position of block load-bearing boss chamber, which is formed, a screw lock nut cavity, and a screw lock is provided with the screw lock nut cavity Nut, sequentially passed through by screw rod after the top panel screw rod resigning hole, lower panel screw rod resigning hole and screw sleeve by described Lock nut locks and one group of described reinforcement bracket is soared into cushion block embedding corresponding to the cushion block together with the reinforcement bracket The position for closing chamber cofferdam is fixedly connected with the tray body, and the screw head of the base portion of screw rod is located at the top panel screw rod In resigning hole.
In a still more specific embodiment of the invention, in the upper and lower part of the cushion block load-bearing boss chamber Between form have a diaphragm, a screw hole is offered in the middle position of the diaphragm, the screw rod passes through the screw hole.
The present invention's and then in a specific embodiment, the quantity of described one group of reinforcement bracket has three, described To shovel arm chamber and longitudinal direction shovel arm chamber respectively have a pair and a pair laterally shovel arm chambers with a pair of longitudinal direction shovel arm chambers interlock in cross Relation, the soar quantity of cushion block of the reinforcement bracket have nine;The rectangular body of described tray body or square.
Described tray body metal reinforcing frame is by longitudinal rectangle in yet a further embodiment of the present invention Metal tube and horizontal rectangular metal pipe composition, longitudinal rectangular metal pipe and horizontal rectangular metal pipe are connected to each other and form well The construction of font.
In the present invention again and then in a specific embodiment, described reinforcement bracket metal reinforcing frame is by the first metal Pipe and the second metal tube composition, first, second metal tube keep parallel in length direction each other, and first metal tube with And second metal tube shape of cross section it is square.
The technique effect of technical scheme provided by the invention is as follows:First, due to being bumped into pallet in tray body intracavitary Base metal reinforcing frame, and one group of reinforcement bracket is connected in the side of tray body lower panel back to tray body top panel And reinforcement bracket metal reinforcing frame has been bumped into reinforcement bracket intracavitary, thus the intensity of tray body can be significantly enhanced, keep away Exempt from tray body to produce amount of deflection under stacking and forklift scraper state and can significantly increase the service life;Second, due to one Group reinforcement bracket, reinforcement bracket soar and the assembly and connection relation of building block system are shown as between pad and tray body three, because And can meet that the ground of pin dynamic role one replaces the part of damage, not only improve and economize on resources, contribute to again reduce user into This.
Brief description of the drawings
Fig. 1 is embodiments of the invention structure chart.
Embodiment
Refer to Fig. 1, applicant it should be noted that;State shown in Fig. 1 just with the state of actual use on the contrary, That is state shown in Fig. 1 and the state of actual use have overturn 180 °.
Figure 1 illustrates the i.e. blow molding blown by blow molding machine by mould by tray body top panel 11 And tray body lower panel 12 form and between tray body upper and lower panel 11,12 form have a surrounding side envelope Why the panel on the top shown in Fig. 1 is referred to as under tray body by one tray body 1 of the tray body chamber 13 closed, applicant Panel 12, and the panel of bottom is referred to as tray body top panel 11, because it has been observed that diagram is overturn with actual use 180 °, therefore this definition is the as follows example by exemplified by real use state;Show be similarly blowing and formed with One group of reinforcement bracket 2 of hollow reinforcement bracket chamber 21, before this group of reinforcement bracket 2 is not only spaced but also be arranged on parallel to each other Tray body lower panel 12 is stated back to the side of foregoing tray body top panel 11, and this group of reinforcement bracket 2 and tray body Space of soaring is maintained between lower panel 12, is configured to laterally shovel arm chamber 3 by the space of soaring, and in this group of reinforcement bracket 2 Two adjacent reinforcement brackets between space be configured to longitudinal direction shovel arm chamber 4.According to professional general knowledge, above foregoing tray body Plate 11 is essentially the stacking platform for stacking goods.
Technical essential as technical scheme provided by the invention:A pallet sheet has been bumped into foregoing tray body chamber 13 Body metal reinforcing frame 131, in foregoing tray body lower panel 12 back to the side of foregoing tray body top panel 11 and right Should respectively be formed in the position of the front end of one group of foregoing reinforcement bracket 2, middle part and rear end has one to be raised in below tray body The cushion block on the surface of plate 12 is fitted together to chamber cofferdam 14(Totally nine), the region that the cushion block is fitted together in chamber cofferdam 14 is configured to cushion block and is fitted together to Chamber 141, be provided with the position that chamber 141 is fitted together to corresponding to cushion block a blowing and cushion block chamber 51 formed with closing reinforcement Bracket is soared cushion block 5, and front end, middle part and the rear end of foregoing one group of reinforcement bracket 2 are soared cushion block 5 corresponding to reinforcement bracket Position forms with foregoing tray body 1 and is removably fixedly connected together with the reinforcement bracket cushion block 5 that soars, in one group of reinforcement bracket 2 Foregoing reinforcement bracket chamber 21 in and along the length direction of reinforcement bracket chamber 21 be respectively bumped into reinforcement bracket metal reinforcing frame 211。
On the tray body lower panel 12 of foregoing tray body 1 and the front end corresponding to foregoing longitudinal direction shovel arm chamber 4, The position of middle part and rear end is respectively by with having been formed tray body lower panel transverse direction reinforcement groove 121, the pallet sheet in the form of paired The groove top wall of body lower panel transverse direction reinforcement groove 121(It is as follows by taking use state as an example)With the foregoing court of tray body top panel 11 Link to the side of tray body lower panel 12, and on tray body lower panel 12 and shoveling arm chamber corresponding to aforementioned lateral There are tray body lower panel longitudinal strengthening groove 122, the pallet in 3 position from left side to the right side interval composition of laterally shovel arm chamber 3 The groove top wall of body lower panel longitudinal strengthening groove 122 is equally with foregoing tray body top panel 11 towards tray body lower panel 12 Side link.
In order that foregoing tray body lower panel transverse direction reinforcement groove 121 and tray body lower panel longitudinal strengthening groove 122 Intensity be able to ultimate attainment performance, thus by tray body lower panel transverse direction reinforcement groove 121 and tray body longitudinal strengthening groove 122 Shape of cross section be arranged to V-shaped.
It is being fitted together on foregoing tray body lower panel 12 and around foregoing cushion block the edge in chamber cofferdam 14 Location interval, which is formed, has lower panel to strengthen frustum 123, and the lower panel strengthens the frustum roof of frustum 123(It is in tray body 1 Exemplified by use state)Link with foregoing tray body top panel 11 towards the side of tray body lower panel 12.
Continue to see Fig. 1, be fitted together on foregoing tray body lower panel 12 and corresponding to foregoing cushion block the residence of chamber 141 Middle position, which is formed, a lower panel screw rod resigning hole 124, and on foregoing tray body top panel 11 and corresponding to following The position of plate screw rod resigning hole 124, which is formed, top panel screw rod resigning hole 111, in one group of foregoing reinforcement bracket 2 towards foregoing Front end, middle part and the rear end of the side of tray body 1 and in each structure in position for the cushion block 5 that soared corresponding to foregoing reinforcement bracket Cheng Youyi cushion blocks lower convex platform is fitted together to chamber 22, reinforcement bracket soar cushion block 5 towards foregoing cushion block be fitted together to chamber 141 a composition have one Cushion block convex platform 52, and cushion block 5 is soared towards the side of the chimeric chamber 22 of cushion block lower convex platform and corresponding to pad in reinforcement bracket The position of the chimeric chamber 22 of block lower convex platform, which is formed, a cushion block lower convex platform 53, the scarf of chamber 141 chimeric with cushion block of cushion block convex platform 52, and The scarf of chamber 22 chimeric with cushion block lower convex platform of cushion block lower convex platform 53.
Foregoing reinforcement bracket soar cushion block 5 center and in the position corresponding to foregoing lower panel screw rod resigning hole 124 Putting composition has a cushion block load-bearing boss 54, each in the upper and lower part of the cushion block load-bearing boss chamber 541 of the cushion block load-bearing boss 54 A screw sleeve 5411 is provided with, the center of chamber 22 is fitted together to and corresponding to cushion block load-bearing boss chamber in foregoing cushion block lower convex platform 541 position, which is formed, a screw lock nut cavity 221, and a screw lock spiral shell is provided with the screw lock nut cavity 221 Mother 2211, foregoing top panel screw rod resigning hole 111, lower panel screw rod resigning hole 124 and screw sleeve are sequentially passed through by screw rod 6 Locked after 5411 by foregoing lock nut 2211 and one group of foregoing reinforcement bracket 2 soars cushion block together with foregoing reinforcement bracket 5 are fixedly connected in the position that chamber cofferdam 14 is fitted together to corresponding to foregoing cushion block with foregoing tray body 1, and the base portion of screw rod 6 Screw head 61 is located in foregoing top panel screw rod resigning hole 111.
As preferable scheme, being formed between the foregoing upper and lower part of foregoing cushion block load-bearing boss chamber 541 has a diaphragm 5412, a screw hole 54121 is offered in the middle position of the diaphragm 5412, foregoing screw rod 6 passes through the screw hole 54121.
As shown in Figure 1, the quantity of one group of foregoing reinforcement bracket 2 has three, foregoing to shovel arm chamber 3 and longitudinal direction shovel arm It is in cross false relation that chamber 4, which respectively has a pair and a pair horizontal shovel arm chambers 3 and a pair of longitudinal direction shovel arm chambers 4, and foregoing reinforcement bracket is risen The quantity of empty cushion block 5 has nine.In the present embodiment, foregoing 1 rectangular body of tray body is but it is also possible to be square.
Continue to see Fig. 1, foregoing tray body metal reinforcing frame 131 is by longitudinal rectangular metal pipe 1311 and horizontal rectangle gold Category pipe 1312 forms, and longitudinal rectangular metal pipe 1311 and horizontal rectangular metal pipe 1312 are connected to each other and form groined type Construction;Foregoing reinforcement bracket metal reinforcing frame 211 is made up of the first metal tube 2111 and the second metal tube 2112, this first, Second metal tube 2111,2112 keeps parallel in length direction each other, and the metal tube of the first metal tube 2111 and second 2112 shape of cross section is square.
Pass through the superincumbent explanation of applicant;1, one group of reinforcement bracket 2 of tray body and nine pieces of reinforcement brackets soar Cushion block 5 is fabricated separately, and by assembling and what is combined, assembling process is described above, no longer multiple State.In use, if tray body 1 damage or one group of reinforcement bracket 2 in any one reinforcement bracket damage, that Only need to be by the whiz of screw lock nut 2211 in screw rod 6, or screw rod 6 is operated counterclockwise, release tray body 1, reinforcement Bracket 2 and reinforcement bracket soar the annexation of the three of cushion block 5, implement to assemble again after the corresponding component for replacing damage.
Because the application method and the mechanism of action of pallet belong to prior art, the superincumbent back of the body of applicant see, for example, The patent specification referred in scape technology column, thus repeat no more.
In summary, technical scheme provided by the invention compensate for the shortcoming in prior art, favorably accomplish invention Task, the technique effect referred in the superincumbent technique effect column of applicant is faithfully cashed.

Claims (9)

1. a kind of built-up pallet with two-way shovel arm chamber, including blowing by tray body top panel (11) and pallet sheet It is that body lower panel (12) is formed and formed between tray body upper and lower panel (11,12) and have the support of a surrounding side-closed A tray body (1) for disk body cavity (13);Be similarly blowing and formed with one group of hollow reinforcement bracket chamber (21) Reinforcement bracket (2), this group of reinforcement bracket (2) be not only spaced but also be arranged on the tray body lower panel (12) parallel to each other Back to the side of the tray body top panel (11), and between this group of reinforcement bracket (2) and tray body lower panel (12) Space of soaring is maintained, is configured to laterally shovel arm chamber (3) by the space of soaring, and two in this group of reinforcement bracket (2) are adjacent Reinforcement bracket between space be configured to longitudinal direction shovel arm chamber (4), it is characterised in that be bumped into the tray body chamber (13) There is a tray body metal reinforcing frame (131), in the tray body lower panel (12) back to the tray body top panel (11) side and respectively being formed in the position corresponding to the front end of one group of described reinforcement bracket (2), middle part and rear end has One cushion block for being raised in the surface of tray body lower panel (12) is fitted together to chamber cofferdam (14), and the cushion block is fitted together in chamber cofferdam (14) Region is configured to cushion block and is fitted together to chamber (141), be provided with the position that chamber (141) is fitted together to corresponding to cushion block a blowing and is formed The reinforcement bracket for having the cushion block chamber (51) of closing soars cushion block (5), the front end of described one group of reinforcement bracket (2), middle part and after Hold corresponding to reinforcement bracket soar cushion block (5) position it is solid together with soar cushion block (5) and the tray body (1) of reinforcement bracket Fixed connection, in the reinforcement bracket chamber (21) of one group of reinforcement bracket (2) and along the length side of reinforcement bracket chamber (21) To being respectively bumped into reinforcement bracket metal reinforcing frame (211), on the tray body lower panel (12) of the tray body (1) and Corresponding to the front end of the longitudinal direction shovel arm chamber (4), middle part and rear end position respectively by with having been formed pallet in the form of paired Body lower panel transverse direction reinforcement groove (121), the groove top wall of the tray body lower panel transverse direction reinforcement groove (121) and the pallet sheet Body top panel (11) links towards the side of tray body lower panel (12), and on tray body lower panel (12) and right The position that arm chamber (3) is laterally shoveled described in Ying Yu has below tray body from left side to the right side interval composition of laterally shovel arm chamber (3) Plate longitudinal strengthening groove (122), the groove top wall of the tray body lower panel longitudinal strengthening groove (122) equally with the tray body Panel (11) links towards the side of tray body lower panel (12).
2. the built-up pallet according to claim 1 with two-way shovel arm chamber, it is characterised in that described tray body The shape of cross section of lower panel transverse direction reinforcement groove (121) and tray body lower panel longitudinal strengthening groove (122) is in the shape of the letter V.
3. the built-up pallet according to claim 1 with two-way shovel arm chamber, it is characterised in that in described pallet sheet Have on body lower panel (12) and in the location interval composition that the edge of chamber cofferdam (14) is fitted together to around the cushion block following Plate enhancing frustum (123), frustum roof and the tray body top panel (11) direction of lower panel enhancing frustum (123) are held in the palm The side of disk body lower panel (12) links.
4. the built-up pallet according to claim 1 with two-way shovel arm chamber, it is characterised in that in described pallet sheet Forming on body lower panel (12) and in the middle position that chamber (141) is fitted together to corresponding to the cushion block has lower panel screw rod resigning Hole (124), and on the tray body top panel (11) and in the position structure corresponding to lower panel screw rod resigning hole (124) Into there is top panel screw rod resigning hole (111), in one group of described reinforcement bracket (2) towards the side of the tray body (1) Front end, middle part and rear end and respectively being formed in the position for the cushion block (5) that soared corresponding to the reinforcement bracket has convex under a cushion block Platform is fitted together to chamber (22), reinforcement bracket soar cushion block (5) towards the cushion block be fitted together to chamber (141) a composition have a cushion block convex Platform (52), and cushion block (5) is soared towards the side of the chimeric chamber (22) of cushion block lower convex platform and corresponding to cushion block in reinforcement bracket The position composition that lower convex platform is fitted together to chamber (22) has a cushion block lower convex platform (53), cushion block convex platform (52) chamber (141) chimeric with cushion block Scarf, and cushion block lower convex platform (53) chamber (22) scarf chimeric with cushion block lower convex platform.
5. the built-up pallet according to claim 4 with two-way shovel arm chamber, it is characterised in that in the reinforcement bracket Soar cushion block (5) center and corresponding to the lower panel screw rod resigning hole (124) position form have a cushion block load-bearing Boss (54), a screw rod is each provided with the upper and lower part of the cushion block load-bearing boss chamber (541) of the cushion block load-bearing boss (54) Cover (5411), the center of chamber (22) is fitted together to and in the position corresponding to cushion block load-bearing boss chamber (541) in the cushion block lower convex platform Putting composition has a screw lock nut cavity (221), and a screw lock nut is provided with the screw lock nut cavity (221) (2211) the top panel screw rod resigning hole (111), lower panel screw rod resigning hole (124) and spiral shell, are sequentially passed through by screw rod (6) Locked after rod set (5411) by the lock nut (2211) by one group of described reinforcement bracket (2) together with the reinforcement support Frame soar cushion block (5) corresponding to the cushion block be fitted together to chamber cofferdam (14) position be fixedly connected with the tray body (1), and And the screw head (61) of the base portion of screw rod (6) is located in the top panel screw rod resigning hole (111).
6. the built-up pallet according to claim 5 with two-way shovel arm chamber, it is characterised in that in the cushion block load-bearing Being formed between the upper and lower part of boss chamber (541) has a diaphragm (5412), is offered in the middle position of the diaphragm (5412) One screw hole (54121), the screw rod (6) pass through the screw hole (54121).
7. the built-up pallet according to claim 1 with two-way shovel arm chamber, it is characterised in that one group of described reinforcement The quantity of bracket (2) has three, described respectively to have a pair and a pair laterally shovels to shovel arm chamber (3) and longitudinal direction shovel arm chamber (4) It is in cross false relation that arm chamber (3) shovels arm chambers (4) with a pair of longitudinal directions, and the soar quantity of cushion block (5) of the reinforcement bracket has nine; The described rectangular body of tray body (1) or square.
8. the built-up pallet according to claim 1 with two-way shovel arm chamber, it is characterised in that described tray body Metal reinforcing frame (131) is made up of longitudinal rectangular metal pipe (1311) and horizontal rectangular metal pipe (1312), longitudinal rectangle gold Category pipe (1311) and horizontal rectangular metal pipe (1312) are connected to each other and form the construction of groined type.
9. the built-up pallet according to claim 1 with two-way shovel arm chamber, it is characterised in that described reinforcement bracket Metal reinforcing frame (211) is made up of the first metal tube (2111) and the second metal tube (2112), first, second metal tube (2111,2112) keep parallel in length direction each other, and first metal tube (2111) and the second metal tube (2112) Shape of cross section it is square.
CN201610898417.3A 2016-10-14 2016-10-14 Built-up pallet with two-way shovel arm chamber Active CN106275726B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610898417.3A CN106275726B (en) 2016-10-14 2016-10-14 Built-up pallet with two-way shovel arm chamber

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610898417.3A CN106275726B (en) 2016-10-14 2016-10-14 Built-up pallet with two-way shovel arm chamber

Publications (2)

Publication Number Publication Date
CN106275726A CN106275726A (en) 2017-01-04
CN106275726B true CN106275726B (en) 2017-11-17

Family

ID=57717388

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610898417.3A Active CN106275726B (en) 2016-10-14 2016-10-14 Built-up pallet with two-way shovel arm chamber

Country Status (1)

Country Link
CN (1) CN106275726B (en)

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3277847A (en) * 1965-09-09 1966-10-11 Jensen Christian Lightweight compact versatile pallet
US8141500B2 (en) * 2007-03-30 2012-03-27 Chep Technology Pty Limited Plastic pallet with sleeved reinforcing rods and associated method for making the same
CN201923401U (en) * 2011-01-24 2011-08-10 上海派瑞特塑业有限公司 Latticed plastic pallet applying enhancement technology
CN203419349U (en) * 2013-07-18 2014-02-05 路凯包装设备租赁(上海)有限公司 Plastic pallet with detachable piers capable of being assembled
CN105253423A (en) * 2015-10-22 2016-01-20 苏州同大机械有限公司 Tray with shovel arm cavities in two directions
CN206107821U (en) * 2016-10-14 2017-04-19 苏州同大机械有限公司 Modular trays with two -way shovel arm chamber

Also Published As

Publication number Publication date
CN106275726A (en) 2017-01-04

Similar Documents

Publication Publication Date Title
CN104443799B (en) A kind of liquid-crystalline glasses packing case and packing method
CN208278566U (en) A kind of EPS packing case for inner guard board of automobile door
CN106428904B (en) Two-way shovel arm chamber assembly type pallet
US20160107828A1 (en) A box for carrying the liquid crystal display panel
CN206107821U (en) Modular trays with two -way shovel arm chamber
CN106275726B (en) Built-up pallet with two-way shovel arm chamber
CN206068396U (en) Two-way shovel arm chamber assembled pallet
CN104563333A (en) Exterior steel plate and in-fill concrete combined shear wall
CN206013446U (en) Multi-functional shock-proof packing cratess
CN206068398U (en) Two-way shovel arm chamber pallet
CN202214991U (en) Arm of arm support of concrete pump vehicle as well as corresponding arm support and concrete pump vehicle
CN108528919A (en) The selectable Modular assembled pallet of cargo branch mode
CN105253423A (en) Tray with shovel arm cavities in two directions
CN202863913U (en) Tray
Teke et al. Topology optimization and fatigue analysis of a lifting hook
CN202670379U (en) Support for loading and transportation of mineral water barrel
CN103552737B (en) Pallet with improved structure
CN206068389U (en) Pallet
CN103625731A (en) Damping tray
CN205366653U (en) Tray formula container
CN206654406U (en) A kind of reinforcement type container
CN208531070U (en) A kind of value preserving express box based on environment-friendly materials
CN102887264A (en) Tray
CN208199144U (en) The selectable Modular assembled pallet of cargo branch mode
CN205366633U (en) Packaging structure of tradition corrugated box heavy -duty machine car

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 215614 No.8, Fenghuang Avenue, Fenghuang Town, Zhangjiagang City, Suzhou City, Jiangsu Province

Patentee after: Suzhou Tongda Machinery Co.,Ltd.

Country or region after: China

Address before: 215614 No.8, Fenghuang Avenue, Fenghuang Town, Zhangjiagang City, Suzhou City, Jiangsu Province

Patentee before: SUZHOU TONGDA MACHINERY Co.,Ltd.

Country or region before: China