CN206053339U CN201620844330.3U CN201620844330U CN206053339U CN 206053339 U CN206053339 U CN 206053339U CN 201620844330 U CN201620844330 U CN 201620844330U CN 206053339 U CN206053339 U CN 206053339U
Authority
CN
China
Prior art keywords
tower
scalable
section
tower crane
passage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620844330.3U
Other languages
Chinese (zh)
Inventor
李长明
李育超
唐立刚
赵国辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fourth Bureau Third Construction Engineering Co Ltd
Original Assignee
China Construction Fourth Bureau Third Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fourth Bureau Third Construction Engineering Co Ltd filed Critical China Construction Fourth Bureau Third Construction Engineering Co Ltd
Priority to CN201620844330.3U priority Critical patent/CN206053339U/en
Application granted granted Critical
Publication of CN206053339U publication Critical patent/CN206053339U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses tower passage on a kind of scalable turnover type tower crane driver, fabric structure and the tower crane being made up of standard section of tower crane positioned at fabric structure side including hot work in progress, tower passage on arranging between fabric structure and tower crane, wherein on this, tower passage includes at least one fixed knot and scalable section, the fixed knot of adjacent fabric structure side is hinged by the pre-embedded anchoring bolts on fabric structure structural slab with fabric structure, scalable section is freely ridden upon on standard section of tower crane, safety protection standard block is arranged on fixed knot and scalable section both sides realize that the both sides of upper tower passage are fixed, this utility model simple structure, it is easy to make, and adopt modularized design, turnover is convenient, intensity high stability is good simultaneously, it is safe, suitable large-scale promotion.

Description

Tower passage on a kind of scalable turnover type tower crane driver
Technical field
This utility model is related to construction technical field of auxiliary equipment, especially a kind of scalable turnover type tower crane driver Upper tower passage.
Background technology
Up to now, in existing building construction, on tower crane driver, tower mainly passes through two ways:1. when construction structure is firm When starting construction, tower crane driver cat ladder one generally from inside standard section of tower crane is saved climbs up tower crane driver room;2. with building After thing has arrived certain altitude, driver can not possibly climb to drivers' cab, therefore interim frame plate is generally set up between building body and tower crane.All it is Built with scaffold, template, adopt the driver's climbing tower passage built in this way not only build, dismantle it is cumbersome, it is time-consuming Arduously, and safety is not fine, it is impossible to prevent dropped object from hurting sb.'s feelings, in addition, being not easy to be used in turn.
Utility model content
Technical problem to be solved in the utility model is:There is provided a kind of simple structure, easy accessibility, protective it is good, peace It is complete reliable, and the tower crane driver for construction site that can be used in turn on tower passage, can be used for 3m-6m different The extension type passage of tower body and building body spacing, to overcome the deficiencies in the prior art.
What this utility model was realized in:
Tower passage on a kind of scalable turnover type tower crane driver, including hot work in progress fabric structure and be located at building The tower crane being made up of standard section of tower crane of structure side, arranges tower passage, between fabric structure and tower crane wherein on this Tower passage includes at least one fixed knot and scalable section, and the fixed knot of adjacent fabric structure side is passed through with fabric structure On fabric structure structural slab, pre-embedded anchoring bolts are hinged, and scalable section is freely ridden upon on standard section of tower crane, security protection Calibrated bolck is arranged on fixed knot and scalable section both sides realize that the both sides of upper tower passage are fixed.
On a kind of aforesaid scalable turnover type tower crane driver in tower passage, the fixed knot does girder using 10# channel-section steels, Secondary beam adopts 10@200 of one-level steel, surface channel 2mm checkered steel plates.
On a kind of aforesaid scalable turnover type tower crane driver in tower passage, the scalable section is decided using 8# channel-section steels Beam, secondary beam adopt 10@200 of one-level steel, surface channel 2mm checkered steel plates.
On a kind of aforesaid scalable turnover type tower crane driver in tower passage, pre-buried anchor is set in one end of fabric structure Ring, with the scalable pre-buried collar in fixed knot end for saving and being connected, steel wire rope two ends are connected solid respectively with pre-buried anchor ring and the pre-buried collar It is fixed.
On a kind of aforesaid scalable turnover type tower crane driver in tower passage, the steel wire rope two ends adopt doubling mode shape Connect with the corresponding collar into ring set, fixed using at least 2 U-bolts after the steel wire rope doubling, it is non-between adjacent U-bolt The safety that part of the force steel wire rope forms arcuation is curved, curved by arranging safety, can be prevented effectively from U-bolt mutual with steel wire rope Slide, improve safety.
As a result of above-mentioned technical proposal, compared with prior art, this utility model simple structure is easy to make, and And modularized design is adopted, turnover is convenient, while intensity high stability is good, it is safe, it is adapted to large-scale promotion.
Description of the drawings
Accompanying drawing 1 is structural representation of the present utility model;
Accompanying drawing 2 is the structural representation of fixed knot in this utility model;
Accompanying drawing 3 is the structural representation of scalable section in this utility model;
Accompanying drawing 4 is the structural representation of safety protection standard block in this utility model;
Accompanying drawing 5 is the structural representation of safety rope in this utility model.
Specific embodiment
Embodiment of the present utility model:Tower passage on a kind of scalable turnover type tower crane driver, as shown in drawings, including just In the fabric structure 1 and the tower crane being made up of standard section of tower crane 2 positioned at 1 side of fabric structure of construction, tie in building Upper tower passage 3 is set between structure 1 and tower crane, and wherein on this, tower passage 3 includes at least one fixed knot 4 and scalable section 5, adjacent Fixed knot 4 and the fabric structure 1 of 1 side of fabric structure is cut with scissors by the pre-embedded anchoring bolts on 1 structural slab of fabric structure Connect, scalable section 5 is freely ridden upon on standard section of tower crane 2, safety protection standard block 6 is arranged on fixed knot 4 and scalable section 5 Realize that the both sides of upper tower passage 3 are fixed in both sides.
Wherein the fixed knot 4 does girder using 10# channel-section steels, and secondary beam adopts one-level steel 10 200, surface channel 2mm riffled irons Plate, the scalable section 5 do girder using 8# channel-section steels, and secondary beam adopts one-level steel 10 200, surface channel 2mm checkered steel plates building The one end for building thing structure 1 arranges pre-buried anchor ring 7, the pre-buried collar 8 in 4 end of fixed knot being connected with scalable section 5,9 two ends of steel wire rope It is connected with pre-buried anchor ring 7 and the pre-buried collar 8 respectively, 9 two ends of steel wire rope form ring set with corresponding set using doubling mode Ring connects, and is fixed using at least 2 U-bolts 10, the non-stress part between adjacent U-bolt 10 after 9 doubling of steel wire rope Steel wire rope 9 forms the safety curved 11 of arcuation.
During concrete making
Tower passage in a kind of scalable turnover type tower department for construction site of the present embodiment, including fixed knot and Scalable section, guard system, attachment anchor system etc., fixed knot (is referred to using pre-buried 22mm bolt connections near building body side Accompanying drawing), distal end is socketed (see figure) using steel wire rope with building body, and scalable section is freely ridden upon on standard section of tower crane.
1st, fixed knot
Fixed knot 40000 × 7000mm of size, does passage girder using 10# channel-section steels (channel cross-section size refers to accompanying drawing), Secondary beam adopts the length of side for 10mm round steel, and surface channel 2mm thickness checkered steel plates, fixed knot overlap 400mm with building body face.
2nd, scalable section
Scalable section 6890 × 30000mm of size, girder are adopted using 8# thickness channel-section steel (girder section refers to accompanying drawing), secondary beam 10mm round steel, scalable section surface channel open 150mm holes using 2mm thickness checkered steel plates, scalable section girder interval 1m, and at each Stay the bolt hole of diameter 22mm in hole.Security protection vertical rod on safety protection standard block is inserted directly in girder, insertion depth 80mm, it is ensured that protection safety reliability.Scalable section overlaps 400mm with tower body, freely rides upon tower-body standard section girder.
3rd, passage and building body connecting node
In advance in the foundation bolt of the pre-buried diameter 22mm of floor installed by people's passage, position is logical in strict accordance with installing The position in road is pre-buried, controls the spacing of two pre-embedded bolts.It is (referring to accompanying drawing) in the pre-buried cable wire drawknot ring of last layer, pre-buried Position is far from building side 300mm.(referring to accompanying drawing)
4th, fixed knot and telescopic joint stationary nodes
4.1 are fixed with scalable section to fixed knot using the bolt of diameter 22mm.
4.2 arrange oblique pull steel wire rope
(1) in order to reduce the amount of deflection of channel-section steel of encorbelmenting, using steel wire rope unloading, the concrete strength value of suspension ring of encorbelmenting should reach 10N/ Steel wire rope can be installed during more than mm2 carries out off-load, unloads for installing in the pre-buried good reinforcing bar suspension ring of corresponding site during structure construction Carry steel wire rope.
(2) cantilevered plate is fixed locking nub upper strata steel wire rope drawknot and is illustrated.
(3) embedded U-shaped A16 reinforcing bars, the drawknot that wirerope-winding this node carries out hard protection is fixed.Embedded U-shaped A16 steel Muscle hook need to carry out load capacity calculation in advance.
5th, guard system
Safety protection standard block:Using calibrated bolck (accompanying drawing 4), vertical rod adopts length of side 150mm square tube, wall thickness 2mm, protective block Using 100 reinforced mesh of 8mm@.
The description of such scheme is the utility model for being understood that for ease of those skilled in the art and using. Person skilled in the art obviously easily can make various modifications to embodiment.Therefore, this utility model is not limited In above-mentioned real scheme, those skilled in the art are made without departing from this utility model category according to method of the present utility model Improving and change all should be within protection domain of the present utility model.

Claims (5)

1. a kind of tower passage on scalable turnover type tower crane driver, including the fabric structure of hot work in progress(1)Build with being located at Thing structure(1)Side by standard section of tower crane(2)The tower crane of composition, it is characterised in that:In fabric structure(1)Between tower crane Tower passage in setting(3), tower passage wherein on this(3)Including at least one fixed knot(4)With scalable section(5), adjacent building Thing structure(1)The fixed knot of side(4)With fabric structure(1)By in fabric structure(1)Pre-buried lower margin spiral shell on structural slab Bolt is hinged, scalable section(5)Standard section of tower crane is ridden upon freely(2)On, safety protection standard block(6)It is arranged on fixed knot(4) With scalable section(5)Realize upper tower passage in both sides(3)Both sides fix.
2. tower passage on a kind of scalable turnover type tower crane driver according to claim 1, it is characterised in that:The fixation Section(4)Girder is done using 10# channel-section steels, secondary beam adopts one-level steel 10 200, surface channel 2mm checkered steel plates.
3. tower passage on a kind of scalable turnover type tower crane driver according to claim 1, it is characterised in that:It is described to stretch Casing coupling(5)Girder is done using 8# channel-section steels, secondary beam adopts one-level steel 10 200, surface channel 2mm checkered steel plates.
4. tower passage on a kind of scalable turnover type tower crane driver according to claim 1, it is characterised in that:In building Structure(1)One end pre-buried anchor ring is set(7), with scalable section(5)The fixed knot of connection(4)Hold the pre-buried collar(8), steel wire rope (9)Two ends respectively with pre-buried anchor ring(7)With the pre-buried collar(8)It is connected.
5. tower passage on a kind of scalable turnover type tower crane driver according to claim 4, it is characterised in that:The steel wire Rope(9)Two ends are formed ring set using doubling mode and are connected with the corresponding collar, the steel wire rope(9)At least 2 U-shaped spiral shells are adopted after doubling Bolt(10)It is fixed, in adjacent U-bolt(10)Between non-stress part steel wire rope(9)The safety for forming arcuation is curved(11).
CN201620844330.3U 2016-08-08 2016-08-08 Tower passage on a kind of scalable turnover type tower crane driver Active CN206053339U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620844330.3U CN206053339U (en) 2016-08-08 2016-08-08 Tower passage on a kind of scalable turnover type tower crane driver

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620844330.3U CN206053339U (en) 2016-08-08 2016-08-08 Tower passage on a kind of scalable turnover type tower crane driver

Publications (1)

Publication Number Publication Date
CN206053339U true CN206053339U (en) 2017-03-29

Family

ID=58380086

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620844330.3U Active CN206053339U (en) 2016-08-08 2016-08-08 Tower passage on a kind of scalable turnover type tower crane driver

Country Status (1)

Country Link
CN (1) CN206053339U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106437153A (en) * 2016-08-08 2017-02-22 中建四局第三建筑工程有限公司 Telescopic and transferrable crane climbing passageway for tower crane driver

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106437153A (en) * 2016-08-08 2017-02-22 中建四局第三建筑工程有限公司 Telescopic and transferrable crane climbing passageway for tower crane driver

Similar Documents

Publication Publication Date Title
CN106437153A (en) Telescopic and transferrable crane climbing passageway for tower crane driver
CN110847156A (en) Steel reinforcement cage suitable for underground diaphragm wall of air shaft and use method
CN204782031U (en) Interior climbing tower hangs entrance to a cave from promoting safety protection platform
CN104481552B (en) Super-huge karst cave hole roof fall stone protection construction method
CN208280965U (en) Coal mine deep well tunnel smooth surface concrete spraying support structure
CN108360380A (en) A kind of bridge pier column construction operation platform and its construction method
CN106245931A (en) The underpinning device of load bearing wall and construction method in brick mix structure
CN107254933A (en) The high-rise single through hole precast shear wall of assembled and its assembling structure and construction method
CN104533483A (en) Roadway total-space prestress truss, anchor cable and anchor rod coordinated supporting method
CN203499226U (en) Binding beam type steel cantilever scaffold
CN205712590U (en) A kind of fabricated shear wall and the attachment structure of Prefabricated concrete-filled steel tube post
CN104847102B (en) Attachment type raise scaffold is received attached wall method and the device thereof of section in external wall
CN206448504U (en) It is a kind of be used for interior build by laying bricks or stones, the lift Mobile operating platform of plastering construction
CN107227814B (en) A kind of large cantilever concrete structure section construction method
CN206337655U (en) A kind of assembly concrete wallboard and its soft rope anchor ring attachment structure of reinforcement
CN206053339U (en) Tower passage on a kind of scalable turnover type tower crane driver
CN108222006B (en) Construction method of square underground continuous wall
CN211143813U (en) Elevator shaft protection device
CN107035131A (en) A kind of construction method of elevator integral lifting construction operation platform and elevator
CN204311457U (en) A kind of Metro station excavation excavation construction composite retaining structure system
CN103334580B (en) Section steel tripod in a kind of overhanging scaffold and connection system for guide rail
CN203499259U (en) Tool type cantilevered unloading platform
CN207177310U (en) A kind of crane beam on rock wall for underground power house reinforcing bar is from steady structure
CN105755959B (en) Suitable for the Sarasota construction auxiliary stand system and building method of different cross section
CN202039299U (en) Totally-closed hanging basket

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant