CN206091288U - Concrete post -cast strip is propped up and is established device - Google Patents

Concrete post -cast strip is propped up and is established device Download PDF

Info

Publication number
CN206091288U
CN206091288U CN201621140588.1U CN201621140588U CN206091288U CN 206091288 U CN206091288 U CN 206091288U CN 201621140588 U CN201621140588 U CN 201621140588U CN 206091288 U CN206091288 U CN 206091288U
Authority
CN
China
Prior art keywords
concrete body
cast strip
concrete
concrete structure
post
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621140588.1U
Other languages
Chinese (zh)
Inventor
朱林
吴顺利
朱峰
廖湘红
王征
李�杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan No4 Engineering Corp Co Ltd
Original Assignee
Hunan No4 Engineering Corp Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan No4 Engineering Corp Co Ltd filed Critical Hunan No4 Engineering Corp Co Ltd
Priority to CN201621140588.1U priority Critical patent/CN206091288U/en
Application granted granted Critical
Publication of CN206091288U publication Critical patent/CN206091288U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The utility model discloses a concrete post -cast strip is propped up and is established device. Concrete post -cast strip is propped up and is established device is including fixing the steel sheet net at the concrete structure body and the 2nd concrete structure end of body respectively, form post -cast strip casting area between the concrete structure body and the 2nd concrete structure body, be equipped with many ejector pins between the tip of the concrete structure body and the tip of the 2nd concrete structure body, the tight top of one end of every ejector pin is in the tip department that a concrete structure personally experienced sth. Part of the body, and the tight top of the other end of this ejector pin is in the tip department of the 2nd concrete structure body, the tip of the concrete structure body and the equal pre -buried at least waterstop that has of the tip of the 2nd concrete structure body, the at least part of this waterstop stretches into post -cast strip casting area, link to each other through an at least pull rod is fixed between two adjacent ejector pins. The utility model discloses the size of having guaranteed waterstop position and concrete post -cast strip is accurate, and bulging die, indeformable not.

Description

A kind of late poured band installs device
Technical field
The utility model is related to a kind of late poured band and installs device, belongs to installing for architectural engineering late poured band Apparatus field.
Background technology
When high-rise building design has annex, due to the load and stiffness difference of main building and annex it is larger, it will usually cause base Plinth internal force and Foundation pressure are changed greatly, and excessive differential settlement occurs so as to cause basis.This relative settlement will cause Larger shearing and moment of flexure, are likely to result under certain condition the even more big destruction of the cracking leak of base plate.
In order to solve the problems, such as settlement difference, movement joint or pouring after settlement are set generally between main building and annex.Typically For, post-cast strip is referred in cast-in-place integral reinforced concrete structure, the provisional band shape seam only retained in construction period, is risen To the effect of digestion sedimentation contraction distortion, according to requirement of engineering, after retaining certain hour, then become company with concreting is closely knit Continue overall structure.
First, the setting of post-cast strip will increase construction workload, and higher requirement is it is also proposed to construction technology.Due to rear Pour belt construction and be related to secondary operation, not only actually increase the complexity of construction technology, and influence whether to construct into Degree, increase construction cost expense.
Secondly, with the fast development of national economy, building site an inch of land is an inch of gold, skyscraper is more and more more, and high level is built During building foundation pit construction, in order to avoid Sand phenomenon during excavation of foundation pit, precipitation will be carried out, but thus be caused peripherally Lower water level reduces causing adjacent building cracking, subsidence phenomenon to happen occasionally, and stops precipitation in advance and drop to a great extent The probability that low above-mentioned accident occurs.
The problems such as deforming to solve the relative settlement between main structure body and podium, structure both shrinks deformation and temperature stress, The mode of indwelling post-cast strip is used widely in architectural engineering.
At present, the device that installs of conventional architectural engineering late poured band mainly has plank sheathing formwork erection device, general Logical expanded metal lath installs two kinds of device, and both modes deposit respective technological deficiency:
1)Plank sheathing installs device, is installed using plank, flitch steel pipe, inconvenient operation, high material consumption, and precision owes standard Really, work consuming is time-consuming during form removal.
2)It is to install absolute altitude, position with reinforcing bar, expanded metal lath, steel pipe to be difficult to control to that ordinary steel expanded metals installs device, is especially existed Mass defect is easily caused with post-cast strip steel plate water-stopping strip junction.
Chinese patent application CN201510032618.0 discloses a kind of post-cast strip exterior wall closure knot with elastic waterstop bar Structure.It includes outer wall of basement, post-cast strip, wall outer side face, prefabricated cover plate;Described outer wall of basement, post-cast strip outside set There is prefabricated cover plate, between outer wall of basement and prefabricated cover plate rubber fastening band is provided with;Horizontal steel is provided with inside described post-cast strip Muscle, longitudinal reinforcement;Described preform lid intralamellar part sets cover plate embedded bar;Described outer wall of basement is with prefabricated cover plate by solid Determine pull bar connection, and wall outer side face is bonding using waterproof mortar with prefabricated cover plate connection end portion.The patent easy construction, work Low intensity, high working efficiency, and blocking-proof result is notable, impervious waterproof ability is strong.But patent position in construction is still difficult To control, especially mass defect is still being easily caused with post-cast strip steel plate water-stopping strip junction.
Utility model content
The utility model aims to provide a kind of late poured band and installs device, and this installs device and can ensure that waterstop position Put and late poured band size accurately, it is and not swollen mould, indeformable.
To achieve these goals, the technical scheme that the utility model is adopted is:
A kind of late poured band installs device, including be separately fixed at the first concrete body and the second concrete knot The expanded metals in structure body end portion;Post-cast strip casting area is formed between first concrete body and the second concrete body; It is structurally characterized in that, many tops are provided between the end of first concrete body and the end of the second concrete body Bar, one end of every push rod is pressed closer in the end of the first concrete body, and the other end of the push rod is pressed closer in the second coagulation The end of soil structured body;The end of first concrete body and the end of the second concrete body be embedded with to A few waterstop, the waterstop is extending at least partially into the post-cast strip casting area;By extremely between adjacent two push rods A few pull bar is fixedly linked.
Thus, expanded metals is fixed by push rod, then is strained and fixed connected two push rods with pull bar, thus, expanded metals, waterstop with Concrete body pours integral, does not remove, it is ensured that the size of waterstop position and late poured band is accurate.
According to embodiment of the present utility model, further optimization can also be made to the utility model, below for optimization after The technical scheme of formation:
Region is installed in order to increase, the end of the push rod and first concrete body or the second xoncrete structure It is connected by bracketing between body.
Preferably, the waterstop is arranged between adjacent two bracketings.Thus, bracketing is clamped only under the pulling force of pull bar Water band, it is ensured that the size of waterstop position and late poured band is accurate.
Preferably, two are provided between the end of first concrete body and the end of the second concrete body Push rod.
Preferably, it is fixedly linked by two pull bars between adjacent two push rods.
Push rod length is adjusted for convenience, various sizes of post-cast strip is adapted to, and the push rod is length-adjustable adjustable Push rod bolt.
Preferably, the pull bar is length-adjustable stay-bolt.
Preferably, the waterstop is steel plate water stopper.
For raising bonding strength, by pouring between first concrete body and the second concrete body Build and be connected in the post-cast strip of post-cast strip casting area.Thus, expanded metals, waterstop and concrete body pour it is integral, Do not remove.
By said structure, expanded metals of the present utility model, steel plate water stopper are not removed after installing, with concreting one Rise.Bracketing is held out against with adjustable ejector rod screw rod and fix expanded metals, prevent casting and compacting of concrete effect from making expanded metals distending.Drawn with stay-bolt Tight upper and lower two layers of adjustable ejector rod bolt, clamps steel plate water stopper, it is ensured that steel plate water stopper position and late poured band Size is accurately, not swollen mould, indeformable.
Compared with prior art, the beneficial effects of the utility model are:The utility model guarantee steel plate water stopper position and The size of post-cast strip accurately, has the advantages that not swollen mould, indeformable, easy to operate, low cost, safe and reliable, effect are good.
Description of the drawings
Fig. 1 is the structure principle chart of the utility model one embodiment.
In figure
1- expanded metals;2- push rods;3- bracketings;4- pull bars;5- waterstops;The concrete bodies of 6- first;The concrete of 7- second Structure.
Specific embodiment
Below with reference to accompanying drawing and in conjunction with the embodiments describing the utility model in detail.It should be noted that not conflicting In the case of, the feature in embodiment and embodiment in the utility model can be mutually combined.For sake of convenience, hereinafter such as Occur " on ", D score, "left", "right" printed words, only represent it is consistent with the upper and lower, left and right direction of accompanying drawing itself, not to structure Play restriction effect.
A kind of late poured band installs device, as shown in figure 1, including expanded metals 1(Preferably expanded metal lath), push rod 2(It is preferred that For adjustable ejector rod bolt), bracketing 3, pull bar 4, steel plate water stopper 5.Wherein expanded metals 1 is separately fixed at the first concrete body 6 and the end of the second concrete body 7, pour after being formed between the concrete body 7 of first concrete body 6 and second Band casting area;Two tops are provided between the end of the end of first concrete body 6 and the second concrete body 7 Bar 2, one end of every push rod 2 is pressed closer in the end of the first concrete body 6 by a bracketing 3, the push rod 2 it is another End is pressed closer in the end of the second concrete body 7 by another bracketing 3;The end of first concrete body 6 A steel plate water stopper 5 is embedded with the end of the second concrete body 7, the part of the steel plate water stopper 5 is stretched into described Post-cast strip casting area;It is fixedly linked by two pull bars 4 between adjacent two push rods 2.
The course of work of the present utility model is as follows:First concrete body 6 and the second concrete body 7 are installed first The expanded metal lath of end lower, then installs one group of adjustable ejector rod bolt and bracketing, and by adjusting push rod bolt bracketing is held out against, and makes Steel plate water stopper 5 accurately, is finally installed in the expanded metal lath position of the first concrete body 6 and the second concrete body 7, checks Adjustment position, it is accurately rear fixed.
The expanded metal lath of the first concrete body 6 and the end upper of the second concrete body 7 is installed, is then installed another Layer adjustable ejector rod bolt and bracketing, by adjusting upper strata push rod bolt bracketing is held out against, and makes top expanded metal lath position accurate;Finally To be strained and fixed after upper and lower two groups of push rods bolt stay-bolt tightening nuts.
The content that above-described embodiment is illustrated should be understood to that these embodiments are only used for being illustrated more clearly that the utility model, Rather than scope of the present utility model is limited, after the utility model has been read, those skilled in the art are new to this practicality The modification of the various equivalent form of values of type each falls within the application claims limited range.

Claims (9)

1. a kind of late poured band installs device, including being separately fixed at the first concrete body(6)With the second concrete Structure(7)The expanded metals of end(1);First concrete body(6)With the second concrete body(7)Between formed after Pour band casting area;Characterized in that, first concrete body(6)End and the second concrete body(7)'s Many push rods are provided between end(2), every push rod(2)One end press closer in the first concrete body(6)End, should Push rod(2)The other end press closer in the second concrete body(7)End;First concrete body(6)End Portion and the second concrete body(7)End be embedded with least one waterstop(5), the waterstop(5)It is at least part of Stretch into the post-cast strip casting area;Adjacent two push rods(2)Between pass through at least one pull bar(4)It is fixedly linked.
2. late poured band according to claim 1 installs device, it is characterised in that the push rod(2)End with First concrete body(6)Or second concrete body(7)Between pass through bracketing(3)It is connected.
3. late poured band according to claim 2 installs device, it is characterised in that the waterstop(5)It is arranged on Adjacent two bracketings(3)Between.
4. late poured band according to claim 1 installs device, it is characterised in that first concrete body (6)End and the second concrete body(7)End between be provided with two push rods(2).
5. late poured band according to claim 1 installs device, it is characterised in that adjacent two push rods(2)Between By two pull bars(4)It is fixedly linked.
6. the late poured band according to one of claim 1-5 installs device, it is characterised in that the push rod(2)For Length-adjustable adjustable ejector rod bolt.
7. the late poured band according to one of claim 1-5 installs device, it is characterised in that the pull bar(4)For Length-adjustable stay-bolt.
8. the late poured band according to one of claim 1-5 installs device, it is characterised in that the waterstop(5) For steel plate water stopper.
9. the late poured band according to one of claim 1-5 installs device, it is characterised in that first concrete Structure(6)With the second concrete body(7)Between be connected by being cast in the post-cast strip of post-cast strip casting area.
CN201621140588.1U 2016-10-20 2016-10-20 Concrete post -cast strip is propped up and is established device Active CN206091288U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621140588.1U CN206091288U (en) 2016-10-20 2016-10-20 Concrete post -cast strip is propped up and is established device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621140588.1U CN206091288U (en) 2016-10-20 2016-10-20 Concrete post -cast strip is propped up and is established device

Publications (1)

Publication Number Publication Date
CN206091288U true CN206091288U (en) 2017-04-12

Family

ID=59975858

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621140588.1U Active CN206091288U (en) 2016-10-20 2016-10-20 Concrete post -cast strip is propped up and is established device

Country Status (1)

Country Link
CN (1) CN206091288U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111188355A (en) * 2019-12-31 2020-05-22 湖北省路桥集团有限公司 Super-gravity type anchorage shallow-buried foundation and construction method
CN111593885A (en) * 2019-02-20 2020-08-28 广西华业建筑工程有限公司 Plug-in type composite post-cast strip side mold and construction method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111593885A (en) * 2019-02-20 2020-08-28 广西华业建筑工程有限公司 Plug-in type composite post-cast strip side mold and construction method
CN111188355A (en) * 2019-12-31 2020-05-22 湖北省路桥集团有限公司 Super-gravity type anchorage shallow-buried foundation and construction method
CN111188355B (en) * 2019-12-31 2021-08-20 湖北省路桥集团有限公司 Super-gravity type anchorage shallow-buried foundation and construction method

Similar Documents

Publication Publication Date Title
CN208473116U (en) A kind of partial precast assembly steel reinforced concrete holes in soffit beam
CN102383418A (en) Anti-seismic prefabricated concrete solid square pile and production method thereof
CN206091288U (en) Concrete post -cast strip is propped up and is established device
WO2020244268A1 (en) Variable cross-section pipe gallery structure suitable for rapid construction and construction method therefor
CN205501843U (en) Consolidate rigid framed arch bridge
CN205077525U (en) Basement waterproof concrete bottom plate post -cast strip is with novel waterstop structure
CN104594389A (en) Post-cast strip external wall plugging structure with elastic water stoppers
CN206928323U (en) A kind of ring muscle fastens assembled pipe gallery
CN105442457A (en) Construction structure and method for extending bridge floor plate bridge filled with fine sand
CN112627034A (en) Synchronous construction method for turning over mold of high pier of bridge
CN106836559A (en) Reinforced concrete wall structure capable of preventing cracking and construction method thereof
CN216617534U (en) Tunnel concrete monolithic pouring support system
CN206529881U (en) The constructing device of cushion cap and ground girder construction
CN206957198U (en) Cast-in-situ template structure at a kind of sandwich exterior wall J-shaped wall of prefabricated concrete structure
CN206052565U (en) A kind of beam-column type bracket
CN113605247B (en) Flange type steel box arch springing consolidation structure and construction method
CN211250565U (en) Pouring die for beam
CN210459289U (en) Variable cross-section pipe gallery structure suitable for rapid construction
CN205382505U (en) Board -like concrete air cooling platform basis of rib is erected in area
CN110005429B (en) Box-type top plate structure of urban tunnel bifurcation
CN210439720U (en) Reinforced structure for increasing cross section of concrete beam side
CN210712964U (en) Bilateral-shaped basement shear wall post-cast strip plugging member
CN104908150B (en) A kind of piping shaft making template and the method based on factorial praluction piping shaft
CN210002441U (en) Box-type top plate structure for large-span urban tunnel
CN209854778U (en) Post-cast strip support-free structure