CN206060080U CN201621072203.2U CN201621072203U CN206060080U CN 206060080 U CN206060080 U CN 206060080U CN 201621072203 U CN201621072203 U CN 201621072203U CN 206060080 U CN206060080 U CN 206060080U
Authority
CN
China
Prior art keywords
tower crane
side wall
fix bar
cable holder
cable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621072203.2U
Other languages
Chinese (zh)
Inventor
陈冲
裴跃锋
李晓明
雷少华
万文杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fourth Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Original Assignee
Fourth Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fourth Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd filed Critical Fourth Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority to CN201621072203.2U priority Critical patent/CN206060080U/en
Application granted granted Critical
Publication of CN206060080U publication Critical patent/CN206060080U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Laying Of Electric Cables Or Lines Outside (AREA)

Abstract

The utility model discloses a kind of tower crane cable holder, including installing rack (3), the screw rod (1) that the installing rack (3) can be fixed on standard section of tower crane, through hole is offered on the first side wall of the installing rack (3), fix bar passes through the through hole, and the fix bar is fastened by the first nut on the inside of the first side wall, there is on the outside of the first side wall fixation hook for being used to fixing cable, the fixation hook is insulated hook.The problems such as tower crane cable holder efficiently solves electric cable transporting inconvenience.

Description

A kind of tower crane cable holder
Technical field
This utility model is related to architectural engineering technical field of transportation, more particularly to a kind of tower crane cable holder.
Background technology
Tower crane cable is because with need to be with tower crane up and down during tower crane lifting operation, tower crane be the most frequently used on construction site A kind of crane gear, also known as derrick crane, with a section spreading or connect height, abbreviation standard knot, use for hanging construction Reinforcing bar, wood stupefied, concrete, the raw material of the construction such as steel pipe.
Present tower crane cable fixed form is typically hung on porcelain vase using rope made of hemp colligation, and porcelain vase is one kind porcelain Or electric elements made by glass, in oval shape, cydariform, cylinder etc..For fixed conductor and make this conductor and other Conductor insulation, also referred to as insulator.The rope made of hemp need to be untied in tower crane lifting operation, colligation again again after lifting operation.Porcelain vase is fixed Rope made of hemp colligation is also adopted by when on standard section of tower crane.But, constructed using existing construction method, carry out tower crane lifting operation every time Cable, porcelain vase will be removed, after the completion of jacking, colligation is fixed again again, fixed and dismounting is inconvenient, cumbersome;Porcelain vase is solid Fixed insecure, during use, porcelain vase is easy to fall off, causes potential safety hazard;Colligation again after all must removing during tower crane jacking every time Fixed, when cable is fixed, operating difficultiess, work high above the ground are dangerous big, easily cause security incident;Also, carrying out safety inspection When regular inspection go out the loose situation of situation and tower crane cable with iron wire colligation.
In sum, the problems such as how efficiently solving electric cable transporting inconvenience, is that current those skilled in the art are badly in need of The problem of solution.
Utility model content
The purpose of this utility model is to provide a kind of tower crane cable holder, and the tower crane cable holder is efficiently solved The problems such as electric cable transporting is inconvenient.
To solve above-mentioned technical problem, this utility model provides following technical scheme:
A kind of tower crane cable holder, including installing rack, the spiral shell that the installing rack can be fixed on standard section of tower crane Bar, offers through hole on the first side wall of the installing rack, fix bar passes through the through hole, and the fix bar is described first Inside sidewalls are fastened by the first nut, have the fixation hook for being used to fixing cable on the outside of the first side wall, described solid Hook is determined for insulated hook.
Preferably, the fix bar can be flexible along the through hole, portion of the fix bar on the inside of the first side wall Divide the spring for being set with the fixation fixation hook position.
Preferably, the quantity of the fix bar at least two, the fixation hook of the fix bar is relative two-by-two to form card Ring, the cable are fixed in the snap ring.
Preferably, the installing rack includes top surface, the first side wall for being arranged at the top surface lower surface and described The relative second sidewall of side wall, be installed on it is relative with the second sidewall between the first side wall and the second sidewall Installing plate, the second sidewall and the installing plate correspondence position offer opening, and the screw rod is through the opening and passes through Second nut is fastened.
Preferably, the first side wall, the second sidewall, the installing plate are parallel.
Preferably, movable clamp groove is offered on the top surface, the installing plate is connected in the movable clamp groove and can Move along the movable clamp groove.
Tower crane cable holder provided by the utility model, including installing rack, screw rod, fix bar, screw rod will can be pacified Shelve and be fixed on standard section of tower crane, holder is fixed on standard section of tower crane, it is easy for installation.First side of installing rack Offer through hole on wall, fix bar passes through through hole, the thickness sets itself of the size of through hole according to fix bar.Fix bar is first Inside sidewalls are fastened by the first nut, to be detachably connected, facilitate dismounting and change.Have for fixing on the outside of the first side wall The fixation hook of cable, fixation, fixation hook are insulated hook, safer.
Tower crane cable holder provided by the utility model, easy for installation, once mounting, during tower crane lifting operation without Cable is removed, simple to operate, cable is without departing from cable is fixed more firmly, and safe, electric cable transporting is more convenient.
Description of the drawings
In order to be illustrated more clearly that this utility model embodiment or technical scheme of the prior art, below will be to embodiment Or accompanying drawing to be used is briefly described needed for description of the prior art, it should be apparent that, drawings in the following description are only It is some embodiments of the present utility model, for those of ordinary skill in the art, in the premise for not paying creative work Under, can be with according to these other accompanying drawings of accompanying drawings acquisition.
The structural representation of the tower crane cable holder that Fig. 1 is provided by a kind of specific embodiment in this utility model;
Fig. 2 is the upward view in Fig. 1.
In accompanying drawing, labelling is as follows:
1- screw rods, 2- installing plates, 3- installing racks, 4- snap rings, 5- movable clamp grooves.
Specific embodiment
This utility model core is to provide a kind of tower crane cable holder, and the tower crane cable holder efficiently solves electricity The problems such as cable transport is inconvenient.
Below in conjunction with the accompanying drawing in this utility model embodiment, the technical scheme in this utility model embodiment is carried out Clearly and completely describe, it is clear that described embodiment is only this utility model a part of embodiment, rather than whole Embodiment.Based on the embodiment in this utility model, those of ordinary skill in the art are not under the premise of creative work is made The every other embodiment for being obtained, belongs to the scope of this utility model protection.
Refer to Fig. 1 and Fig. 2, Fig. 1 to be fixed by the tower crane cable that a kind of specific embodiment in this utility model is provided The structural representation of device.
In a kind of specific embodiment, tower crane cable holder provided by the utility model, including installing rack 3, spiral shell Bar 1, fix bar, screw rod 1 can be fixed on installing rack 3 on standard section of tower crane, and holder is fixed on standard section of tower crane On, it is easy for installation.Through hole is offered on the first side wall of installing rack 3, fix bar passes through through hole, and the size of through hole is according to fix bar Thickness sets itself.Fix bar is fastened by the first nut on the inside of the first side wall, and to be detachably connected, convenient dismounting is more Change.There is on the outside of the first side wall the fixation hook for being used to fixing cable, fixation, fixation hook are insulated hook, safer.
Tower crane cable holder provided by the utility model, easy for installation, once mounting, during tower crane lifting operation without Cable is removed, simple to operate, cable is without departing from cable is fixed more firmly, and safe, electric cable transporting is more convenient.
Above-mentioned tower crane cable holder is only a kind of preferred version, is specifically not limited thereto, on this basis can basis It is actually needed to make having and targetedly adjusts, so as to obtain different embodiments, fix bar can be flexible along through hole, promotes Scalable fix bar, cable is placed in the fixation hook of scalable fix bar front end, unclamps fix bar, has both completed cable solid It is fixed.Part of the fix bar on the inside of the first side wall is set with spring, and the elastic force of spring can be locked hook and cable Relative position, can apply to the cable of different thicknesses, and the scope of application is wider, make fixation hook preferably fix cable, knot Structure is simple, and cable is fixed more firmly, and cable is without departing from safe.
On the basis of above-mentioned specific embodiment, those skilled in the art can be according to the difference of concrete occasion, to tower Hanging cable retainer carries out some changes, and the quantity of fix bar at least two can be two, or and many, two are solid One group of fixed pole, can fix a cable, it is also possible to which fixed multi-cable line, form are more, using more convenient, concrete solid The quantity of fixed pole is unrestricted, can be according to the different sets itselfs of specifically used situation.The fixation hook of fix bar is relative two-by-two Snap ring 4 is formed, cable is fixed in snap ring 4, cable is difficult to depart from from snap ring 4, fixation.
Obviously, under the guidance of this thought, those skilled in the art can be according to the difference of concrete occasion to above-mentioned Specific embodiment carries out some changes, and installing rack 3 includes top surface, the first side wall, second sidewall, installing plate 2, the first side wall, Second sidewall, installing plate 2 are arranged at top surface lower surface.
Second sidewall it is relative with the first side wall, installing plate 2 be installed between the first side wall and second sidewall, installing plate 2 It is relative with second sidewall, simple structure, it is easy to connect.Second sidewall and 2 correspondence position of installing plate offer opening, and screw rod 1 is worn Cross opening and fastened by the second nut, between installing plate 2, second sidewall, top surface and screw rod 1, form annular space, tower crane mark Quasi- section is fixed in this annular space, fixes tower crane cable holder with this, installs more convenient.
It is important to note that tower crane cable holder provided by the utility model is not intended to be limited to this kind of feelings Shape, the first side wall, second sidewall, installing plate 2 are parallel, it is preferable that top surface and the first side wall, 2 phase of second sidewall and installing plate Vertically, more carefully and neatly, simple structure.Certainly, state the parallel simply a kind of preferred reality of the first side wall, second sidewall, installing plate 2 Mode is applied, is not unique, it is also possible to not parallel, depending on concrete form can be according to practical situations, all in this practicality In new protection domain.
Tower crane cable holder provided by the utility model, in the case of other parts are immovable, opens up on top surface There is movable clamp groove 5, installing plate 2 is connected in movable clamp groove 5 and can move along movable clamp groove 5, can be according to standard section of tower crane Size adjust the position of installing plate 2, it is adaptable to various sizes of standard section of tower crane, using relatively broad, application is larger.
In description of the present utility model, it should be noted that on the inside of term, outside, the orientation of instruction such as lower surface or Position relationship is, based on orientation shown in the drawings or position relationship, to be for only for ease of description this utility model and simplify description, Rather than indicate or imply indication device or element must have specific orientation, with specific azimuth configuration and operation, because This is it is not intended that to restriction of the present utility model.
In this specification, each embodiment is described by the way of progressive, and what each embodiment was stressed is and other The difference of embodiment, between each embodiment identical similar portion mutually referring to.
The foregoing description of the disclosed embodiments, enables professional and technical personnel in the field to realize or use that this practicality is new Type.Various modifications to these embodiments will be apparent for those skilled in the art, determined herein The General Principle of justice can be realized in the case of without departing from spirit or scope of the present utility model in other embodiments.Cause This, this utility model is not intended to be limited to the embodiments shown herein, and is to fit to and principles disclosed herein The most wide scope consistent with features of novelty.

Claims (6)

1. a kind of tower crane cable holder, it is characterised in that including installing rack (3), the installing rack (3) can be fixed on tower The screw rod (1) on standard knot is hung, through hole on the first side wall of the installing rack (3), is offered, fix bar passes through the through hole, and The fix bar is fastened by the first nut on the inside of the first side wall, is had for fixed electricity on the outside of the first side wall The fixation hook of cable, the fixation hook are insulated hook.
2. tower crane cable holder according to claim 1, it is characterised in that the fix bar can be stretched along the through hole Contracting, part of the fix bar on the inside of the first side wall are set with the spring of the fixation fixation hook position.
3. tower crane cable holder according to claim 2, it is characterised in that the quantity of the fix bar at least two, The fixation hook of the fix bar is relative two-by-two to form snap ring (4), and the cable is fixed in the snap ring (4).
4. the tower crane cable holder according to any one of claim 1-3, it is characterised in that the installing rack (3) includes Top surface, it is arranged at the first side wall of the top surface lower surface second sidewall relative with the first side wall, is installed on institute State installing plate (2) relative with the second sidewall between the first side wall and the second sidewall, the second sidewall and described Installing plate (2) correspondence position offers opening, and the screw rod (1) is fastened through the opening and by the second nut.
5. tower crane cable holder according to claim 4, it is characterised in that the first side wall, the second sidewall, The installing plate (2) is parallel.
6. tower crane cable holder according to claim 4, it is characterised in that offer movable clamp groove on the top surface (5), the installing plate (2) is connected in the movable clamp groove (5) and can be mobile along the movable clamp groove (5).
CN201621072203.2U 2016-09-22 2016-09-22 A kind of tower crane cable holder Expired - Fee Related CN206060080U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621072203.2U CN206060080U (en) 2016-09-22 2016-09-22 A kind of tower crane cable holder

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621072203.2U CN206060080U (en) 2016-09-22 2016-09-22 A kind of tower crane cable holder

Publications (1)

Publication Number Publication Date
CN206060080U true CN206060080U (en) 2017-03-29

Family

ID=58365991

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621072203.2U Expired - Fee Related CN206060080U (en) 2016-09-22 2016-09-22 A kind of tower crane cable holder

Country Status (1)

Country Link
CN (1) CN206060080U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114400608A (en) * 2021-12-20 2022-04-26 上海骎麦建设工程有限公司 Fastening device and fastening method for building construction tower crane

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114400608A (en) * 2021-12-20 2022-04-26 上海骎麦建设工程有限公司 Fastening device and fastening method for building construction tower crane

Similar Documents

Publication Publication Date Title
CN204435979U (en) A kind of protection device for installing of electric power facility
CN203747339U (en) Pole-mounted insulating bracket for bypass operation
CN104852329A (en) Construction tool of protective casing of high-pressure overhead line
CN206060080U (en) A kind of tower crane cable holder
CN204166812U (en) Power cable sign board hanging clip
CN102761077B (en) Insulating hoisting bracket for strain insulator string of 1000kV extra-high alternating current line
CN203103882U (en) Insulation bracing frame for live 10kV cable lead disconnection and connection operation
CN102623927B (en) Charged for replacement 220kV circuit multiloop double bundle conductor insulator tool and method
CN102237654B (en) Method for replacing jumper string using tool at double angle hanging point
CN204258160U (en) Change transmission tower insulator instrument
CN106785521A (en) A kind of combined type ground wire group
CN206211456U (en) Bilateral street code
CN201663250U (en) Turnable grounding wire hook
CN205846660U (en) The aerial cable strain clamp of Fast Installation
CN205304128U (en) Tower crane cable fixed bolster
CN204131004U (en) Four loop straight line steel tube tower circle cross-arm jigs
CN204369398U (en) Insulation hoisting bracket
CN203961262U (en) The adjustable device for erecting pole of a kind of scaffold
CN204050726U (en) Fixed connector between framework and safety belt during work high above the ground
CN204068158U (en) Auto lock stockbridge damper
CN203150833U (en) Universal hook for ground lead
CN203932825U (en) In 10kV power distribution network, charged vertical bottle is changed device
CN205811075U (en) A kind of safety earth rod
CN106655042B (en) A kind of bilateral street code
CN202840363U (en) Insulated lifting bracket for tension insulator chain of 1000-kV extra-high voltage alternating current circuit

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170329

Termination date: 20210922