CN206053328U - A kind of middle buried water stop fixing device - Google Patents
A kind of middle buried water stop fixing device Download PDFInfo
- Publication number
- CN206053328U CN206053328U CN201620833514.XU CN201620833514U CN206053328U CN 206053328 U CN206053328 U CN 206053328U CN 201620833514 U CN201620833514 U CN 201620833514U CN 206053328 U CN206053328 U CN 206053328U
- Authority
- CN
- China
- Prior art keywords
- upper die
- fastening band
- die plate
- support column
- rubber fastening
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
The utility model discloses a kind of middle buried water stop fixing device, including support column, base plate, two Screw arbor with nut at both-ends, support flitch, upper die plate and lower templates;Support column is vertically installed on base plate;It is parallel on the support columns to be provided with two pieces of clamping plates for clamping rubber fastening band;Two Screw arbor with nut at both-ends are separately mounted to support column on upper die plate and lower template;Upper die plate and lower template are vertically installed at the both sides up and down of rubber fastening band respectively;Flitch is supported to support installed between support column and upper die plate and lower template.The rubber fastening band fixing device can carry out clamping position to rubber fastening band, and in preventing concreting process, rubber fastening band is shifted over, while also without compromising on rubber fastening band, with preferable application effect.
Description
Technical field
This utility model is related to a kind of waterstop fixing device, it is especially a kind of in buried rubber fastening band fixed dress
Put.
Background technology
In buried rubber fastening band is a large amount of in architectural engineering, commonly use, particularly after architectural engineering advanced water-stopping
Pour and have extensive utilization in water structures with what position, new and old building thing were connected position and industrial building;In buried rubber
(Steel plate)Waterstop mainly solves the problems, such as three aspects:First is to solve the problems, such as that structure one-off construction is long(Pour after i.e.
Band problem);Second is to solve the problems, such as that adjacent structure sedimentation is different;3rd is to solve the problems, such as structurally waterproof.
For a long time, the buried rubber in(Steel plate)The construction fixing meanss of waterstop, neither one unification, effectively
Method, both can guarantee that rubber fastening band fixation, it is impossible to damage rubber fastening band in the formwork reinforcement at this position(Such as ferrum
Follow closely fixed etc.), can guarantee that in concreting process rubber fastening band is not shifted again.
And if in construction rubber(Steel plate)Waterstop is not constructed, then this position easily occurs percolating water phenomenon, and
And its seepage is difficult radical cure.
Utility model content
Utility model purpose:There is provided one kind can be to rubber(Steel plate)Waterstop is fixed, it is ensured that concreting
Rubber fastening band is guaranteed in journey(Steel plate)Do not shift.
Technical scheme:Middle buried water stop fixing device described in the utility model, including support column, base plate, two it is right
Draw screw rod, support flitch, upper die plate and lower template;Support column is vertically installed on base plate;It is parallel on the support columns to be provided with two
Block is used for the clamping plate for clamping rubber fastening band;Two Screw arbor with nut at both-ends are separately mounted to support column on upper die plate and lower template;On
Template and lower template are vertically installed at the both sides up and down of rubber fastening band respectively;Flitch is supported to support installed in support column and upper mould
Between plate and lower template.
The clamping position of rubber fastening band is completed using upper die plate and lower template and two clamping plates collective effect, prevents from mixing
In solidifying soil casting process, rubber fastening band is shifted over;The stability of support column can effectively be strengthened using base plate, construction is prevented
During occur it is crooked.
Used as further limits scheme of the present utility model, upper die plate and lower template are perpendicular with Screw arbor with nut at both-ends.This sets
Meter guarantees the perpendicularity of upper die plate and lower template, it is ensured that facade effect.
As further limits scheme of the present utility model, the rubber in the middle part of upper die plate and lower template and rubber fastening band
The end of reinforcing ring contact is equipped with a slope;Slope is cylindrical tangent with rubber reinforcing ring.Designed using slope
Can be bonded to each other with the rubber reinforcing ring in the middle of rubber fastening band tight, and without compromising on rubber fastening band.
Compared with prior art, its advantage is this utility model:(1)Using upper die plate and lower template and two pieces of folders
Plate collective effect completes the clamping position of rubber fastening band, and in preventing concreting process, rubber fastening band is shifted over;(2)
The stability of support column can effectively be strengthened using base plate, occurred in preventing work progress crooked;(3)Energy is designed using slope
Rubber reinforcing ring in the middle of enough and rubber fastening band is bonded to each other tight, and without compromising on rubber fastening band.
Description of the drawings
Fig. 1 is side structure schematic diagram of the present utility model.
In figure:1st, support column, 2, base plate, 3, clamping plate, 4, Screw arbor with nut at both-ends, 5, support flitch, 6, rubber fastening band, 7, upper mould
Plate, 8, lower template, 9, rubber reinforcing ring, 10, slope.
Specific embodiment
Below in conjunction with the accompanying drawings technical solutions of the utility model are described in detail, but protection domain of the present utility model
It is not limited to the embodiment.
Embodiment 1:
As shown in figure 1, middle buried water stop fixing device of the present utility model includes:Support column 1, base plate 2, two are to drawing
Screw rod 4, several support flitch 5, upper die plate 7 and lower templates 8.
Wherein, support column 1 is vertically-mounted on a base plate 2;It is parallel on support column 1 to be provided with two pieces for clamping rubber water-proof
With 6 clamping plate 3;Two Screw arbor with nut at both-ends 4 are separately mounted to support column 1 on upper die plate 7 and lower template 8;Upper die plate 7 and lower template
8 both sides up and down for being vertically installed at rubber fastening band 6 respectively;Support flitch 5 support installed in support column 1 and upper die plate 7 and
Between lower template 8;Upper die plate 7 and lower template 8 are perpendicular with Screw arbor with nut at both-ends 4;In upper die plate 7 and lower template 8 and rubber water-proof
The end contacted with the rubber reinforcing ring 9 in the middle part of in the of 6 is equipped with a slope 10;Slope 10 is cylindrical with rubber reinforcing ring 9
It is tangent.
Middle buried water stop fixing device of the present utility model is needed long according to the construction of rubber fastening band 6 in construction
Fixing device of the degree using corresponding number, adjacent fixation devices are spaced between 1 ~ 2m;Upper die plate 7 needs to be higher by structural plane
150mm, so as to prevent trickling to beyond template on waterstop in structure base slab concreting process, in case pollution and cleaning are tired
It is difficult;Screw arbor with nut at both-ends 4 can be using being welded and fixed with the upper and lower cage bar of the structural slab in left side after passing through upper die plate 7 or lower template 8;
In order to ensure that the rubber fastening band 6 for being reserved in outside is not damaged during formwork reinforcement, using two-stage flitch transition, three-level wood
The method of Fang Jiagu;Support not of uniform size, the quantity of flitch 5 not to limit, can according to support column 1 and upper die plate 7 and lower template 8 it
Between distance selected, it is ensured that it is stable between support column 1 and upper die plate 7 and lower template 8 to support.
As described above, although this utility model has been represented and described with reference to specific preferred embodiment, which must not
It is construed to the restriction to this utility model itself.In the spirit and scope of the present utility model defined without departing from claims
Under the premise of, can various changes can be made in the form and details to which.
Claims (3)
1. a kind of middle buried water stop fixing device, it is characterised in that:Including support column(1), base plate(2), two pieces Screw arbor with nut at both-ends
(4), support flitch(5), upper die plate(7)And lower template(8);Support column(1)It is vertically installed at base plate(2)On;In support column
(1)It is above parallel to be provided with two pieces for clamping rubber fastening band(6)Clamping plate(3);Two Screw arbor with nut at both-ends(4)By support column(1)Point
An Zhuan not upper die plate(7)And lower template(8)On;Upper die plate(7)And lower template(8)Rubber fastening band is vertically installed at respectively
(6)Both sides up and down;Support flitch(5)Support installed in support column(1)With upper die plate(7)And lower template(8)Between.
2. middle buried water stop fixing device according to claim 1, it is characterised in that:Upper die plate(7)And lower template(8)
And Screw arbor with nut at both-ends(4)It is perpendicular.
3. middle buried water stop fixing device according to claim 1 and 2, it is characterised in that:In upper die plate(7)With lower mould
Plate(8)With rubber fastening band(6)The rubber reinforcing ring at middle part(9)The end of contact is equipped with a slope(10);Slope
(10)With rubber reinforcing ring(9)It is cylindrical tangent.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620833514.XU CN206053328U (en) | 2016-08-02 | 2016-08-02 | A kind of middle buried water stop fixing device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620833514.XU CN206053328U (en) | 2016-08-02 | 2016-08-02 | A kind of middle buried water stop fixing device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206053328U true CN206053328U (en) | 2017-03-29 |
Family
ID=58379742
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620833514.XU Active CN206053328U (en) | 2016-08-02 | 2016-08-02 | A kind of middle buried water stop fixing device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206053328U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109372133A (en) * | 2018-12-04 | 2019-02-22 | 中国核工业华兴建设有限公司 | In buried rubber fastening band positioning construction method is installed |
CN109594662A (en) * | 2019-01-16 | 2019-04-09 | 中建八局第建设有限公司 | A kind of middle buried water stop fixing means and its grip device |
CN110499781A (en) * | 2019-09-12 | 2019-11-26 | 成都交投建筑工业化有限公司 | Electric power piping lane tube coupling sealing section molding die and electric power piping lane tube coupling forming method |
CN110952494A (en) * | 2019-11-28 | 2020-04-03 | 中国水利水电第五工程局有限公司 | Mixed double-water-stop formwork and construction method thereof |
-
2016
- 2016-08-02 CN CN201620833514.XU patent/CN206053328U/en active Active
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109372133A (en) * | 2018-12-04 | 2019-02-22 | 中国核工业华兴建设有限公司 | In buried rubber fastening band positioning construction method is installed |
CN109594662A (en) * | 2019-01-16 | 2019-04-09 | 中建八局第建设有限公司 | A kind of middle buried water stop fixing means and its grip device |
CN109594662B (en) * | 2019-01-16 | 2024-01-30 | 中建八局第一建设有限公司 | Method for fixing embedded water stop and clamp device thereof |
CN110499781A (en) * | 2019-09-12 | 2019-11-26 | 成都交投建筑工业化有限公司 | Electric power piping lane tube coupling sealing section molding die and electric power piping lane tube coupling forming method |
CN110952494A (en) * | 2019-11-28 | 2020-04-03 | 中国水利水电第五工程局有限公司 | Mixed double-water-stop formwork and construction method thereof |
CN110952494B (en) * | 2019-11-28 | 2021-07-20 | 中国水利水电第五工程局有限公司 | Mixed double-water-stop formwork and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206053328U (en) | A kind of middle buried water stop fixing device | |
CN103215894B (en) | Portable interim prestressed stretch-draw anchor block | |
CN205100120U (en) | Bury mounting structure of formula waterstop in box culvert | |
CN204982970U (en) | Mould is fixed to bottom plate steel limit rubber waterstop | |
CN207794605U (en) | The positioning protection device of deformation joint rubber fastening band when concreting | |
CN205604290U (en) | Frame energy dissipation formula utility tunnel structure turns up | |
CN203613797U (en) | Bottom plate post-pouring belt template provided with water-stopping steel plates | |
CN205531326U (en) | L type dysmorphism post template | |
CN204112712U (en) | A kind of side root haunch cast-in-place wall model sheetinstallat device | |
CN106381883B (en) | Bar Seepage method through walls | |
CN203113371U (en) | Concrete foundation pillar top structure with steel plate embedded parts | |
CN203334661U (en) | Scaffold-hole-free formwork construction device for brick-concrete structure construction column | |
CN201972395U (en) | Steel-frame double-layer-net building template | |
CN207131070U (en) | A kind of Concrete Double wall formwork support process improves construction | |
CN205604289U (en) | Can resist single storehouse underground pipe gallery of big deformation | |
CN203403434U (en) | Basement | |
CN204645615U (en) | Top board rubber watertight strip fixed mould | |
CN206956795U (en) | Concrete prefabricated aproll | |
CN201276843Y (en) | Internal corner adapter for wall beam template | |
CN108532631A (en) | Formwork reinforcement structure and construction method at a kind of underground pipe gallery horizontal construction joint | |
CN203213022U (en) | Mobile temporary prestress tensioning anchor block | |
CN206418776U (en) | A kind of slab thickness controls prefabricated components | |
CN203393536U (en) | Road side ditch | |
CN206859263U (en) | A kind of large formwork construction device of subway station side wall | |
CN206457821U (en) | A kind of domatic building concrete layer landslide-proofing fixing device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |