CN206091254U - Whole construction scaffold frame of track formula of climbing - Google Patents
Whole construction scaffold frame of track formula of climbing Download PDFInfo
- Publication number
- CN206091254U CN206091254U CN201620882443.2U CN201620882443U CN206091254U CN 206091254 U CN206091254 U CN 206091254U CN 201620882443 U CN201620882443 U CN 201620882443U CN 206091254 U CN206091254 U CN 206091254U
- Authority
- CN
- China
- Prior art keywords
- support
- support body
- rack
- backgear
- construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Movable Scaffolding (AREA)
Abstract
The utility model relates to the field of building -construction, specifically a whole construction scaffold frame of track formula of climbing. Including the support body, still include the rack support, the rack support passes through the bolt fastening on building wall, and the support body passes through fixed pulley and rack support sliding connection, is equipped with the motor support on the support body, is equipped with the motor on the motor support, is equipped with the rack complex drive gear with the rack support on the transmission shaft of motor. The utility model discloses along with the use of building subject construction direct mount, increase the hoist speed that scaffold put up, shorten construction cycle, improve production efficiency, support body overall stability is strong, has increased the working range of personnel's constructions, the convenience construction.
Description
Technical field
The utility model is related to the realm of building construction, specifically a kind of track climbing type monolithic architecture construction scaffolding.
Background technology
The mounting means of existing construction scaffolding is to start assembling after main building construction speed reaches index bed mostly
Support body, support body is lifted using electric hoist, is also movable Scaffold, only possesses operation platform function, and it is slow that electric hoist lifts speed
And it is unstable, increase the engineering time, extend man-hour, using some seats in the plane, somewhat expensive, produce and set up sufficiently complex, building site
Dismounting is difficult, and another kind of method is that I-steel is beaten in body of wall, and then scaffold tube is placed on I-steel front end as support,
Then scaffold is set up above, starting when the method is built can be synchronous with main body, more than three layers need to be built again after dismounting, secondary
Take a lot of work, increase cost, both the above method uses single function, without water supply capacity, scaffold frame nonintegrated structure, Gong Ren
Can not smoothly change between in each several part construction, inconvenience and potential safety hazard are caused in work progress.
Utility model content
The utility model aims to solve the problem that the problems referred to above, and use, energy are mounted directly with building body construction so as to provide one kind
Enough increase the strong track climbing type of support body lifting speed and workmen's working range, improve production efficiency, resistance to overturning whole
Body construction scaffold.
The utility model solves the problem, and the technical scheme of employing is:
A kind of track climbing type monolithic architecture construction scaffolding, including support body, also including rack support, rack support passes through
It is bolted on construction wall, support body is slidably connected by fixed block with rack support, support body is provided with electric machine support, electricity
Machine support is provided with motor, and the power transmission shaft of motor is provided with the travelling gear coordinated with the tooth bar of rack support.
Using the utility model of above-mentioned technical proposal, compared with prior art, it is the characteristics of its protrusion:
1. it is mounted directly with building body construction and uses, the mode that electric hoist in prior art is lifted is changed to be passed by tooth bar
Dynamic hoisting way, it is overall to increase the degree of stability for lifting speed and full building scaffold support body, shorten construction period, improve production
Efficiency, it is overall to be climbed one layer with the time of 5-10 minutes when building body high level needs scaffold, do not affect the construction period.
2. support body resistance to overturning is strong, increased the working range of personnel's construction, convenient construction.
Preferably, the utility model further technical scheme is:
Support body includes crossbeam, vertical beam, and crossbeam, vertical beam constitute frame structure, frame structure by connector and bolt connection
On be respectively equipped with bridging, top layer guardrail diagonal brace, top layer guardrail directly support, flat bed diagonal brace.
Crossbeam includes scaffold top guardrail cross beams, Horizontal load-bearing beam, flat bed load-bearing straight beam.
Support body is provided with the electrical control cabinet with electronic mechatronics, realizes that centralized Control motor drives support body lifting.
Each layer of workbench of support body is provided with fire water box, and support body is provided with and is placed in above each layer of workbench
Fire extinguisher canvas hose bracing frame, the fire extinguisher canvas hose bracing frame above each layer of workbench is provided with and disappearing that corresponding fire water box connects
Guard tube, the rescue once generation fire can put out a fire in time, greatly improves monolithic architecture safety coefficient.
Fixed block is arranged on support body, including the front back of the body for being respectively placed in rack support support beam front side, rear side and outside
Wheel, rear backgear and side backgear, support body is slided up and down by front backgear, rear backgear and side backgear on rack support, fixed block
Effect be to realize being slidably connected for support body and rack support.
Description of the drawings
Fig. 1 is the utility model embodiment main structure diagram;
Fig. 2 is the partial enlarged drawing of A in Fig. 1;
Fig. 3 is B-B cross-sectional views in Fig. 1;
Fig. 4 is the utility model embodiment side structure schematic view;
Fig. 5 is the partial enlarged drawing of B in Fig. 4;
In figure:Rack support 1;Tooth bar 2;Body of wall 3;Travelling gear 4;Motor 5;Electric machine support 6;Scaffold top guardrail is horizontal
Beam 7;Horizontal load-bearing beam 8;Flat bed load-bearing straight beam 9;Vertical beam 10;Bridging 11;Top layer guardrail diagonal brace 12;Top layer guardrail directly supports 13;
Flat bed diagonal brace 14;Fire water box 15;Electrical control cabinet 16;Front backgear 17;Backgear 18 afterwards;Side backgear 19;Fire extinguisher canvas hose 20;Disappear
Guard tube bracing frame 21;Support body 22.
Specific embodiment:
With reference to embodiment, the utility model is described in further detail, and purpose is only that and more fully understands the utility model
Content, therefore, the cited case is not intended to limit protection domain of the present utility model.
Referring to Fig. 1, Fig. 2, Fig. 3, Fig. 4, Fig. 5, rack support 1 is fixed on body of wall 3 by bolt by the bolt hole on body of wall 3
On, support body 22 is slidably connected by fixed block with rack support 1, and fixed block is arranged on support body 22, including being respectively placed in
The support beam of rack support 1 front side, the front backgear 17 in rear side and outside, rear backgear 18 and side backgear 19, support body 22 passes through front backgear
17th, rear backgear 18 and side backgear 19 are slided up and down on rack support 1, and the effect of fixed block is to realize support body 22 with tooth bar
Frame 1 is slidably connected, and motor 5 is bolted on electric machine support 6, electric machine support 6 is bolted on support body 22, electricity
The power transmission shaft of motivation 5 is provided with the travelling gear 4 coordinated with the tooth bar 2 of rack support 1, and support body 22 is horizontal by scaffold top guardrail
Beam 7, Horizontal load-bearing beam 8, flat bed load-bearing straight beam 9, vertical beam 10 and bridging 11, top layer guardrail diagonal brace 12, top layer guardrail are directly supportted
13rd, flat bed diagonal brace 14 passes through connector and is bolted together the frame structure of composition, after the completion of the holistic conformation of support body 22, often
Platform liner plate is covered on the Horizontal load-bearing beam 8 of layer, each layer of workbench of support body 22 is provided with fire water box 15, on support body 22
The fire extinguisher canvas hose bracing frame 21 being placed in above each layer of workbench is provided with, the fire extinguisher canvas hose above each layer of workbench is supported
Frame 21 is provided with the fire extinguisher canvas hose 20 with the connection of corresponding fire water box 15, the rescue once generation fire can put out a fire in time, greatly
Monolithic architecture safety coefficient is improved, support body 22 is provided with the electrical control cabinet 16 electrically connected with motor 5, realize centralized Control electricity
Motivation 5 drives support body 22 to lift.
Start to build this device while building body starts and builds, by the steel pipe of support body 22 and connecting rod using connection
Part is coupled together, and platform liner plate is laid on the horizontal support framework of 22 1 layers of overall support body, after the completion of building by directly supply
Workmen uses, while installing electrical control cabinet 16 and fire water box 15, one layer of owner's body to be built is built and completes to pull down outward
After boxing plate, the fixing hole of rack support is bored in the appropriate location of body of wall 3, rack support 1 is installed, while in overall support body 22 1
Electric machine support 6 and motor 5 are installed in layer top, and building main body starts to build after the second layer, also with the steel pipe of support body 22
The second layer of overall support body 22, the same ground floor of form of construction work are built with connecting rod, two layers of owner's body to be built is built and completes side mould and tear open
The fixing hole of rack support is bored after removing in the appropriate location of body of wall 3, rack support 1 is installed, building main body starts to build third layer
When start simultaneously at and build the third layer of support body 22, it is the same to build mode, afterwards with the increase of building main body construction height, support body 22
Driven by motor 5 and lifted, coordinate the increase of building main body construction height, after support body 22 is lifted, can be by
The rack support 1 that leaves unused below the working lining of support body 22 is removed from the body of wall 3 of building main body, and being installed to needs the upper strata for being lifted to build
Build on thing body of wall 3, after the completion of building main body construction, support body 22 can simultaneously decline with the carrying out of secondary construction, support body 22, together
When remove the rack support 1 on support body 22 working lining upper strata, attach it on the gravitating bed of support body 22, it is downward with secondary construction
Carry out, support body 22 also drops to completely ground, dismounting operation can be carried out to support body 22 after the completion of secondary construction.
This device is mounted directly with building body construction and uses, and increases the lifting speed of support body 22, increases on support body 22
Fire water box 15, can improve safety coefficient, and support body 22 is integral frame structure, increases the working range of personnel's construction, is conveniently applied
Work, it is to avoid I-steel is set on body of wall 3 and causes secondary construction, shorten construction period, simple structure is quick for installation, and reduction is applied
Between man-hour, operating efficiency is improve.
The preferably feasible embodiment of the utility model is the foregoing is only, not thereby limits to power of the present utility model
Sharp scope, the equivalence changes that all utilization the utility model specifications and its accompanying drawing content are made, is both contained in of the present utility model
Within interest field.
Claims (6)
1. a kind of track climbing type monolithic architecture construction scaffolding, including support body, it is characterised in that:Also include rack support, tooth
Bar support is bolted on construction wall, and support body is slidably connected by fixed block with rack support, and support body is provided with
Electric machine support, electric machine support is provided with motor, and the power transmission shaft of motor is provided with the transmission coordinated with the tooth bar of rack support
Gear.
2. track climbing type monolithic architecture construction scaffolding according to claim 1, it is characterised in that:Support body includes horizontal stroke
Beam, vertical beam, crossbeam, vertical beam constitute frame structure by connector and bolt connection, and bridging, top are respectively equipped with frame structure
Layer guardrail diagonal brace, top layer guardrail are directly supportted, flat bed diagonal brace.
3. track climbing type monolithic architecture construction scaffolding according to claim 2, it is characterised in that:Crossbeam includes pin hand
Frame top guardrail cross beams, Horizontal load-bearing beam, flat bed load-bearing straight beam.
4. track climbing type monolithic architecture construction scaffolding according to claim 1, it is characterised in that:Support body be provided with
The electrical control cabinet of electronic mechatronics.
5. track climbing type monolithic architecture construction scaffolding according to claim 1, it is characterised in that:Each layer of support body
Workbench is provided with fire water box, and support body is provided with the fire extinguisher canvas hose bracing frame being placed in above each layer of workbench, each
Fire extinguisher canvas hose bracing frame above layer workbench is provided with the fire extinguisher canvas hose with the connection of corresponding fire water box.
6. track climbing type monolithic architecture construction scaffolding according to claim 1, it is characterised in that:Fixed block is installed
On support body, including the front backgear, rear backgear and the side backgear that are respectively placed in rack support support beam front side, rear side and outside, frame
Body is slided up and down by front backgear, rear backgear and side backgear on rack support.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620882443.2U CN206091254U (en) | 2016-08-16 | 2016-08-16 | Whole construction scaffold frame of track formula of climbing |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620882443.2U CN206091254U (en) | 2016-08-16 | 2016-08-16 | Whole construction scaffold frame of track formula of climbing |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206091254U true CN206091254U (en) | 2017-04-12 |
Family
ID=59522792
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620882443.2U Active CN206091254U (en) | 2016-08-16 | 2016-08-16 | Whole construction scaffold frame of track formula of climbing |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206091254U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106088564A (en) * | 2016-08-16 | 2016-11-09 | 天力博达科技有限公司 | Track climbing type monolithic architecture construction scaffolding |
-
2016
- 2016-08-16 CN CN201620882443.2U patent/CN206091254U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106088564A (en) * | 2016-08-16 | 2016-11-09 | 天力博达科技有限公司 | Track climbing type monolithic architecture construction scaffolding |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206088920U (en) | Construction scaffold | |
CN204112696U (en) | For the electric hoist elevator shaft platform of main building construction | |
CN108194286A (en) | A kind of medium wind-driven generator repairs control tower | |
CN109629814A (en) | A kind of wind-powered electricity generation concrete tower mounting platform | |
CN110284703A (en) | A kind of light-duty climbing form system of screw rod promotion | |
CN205932929U (en) | Large power supply equipment fixing is with hoist and mount framework | |
CN206091254U (en) | Whole construction scaffold frame of track formula of climbing | |
CN106088564A (en) | Track climbing type monolithic architecture construction scaffolding | |
CN210369893U (en) | Light-duty creeping formwork system of lead screw promotion | |
CN106437126B (en) | A kind of console mode hydraulic lifting scaffold guiding bearing and method for dismounting | |
CN108798714A (en) | A kind of working portable shifting formwork trolley of channel wall body and its construction method | |
CN212832684U (en) | Self-propelled combined lifting multifunctional aerial work platform truck | |
CN111364300B (en) | Multifunctional construction vehicle for subway rail | |
CN209482685U (en) | A kind of wind-powered electricity generation concrete tower mounting platform | |
CN103601081A (en) | Tower crane internal-climbing support system | |
CN211257769U (en) | Truss bridging based on attached lifting platform | |
CN212154108U (en) | Wall-attached type anti-tilting and anti-falling support | |
CN210712584U (en) | Movable supporting bracket for road and bridge construction | |
CN208310801U (en) | A kind of working portable shifting formwork trolley of channel wall | |
CN206707248U (en) | A kind of hanging basket for overflow weir | |
CN208716716U (en) | Wind-power electricity generation installs loop wheel machine | |
CN208056658U (en) | Aerial for industrialized building makes building machine | |
CN206174964U (en) | Template landing stage platform truck | |
CN216005086U (en) | Auxiliary device for dismounting hydraulic turbine servomotor | |
CN205577377U (en) | Superelevation industry factory building operation platform is removed in detachable remote control |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20200325 Address after: 063000 office building 202, west side of Kaisan Road, north side of Ronghua Road, Tangshan high tech Industrial Park, Tangshan City, Hebei Province Patentee after: Daze Construction Machinery Manufacturing Co., Ltd Address before: 063000 Tangshan City high tech Industrial Park in Hebei Province Xingcheng era B block room 410 Co-patentee before: Sang Yinxiang Patentee before: TIANLI BODA TECHNOLOGY Co.,Ltd. |
|
TR01 | Transfer of patent right |