CN206070274U - A kind of roadbed stone for sponge city - Google Patents

A kind of roadbed stone for sponge city Download PDF

Info

Publication number
CN206070274U
CN206070274U CN201621095451.9U CN201621095451U CN206070274U CN 206070274 U CN206070274 U CN 206070274U CN 201621095451 U CN201621095451 U CN 201621095451U CN 206070274 U CN206070274 U CN 206070274U
Authority
CN
China
Prior art keywords
roadbed stone
roadbed
sponge city
boss
stone
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621095451.9U
Other languages
Chinese (zh)
Inventor
李津
李津一
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TIANJIN HAITAI MUNICIPAL AFFAIRS GREENING CO Ltd
Original Assignee
TIANJIN HAITAI MUNICIPAL AFFAIRS GREENING CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TIANJIN HAITAI MUNICIPAL AFFAIRS GREENING CO Ltd filed Critical TIANJIN HAITAI MUNICIPAL AFFAIRS GREENING CO Ltd
Priority to CN201621095451.9U priority Critical patent/CN206070274U/en
Application granted granted Critical
Publication of CN206070274U publication Critical patent/CN206070274U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Paving Structures (AREA)

Abstract

This utility model provides a kind of roadbed stone for sponge city, the roadbed stone for sponge city includes the roadbed stone body in rectangular structure and is arranged on the boss of the side of the roadbed stone body, and the boss is with the roadbed stone body into " L " shape;The inside of the roadbed stone body is provided with the multiple first passages for intersecting through the roadbed stone body anyhow in the horizontal direction, the upper surface of the roadbed stone body arranges multiple first through hole vertically downward, and the plurality of first through hole is interconnected with the plurality of first passage;The boss is provided with the multiple second channels for intersecting anyhow in the horizontal direction, and the plurality of second channel runs through the boss, and the boss is interior to arrange multiple second through holes vertically downward, and the second channel is connected with the plurality of second through hole.Roadbed stone for sponge city of the present utility model is laid on both sides of the road, can effectively accelerate urban rainwater penetrating power.

Description

A kind of roadbed stone for sponge city
Technical field
This utility model is related to sponge urban construction field, more particularly to for the roadbed stone in sponge city.
Background technology
Urban waterlogging takes place frequently for many years, and mainly city is drastically expanded in a short time, and quick urbanization ties up river lake, disturbs Random water system.On the one hand, during urbanization Rapid Expansion, natural climate environment there occurs change, cause city rainfall point Cloth, intensity and frequency etc. all there occurs change.On the other hand, after urbanization, surface sealing, under identical rainfall, Flow path surface is just greatly increased, and exacerbates the harm of urban flooding.Additionally, after city expands outwardly, original some outside the citys Flood discharge river all become the inland river in city, without the space for widening river course.
Annual most cities are flooded caused by being all waterlogging.Rainy season road drainage is that current city faces Huge difficult problem, no matter floor tile or roadbed stone are all made up of traditional cement in the present case, its penetrating power pole Difference, it is difficult to the precipitation in the short time is discharged, so as to form road hydrops.At present in sponge Process of Urban Development, for The selection of roadbed stone remains Traditional foundations stone and is arranged in road both sides, is blocked water with playing, but runs into heavy rain, and water level covers road Foundation stone will form road to two hydrops, and its effect is not obvious.
In order to improve urban road rainy season water on urban streets problem, urban construction person and engineers and technicians are to city The carrying out construction in sponge city, but for the selection of roadbed stone is still conventional traditional structure.
Therefore, urban pavement hydrops can effectively be alleviated in order to further road improvement hydrops problem is necessary that proposition is a kind of For the roadbed stone in sponge city.
Utility model content
This utility model provides a kind of roadbed stone for sponge city, and the roadbed stone for sponge city includes Roadbed stone body in rectangular structure and be arranged on the roadbed stone body side boss, the boss and the road Foundation stone body is into " L " shape;
The inside of the roadbed stone body is provided with multiple for intersecting through the roadbed stone body anyhow in the horizontal direction One passage, the upper surface of the roadbed stone body arrange multiple first through hole vertically downward, the plurality of first through hole with it is described Multiple first passages are interconnected;
The boss is provided with the multiple second channels for intersecting anyhow in the horizontal direction, and the plurality of second channel is through described In boss, the boss, multiple second through holes, the plurality of second channel and the plurality of second through hole phase are set vertically downward Connection.
Preferably, it is arranged in a mutually vertical manner between the described multiple first passages for intersecting anyhow.
Preferably, between the described multiple first passages for intersecting anyhow, angle is 60 °.
Preferably, the both sides of the edge of the roadbed stone body are provided with and mutually spell for the roadbed stone for sponge city The tongue and groove for connecing.
Preferably, the tongue and groove is arranged in reverse symmetry.
Preferably, circular concave arc, the shape after splicing of the roadbed stone for sponge city are provided with the inside of the tongue and groove Into circular hole.
Preferably, the upper surface of the roadbed stone body is provided with for intercepting the multiple projections being arranged in array of debris.
Preferably, into arc-shaped on the inside of the boss and the junction of the roadbed stone body.
Preferably, on the inside of the boss and the junction of the roadbed stone body at a right angle.
This utility model can be used for sponge urban construction, and the roadbed stone for sponge city is laid on both sides of the road, Urban rainwater penetrating power can effectively be accelerated, alleviated urban waterlogging hydrops problem, rainwater is rapidly feeding into underground water cell, is Urban rainwater recycles water-retention, saves city water resource.
It should be appreciated that aforementioned description substantially and follow-up description in detail are exemplary illustration and explanation, should not As the restriction to the claimed content of this utility model.
Description of the drawings
With reference to the accompanying drawing enclosed, the more purposes of this utility model, function and advantage will be by this utility model embodiment party The described below of formula is illustrated, wherein:
Fig. 1 schematically shows the three-dimensional structure diagram of the roadbed stone for sponge city of the present utility model;
Fig. 2 shows the lateral plan of the roadbed stone for sponge city of the present utility model;
Fig. 3 shows another angle three-dimensional structure diagram of the roadbed stone for sponge city of the present utility model;
Fig. 4 shows the front schematic view of the roadbed stone for sponge city of the present utility model;
Fig. 5 shows the schematic rear view of the roadbed stone for sponge city of the present utility model;
Fig. 6 shows the assembled schematic diagram of the roadbed stone for sponge city of the present utility model.
Specific embodiment
By reference to one exemplary embodiment, the purpose of this utility model and function and for realizing these purposes and function Method will be illustrated.However, this utility model is not limited to one exemplary embodiment disclosed below;Can be by not Which is realized with form.The essence of description is only to aid in various equivalent modifications Integrated Understanding this utility model Detail.
Hereinafter, embodiment of the present utility model will be described with reference to the drawings.In the accompanying drawings, identical reference is represented Same or similar part, or same or like step.
Embodiment one:
The roadbed stone concrete structure and drainage procedure for sponge city of the present utility model is entered by the present embodiment Row is described in detail, as shown in Figure 1 the three-dimensional structure diagram of the foundation stone for sponge city of the present utility model, described for sponge The roadbed stone in city is mainly used in sponge city, it should be appreciated that suitable of the present utility model for sponge city for other The place of the roadbed stone in city can use.
The described roadbed stone for sponge city includes the roadbed stone body 10 in rectangular structure and is arranged on road 10 one-tenth " L " shapes of roadbed stone body of the boss 20 of the side of foundation stone body 10, boss 20 and rectangular structure.Roadbed stone body 10 Inside be provided with the horizontal direction anyhow intersect through the roadbed stone body multiple first passages, horizontal first passage 13a It is parallel with the long side of roadbed stone body 10 through roadbed stone body 10.Arrange many vertically downward in the upper surface of roadbed stone body 10 Individual first through hole 14, multiple first through hole 14 are interconnected with described horizontal first passage 13a.It should be appreciated that horizontal first Passage 13a can be that arrangement is multiple rows of, in order to clearly illustrate to show schematically the horizontal first passage of a row in the present embodiment 13a.Preferably, roadbed stone body upper surface is provided with for intercepting the multiple projections being arranged in array of debris.
The boss 20 is provided with the multiple second channels for intersecting anyhow in the horizontal direction, and the second channel is divided into horizontal Two passage 21a and vertical second channel 21b, horizontal second channel 21a are parallel with the long side of boss 20 through boss 20, and vertical Two passage 21b are parallel with the minor face of boss 20 through boss 20, arrange multiple second through holes 22 in boss 20 vertically downward, and second Through hole 22 is connected with horizontal second channel 21a, and the second through hole 22 is connected with vertical second channel 21b.
It is illustrated in figure 2 the lateral plan of the roadbed stone for sponge city of the present utility model, 10 He of roadbed stone body Boss 20 constitutes 30 one-tenth arc-shapeds on the inside of the junction of L " shape " structure, roadbed stone body 10 and boss 20;In some embodiments In, on the inside of the junction of roadbed stone body 10 and boss 20,30 could be arranged to be mutually perpendicular to structure at a right angle.Roadbed stone sheet In body 10, horizontal first passage 13a is arranged to boss 20 and the horizontal second channel 21a cloth in alignment in boss 20 Put so that the second through hole 22 through horizontal second channel 21a can be with horizontal first passage 13a to connecting.
It is illustrated in figure 3 another angle three-dimensional structure diagram of the roadbed stone for sponge city of the present utility model, Fig. 4 institutes The front schematic view of the roadbed stone for sponge city of the present utility model is shown as, Fig. 5 show of the present utility model for sea The schematic rear view road of the roadbed stone in continuous city.Foundation stone for sponge city includes roadbed stone body 10 and is arranged on roadbed 10 one-tenth " L " shapes of roadbed stone body of the boss 20 of the side of stone body 10, boss 20 and rectangular structure.Roadbed stone body 10 Inside is provided with the first passage for intersecting through the roadbed stone body anyhow in the horizontal direction, and the first passage includes horizontal the One passage 13a and vertical first passage 13b, horizontal first passage 13a are parallel with the long side of roadbed stone body 10 through roadbed stone Body 10, vertical first passage 13b are parallel with the minor face of roadbed stone body 10 through roadbed stone body 10.In roadbed stone body 10 Upper surface multiple first through hole 14 are set vertically downward, first through hole 14 is interconnected with horizontal first passage 13a, first lead to Hole 14 is interconnected with vertical first passage 13b.
Boss 20 is provided with the multiple second channels for intersecting anyhow in the horizontal direction, and the second channel is divided into horizontal second and leads to Road 21a and vertical second channel 21b, horizontal second channel 21a are parallel with the long side of boss 20 through boss 20, and vertical second leads to Road 21b is parallel with the minor face of boss 20 to arrange multiple second through holes 22, the second through hole in boss 20, boss 20 vertically downward 22 are connected with horizontal second channel 21a, and the second through hole 22 is connected with vertical second channel 21b.
Preferably, horizontal first passage 13a and vertical first passage 13b is arranged in a mutually vertical manner, horizontal second channel 21b with Vertical second channel 21b is arranged in a mutually vertical manner.In certain embodiments, horizontal first passage 13a and vertical first passage 13b it Between angle be 60 °, the angle between horizontal second channel 21b and vertical second channel 21b is 60 degree.
The assembled schematic diagram of the roadbed stone for sponge city of the present utility model as shown in Figure 6, use of the present utility model The tongue and groove that roadbed stone body mutually splices is provided with the roadbed stone body both sides of the edge of the roadbed stone in sponge city.The present embodiment In, the tongue and groove of the roadbed stone body 10a of the spliced one block roadbed stone for sponge city of the present utility model with another piece The tongue and groove of the roadbed stone body 10b of the roadbed stone for sponge city spliced with which forms circular hole 14, is used in sponge city The stitching portion of roadbed stone can effectively draining.For more succinct explanation, it is used for sponge city with one piece of mutual splicing Roadbed stone as a example by, the both sides of the edge for the roadbed stone body 10 in sponge city are provided with tongue and groove 11a, and tongue and groove 11a is in reversely right Claim to arrange, circular concave arc 12a is provided with the inside of tongue and groove 11a so that it is guaranteed that being formed between the spliced roadbed stone for sponge city Circular hole.
Below by the present embodiment for the assembled and assembly for the roadbed stone in sponge city of the present utility model after Drainage procedure do concrete explaination, it should be understood that roadbed stone body of the present utility model 10 be provided with the side of boss 20 and track to Neighbour, roadbed stone body 10 are not provided with the side of boss 20 and sidewalk ground tile to splicing.During raining, there are hydrops in track When, hydrops are entered into inside roadbed stone to first passage 13b by the vertical of roadbed stone body 10, by horizontal first passage 13a Hydrops are scattered, underground is entered into along first through hole 14, the whole process of draining is carried out inside roadbed stone, effectively reduce The hydrops on road surface.
During raining, rainfall is excessive to cause 10 internal drainage of roadbed stone body can not be timely, hydrops cover for The roadbed stone in sponge city, hydrops can be entered inside boss 20 by horizontal second by the vertical second channel 21b of boss 20 Hydrops are scattered by passage 21a, enter into underground along the second through hole 22.Meanwhile, horizontal first passage 13a in roadbed stone body 10 Arrange to boss 20 and the horizontal second channel 21a arrangements in alignment in boss so that flow along the second through hole 22 The rainwater for entering the roadbed stone for sponge city can be protected while enter into horizontal second channel 21a and horizontal first passage 13a Circulation of the rainwater in the roadbed stone for sponge city is demonstrate,proved.
Utility model is used for sponge urban construction, and the roadbed stone for sponge city is laid on both sides of the road, effectively can add Fast urban rainwater penetrating power, alleviates urban waterlogging hydrops problem, rainwater is rapidly feeding underground water cell, is urban rainwater Water-retention is recycled, city water resource is saved.
With reference to the explanation of the present utility model and practice that disclose here, other embodiment of the present utility model is for this area Technical staff will be readily apparent and understand.Illustrate and embodiment be to be considered only as it is exemplary, it is of the present utility model real Scope and spirit are defined in the claims.

Claims (9)

1. a kind of roadbed stone for sponge city, it is characterised in that the roadbed stone for sponge city is included in rectangular The roadbed stone body of body structure and be arranged on the roadbed stone body side boss, the boss and the roadbed stone sheet Body is into " L " shape;
The inside of the roadbed stone body is provided with the horizontal direction to intersect anyhow and leads to through multiple the first of the roadbed stone body Road, the upper surface of the roadbed stone body arrange multiple first through hole vertically downward, the plurality of first through hole with it is the plurality of First passage is interconnected;
The boss is provided with the multiple second channels for intersecting anyhow in the horizontal direction, and the plurality of second channel is through described convex Multiple second through holes are set vertically downward in platform, the boss, the second channel is connected with the plurality of second through hole.
2. the roadbed stone for sponge city according to claim 1, it is characterised in that it is described intersect anyhow it is multiple It is arranged in a mutually vertical manner between first passage.
3. the roadbed stone for sponge city according to claim 1, it is characterised in that it is described intersect anyhow it is multiple Between first passage, angle is 60 °.
4. the roadbed stone for sponge city according to claim 1, it is characterised in that the both sides of the roadbed stone body Edge is provided with the tongue and groove mutually spliced for the roadbed stone for sponge city.
5. the roadbed stone for sponge city according to claim 4, it is characterised in that the tongue and groove is set in reverse symmetry Put.
6. the roadbed stone for sponge city according to claim 4, it is characterised in that be provided with circle on the inside of the tongue and groove Concave arc, the roadbed stone for sponge city form circular hole after splicing.
7. the roadbed stone for sponge city according to claim 1, it is characterised in that the upper table of the roadbed stone body Face is provided with for intercepting the multiple projections being arranged in array of debris.
8. the roadbed stone for sponge city according to claim 1, it is characterised in that the boss and the roadbed stone Into arc-shaped on the inside of the junction of body.
9. the roadbed stone for sponge city according to claim 1, it is characterised in that the boss and the roadbed stone On the inside of the junction of body at a right angle.
CN201621095451.9U 2016-09-30 2016-09-30 A kind of roadbed stone for sponge city Expired - Fee Related CN206070274U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621095451.9U CN206070274U (en) 2016-09-30 2016-09-30 A kind of roadbed stone for sponge city

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621095451.9U CN206070274U (en) 2016-09-30 2016-09-30 A kind of roadbed stone for sponge city

Publications (1)

Publication Number Publication Date
CN206070274U true CN206070274U (en) 2017-04-05

Family

ID=58441351

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621095451.9U Expired - Fee Related CN206070274U (en) 2016-09-30 2016-09-30 A kind of roadbed stone for sponge city

Country Status (1)

Country Link
CN (1) CN206070274U (en)

Similar Documents

Publication Publication Date Title
CN107100227B (en) A kind of pergola on the city road LID biology delay ditch construction method
CN109457566A (en) A kind of assembled gap porous pavement
CN109403181A (en) A kind of porous pavement
CN105625269B (en) Double walls of ditch three, which dam, blocks sand shield canal ship shape traverse furrow
CN207567892U (en) A kind of large size karst depression flood drainage system
CN109440554A (en) A kind of assembled greening band structure and its construction method
CN102322094A (en) Road surface combined drainage system
CN206070274U (en) A kind of roadbed stone for sponge city
CN206887669U (en) Water storage module, drainage structure and water-storing device
CN205804423U (en) A kind of discharge structure of basement
KR200437790Y1 (en) Vegetation revetment block
CN206655512U (en) A kind of ecological forest shade parking lot
CN206692970U (en) A kind of water-permeable brick of energy Quick drainage
CN212772200U (en) Flood-fighting water retaining assembly and flood-fighting water retaining wall
CN207812467U (en) A kind of assembled protective slope brick structure unit and ecological revetment
KR101976073B1 (en) Block with excellent drainage and storage performance
CN209722651U (en) A kind of water-permeable brick and its pavement with the water-permeable brick
CN209323289U (en) A kind of assembled greening band structure
CN207376767U (en) A kind of inlet channel structure
CN112012163A (en) Flood-fighting water retaining assembly and flood-fighting water retaining wall
CN206986652U (en) A kind of floor tile for sponge city
Waldhoff et al. Multifunctional Spaces for Flood Management—An Approach for the City of Hamburg, Germany
KR200410826Y1 (en) Protection block for inclined plane
CN207828850U (en) A kind of superelevation section dewatering type concrete hard shoulder
CN206090202U (en) A ground penetration brick for sponge city

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170405

Termination date: 20180930