CN206034941U CN201620929929.7U CN201620929929U CN206034941U CN 206034941 U CN206034941 U CN 206034941U CN 201620929929 U CN201620929929 U CN 201620929929U CN 206034941 U CN206034941 U CN 206034941U
Authority
CN
China
Prior art keywords
hole
protection net
half protective
port
protection
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620929929.7U
Other languages
Chinese (zh)
Inventor
谭梅红
罗文艺
邓永跃
肖国林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCFEB Civil Engineering Co Ltd
Original Assignee
CCFEB Civil Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCFEB Civil Engineering Co Ltd filed Critical CCFEB Civil Engineering Co Ltd
Priority to CN201620929929.7U priority Critical patent/CN206034941U/en
Application granted granted Critical
Publication of CN206034941U publication Critical patent/CN206034941U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Floor Finish (AREA)

Abstract

The utility model discloses a bored concrete pile stake hole is with protection screen panel for lay on the stake drill way in bored concrete pile stake hole in order to protect the stake hole, the protection screen panel includes: an edge for supporting the supporting skeleton, supporting skeleton upper berth is equipped with reticular protection network, offers the second opening that first opening that the connection rope that supplies to connect pile hammer passed and a plurality of confession mud pump line passed on the protection network, first opening lies in the center of protection screen panel, the second opening is close to the protection screen panel. when be under construction in bored concrete pile stake hole, will the utility model discloses a bored concrete pile stake hole is with protection screen panel lays on bored concrete pile stake drill way to can protect bored concrete pile stake hole, it is downthehole to prevent that site operations personnel and external personnel from falling into the stake, and then effectively avoids the emergence of incident, accords with safe construction specification requirement.

Description

Hole for grout pile protection net
Technical field
This utility model is related to road and bridge construction field, especially, is related to a kind of hole for grout pile protection net.
Background technology
When infrastructure projects adopts the impact drilling filling pile construction, the stake holes depth relatively depth of bored concrete pile and aperture compared with Greatly, during construction, hole, built with slurry sewage, is bored the mud sputtered during hammering blow and periphery place can be caused muddy and cause earth's surface wet It is sliding.
During existing filling pile construction, workman is not typically protected to stake holes to work conveniently, or only in stake holes mouth Place takes one piece of springboard for horizontally extending into stake holes center, or is layed at stake holes mouth into easy protection network using steel-pipe welding, or Enclose near bored concrete pile and set easy guard rail.
During on-site personnel measurement hole depth, due to it is unshielded at stake holes or only Simple protecting and easily because earth's surface is wet and slippery And slip and fall in hole;Survey crew measurement pile monkey whether off normal when, need measuring prism bridge in pile monkey steel wire rope Position, that is, stake holes middle, if simply laying springboard or easy protection network, survey crew also easily slide and fall by foot Enter in hole;Infrastructure project under construction is longer due to battle line, so inconvenience forms the construction environment of closing, if periphery has villager Go deep into scene because construction site management is not in place Deng other staff, it is easy to cause security incident.
Utility model content
This utility model provides a kind of hole for grout pile protection net, to solve during construction hole for grout pile due to stake On hole it is unshielded or only Simple protecting and the site operation personnel or Migrant women that exist easily fall in stake holes to cause peace The technical problem of full accident.
The technical solution adopted in the utility model is as follows:
A kind of hole for grout pile protection net, for being layed on the stake holes mouth of hole for grout pile to prevent to stake holes Shield, protection net include:For the support framework of supporting, netted protection network is equipped with support framework, is opened up on protection network The second port for having the first port passed through for the connecting rope of connection pile monkey and multiple confession mud pump lines to pass through, the first port are located at The center of protection net, the second port is near the edge of protection net.
Further, support framework is in the shape identical wafer type with stake holes mouth, it include mounting ring in a ring and It is arranged in mounting ring and in latticed support rack;Protection network is fixedly welded on the upper surface for supporting rack, and first Port and multiple second ports are correspondingly arranged with the grid on rack is supported respectively.
Further, support rack include many main joists for setting gradually and being parallel to each other and many set gradually and with The vertical secondary joist of many main joists.
Further, rack is supported to be welded to form by four main joists and 12 secondary joists.
Further, mounting ring is formed by square steel tube head and the tail welding;Main joist and secondary joist are square steel tube;Protection network is Rhombus steel wire drawing net.
Further, protection net is docked along the length direction of main joist by two pieces of the first half protective covers in semicircle lamellar It is assemblied to form.
Further, it is provided with the length direction along main joist to prolong in the internal channel of the main joist of first piece of the first half protective cover Stretch out the first latch of first piece of the first half protective cover, the first latch is used for the main joist of the first half protective cover of insertion second piece So that two pieces of the first half protective covers are assembled into protection net in internal channel.
Further, the first port is enclosed to set by two the first breach on two pieces of the first half protective covers and is formed;Two second Port is divided on two pieces of the first half protective covers.
Further, protection net is docked along the length direction of secondary joist by two pieces of the second half protective covers in semicircle lamellar It is assemblied to form.
Further, it is provided with the length direction along secondary joist to prolong in the internal channel of the secondary joist of first piece of the second half protective cover Stretch out the second latch of first piece of the second half protective cover, the second latch is used for the secondary joist of the second half protective cover of insertion second piece So that two pieces of the second half protective covers are assembled into protection net in internal channel.
This utility model has the advantages that:
When hole for grout pile is constructed, hole for grout pile protection net of the present utility model is layed in into grout pile aperture On, so as to protect to hole for grout pile, prevent on-site personnel and Migrant women from falling in stake holes, and then effectively keep away Exempt from the generation of security incident, meet safe construction code requirement;Protection net of the present utility model includes support framework and laying Netted protection network on support framework, is not only simple in structure, and protects tightly, while netted protection network is easy to constructor The situation that member is checked in stake holes at any time;The first port for passing through for connecting rope is offered on protection network and is passed through for mud pump line Second port, consequently facilitating stake holes is opened up and follow-up related cleaning operation;Protection net of the present utility model is repeatable to be made With the suitability is wide, so as to reducing production cost, improving work efficiency and economic benefit.
In addition to objects, features and advantages described above, this utility model also has other purposes, feature and excellent Point.Below with reference to figure, this utility model is described in further detail.
Description of the drawings
The accompanying drawing for constituting the part of the application is used for providing further understanding to of the present utility model, of the present utility model Schematic description and description is used for explaining this utility model, does not constitute to improper restriction of the present utility model.In accompanying drawing In:
Fig. 1 is the main structure diagram of the hole for grout pile protection net of this utility model preferred embodiment;And
Fig. 2 is the space structure schematic diagram of the first embodiment of hole for grout pile protection net in Fig. 1.
Marginal data
10th, support framework;11st, mounting ring;12nd, support rack;121st, main joist;122nd, secondary joist;20th, protection network; 201st, the first port;202nd, the second port;30th, the first half protective covers;301st, the first breach;40th, the first latch.
Specific embodiment
Embodiment of the present utility model is described in detail below in conjunction with accompanying drawing, but this utility model can be by right It is required that the multitude of different ways for limiting and covering is implemented.
With reference to Fig. 1, preferred embodiment of the present utility model provides a kind of hole for grout pile protection net, for laying To protect to stake holes on the stake holes mouth of hole for grout pile, protection net includes:For the support framework 10 of supporting, supporting Netted protection network 20 is equipped with skeleton 10, offers the first port passed through for the connecting rope of connection pile monkey on protection network 20 201 and the second port 202 for passing through of multiple confession mud pump lines, the first port 201 is located at the center of protection net, the second port 202 near the edge of protection net.When hole for grout pile is constructed, hole for grout pile of the present utility model is laid with protection net On grout pile aperture, so as to protect to hole for grout pile, prevent on-site personnel and Migrant women from falling into stake In hole, and then the generation of security incident is prevented effectively from, meets safe construction code requirement;Protection net of the present utility model includes Support framework 10 and the netted protection network 20 being layed on support framework 10, are not only simple in structure, and protect tightly, while net The protection network 20 of shape is easy to the situation that workmen is checked in stake holes at any time;Passed through for connecting rope is offered on protection network 20 One port 201 and the second port 202 passed through for mud pump line, consequently facilitating stake holes is opened up and follow-up related cleaning behaviour Make;Protection net of the present utility model is reusable, and the suitability is wide, so as to reducing production cost, improving work efficiency and Jing Ji benefit.
Alternatively, as shown in figure 1, support framework 10 is in the shape identical wafer type with stake holes mouth, which is included in a ring Mounting ring 11 and be arranged in mounting ring 11 and in latticed support rack 12;Protection network 20 is fixedly welded on support rack On 12 upper surface, and the first port 201 and multiple second ports 202 are correspondingly arranged with the grid on rack 12 is supported respectively. During welding, protection network 20 and the support welding of rack 12 are wanted firm and are unable to injury protection net 20 itself, prevent protection network 20 and prop up Support rack 12 is unable to stress after departing from.
In the present embodiment, as shown in figure 1, supporting rack 12 to include many main joists 121 for setting gradually and being parallel to each other And many set gradually and the secondary joist 122 vertical with many main joists 121.In this specific embodiment, as shown in figure 1, supporting Main joist 121 that rack 12 is set gradually and be parallel to each other by four and 12 are set gradually and are hung down with four main joists 121 Straight secondary joist 122 is welded to form.
In this preferred embodiment, as shown in figure 1, mounting ring 11 is formed by square steel tube head and the tail welding, main joist 121 is imperial with secondary Bone 122 is square steel tube, draws materials simple, and the protection net for making easily makes.Protection network 20 be rhombus steel wire drawing net, protection network 20 adopt netted rhombus steel wire drawing net, may not only facilitate the situation that workmen is checked in stake holes at any time, also effectively can mitigate The deadweight of protection net, and ensure safety of the personnel station on protection net.
Alternatively, as shown in Fig. 2 first embodiment of the present utility model, protection net is by two pieces in semicircle lamellar the Half protective cover 30 is assemblied to form along the length direction docking of main joist 121.As protection net is in semicircle lamellar by two pieces The first half docking of protective cover 30 are assemblied to form, therefore during impact stake normal construction, protection net synthesizes an entirety and is located at stake holes On mouth, close protection is formed, in case personnel are fallen in stake holes.When the pile monkey tooth of impact stake is damaged needs to weld pile monkey, first will Protection net pulls open into two the first half protective covers 30 along the length direction of main joist 121, then puts on pile monkey again, and again again Two pieces of the first half protective covers 30 are spliced into integrated protection net, personnel are fallen in stake holes when preventing from welding pile monkey, are welded After the completion of protection net is divided into into two the first half protective covers 30 again again, put down two the first half protective covers after pile monkey again The integrated protection net of 30 splicings.
Specifically, as shown in Fig. 2 being provided with along main dragon in the internal channel of the main joist 121 of first piece of the first half protective cover 30 The length direction of bone 121 extends the first latch 40 of first piece of the first half protective cover 30, and the first latch 40 is used for insertion second So that two pieces of the first half protective covers 30 are assembled into protection net in the internal channel of the main joist 121 of the first half protective cover 30 of block.
In the present embodiment, as shown in Fig. 2 the first port 201 is by two the first breach on two pieces of the first half protective covers 30 301 enclose to set and form;Two the second ports 202 are divided on two pieces of the first half protective covers 30.
Alternatively, second embodiment of the present utility model, from unlike first embodiment, protection net is by two pieces in partly The second half protective cover (not shown) of disc-shaped are assemblied to form along the length direction docking of secondary joist 122.In second embodiment The first half protective cover 30 of two panels in the assembly of the second protective cover of two panels and method for splitting and first embodiment assembled and split Method is identical, and here is not repeated.
Alternatively, it is provided with along the length side of secondary joist 122 in the internal channel of the secondary joist 122 of first piece of the second half protective cover To the second latch (not shown) for extending first piece of the second half protective cover, the second latch is used for the second half protection of insertion second piece So that two pieces of the second half protective covers are assembled into protection net in the internal channel of the secondary joist 122 of cover.
In the present embodiment, due to constitute main joist 121 square steel tube the length of side and thickness more than secondary joist 122 the length of side and Thickness, and the radical of main joist 121 is less than the radical of secondary joist 122, on the premise of protection net supporting force is ensured, is saving Cost, the weight for mitigating protection net, and be easy to the making of protection net, in the present embodiment, the preferred scheme of first embodiment.
Preferred embodiment of the present utility model is the foregoing is only, this utility model is not limited to, for this For the technical staff in field, this utility model can have various modifications and variations.It is all it is of the present utility model spirit and principle Within, any modification, equivalent substitution and improvements made etc. are should be included within protection domain of the present utility model.

Claims (10)

1. a kind of hole for grout pile protection net, it is characterised in that for being layed on the stake holes mouth of hole for grout pile with right The stake holes is protected, and the protection net includes:
For the support framework (10) of supporting, netted protection network (20), the protection on support framework (10), is equipped with Second passed through for first port (201) that passes through of connecting rope and multiple confession mud pump lines of connection pile monkey is offered on net (20) Port (202), described first port (201) are located at the center of the protection net, and the second port (202) are near described anti- The edge of protecting wire net cover.
2. hole for grout pile protection net according to claim 1, it is characterised in that
Support framework (10), in the shape identical wafer type with the stake holes mouth, which includes mounting ring (11) in a ring And be arranged in the mounting ring (11) and in latticed support rack (12);
Protection network (20) be fixedly welded on it is described support rack (12) upper surface on, and first port (201) and Multiple second port (202) are correspondingly arranged with the grid supported on rack (12) respectively.
3. hole for grout pile protection net according to claim 2, it is characterised in that
Support rack (12) include many main joists for setting gradually and being parallel to each other (121) and many set gradually and with Many main joist (121) vertical secondary joist (122).
4. hole for grout pile protection net according to claim 3, it is characterised in that
Support rack (12) is welded to form by four main joist (121) and 12 secondary joist (122).
5. hole for grout pile protection net according to claim 3, it is characterised in that
Mounting ring (11) are formed by square steel tube head and the tail welding;
Main joist (121) and the secondary joist (122) are square steel tube;
Described protection network (20) are rhombus steel wire drawing net.
6. hole for grout pile protection net according to claim 5, it is characterised in that
The protection net by two pieces of the first half protective covers (30) in semicircle lamellar along the main joist (121) length direction Docking is assemblied to form.
7. hole for grout pile protection net according to claim 6, it is characterised in that
It is provided with along the main joist in the internal channel of the main joist (121) of first piece of the first half protective cover (30) (121) length direction extends first latch (40) of first piece of the first half protective cover (30), first latch (40) so that described in two pieces in the internal channel of the main joist (121) for being used for inserting second piece of the first half protective cover (30) The first half protective covers (30) are assembled into the protection net.
8. hole for grout pile protection net according to claim 7, it is characterised in that
First port (201) are enclosed to set by two the first breach (301) on two pieces of the first half protective covers (30) and are formed;
Two the second port (202) are divided on two pieces of the first half protective covers (30).
9. hole for grout pile protection net according to claim 5, it is characterised in that
The protection net is docked along the length direction of the secondary joist (122) by two pieces of the second half protective covers in semicircle lamellar It is assemblied to form.
10. hole for grout pile protection net according to claim 9, it is characterised in that
It is provided with along the secondary joist (122) in the internal channel of the secondary joist (122) of first piece of the second half protective cover Length direction extends the second latch of first piece of the second half protective cover, described in second latch is used for inserting second piece So that two pieces of the second half protective covers are assembled into the protection in the internal channel of the secondary joist (122) of second half protective covers Guard.
CN201620929929.7U 2016-08-24 2016-08-24 Bored concrete pile stake hole is with protection screen panel Expired - Fee Related CN206034941U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620929929.7U CN206034941U (en) 2016-08-24 2016-08-24 Bored concrete pile stake hole is with protection screen panel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620929929.7U CN206034941U (en) 2016-08-24 2016-08-24 Bored concrete pile stake hole is with protection screen panel

Publications (1)

Publication Number Publication Date
CN206034941U true CN206034941U (en) 2017-03-22

Family

ID=58305243

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620929929.7U Expired - Fee Related CN206034941U (en) 2016-08-24 2016-08-24 Bored concrete pile stake hole is with protection screen panel

Country Status (1)

Country Link
CN (1) CN206034941U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107740405A (en) * 2017-10-23 2018-02-27 安徽送变电工程有限公司 For the disposition operating platform in artificial digging pile borehole operation
CN109235913A (en) * 2018-11-06 2019-01-18 中铁六局集团有限公司 A kind of pin-connected panel orifice protective cover

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107740405A (en) * 2017-10-23 2018-02-27 安徽送变电工程有限公司 For the disposition operating platform in artificial digging pile borehole operation
CN109235913A (en) * 2018-11-06 2019-01-18 中铁六局集团有限公司 A kind of pin-connected panel orifice protective cover

Similar Documents

Publication Publication Date Title
CN205654349U (en) Device based on interconnection removes shield zone cataract or glaucoma impenetrability foreign matter
CN106400802B (en) A kind of drilled pile pile crown is pre-buried to exempt from the whole quickly lifting method of ring cutting that drills
Tu et al. Present situation of fully mechanized mining technology for steeply inclined coal seams in China
CN206034941U (en) Bored concrete pile stake hole is with protection screen panel
CN206233562U (en) The safety device of revealing all the details of hydraulic pressure lift form frame system
CN203374008U (en) Elevator shaft inclined plane protective structure
CN104404979A (en) H-shaped pile slab wall construction method
CN207847548U (en) A kind of movable drilling platform of side slope construction
CN203145488U (en) Limb protective railings of foundation pit and for building construction
CN105507144A (en) Bridge external anti-collision guardrail and safety construction method thereof
CN206859234U (en) A kind of protector for mountain area mud-rock flow
CN111764373A (en) Construction method of underground continuous wall under condition of non-removable underground barrier
CN204126290U (en) Elevator shaft horizontal protective device
CN215003268U (en) Safety protection curtain for tunnel blasting flyrock and shock wave control
Sanada et al. Excavation cycle times recorded during sinking of a deep shaft in crystalline rock–A case example at Ventilation Shaft of Mizunami URL, Japan
CN211666739U (en) Foot protection device for steel arch frame of tunnel
CN205713187U (en) Horizontal entrance to a cave protection architecture
CN203821443U (en) Cave opening protecting device for blasting excavation at light and shade junction part of subway tunnel
CN203050307U (en) Guardrail locking device of equipment lifting opening safety guardrail device
CN201284481Y (en) Synchronous construction protection scaffold
CN208056519U (en) A kind of detachable edge protection column
CN202882995U (en) Tunnel exit passageway
CN206873966U (en) Elevator hoistways isolating and protecting structure
CN110445077A (en) A kind of high-tension cable power channel original position suspension protection method
CN206220551U (en) A kind of protector of wall

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170322