CN205444007U - Isolation pier - Google Patents
Isolation pier Download PDFInfo
- Publication number
- CN205444007U CN205444007U CN201521098733.XU CN201521098733U CN205444007U CN 205444007 U CN205444007 U CN 205444007U CN 201521098733 U CN201521098733 U CN 201521098733U CN 205444007 U CN205444007 U CN 205444007U
- Authority
- CN
- China
- Prior art keywords
- pier
- stiffener
- base
- connecting portion
- dun
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The utility model discloses an isolation pier, its technical scheme main points are the mound body is including pier shaft and pier base, a pier shaft and pier base body coupling, be equipped with first cavity in the pier shaft, be equipped with the second cavity in the pier base, first cavity and second cavity communicate each other, the pier shaft includes dun bi and dunding, a dun bi and mound top body coupling, the dunbi that tells of institute and the dunding department of being connected are equipped with first enhancement, first enhancement strip is the arc surface with the dun ding department of being connected, the arc surface includes first connecting portion, second connecting portion and rib, the rib is arranged in between first connecting portion and the second connecting portion, the rib is circular -arc, first connecting portion, rib and second connecting portion connect gradually, the utility model aims to provide an isolation pier that intensity is high, stability good and move easily.
Description
Technical field
This utility model relates to a kind of means of transportation technical field, more specifically, it relates to a kind of hard shoulder.
Background technology
Described hard shoulder is for road isolation or the product of warning, during using, vehicle accidental impact easily occurs, cause damaging, and during using, easily go out to turn now to situation appearance, and move and more bother during using, and need to be sequentially connected by hard shoulder just to play buffer action during using.
Utility model content
The deficiency existed for prior art, the purpose of this utility model is to provide that a kind of intensity is high, good stability and easily move hard shoulder.
For achieving the above object, this utility model provides following technical scheme: a kind of hard shoulder, including pier body, described pier body includes pier shaft and pier base, described pier shaft and pier base one connect, the first cavity it is provided with in described pier shaft, the second cavity it is provided with in described pier base, the first described cavity and the second cavity are interconnected, described pier shaft includes Dun Bi and pier top, described Dun Bi and pier top one connect, told Dun Bi and pier top connection are provided with the first stiffener, described first stiffener and pier top connection are arc surface, described arc surface includes the first connecting portion, second connecting portion and rib, described rib is placed between the first connecting portion and the second connecting portion, described rib is arc-shaped, described first connecting portion, rib and the second connecting portion are sequentially connected with.
nullBy using technique scheme,Pier body includes pier shaft and pier base,Described pier shaft and pier base one connect,The first cavity it is provided with in described pier shaft,The second cavity it is provided with in described pier base,The first described cavity and the second cavity are interconnected,Arranged by internal cavities,Weight can be alleviated be easy to move,And pier shaft includes Dun Bi and pier top,Described Dun Bi and pier top one connect,Told Dun Bi and pier top connection are provided with the first stiffener,Setting by the first reinforcement,The bonding strength of Dun Bi and pier top can be improved,Described first stiffener and pier top connection are arc surface,Described arc surface includes the first connecting portion、Second connecting portion and rib,Described rib is placed between the first connecting portion and the second connecting portion,Described rib is arc-shaped,Described first connecting portion、Rib and the second connecting portion are sequentially connected with,And the rib of centre it is attached by the first connecting portion on arc surface and the second connecting portion,It is attached by the first connecting portion and the second connecting portion both sides,Rib is made preferably to strengthen the connection of Dun Bi and pier top,Further ensure that the intensity of connection.
This utility model is further arranged to: described Dun Bi is provided with the second stiffener being connected with pier base, and described second stiffener is perpendicular with pier base, and described second stiffener is connected with pier base one, and described second stiffener is connected with Dun Bi one.
By using technique scheme; the second stiffener being connected with pier base it is provided with by Dun Bi; described second stiffener is perpendicular with pier base; described second stiffener is connected with pier base one; described second stiffener is connected with Dun Bi one, first passes through the second stiffener and is connected with pier base one and is connected with Dun Bi one so that Dun Bi and pier base connect into be protected by the second stiffener; so that the bonding strength of junction strengthens, so that bulk strength improves further.
This utility model is further arranged to: be additionally provided with the 3rd stiffener being placed between the first stiffener and the second stiffener on described Dun Bi, and described 3rd stiffener quantity is at least 3 articles.
By using technique scheme, by being additionally provided with the 3rd stiffener being placed between the first stiffener and the second stiffener on Dun Bi, described 3rd stiffener quantity is at least 3 articles, carries out further strengthening intensity on Dun Bi by three article of the 3rd reinforcement so that bulk strength further improves.
This utility model is further arranged to: be provided with the first warning strip between described two the 3rd stiffeners.
By using technique scheme, between two the 3rd stiffeners, it is provided with the first warning strip, it is possible to play the effect of warning, it is to avoid in vehicle collision to product, thus reduce probability of damage, preferably protects Dun Bi and pier base.
This utility model is further arranged to: be provided with the second warning strip between described 3rd stiffener and the first stiffener.
By using technique scheme, between two the 3rd stiffeners and the first stiffener, it is provided with the second warning strip, it is possible to play the effect of warning, it is to avoid in vehicle collision to product, thus reduce probability of damage, preferably protects Dun Bi and pier base.
This utility model is further arranged to: the outer wall of described pier base is provided with the 4th stiffener.
By using technique scheme, it is provided with the 4th stiffener by the outer wall of pier base, improves the intensity of pier base, thus ensure the intensity of bottom.
This utility model is further arranged to: be communicated with the through hole of the first cavity on the end face of described pier base and pier wall contact jaw, and described through hole is provided with sealing lid.
By using technique scheme, by being communicated with the through hole of the first cavity on the pier base end face with pier wall contact jaw, described through hole is provided with sealing lid, it is simple to be filled with water or sand in the inside of pier base, it is simple to improve the stability when of laying.
This utility model is further arranged to: be provided with support seat bottom described pier base, and described support seat includes the spike supporting on base and fixed supporting seat being connected with pier base one, and described spike is 1/4 round shape.
By using technique scheme, support seat it is provided with bottom described pier base, described support seat includes the spike supporting on base and fixed supporting seat being connected with pier base one, by supporting the setting of seat, reduce overall center of gravity, improve stability, and described spike is 1/4 round shape, it is that 1/4 round shape can play good supporting role in bottom by a spike, ensure stability, and arranged by the shape of 1/4 circle, improve the intensity of a spike, thus ensure bulk strength, thus further increase bulk strength.
This utility model is further arranged to: the outer wall that described pier base is connected end with support base is provided with the 5th stiffener.
By using technique scheme, is connected on the outer wall of end at pier base is provided with the 5th stiffener with supporting base, the intensity of further raising pier base, it is ensured that bulk strength.
Accompanying drawing explanation
Fig. 1 is the structural representation of this utility model embodiment.
Fig. 2 is the first stiffener structural representation of this utility model embodiment.
Reference in figure: 101, pier base;102, the 4th stiffener;103, the 5th stiffener;104, base is supported;105, spike is propped up;201, pier shaft;202, Dun Bi;203, pier top;301, the first stiffener;302, the second stiffener;303, the 3rd stiffener;304, arc surface;3041, the first connecting portion;3042, the second connecting portion;3043, rib;401, the first warning strip;402, the second warning strip;501, lid is sealed;601, the first cavity;701, the second cavity.
Detailed description of the invention
Referring to figs. 1 through Fig. 2, this utility model embodiment is described further.
nullA kind of hard shoulder,Including pier body,Described pier body includes pier shaft 201 and pier base 101,Described pier shaft 201 and pier base 101 one connect,The first cavity 601 it is provided with in described pier shaft 201,The second cavity 701 it is provided with in described pier base 101,The first described cavity 601 and the second cavity 701 are interconnected,Described pier shaft 201 includes pier wall 202 and pier top 203,Described pier wall 202 and pier top 203 one connect,Told pier wall 202 and pier top 203 connection are provided with the first stiffener 301,Described first stiffener 301 is arc surface 304 with pier top 203 connection,Described arc surface 304 includes the first connecting portion 3041、Second connecting portion 3042 and rib 3043,Described rib 3043 is placed between the first connecting portion 3041 and the second connecting portion 3042,Described rib 3043 is arc-shaped,Described first connecting portion 3041、Rib 3043 and the second connecting portion 3042 are sequentially connected with.
nullBy using technique scheme,Pier body includes pier shaft 201 and pier base 101,Described pier shaft 201 and pier base 101 one connect,The first cavity 601 it is provided with in described pier shaft 201,The second cavity 701 it is provided with in described pier base 101,The first described cavity 601 and the second cavity 701 are interconnected,Arranged by internal cavities,Weight can be alleviated be easy to move,And pier shaft 201 includes pier wall 202 and pier top 203,Described pier wall 202 and pier top 203 one connect,Told pier wall 202 and pier top 203 connection are provided with the first stiffener 301,Setting by the first reinforcement,The bonding strength of pier wall 202 and pier top 203 can be improved,Described first stiffener 301 is arc surface 304 with pier top 203 connection,Described arc surface 304 includes the first connecting portion 3041、Second connecting portion 3042 and rib 3043,Described rib 3043 is placed between the first connecting portion 3041 and the second connecting portion 3042,Described rib 3043 is arc-shaped,Described first connecting portion 3041、Rib 3043 and the second connecting portion 3042 are sequentially connected with,And the rib 3043 of centre it is attached by the first connecting portion 3041 on arc surface 304 and the second connecting portion 3042,It is attached by the first connecting portion 3041 and the second connecting portion 3042 both sides,Rib 3043 is made preferably to strengthen pier wall 202 and the connection of pier top 203,Further ensure that the intensity of connection.
This utility model is further arranged to: described pier wall 202 is provided with the second stiffener 302 being connected with pier base 101, described second stiffener 302 is perpendicular with pier base 101, described second stiffener 302 is connected with pier base 101 one, and described second stiffener 302 is connected with pier wall 202 one.
By using technique scheme; the second stiffener 302 being connected with pier base 101 it is provided with by pier wall 202; described second stiffener 302 is perpendicular with pier base 101; described second stiffener 302 is connected with pier base 101 one; described second stiffener 302 is connected with pier wall 202 one; first pass through the second stiffener 302 be connected with pier base 101 one and be connected with pier wall 202 one; pier wall 202 and pier base 101 are connected into protected by the second stiffener 302; so that the bonding strength of junction strengthens, so that bulk strength improves further.
This utility model is further arranged to: be additionally provided with the 3rd stiffener 303 being placed between the first stiffener 301 and the second stiffener 302 on described pier wall 202, and described 3rd stiffener 303 quantity is at least 3 articles.
By using technique scheme, by being additionally provided with the 3rd stiffener 303 being placed between the first stiffener 301 and the second stiffener 302 on pier wall 202, described 3rd stiffener 303 quantity is at least 3 articles, carry out further strengthening intensity on pier wall 202 by three article of the 3rd reinforcement so that bulk strength further improves.
This utility model is further arranged to: be provided with the first warning strip 401 between described two the 3rd stiffeners 303.
By using technique scheme, between two the 3rd stiffeners 303, it is provided with the first warning strip 401, it is possible to play the effect of warning, it is to avoid in vehicle collision to product, thus reduce probability of damage, preferably protects pier wall 202 and pier base 101.
This utility model is further arranged to: be provided with the second warning strip 402 between described 3rd stiffener 303 and the first stiffener 301.
By using technique scheme; it is provided with the second warning strip 402, it is possible to play the effect of warning, it is to avoid in vehicle collision to product between two the 3rd stiffeners 303 and the first stiffener 301; thus reduce probability of damage, preferably protect pier wall 202 and pier base 101.
This utility model is further arranged to: the outer wall of described pier base 101 is provided with the 4th stiffener 102.
By using technique scheme, it is provided with the 4th stiffener 102 by the outer wall of pier base 101, improves the intensity of pier base 101, thus ensure the intensity of bottom.
This utility model is further arranged to: be communicated with the through hole of the first cavity 601 on the end face of described pier base 101 and pier wall 202 contact jaw, and described through hole is provided with sealing lid 501.
By using technique scheme, by being communicated with the through hole of the first cavity 601 on the pier base 101 end face with pier wall 202 contact jaw, described through hole is provided with sealing lid 501, it is simple to be filled with water or sand in the inside of pier base 101, it is simple to improve the stability when of laying.
This utility model is further arranged to: be provided with support seat bottom described pier base 101, and described support seat includes the spike 105 supporting on base 104 and fixed supporting seat being connected with pier base 101 one, and described spike 105 is 1/4 round shape.
By using technique scheme, it is provided with support seat bottom described pier base 101, described support seat includes the spike 105 supporting on base 104 and fixed supporting seat being connected with pier base 101 one, by supporting the setting of seat, reduce overall center of gravity, improve stability, and described spike 105 is 1/4 round shape, it is that 1/4 round shape can play good supporting role in bottom by a spike 105, ensure stability, and arranged by the shape of 1/4 circle, improve the intensity of a spike 105, thus ensure bulk strength, thus further increase bulk strength.
This utility model is further arranged to: the outer wall that described pier base 101 is connected end with support base 104 is provided with the 5th stiffener 103.
By using technique scheme, it is connected on the outer wall of end at pier base 101 is provided with the 5th stiffener 103 with supporting base 104, further the intensity of raising pier base 101, it is ensured that bulk strength.
The foregoing is only preferred embodiment of the present utility model, not in order to limit this utility model, those skilled in the art carries out common variations and alternatives in the range of technical solutions of the utility model and should be included in protection domain of the present utility model.
Claims (9)
1. a hard shoulder, including pier body, it is characterized in that: described pier body includes pier shaft and pier base, described pier shaft and pier base one connect, the first cavity it is provided with in described pier shaft, the second cavity it is provided with in described pier base, the first described cavity and the second cavity are interconnected, described pier shaft includes Dun Bi and pier top, described Dun Bi and pier top one connect, told Dun Bi and pier top connection are provided with the first stiffener, described first stiffener and pier top connection are arc surface, described arc surface includes the first connecting portion, second connecting portion and rib, described rib is placed between the first connecting portion and the second connecting portion, described rib is arc-shaped, described first connecting portion, rib and the second connecting portion are sequentially connected with.
A kind of hard shoulder the most according to claim 1, it is characterized in that: described Dun Bi is provided with the second stiffener being connected with pier base, described second stiffener is perpendicular with pier base, and described second stiffener is connected with pier base one, and described second stiffener is connected with Dun Bi one.
A kind of hard shoulder the most according to claim 2, is characterized in that: be additionally provided with the 3rd stiffener being placed between the first stiffener and the second stiffener on described Dun Bi, described 3rd stiffener quantity is at least 3 articles.
A kind of hard shoulder the most according to claim 3, is characterized in that: be provided with the first warning strip between described two the 3rd stiffeners.
A kind of hard shoulder the most according to claim 4, is characterized in that: be provided with the second warning strip between described 3rd stiffener and the first stiffener.
A kind of hard shoulder the most according to claim 5, is characterized in that: the outer wall of described pier base is provided with the 4th stiffener.
A kind of hard shoulder the most according to claim 6, is characterized in that: be communicated with the through hole of the first cavity on the end face of described pier base and pier wall contact jaw, described through hole is provided with sealing lid.
A kind of hard shoulder the most according to claim 7, is characterized in that: be provided with support seat bottom described pier base, and described support seat includes the spike supporting on base and fixed supporting seat being connected with pier base one, and described spike is 1/4 round shape.
A kind of hard shoulder the most according to claim 8, is characterized in that: the outer wall that described pier base is connected end with support base is provided with the 5th stiffener.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201521098733.XU CN205444007U (en) | 2015-12-24 | 2015-12-24 | Isolation pier |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201521098733.XU CN205444007U (en) | 2015-12-24 | 2015-12-24 | Isolation pier |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205444007U true CN205444007U (en) | 2016-08-10 |
Family
ID=56578247
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201521098733.XU Expired - Fee Related CN205444007U (en) | 2015-12-24 | 2015-12-24 | Isolation pier |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205444007U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107653796A (en) * | 2017-09-21 | 2018-02-02 | 马根昌 | Magnetic induction Road isolating pillar |
-
2015
- 2015-12-24 CN CN201521098733.XU patent/CN205444007U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107653796A (en) * | 2017-09-21 | 2018-02-02 | 马根昌 | Magnetic induction Road isolating pillar |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204264210U (en) | A kind of logistics trolley being convenient to handling goods | |
CN204642650U (en) | A kind of protction vibration-resistant package box | |
CN103662246A (en) | Antiskid metal bucket | |
CN205444007U (en) | Isolation pier | |
CN206318245U (en) | New-type logistics container | |
CN206265109U (en) | A kind of thermos bottle arm-tie car | |
CN205366371U (en) | Novel glue bucket | |
CN204284914U (en) | A kind of gas cylinder | |
CN108545102A (en) | A kind of dumper convenient for blanking | |
CN206395098U (en) | A kind of transport package box of new structure | |
CN204691369U (en) | Underground, subway station earthquake resistant structure | |
CN204473332U (en) | A kind of Intelligent bracelet packing box | |
CN204250622U (en) | A kind of bubble bags that effectively can reduce transport and take up room | |
CN208698807U (en) | A kind of mining industry raw material trolley | |
CN207900187U (en) | A kind of dismountable light body structure sandbox | |
CN202608470U (en) | Solid tire with high heat diffusivity | |
CN206645154U (en) | A kind of edible oil bottle | |
CN206704727U (en) | A kind of wine box | |
CN205076764U (en) | Portable goods shovel that turns over of improved generation | |
CN205802070U (en) | Aluminum slag cargo compartment | |
CN204399838U (en) | A kind of container crashproof glue and a kind of container | |
CN204355485U (en) | A kind of express delivery gas flushing pouch | |
CN205918819U (en) | Novel lining sleeve | |
CN211224700U (en) | Packing pad of plastic product | |
CN202156438U (en) | Cart |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CP03 | Change of name, title or address |
Address after: 317100 No. 110 Fangyang Yonglin Road, Zhulan Town, Sanmen County, Zhejiang Province Patentee after: Zhejiang Dingtian Transportation Facilities Co., Ltd. Address before: 317101 No. 110 Fangyang Yonglin Road, Zhulan Town, Sanmen County, Taizhou City, Zhejiang Province Patentee before: ZHEJIANG DINGTIAN TRAFFIC FACILITIES CO., LTD. |
|
CP03 | Change of name, title or address | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160810 Termination date: 20201224 |
|
CF01 | Termination of patent right due to non-payment of annual fee |