CN206053387U - A kind of Quick-mounting bracket for protecting division board to set up - Google Patents
A kind of Quick-mounting bracket for protecting division board to set up Download PDFInfo
- Publication number
- CN206053387U CN206053387U CN201621001269.2U CN201621001269U CN206053387U CN 206053387 U CN206053387 U CN 206053387U CN 201621001269 U CN201621001269 U CN 201621001269U CN 206053387 U CN206053387 U CN 206053387U
- Authority
- CN
- China
- Prior art keywords
- bar
- division board
- quick
- support
- mounting bracket
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Load-Bearing And Curtain Walls (AREA)
Abstract
This utility model provides a kind of Quick-mounting bracket for protecting division board to set up, it includes many rickers being arranged in parallel, the ricker top is provided with foot handss framed bent by they sup-port, the lateral surface of the ricker is provided with bracing frame, the top positioning of the plurality of parallel support frame is provided with support beam, the support beam and bracing frame top droop are mounted with protection division board, and the edge of the protection division board is fitted with metope.This supporting structure is simple, it is easily manufactured, apply the space between construction scaffold and building masonry wall, installation can be quickly finished, and cross-operation safety isolation protective layer can be quickly set up to protecting division board to be supported, take and tear open conveniently, save artificial, without other instruments can Fast Installation in place.
Description
Technical field
This utility model is related to architectural furniture technical field, more particularly to a kind of speed for protecting division board to set up
Dress support.
Background technology
Steel tube fastener is adopted all to prevent generation object between body of wall and shelf from falling mostly in building engineering construction at present
The isolation layer frame set up, sets the soft net of one fall arrest per three layers, and the concrete and debris being scattered easily causes soft network pollution and damage, soft net
Often secondary cannot utilize, remove when exterior wall finishing is carried out not in place and affect subsequent construction, in order to carry out security protection also
Need to repeat to set up, and trickle down and waste time and energy in the soft online material process of having bad luck, artificial and cost input height, safety protective tube
Manage into a difficult problem.And the top-bottom cross operation phenomenon that setting isolating and protecting is damaged in time happens occasionally.Therefore the position
Because secondary isolation protects the potential safety hazard generally existing of generation not in place.
Accordingly, it would be desirable to design a kind of device for blocking gap between body of wall and foot handss framed bent, wall plaster is prevented
The damage of the soft net of isolation for causing that falls of Cement Concrete material in journey, or as material falls the secondary injury for causing.
Utility model content
Technical problem to be solved in the utility model is to provide a kind of Quick-mounting bracket for protecting division board to set up, this
Supporting structure is simple, easily manufactured, applies the space between construction scaffold and building masonry wall, can quickly finish
Install, and cross-operation safety isolation protective layer can be quickly set up to protecting division board to be supported, take and tear open conveniently, section
Less manpower, without other instruments can Fast Installation in place.Can be additionally used in preventing material when exterior wall is installed, fitted up, painting operation
Fall and shed pollution, can effectively solve the timely utilization rate of work layer falling object, be used in turn extremely convenient and swift.
In order to realize above-mentioned technical characteristic, what the purpose of this utility model was realized in:It is a kind of to isolate for protecting
The Quick-mounting bracket that plate is set up, it includes many rickers being arranged in parallel, and the ricker top passes through support bar
Support is provided with foot handss framed bent, and the lateral surface of the ricker is provided with bracing frame, the top of the plurality of parallel support frame
Edge positioning in portion is provided with support beam, and the support beam and bracing frame top droop are mounted with protection division board, described anti-
Fit with metope at the edge of shield division board.
Support frame as described above includes horizon bar, and the horizon bar is connected by arc transition with tilting bar, the horizon bar
End is machined with semicircle crozier, and the semicircle crozier is engaged with the outline of ricker, pushes up on the horizon bar
Face ending vertical is welded with locating dowel, and the end of the tilting bar is welded with semicircle and supports hoop, the semicircle to support hoop and foot handss
The outline for erecting post is engaged, and the locating dowel is engaged with the outer face for supporting beam and which is positioned.
The first bracing piece and the second bracing piece, first bracing piece and are provided between the horizon bar and tilting bar
Two bracing piece arranged crosswises.
The horizon bar adopts whole bar bending molding with tilting bar, adopts arc transition in angle.
The horizon bar is respectively adopted two reinforcing bar cross welds with tilting bar and forms.
Bar material of all components of support frame as described above all using diameter not less than 10mm is made.
The length of the horizon bar is 300-500mm.
This utility model has the advantages that:
1st, the support fully demonstrates which conveniently, soon in building engineering construction site safety civilized construction standardized management
It is prompt, practical.The Quick-mounting bracket is mainly used in space between construction scaffold and building masonry wall, can quickly set up intersection
Job safety isolating and protecting layer, takes and tears open conveniently, saves artificial, without other instruments can Fast Installation in place.Can be additionally used in outer
Prevent from material from falling when wall installation, finishing, rendering operation to shed pollution, can effectively solve the timely utilization of work layer falling object
Rate, is used in turn extremely convenient and swift.
2nd, the Quick-mounting bracket will obtain everybody accreditation in building engineering construction enterprise and widely promote the use of, and turn
Become the construction technology for protection in space between original construction scaffold and building masonry wall.
3rd, paint dropping for thing during wall construction being effectively prevented by installation protection division board, serve safety
Effect.
Description of the drawings
The utility model is described in further detail with reference to the accompanying drawings and examples.
Fig. 1 this utility model overall structure front views.
Fig. 2 this utility model overall structure axonometric charts.
Fig. 3 this utility model overall structure another view stereo figure.
Cooperation mounting structure schematic diagram between Fig. 4 this utility model bracing frame and ricker.
In figure:Ricker 1, support bar 2, foot handss framed bent 3, protection division board 4, support beam 5, metope 6, bracing frame
7th, semicircle support the 701, first bracing piece 702 of hoop, the second bracing piece 703, tilting bar 704, horizon bar 705, locating dowel 706, half
Circle crozier 707.
Specific embodiment
Below in conjunction with the accompanying drawings embodiment of the present utility model is described further.
Referring to Fig. 1-4, a kind of Quick-mounting bracket for protecting division board to set up, it includes many scaffolds being arranged in parallel
Column 1,1 top of the ricker are supported by support bar 2 and are provided with foot handss framed bent 3, the outside of the ricker 1
Face is provided with bracing frame 7, and the top positioning of the plurality of parallel support frame 7 is provided with support beam 5, the support beam
5 and 7 top droop of bracing frame be mounted with protection division board 4, it is described protection division board 4 edge fit with metope 6.
Further, support frame as described above 7 includes horizon bar 705, and the horizon bar 705 passes through circular arc mistake with tilting bar 704
Cross connected, the end of the horizon bar 705 is machined with semicircle crozier 707, the semicircle crozier 707 and ricker 1
Outline be engaged, on the horizon bar 705, top surface ends are vertically welded with locating dowel 706, the end of the tilting bar 704
Being welded with semicircle supports hoop 701, the semicircle to support hoop 701 to be engaged with the outline of ricker 1, the locating dowel
706 are engaged which are positioned with the outer face for supporting beam 5.
Further, the first bracing piece 702 and the second bracing piece are provided between the horizon bar 705 and tilting bar 704
703,703 arranged crosswise of first bracing piece 702 and the second bracing piece.
Further, the horizon bar 705 adopts whole bar bending molding with tilting bar 704, in angle using circle
Arc transition.
Further, the horizon bar 705 is respectively adopted two reinforcing bar cross welds with tilting bar 704 and forms.Manufactured
Journey is simple.
Further, bar material of all components of support frame as described above 7 all using diameter not less than 10mm is made.The speed
Dress support can have technical staff to calculate bearing capacity according to the position and top stressing conditions size for using, and structural support can be carried out
Adjustment.
Further, the length of the horizon bar 705 is 300-500mm.Above-mentioned size can meet engineering construction need substantially
Will, if space is less than 300mm in use, support oblique placement can be solved into insufficient space phenomenon quickly, vertically be received
Power is constant.Hang over when the horizontal crotch in vertical rod makes or so.
Operation principle of the present utility model is:
During installation, the semicircle crozier 707 of bracing frame 7 is caught on into the outer surface of ricker 1, while semicircle is supported
Hoop 701 is supported on ricker 1, and beam 5 then will be supported to be placed on the end of horizon bar 705 and by locating dowel 706
Positioned, finally protection division board 4 is placed on support beam 5 and bracing frame 7, and ensure to protect the outside of division board 4
Less gap is kept between edge and metope 6, so metope 6 is being carried out in work progress, by protecting division board 4 effective
Prevent material to fall and shed pollution, can effectively solve the timely utilization rate of work layer falling object, be used in turn and extremely facilitate
Fast.
The above embodiments are only optimal technical scheme of the present utility model, and are not construed as limit of the present utility model
System, the technical scheme that protection domain of the present utility model should be recorded with claim, including the technical scheme that claim is recorded
The equivalents of middle technical characteristic are protection domain.Equivalent i.e. within this range is improved, also in this utility model
Protection domain within.
Claims (6)
1. a kind of Quick-mounting bracket for protecting division board to set up, it is characterised in that:It includes many scaffolds being arranged in parallel
Column(1), the ricker(1)Top passes through support bar(2)Support is provided with foot handss framed bent(3), the scaffold stand
Post(1)Lateral surface bracing frame is installed(7), the plurality of parallel support frame(7)Top positioning to be provided with support horizontal
Wood(5), the support beam(5)And bracing frame(7)Top droop is mounted with protection division board(4), the protection division board(4)
Edge and metope(6)Laminating;
Support frame as described above(7)Including horizon bar(705), the horizon bar(705)With tilting bar(704)By arc transition phase
Even, the horizon bar(705)End be machined with semicircle crozier(707), the semicircle crozier(707)With ricker
(1)Outline be engaged, the horizon bar(705)Upper top surface ends are vertically welded with locating dowel(706), the tilting bar
(704)End be welded with semicircle support hoop(701), the semicircle support hoop(701)With ricker(1)Outline phase
Coordinate, the locating dowel(706)With support beam(5)Outer face be engaged which positioned.
2. a kind of Quick-mounting bracket for protecting division board to set up according to claim 1, it is characterised in that:The level
Bar(705)With tilting bar(704)Between be provided with the first bracing piece(702)With the second bracing piece(703), first bracing piece
(702)With the second bracing piece(703)Arranged crosswise.
3. a kind of Quick-mounting bracket for protecting division board to set up according to claim 1, it is characterised in that:The level
Bar(705)With tilting bar(704)Using whole bar bending molding, arc transition is adopted in angle.
4. a kind of Quick-mounting bracket for protecting division board to set up according to claim 1, it is characterised in that:The level
Bar(705)With tilting bar(704)Two reinforcing bar cross welds are respectively adopted to form.
5. a kind of Quick-mounting bracket for protecting division board to set up according to claim 1, it is characterised in that:The support
Frame(7)All components all made not less than the bar material of 10mm using diameter.
6. a kind of Quick-mounting bracket for protecting division board to set up according to claim 1, it is characterised in that:The level
Bar(705)Length be 300-500mm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621001269.2U CN206053387U (en) | 2016-08-31 | 2016-08-31 | A kind of Quick-mounting bracket for protecting division board to set up |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621001269.2U CN206053387U (en) | 2016-08-31 | 2016-08-31 | A kind of Quick-mounting bracket for protecting division board to set up |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206053387U true CN206053387U (en) | 2017-03-29 |
Family
ID=58379200
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621001269.2U Active CN206053387U (en) | 2016-08-31 | 2016-08-31 | A kind of Quick-mounting bracket for protecting division board to set up |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206053387U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110331850A (en) * | 2019-07-22 | 2019-10-15 | 浙江奔腾市政园林建设工程有限公司 | Masking device and its application method for gap between scaffold and external wall |
-
2016
- 2016-08-31 CN CN201621001269.2U patent/CN206053387U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110331850A (en) * | 2019-07-22 | 2019-10-15 | 浙江奔腾市政园林建设工程有限公司 | Masking device and its application method for gap between scaffold and external wall |
CN110331850B (en) * | 2019-07-22 | 2021-03-30 | 浙江奔腾市政园林建设工程有限公司 | Shielding device for gap between scaffold and building outer wall and using method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202954570U (en) | High-rise building construction sump pit template | |
CN106368245A (en) | Construction method for post-cast strip supporting formwork easy to clean | |
CN106592775A (en) | High-precision embedded part reinforcing and mounting device and method and purpose | |
CN204001652U (en) | The portable exterior wall operating platform of fabricated shear wall structure | |
CN204825927U (en) | Steel column is consolidated to wall body bracing | |
CN206053387U (en) | A kind of Quick-mounting bracket for protecting division board to set up | |
CN203452397U (en) | Safe protection rack | |
CN107795135A (en) | It is a kind of to be used to protect the Quick-mounting bracket that division board is set up | |
CN202117074U (en) | Foundation bed steel structure for positioning and mounting base of tower crane | |
CN201817814U (en) | Adjustable fixed support of vertical surface sheet steel form | |
CN102926554B (en) | Steel hanging seat formwork support and construction method thereof | |
CN105696802B (en) | Edge protection column and its installation method in constructing applied to large area floor template | |
CN109594759B (en) | Height-adjustable assembled double-layer outer protection frame device and using method thereof | |
CN213683193U (en) | Anti-deviation device for high formwork support | |
CN203145475U (en) | Foundation of floor concrete leveling device | |
CN209760791U (en) | Post-cast strip template device | |
CN206419559U (en) | A kind of holder device of protection underground utilities | |
CN105275202A (en) | Supporting system of pre-stressed concrete laminated slab of shear wall structure | |
CN207727978U (en) | Girderless floor bolumn cap template reinforcing device | |
CN204126290U (en) | Elevator shaft horizontal protective device | |
CN206159649U (en) | Pipeline suspends bracket in midair | |
CN204919567U (en) | Shoring of trench stand shock attenuation construction equipment | |
CN205012621U (en) | Template is pour to outside decorative layer of toper post | |
CN207847031U (en) | A kind of supporting rack of construction site portable scaffold | |
CN103195079A (en) | Installation type templates, installation type template group and set of installation type template devices |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |