Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721017414.0U
Other languages
Chinese (zh)
Inventor
李辰同
张勇
李德民
王涛
李治卫
韩飞
苏海东
廖雄龙
胡欢
胡一欢
高书艳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Beijing Engineering Group Co Ltd
China Railway Beijing Engineering Group Beijing Co Ltd
Original Assignee
China Railway Beijing Engineering Group Co Ltd
China Railway Beijing Engineering Group Beijing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Beijing Engineering Group Co Ltd, China Railway Beijing Engineering Group Beijing Co Ltd filed Critical China Railway Beijing Engineering Group Co Ltd
Priority to CN201721017414.0U priority Critical patent/CN207131070U/en
Application granted granted Critical
Publication of CN207131070U publication Critical patent/CN207131070U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

Improve and construct the utility model discloses a kind of Concrete Double wall formwork support process, belong to construction engineering technical field.Described extruded polystyrene board is fixed between twice concrete structure wall, described double F steel-fastenings muscle are fixed on concrete wall horizontal reinforcement, the concrete pad is fixed on twice concrete wall vertical reinforcement both sides, formwork reinforcement system is installed with by split bolt on the outside of described twice concrete wall vertical reinforcement, Concrete Double wall formwork support process of the present utility model improves construction, by the use of width stack pile between wall extruded polystyrene board as separate template replace wall between form bracing system, gap is dealt with improperly between reducing in concreting process double walls, waste to concrete material.

Description

A kind of Concrete Double wall formwork support process improves construction
Technical field
It the utility model is related to a kind of Concrete Double wall formwork support process and improve construction, belong to construction engineering technical field.
Background technology
During universal Concrete Double wall construction construction, because gap is narrow and small between balcony structure, it is divided into two kinds of different construction shapes State:Same construction flowing water section can only be reinforced Concrete Double wall simultaneously, and middle part sets support system between minimum gap, it is impossible to The stability of support system is effectively ensured, causes the pollution between double walls in work progress unavoidably, and construct and cause to tear open later Except phenomenon;Difference construction flowing water section is needed first to pour side concrete wall, and opposite side wall form branch is carried out after form removal If also due to gap is smaller, it is impossible to support system stabilization is effectively ensured, causes the pollution between double walls in work progress unavoidably, And construction later causes that phenomenon can not be removed.And external wall construction processing is more difficult between Concrete Double wall, easily occurs between wall Rain leakage situation, heat insulation effect is poor between gap, forms cold bridge, situations such as causing indoor condensation, influences exterior wall using effect.
Therefore, to solve the above problems, improving construction it is necessory to the Concrete Double wall formwork support process for providing a kind of innovation, To overcome the defect of the prior art.
Utility model content
Change in view of the above-mentioned problems, the technical problems to be solved in the utility model is to provide a kind of Concrete Double wall formwork support process Enter construction.
Concrete Double wall formwork support process of the present utility model improves construction, and it includes extruded polystyrene board, double F steel-fastenings muscle, right Bolt, formwork reinforcement system and concrete pad, described extruded polystyrene board is drawn to be fixed between twice concrete structure wall, Described double F steel-fastenings muscle are fixed on concrete wall horizontal reinforcement, and the concrete pad is fixed on twice concrete walls Body vertical reinforcement both sides, described twice concrete wall vertical reinforcement outside are installed with formwork reinforcement by split bolt System.
Preferably, width of the thickness of described extruded polystyrene board between twice concrete structure wall.
The beneficial effects of the utility model:1st, Concrete Double wall formwork support process of the present utility model improves construction, according to two Gap width between side wall body, using the extruded polystyrene board of width stack pile between wall instead of form bracing system between wall, solution Concrete lateral pressure is determined and both sides difference pours many construction loads such as the shearing of concrete and concrete vibrating under height Adverse effect, by load calculate and simulated experiment, it is determined that the intensity and specification of extruded polystyrene board, and efficiently solve because Form bracing system caused by gap is narrow between wall is reinforced loosely and support system situation about can not remove, and it is difficult to reduce construction Degree.
2nd, Concrete Double wall formwork support process of the present utility model improves construction, utilizes the extrusion molding of width stack pile between wall Styrofoam reduces gap processing between double walls in concreting process as template is separated instead of form bracing system between wall It is improper, the waste to concrete material.
3rd, Concrete Double wall formwork support process of the present utility model improves construction, utilizes the extrusion molding of width stack pile between wall Styrofoam replace wall between form bracing system, simple to operate, high insulating effect, can effectively prevent cold bridge, can prevent because Rainwater penetrates into and reduces heat insulation effect.
4th, Concrete Double wall formwork support process of the present utility model improves construction, sets double F card measures reinforcing bars, concrete mats Block, the interaction with wall form by Duola's bolt, is fixed together with reinforcing bar, template system, twice has been effectively ensured Globality, the stability of concrete wall reinforcing bar, and the thickness of cover to reinforcement.
Brief description of the drawings
For ease of explanation, the utility model is described in detail by following specific implementations and accompanying drawing.
Fig. 1 is structure sectional view of the present utility model.
Reference:Extruded polystyrene board 1, double F steel-fastenings muscle 2, split bolt 3, formwork reinforcement system 4, concrete pad 5, Concrete structure wall a, concrete wall horizontal reinforcement b, concrete wall vertical reinforcement c.
Embodiment
As shown in figure 1, present embodiment uses following technical scheme:It includes extruded polystyrene board 1, double F steel-fastenings muscle 2nd, split bolt 3, formwork reinforcement system 4 and concrete pad 5, described extruded polystyrene board 1 are fixed on twice concrete structure Between wall a, the width of the thickness of described extruded polystyrene board 1 between twice concrete structure wall a, described double F cards Reinforcing bar 2 is fixed on concrete wall horizontal reinforcement b, and the concrete pad 5 is fixed on twice concrete wall vertical steel Muscle c both sides, described twice concrete wall vertical reinforcement c outsides are installed with formwork reinforcement system by split bolt 3 4。
Embodiment:Extruded polystyrene board 1 is 1200mm × 600mm × 100mm(Thickness refers to wall crack size), burning Performance is not less than B1 levels, apparent density:30.0-35.0kg/m3 compressive strength:>=200kpa, thermal conductivity factor(25℃):≤ 0.032W/(m.K).
Placement layer by layer should be distinguished in double wall concrete constructions, lift height should be under no more than 500mm, upper layer concrete Pour and finish before layer concrete initial set.Vibrating head should be accomplished " fast insert is pulled out slowly " perpendicular to concrete surface between wall steel bar Avoid directly touching extruded polystyrene board 1 and cause to damage.Vibrating time is controlled in 25s, and unsuitable long, is ensured integrally-built Stability.
The advantages of general principle and principal character of the present utility model and the utility model has been shown and described above.One's own profession The technical staff of industry is it should be appreciated that the utility model is not restricted to the described embodiments, described in above-described embodiment and specification Simply illustrate principle of the present utility model, on the premise of the spirit and scope of the utility model is not departed from, the utility model is also Various changes and modifications are had, these changes and improvements are both fallen within claimed the scope of the utility model.The utility model Claimed scope is by appended claims and its equivalent thereof.

Claims (2)

1. a kind of Concrete Double wall formwork support process improves construction, it is characterised in that:It includes extruded polystyrene board(1), double F steel-fastenings muscle (2), split bolt(3), formwork reinforcement system(4)And concrete pad(5), described extruded polystyrene board(1)It is fixed on twice Concrete structure wall(a)Between, described double F steel-fastenings muscle(2)It is fixed on concrete wall horizontal reinforcement(b)On, it is described Concrete pad(5)It is fixed on twice concrete wall vertical reinforcement(c)Both sides, described twice concrete wall vertical reinforcement (c)Outside passes through split bolt(3)It is installed with formwork reinforcement system(4).
2. a kind of Concrete Double wall formwork support process according to claim 1 improves construction, it is characterised in that:Described extrusion molding Styrofoam(1)Thickness be twice concrete structure wall(a)Between width.
CN201721017414.0U 2017-08-14 2017-08-14 A kind of Concrete Double wall formwork support process improves construction Active CN207131070U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721017414.0U CN207131070U (en) 2017-08-14 2017-08-14 A kind of Concrete Double wall formwork support process improves construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721017414.0U CN207131070U (en) 2017-08-14 2017-08-14 A kind of Concrete Double wall formwork support process improves construction

Publications (1)

Publication Number Publication Date
CN207131070U true CN207131070U (en) 2018-03-23

Family

ID=61634931

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721017414.0U Active CN207131070U (en) 2017-08-14 2017-08-14 A kind of Concrete Double wall formwork support process improves construction

Country Status (1)

Country Link
CN (1) CN207131070U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108518062A (en) * 2018-03-30 2018-09-11 中国建筑第八工程局有限公司 The molding construction method of combined member concrete one-time-concreting
CN110344589A (en) * 2019-07-15 2019-10-18 淮南川石化工科技有限公司 A kind of crystalline p p sheet

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108518062A (en) * 2018-03-30 2018-09-11 中国建筑第八工程局有限公司 The molding construction method of combined member concrete one-time-concreting
CN108518062B (en) * 2018-03-30 2020-09-08 中国建筑第八工程局有限公司 Construction method for one-step pouring and forming of concrete of combined member
CN110344589A (en) * 2019-07-15 2019-10-18 淮南川石化工科技有限公司 A kind of crystalline p p sheet
CN110344589B (en) * 2019-07-15 2021-07-09 温州鑫泰新材料股份有限公司 Polypropylene sheet

Similar Documents

Publication Publication Date Title
CN106703269A (en) Prestressed concrete superimposed sheet with steel trusses and manufacturing method
CN107288256A (en) Light composite heat insulation outer wall plate, particular manufacturing craft and preparation method thereof
CN101858142A (en) Construction method for preventing vertical cracking between main structure and filled wall
CN207131070U (en) A kind of Concrete Double wall formwork support process improves construction
CN107605070A (en) The node connection engineering method of overlaid plate type Combined concrete prefabricated components
CN103452328B (en) Post brutal bracing means and method is subtracted for reinforced concrete member
CN205444693U (en) Thin wall steel tube - reinforcing bar recycled concrete combination column
CN201713970U (en) Structural system with light multi-ribbed plates and light multi-ribbed floor systems
CN206957042U (en) Light composite heat insulation outer wall plate and particular manufacturing craft
CN104612291B (en) Non-dismantling heat preservation wall module unit
CN113898102A (en) Ribbed concrete laminated slab
CN103866866B (en) Super High Core Walls Structure and housing water node after setting a roof beam in place
CN111350348A (en) Positioning and reinforcing device for outer wall anti-seepage inverted beam template and construction method
CN106836641A (en) Side sticking steel plate formula Combined concrete coupling beam
CN107012986A (en) Multilayer steel-enclosed concrete members composite coupling beams
CN106285001A (en) A kind of little area segmentation quickly intersects flowing water construction method
CN207582763U (en) Two-way close spelling laminated floor slab connecting joint structure with groove type embedded part
CN2934421Y (en) Wall made of concrete hollow panel
CN206448171U (en) A kind of component for controlling hollow slab beam core mould to float
CN206448148U (en) A kind of align member of bridge hollow board beam core
CN204898909U (en) Prefabricated composite insulation board and cast in situ concrete wall structure thereof
CN104110131A (en) Hollow concrete shuttering of constructional wall column
CN104631675B (en) A kind of two-sided prefabricated superimposed sheet
CN205399830U (en) Easy plane is plastics split heads for reinforcing bar
CN104746521A (en) Application of super large-section slope cushion layer construction structure