CN107740405A - For the disposition operating platform in artificial digging pile borehole operation - Google Patents
For the disposition operating platform in artificial digging pile borehole operation Download PDFInfo
- Publication number
- CN107740405A CN107740405A CN201710990632.0A CN201710990632A CN107740405A CN 107740405 A CN107740405 A CN 107740405A CN 201710990632 A CN201710990632 A CN 201710990632A CN 107740405 A CN107740405 A CN 107740405A
- Authority
- CN
- China
- Prior art keywords
- frame component
- component pipe
- body frame
- pipe
- side wall
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/34—Concrete or concrete-like piles cast in position ; Apparatus for making same
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/32—Safety or protective measures for persons during the construction of buildings
- E04G21/3204—Safety or protective measures for persons during the construction of buildings against falling down
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Structural Engineering (AREA)
- Civil Engineering (AREA)
- Mechanical Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- General Engineering & Computer Science (AREA)
- Earth Drilling (AREA)
Abstract
The present invention relates to a kind of safety device for artificial digging pile borehole process, specifically, is related to a kind of disposition operating platform being used in artificial digging pile borehole operation.It includes the operating platform body being used at artificial digging pile aperture, and pail passage is provided with the middle part of operating platform body;Operating platform body includes support frame, and protective screen plate is provided with support frame;Support frame is surrounded by multiple installing plates, and installation through-hole is equipped with any installing plate.The present invention can be preferably to protecting operating personnel during the borehole of artificial digging pile.
Description
Technical field
The present invention relates to a kind of safety device for artificial digging pile borehole process, specifically, it is related to one kind
For the disposition operating platform in artificial digging pile borehole operation.
Background technology
Hand-dug pile foundation because its construction method is convenient, without large-scale construction equipment the features such as, and be widely used in
In various engineering fields, it is particularly suitable as the structure base of the landform such as mountain area, hills.But in artificial digging pile
Higher high falling, falling object from high altitude equivalent risk in borehole operation process be present, this is near coal-mine and hole bottom operating personnel person
Safety causes serious threat.It is the safety meaning by lifting construction personnel mostly in the work progress of existing artificial digging pile
Know and be equipped with conventional security protection articles for use to evade the security risk in operation process, but such safeguard procedures obviously can not be compared with
Solve the hidden danger such as high falling during borehole, falling object from high altitude well.
The content of the invention
Present disclosure is to provide a kind of disposition operating platform being used in artificial digging pile borehole operation, its
Certain or some defects of prior art can be overcome.
According to the disposition operating platform being used in artificial digging pile borehole operation of the present invention, it includes being used to set
Operating platform body at artificial digging pile aperture, operating platform body middle part are provided with pail passage;Operating platform body bag
Support frame is included, protective screen plate is provided with support frame;Support frame is surrounded by multiple installing plates, and installation is equipped with any installing plate
Through hole.
In the present invention, operating platform body can be located at the aperture of artificial digging pile, pass through connector and installing plate
Coordinate, preferably support frame can be fixed, so that operating platform body more can firmly be located at excavated by manual work
At the aperture of hole stake;Pass through the cooperation of protective screen plate and support frame so that operating platform body can have preferably strong simultaneously
Degree and lighter weight, preferably protect so that operating platform body can provide and enable workmen preferably
Operation is carried out above operating platform body;In addition, the setting of protective screen plate, also make it that operating platform body will not be to excavated by manual work
Light and ventilation in the stake of hole cause large effect.
Operating platform body can be located at the aperture of artificial digging pile by the present invention in actual use by connector
Place, carrying native machine can be set up in above operating platform body, and carrying native bucket can pass in and out at pail passage, so as to ensure that borehole
Operation is normally carried out.
By the above-mentioned construction of the present invention, the falling from high altitude risk of ground operation personnel can be preferably reduced, and can
The falling object from high altitude that is effectively prevented from aperture and to the injury caused by the operating personnel of underground.
Preferably, inside left's frame, left body frame, right body frame and inside right forward's frame, protective screen plate that support frame includes being sequentially connected have
It is multiple and be respectively arranged inside left's frame, left body frame, right body frame and inside right forward's frame.Pass through this kind of splicing structure so that of the invention
Operating platform body can be easy to make, transport and assemble.
Preferably, inside left's frame, left body frame, right body frame and inside right forward's frame form by square steel pipe welded, inside left's frame and the right side
The integrally constructed symmetrical isosceles trapezoid shape of sub-frame, left body frame and the integrally constructed symmetrical rectangle of right body frame
Shape;
Inside left's frame is included from first inside left's frame component pipe and second inside left's frame component pipe left and that the right side be arranged in parallel successively, the
The length of one inside left's frame component pipe is less than the length of second inside left's frame component pipe;The both ends of first inside left's frame component pipe are left with second
The 3rd inside left's frame component pipe and the 4th inside left's frame component pipe are respectively equipped between the both ends of sub-frame component pipe;
Left body frame is included from the first left body frame component pipe and the second left body frame component pipe left and that the right side be arranged in parallel successively, the
The length of one left body frame component pipe, the second left body frame component pipe and second inside left's frame component pipe is identical;First left body frame component pipe
Both ends side wall and the second left body frame component pipe both ends side wall between be provided with the 3rd left body frame component pipe and the 4th with being respectively perpendicular
Left body frame component pipe;The 5th left body frame component pipe and the 6th left master are respectively equipped with the right side wall at the second left body frame component pipe both ends
Frame component pipe, the 7th spaced left body frame component pipe and the are also vertically provided with the right side wall of the second left body frame component pipe
Eight left body frame component pipes;The both ends left side wall of one the 9th left body frame component pipe respectively with the 5th left body frame component pipe and the 7th left master
The right part connection of frame component pipe, the both ends left side wall of 1 the tenth left body frame component pipe respectively with the 6th left body frame component pipe and the
The right part connection of eight left body frame component pipes;The first half bore is formed between 7th left body frame component pipe and the 8th left body frame component pipe;
Right body frame is included from the first right body frame component pipe and the second right body frame component pipe right and that a left side be arranged in parallel successively, the
The length of one right body frame component pipe, the second right body frame component pipe and the second left body frame component pipe is identical;First right body frame component pipe
Both ends side wall and the second right body frame component pipe both ends side wall between be provided with the 3rd right body frame component pipe and the 4th with being respectively perpendicular
Right body frame component pipe;The 5th right body frame component pipe and the 6th right master are respectively equipped with the left side wall at the second right body frame component pipe both ends
Frame component pipe, the 7th spaced right body frame component pipe and the are also vertically provided with the left side wall of the second right body frame component pipe
Eight right body frame component pipes;The both ends right side wall of one the 9th right body frame component pipe respectively with the 5th right body frame component pipe and the 7th right master
The left part connection of frame component pipe, the both ends right side wall of 1 the tenth right body frame component pipe respectively with the 6th right body frame component pipe and the
The left part connection of eight right body frame component pipes;The second half bore is formed between 7th right body frame component pipe and the 8th right body frame component pipe,
Second half bore and the first half bore are collectively forming pail passage;
Inside right forward's frame is included from first inside right forward's frame component pipe and second inside right forward's frame component pipe right and that a left side be arranged in parallel successively, the
The length of one inside right forward's frame component pipe is less than the length of second inside right forward's frame component pipe;The both ends of first inside right forward's frame component pipe are right with second
The 3rd inside right forward's frame component pipe and the 4th inside right forward's frame component pipe are respectively equipped between the both ends of sub-frame component pipe.
In the present invention, inside left's frame, left body frame, the above-mentioned construction of right body frame and inside right forward's frame so that operating platform body can
Making and convenient material drawing can be easy to, so as to which cost of manufacture is relatively low;In addition, pass through this kind construct so that inside left's frame, left body frame,
Right body frame and inside right forward's frame can possess preferable strength and stiffness.
Preferably, also it is interval with the 5th to be parallel to each other between first inside left's frame component pipe and second inside left's frame component pipe
The respective end difference of inside left's frame component pipe and the 6th inside left's frame component pipe, the 5th inside left's frame component pipe and the 6th inside left's frame component pipe
It is vertical at the right side wall at first inside left's frame component pipe both ends.So that inside left's frame can further possess preferably
Strength and stiffness.
Preferably, spaced the is also vertically provided between the first left body frame component pipe and the second left body frame component pipe
11 left body frame component pipes and the 12nd left body frame component pipe.So that left body frame can further possess preferably
Strength and stiffness.
Preferably, spaced the is also vertically provided between the first right body frame component pipe and the second right body frame component pipe
11 right body frame component pipes and the 12nd right body frame component pipe.So that right body frame can further possess preferably
Strength and stiffness.
Preferably, also it is interval with the 5th to be parallel to each other between first inside right forward's frame component pipe and second inside right forward's frame component pipe
The respective end difference of inside right forward's frame component pipe and the 6th inside right forward's frame component pipe, the 5th inside right forward's frame component pipe and the 6th inside right forward's frame component pipe
It is vertical at the right side wall at first inside right forward's frame component pipe both ends.So that inside right forward's frame can further possess preferably
Strength and stiffness.
Preferably, the multiple installing plate is respectively arranged at the left side wall of first inside left's frame component pipe, the 3rd left body frame
At the upper side wall of component pipe and the 5th left body frame component pipe, the lower wall of the 4th left body frame component pipe and the 6th left body frame component pipe
Place, the 3rd right body frame component pipe and the 5th right body frame component pipe upper side wall at, the 4th right body frame component pipe and the 6th right body frame
At the lower wall of component pipe and at the right side wall of first inside right forward's frame component pipe.So as to rational in infrastructure, and it is easy to make.
Preferably, the respective end of the 3rd inside left's frame component pipe and the 4th inside left's frame component pipe is all connected to second inside left's frame
At the left side wall of component pipe, the respective end of the 3rd inside right forward's frame component pipe and the 4th inside right forward's frame component pipe is all connected to second inside right forward's frame
At the right side wall of component pipe;It is sequentially connected between inside left's frame, left body frame, right body frame and inside right forward's frame by connecting bolt, even
Patching pin includes pinboard, and pinboard side compartment of terrain is provided with 2 latch posts, the first jack is penetratingly provided with latch post;The
Two inside left's frame component pipes, the first left body frame component pipe, the first right body frame component pipe and second inside right forward's frame component pipe both ends at,
At the upper end of nine left body frame component pipes and the 9th right body frame component pipe, and the tenth left body frame component pipe and the tenth right body frame component
The second jack corresponding with the first jack is equipped with the lower end of pipe.So as to preferably realize inside left's frame, left body frame, right body frame
Being sequentially connected between inside right forward's frame.
Preferably, installing plate is used to coordinate with holdfast, holdfast includes end head, and vertically a plug is set in the middle part of end head
Portion, end head and intercalation part form by round steel interception, and intercalation part distal tip end is provided with oblique raft.So as to make simple and be easy to
Use.
Brief description of the drawings
Fig. 1 is the schematic diagram of the operating platform body in embodiment 1;
Fig. 2 is the schematic diagram of the support frame in embodiment 1;
Fig. 3 is the schematic diagram of inside left's frame in embodiment 1;
Fig. 4 is the schematic diagram of the left body frame in embodiment 1;
Fig. 5 is the schematic diagram of the right body frame in embodiment 1;
Fig. 6 is the schematic diagram of inside right forward's frame in embodiment 1;
Fig. 7 is the schematic diagram in embodiment 1;
Fig. 8 is the schematic diagram in embodiment 1.
Embodiment
To further appreciate that present disclosure, the present invention is described in detail in conjunction with the accompanying drawings and embodiments.It should be understood that
, embodiment be only the present invention is explained and and it is non-limiting.
Embodiment 1
A kind of disposition operating platform being used in artificial digging pile borehole operation is present embodiments provided, it is being protected
While card borehole operation is normally carried out, additionally it is possible to the high falling of ground operation personnel is effectively prevented, and can be effectively
Avoid the falling object from high altitude at aperture and to the injury caused by the operating personnel of underground.
As shown in figure 1, the disposition operating platform of the present embodiment includes being used at artificial digging pile aperture
Operating platform body 100, the middle part of operating platform body 100 are provided with pail passage 130;Operating platform body 100 includes support frame
110, protective screen plate 120 is provided with support frame 110;Support frame 110 is surrounded by multiple installing plates 140, at any installing plate 140
It is equipped with installation through-hole 141.
In the present embodiment, installing plate 140 is using long 10cm, wide 4cm, thick 0.2cm steel plate, and installation through-hole 141 is through peace
Loading board 140, and the aperture of installation through-hole 141 is 2.5cm.
As shown in Fig. 2 support frame 110 includes inside left's frame 111, left body frame 112, right body frame 113 and the inside right forward being sequentially connected
Frame 114, protective screen plate 120 have multiple and are respectively arranged inside left's frame 111, left body frame 112, right body frame 113 and inside right forward's frame 114.
In the present embodiment, inside left's frame 111, left body frame 112, right body frame 113 and inside right forward's frame 114 are 4cm*4cm* by parameter
The square steel pipe welded of 0.3 (length, width and the thickness of cross section) forms, and inside left's frame 111 and inside right forward's frame 114 are integrally constructed
Symmetrical isosceles trapezoid shape, the left integrally constructed symmetrical oblong-shaped of body frame 112 and right body frame 113.
As shown in figure 3, inside left's frame 111 is included from left and right first inside left's frame component pipe 310 be arrangeding in parallel successively and the
Two inside left's frame component pipes 320, the length of first inside left's frame component pipe 310 are less than the length of second inside left's frame component pipe 320;First
The 3rd inside left's frame component pipe 330 is respectively equipped between the both ends of inside left's frame component pipe 310 and the both ends of second inside left's frame component pipe 320
With the 4th inside left's frame component pipe 340.
In addition, to be parallel to each other is also interval between first inside left's frame component pipe 310 and second inside left's frame component pipe 320
Five inside left's frame component pipes 350 and the 6th inside left's frame component pipe 360, the 5th inside left's frame component pipe 350 and the 6th inside left's frame component pipe
360 respective end is respectively perpendicular at the right side wall at the both ends of first inside left's frame component pipe 310.
As shown in figure 4, left body frame 112 is included from left and right the first left body frame component pipe 410 be arrangeding in parallel successively and the
Two left body frame component pipes 420, the first left body frame component pipe 410, the second left body frame component pipe 420 and second inside left's frame component pipe
320 length is identical;Between the both ends side wall of first left body frame component pipe 410 and the both ends side wall of the second left body frame component pipe 420
It is provided with the 3rd left 431 and the 4th left body frame component pipe 432 of body frame component pipe with being respectively perpendicular;Second left 420 liang of body frame component pipe
The 5th left 441 and the 6th left body frame component pipe 442 of body frame component pipe, the second left body frame component pipe are respectively equipped with the right side wall at end
The 7th spaced left 451 and the 8th left body frame component pipe 452 of body frame component pipe is also vertically provided with 420 right side wall;
The both ends left side wall of one the 9th left body frame component pipe 461 respectively with the 5th left 441 and the 7th left body frame component pipe of body frame component pipe
451 right part connection, the both ends left side wall of 1 the tenth left body frame component pipe 462 respectively with the 6th left body frame component pipe 442 and
The right part connection of 8th left body frame component pipe 452;Shape between 7th left 451 and the 8th left body frame component pipe 452 of body frame component pipe
Into the first half bore 470.
In addition, also vertically it is provided between the first left 410 and second left body frame component pipe 420 of body frame component pipe spaced
11st left the 481 and the 12nd left body frame component pipe 482 of body frame component pipe.
As shown in figure 5, right body frame 113 is included from right and left the first right body frame component pipe 510 be arrangeding in parallel successively and the
Two right body frame component pipes 520, the first right body frame component pipe 510, the second right 520 and second left body frame component pipe of body frame component pipe
420 length is identical;Between the both ends side wall of first right body frame component pipe 510 and the both ends side wall of the second right body frame component pipe 520
It is provided with the 3rd right 531 and the 4th right body frame component pipe 532 of body frame component pipe with being respectively perpendicular;Second right 520 liang of body frame component pipe
The 5th right 541 and the 6th right body frame component pipe 542 of body frame component pipe, the second right body frame component pipe are respectively equipped with the left side wall at end
The 7th spaced right 551 and the 8th right body frame component pipe 552 of body frame component pipe is also vertically provided with 520 left side wall;
The both ends right side wall of one the 9th right body frame component pipe 561 respectively with the 5th right 541 and the 7th right body frame component pipe of body frame component pipe
551 left part connection, the both ends right side wall of 1 the tenth right body frame component pipe 562 respectively with the 6th right body frame component pipe 542 and
The left part connection of 8th right body frame component pipe 552;Shape between 7th right 551 and the 8th right body frame component pipe 552 of body frame component pipe
Into the second half bore 570, the second half bore 570 and the first half bore 470 are collectively forming pail passage 130.
In addition, also vertically it is provided between the first right 510 and second right body frame component pipe 520 of body frame component pipe spaced
11st right the 581 and the 12nd right body frame component pipe 582 of body frame component pipe.
As shown in fig. 6, inside right forward's frame 114 is included from right and left first inside right forward's frame component pipe 610 be arrangeding in parallel successively and the
Two inside right forward's frame component pipes 620, the length of first inside right forward's frame component pipe 610 are less than the length of second inside right forward's frame component pipe 620;First
The 3rd inside right forward's frame component pipe 630 is respectively equipped between the both ends of inside right forward's frame component pipe 610 and the both ends of second inside right forward's frame component pipe 620
With the 4th inside right forward's frame component pipe 640.
In addition, to be parallel to each other is also interval between first inside right forward's frame component pipe 610 and second inside right forward's frame component pipe 620
Five inside right forward's frame component pipes 650 and the 6th inside right forward's frame component pipe 660, the 5th inside right forward's frame component pipe 650 and the 6th inside right forward's frame component pipe
660 respective end is respectively perpendicular at the right side wall at the both ends of first inside right forward's frame component pipe 610.
In the present embodiment, the multiple installing plate 140 is respectively arranged at the left side wall of first inside left's frame component pipe 310,
At the upper side wall of three left 431 and the 5th left body frame component pipes 441 of body frame component pipe, the 4th left body frame component pipe 432 and the 6th it is left
At the lower wall of body frame component pipe 442, at the upper side wall of the 3rd right 531 and the 5th right body frame component pipe 541 of body frame component pipe,
At the lower wall of four right 532 and the 6th right body frame component pipes 542 of body frame component pipe and first inside right forward's frame component pipe 610 the right side
Side-walls.
In the present embodiment, the respective end of the 3rd inside left's frame component pipe 330 and the 4th inside left's frame component pipe 340 is all connected to
At the left side wall of two inside left's frame component pipes 320, the respective end of the 3rd inside right forward's frame component pipe 630 and the 4th inside right forward's frame component pipe 640
It is all connected at the right side wall of second inside right forward's frame component pipe 620;Inside left's frame 111, left body frame 112, right body frame 113 and inside right forward's frame
It is sequentially connected between 114 by connecting bolt 115.
As shown in fig. 7, connecting bolt 115 includes pinboard 710, the side compartment of terrain of pinboard 710 is provided with 2 latch posts
720, the first jack 721 is penetratingly provided with latch post 720;Second inside left's frame component pipe 320, the first left body frame component pipe 410,
At the both ends of first right body frame component pipe 510 and second inside right forward's frame component pipe 620, the 9th left body frame component pipe 461 and the 9th is right
At the upper end of body frame component pipe 561, and at the lower end of the tenth left 462 and the tenth right body frame component pipe 562 of body frame component pipe it is equal
Provided with 721 corresponding second jack 150 of the first jack.
In the present embodiment, pinboard 710 is using long 9cm, wide 3cm, thick 0.2cm steel plate, and latch post 720 is from 3cm*3cm*
Interception forms at 0.3cm rectangular steel tube, and 720 long 15cm of latch post, the first length of the jack 721 away from pinboard 710 is 10cm,
The second corresponding distance of the jack 150 away from corresponding assembly tube end is also 10cm, the first jack 721 and the second jack 150
Aperture is 1cm.
As shown in figure 8, installing plate 140 is used to coordinate with holdfast 210, holdfast 210 includes end head 810, in end head 810
Portion vertically sets an intercalation part 820, end head 810 and intercalation part 820 and formed by a diameter of 2cm round steel interception, intercalation part 820
The end of distal tip 810 is provided with oblique raft 821.
In the present embodiment, 810 long 8cm of end head, 82 long 20cm of intercalation part.
In the present embodiment, protective screen plate 120 includes bar mat, and bar mat surrounding is welded with the framework formed by angle steel.
The disposition operating platform of the present embodiment when in use, is spliced, afterwards by connecting bolt 115 first
It is fixed using holdfast 210, native frame will be put forward afterwards and be located at the top of operating platform body 100, pail can be passed through by carrying native bucket
Passage 130 passes in and out, so as to ensure that being normally carried out for borehole operation.
Schematically the present invention and embodiments thereof are described above, this describes no restricted, institute in accompanying drawing
What is shown is also one of embodiments of the present invention, and actual structure is not limited thereto.So if common skill of this area
Art personnel are enlightened by it, without departing from the spirit of the invention, without designing and the technical scheme for creativeness
Similar frame mode and embodiment, protection scope of the present invention all should be belonged to.
Claims (10)
1. for the disposition operating platform in artificial digging pile borehole operation, it is characterised in that:Including for located at people
Operating platform body (100) at work caisson aperture, operating platform body (100) middle part are provided with pail passage (130);Operation
Platform body (100) includes support frame (110), and support frame (110) place is provided with protective screen plate (120);Support frame (110) surrounding is set
There are multiple installing plates (140), any installing plate (140) place is equipped with installation through-hole (141).
2. the disposition operating platform according to claim 1 being used in artificial digging pile borehole operation, its feature
It is:Support frame (110) includes inside left's frame (111), left body frame (112), right body frame (113) and the inside right forward's frame being sequentially connected
(114), protective screen plate (120) has multiple and is respectively arranged on inside left's frame (111), left body frame (112), right body frame (113) and inside right forward
Frame (114) place.
3. the disposition operating platform according to claim 2 being used in artificial digging pile borehole operation, its feature
It is:Inside left's frame (111), left body frame (112), right body frame (113) and inside right forward's frame (114) form by square steel pipe welded, left
Sub-frame (111) and the integrally constructed symmetrical isosceles trapezoid shape of inside right forward's frame (114), left body frame (112) and right body frame (113)
Integrally constructed symmetrical oblong-shaped;
Inside left's frame (111) is included from the right first inside left's frame component pipe (310) be arrangeding in parallel successively in a left side and second inside left's frame group
Part pipe (320), the length of first inside left's frame component pipe (310) are less than the length of second inside left's frame component pipe (320);First inside left
The 3rd inside left's frame component pipe is respectively equipped between the both ends of frame component pipe (310) and the both ends of second inside left's frame component pipe (320)
And the 4th inside left's frame component pipe (340) (330);
Left body frame (112) is included from right the first left body frame component pipe (410) be arrangeding in parallel successively in a left side and the second left body frame group
Part pipe (420), the first left body frame component pipe (410), the second left body frame component pipe (420) and second inside left's frame component pipe (320)
Length it is identical;Between the both ends side wall of first left body frame component pipe (410) and the both ends side wall of the second left body frame component pipe (420)
It is provided with the 3rd left body frame component pipe (431) and the 4th left body frame component pipe (432) with being respectively perpendicular;Second left body frame component pipe
(420) it is respectively equipped with the 5th left body frame component pipe (441) and the 6th left body frame component pipe (442) at the right side wall at both ends, second
Spaced the 7th left body frame component pipe (451) and the 8th is also vertically provided with the right side wall of left body frame component pipe (420)
Left body frame component pipe (452);The both ends left side wall of one the 9th left body frame component pipe (461) respectively with the 5th left body frame component pipe
(441) right part with the 7th left body frame component pipe (451) connects, the both ends left side wall of 1 the tenth left body frame component pipe (462)
The right part with the 6th left body frame component pipe (442) and the 8th left body frame component pipe (452) is connected respectively;7th left body frame component
The first half bore (470) is formed between pipe (451) and the 8th left body frame component pipe (452);
Right body frame (113) is included from left the first right body frame component pipe (510) be arrangeding in parallel successively in the right side and the second right body frame group
Part pipe (520), the first right body frame component pipe (510), the second right body frame component pipe (520) and the second left body frame component pipe (420)
Length it is identical;Between the both ends side wall of first right body frame component pipe (510) and the both ends side wall of the second right body frame component pipe (520)
It is provided with the 3rd right body frame component pipe (531) and the 4th right body frame component pipe (532) with being respectively perpendicular;Second right body frame component pipe
(520) it is respectively equipped with the 5th right body frame component pipe (541) and the 6th right body frame component pipe (542) at the left side wall at both ends, second
Spaced the 7th right body frame component pipe (551) and the 8th is also vertically provided with the left side wall of right body frame component pipe (520)
Right body frame component pipe (552);The both ends right side wall of one the 9th right body frame component pipe (561) respectively with the 5th right body frame component pipe
(541) left part with the 7th right body frame component pipe (551) connects, the both ends right side wall of 1 the tenth right body frame component pipe (562)
The left part with the 6th right body frame component pipe (542) and the 8th right body frame component pipe (552) is connected respectively;7th right body frame component
The second half bore (570), the second half bore (570) and the first half bore are formed between pipe (551) and the 8th right body frame component pipe (552)
(470) it is collectively forming pail passage (130);
Inside right forward's frame (114) is included from the left first inside right forward's frame component pipe (610) be arrangeding in parallel successively in the right side and second inside right forward's frame group
Part pipe (620), the length of first inside right forward's frame component pipe (610) are less than the length of second inside right forward's frame component pipe (620);First inside right forward
The 3rd inside right forward's frame component pipe is respectively equipped between the both ends of frame component pipe (610) and the both ends of second inside right forward's frame component pipe (620)
And the 4th inside right forward's frame component pipe (640) (630).
4. the disposition operating platform according to claim 3 being used in artificial digging pile borehole operation, its feature
It is:It is left that the 5th to be parallel to each other is also interval between first inside left's frame component pipe (310) and second inside left's frame component pipe (320)
Sub-frame component pipe (350) and the 6th inside left's frame component pipe (360), the 5th inside left's frame component pipe (350) and the 6th inside left's frame component
The respective end of pipe (360) is respectively perpendicular at the right side wall at first inside left frame component pipe (310) both ends.
5. the disposition operating platform according to claim 3 being used in artificial digging pile borehole operation, its feature
It is:The spaced the tenth is also vertically provided between first left body frame component pipe (410) and the second left body frame component pipe (420)
One left body frame component pipe (481) and the 12nd left body frame component pipe (482).
6. the disposition operating platform according to claim 3 being used in artificial digging pile borehole operation, its feature
It is:The spaced the tenth is also vertically provided between first right body frame component pipe (510) and the second right body frame component pipe (520)
One right body frame component pipe (581) and the 12nd right body frame component pipe (582).
7. the disposition operating platform according to claim 3 being used in artificial digging pile borehole operation, its feature
It is:It is right that the 5th to be parallel to each other is also interval between first inside right forward's frame component pipe (610) and second inside right forward's frame component pipe (620)
Sub-frame component pipe (650) and the 6th inside right forward's frame component pipe (660), the 5th inside right forward's frame component pipe (650) and the 6th inside right forward's frame component
The respective end of pipe (660) is respectively perpendicular at the right side wall at first inside right forward frame component pipe (610) both ends.
8. the disposition operating platform according to claim 3 being used in artificial digging pile borehole operation, its feature
It is:The multiple installing plate (140) is respectively arranged at the left side wall of first inside left's frame component pipe (310), the 3rd left body frame group
At part pipe (431) and the upper side wall of the 5th left body frame component pipe (441), the 4th left body frame component pipe (432) and the 6th left body frame
At the lower wall of component pipe (442), at the upper side wall of the 3rd right body frame component pipe (531) and the 5th right body frame component pipe (541),
At the lower wall of 4th right body frame component pipe (532) and the 6th right body frame component pipe (542) and first inside right forward's frame component pipe
(610) at right side wall.
9. the disposition operating platform according to claim 3 being used in artificial digging pile borehole operation, its feature
It is:The respective end of 3rd inside left's frame component pipe (330) and the 4th inside left's frame component pipe (340) is all connected to second inside left's frame group
At the left side wall of part pipe (320), the respective end of the 3rd inside right forward's frame component pipe (630) and the 4th inside right forward's frame component pipe (640) connects
It is connected at the right side wall of second inside right forward's frame component pipe (620);Inside left's frame (111), left body frame (112), right body frame (113) and inside right forward
It is sequentially connected between frame (114) by connecting bolt (115), connecting bolt (115) includes pinboard (710), pinboard
(710) side compartment of terrain is provided with 2 latch posts (720), and latch post (720) place is penetratingly provided with the first jack (721);Second is left
Sub-frame component pipe (320), the first left body frame component pipe (410), the first right body frame component pipe (510) and second inside right forward's frame component pipe
(620) at both ends, at the upper end of the 9th left body frame component pipe (461) and the 9th right body frame component pipe (561), and the tenth left
It is equipped with and the first jack (721) corresponding second at the lower end of body frame component pipe (462) and the tenth right body frame component pipe (562)
Jack (150).
10. the disposition operating platform according to claim 1 being used in artificial digging pile borehole operation, its feature
It is:Installing plate (140) is used to coordinate with holdfast (210), and holdfast (210) includes end head (810), end head (810) middle part
A vertical intercalation part (820), end head (810) and the intercalation part (820) of setting forms by round steel interception, intercalation part (820) distal end
Head (810) end is provided with oblique raft (821).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710990632.0A CN107740405A (en) | 2017-10-23 | 2017-10-23 | For the disposition operating platform in artificial digging pile borehole operation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710990632.0A CN107740405A (en) | 2017-10-23 | 2017-10-23 | For the disposition operating platform in artificial digging pile borehole operation |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107740405A true CN107740405A (en) | 2018-02-27 |
Family
ID=61238057
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710990632.0A Pending CN107740405A (en) | 2017-10-23 | 2017-10-23 | For the disposition operating platform in artificial digging pile borehole operation |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107740405A (en) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP3159172U (en) * | 2010-01-28 | 2010-05-13 | 勝義 玉重 | Fall prevention safety fence for solar power generation panel installation construction |
CN206034941U (en) * | 2016-08-24 | 2017-03-22 | 中建五局土木工程有限公司 | Bored concrete pile stake hole is with protection screen panel |
CN206299140U (en) * | 2016-11-28 | 2017-07-04 | 云南工程建设总承包公司 | A kind of construction multipurpose safety protective screen plate |
CN106948606A (en) * | 2017-03-30 | 2017-07-14 | 中建四局第五建筑工程有限公司 | Cover type artificial digging pile aperture means of defence and its device |
CN207376614U (en) * | 2017-10-23 | 2018-05-18 | 安徽送变电工程有限公司 | For the disposition operating platform in artificial digging pile borehole operation |
-
2017
- 2017-10-23 CN CN201710990632.0A patent/CN107740405A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP3159172U (en) * | 2010-01-28 | 2010-05-13 | 勝義 玉重 | Fall prevention safety fence for solar power generation panel installation construction |
CN206034941U (en) * | 2016-08-24 | 2017-03-22 | 中建五局土木工程有限公司 | Bored concrete pile stake hole is with protection screen panel |
CN206299140U (en) * | 2016-11-28 | 2017-07-04 | 云南工程建设总承包公司 | A kind of construction multipurpose safety protective screen plate |
CN106948606A (en) * | 2017-03-30 | 2017-07-14 | 中建四局第五建筑工程有限公司 | Cover type artificial digging pile aperture means of defence and its device |
CN207376614U (en) * | 2017-10-23 | 2018-05-18 | 安徽送变电工程有限公司 | For the disposition operating platform in artificial digging pile borehole operation |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205654349U (en) | Device based on interconnection removes shield zone cataract or glaucoma impenetrability foreign matter | |
CN207376614U (en) | For the disposition operating platform in artificial digging pile borehole operation | |
CN106407552B (en) | A kind of design method promoting the anti-collapse ability of RC frame core wall structure | |
CN205088933U (en) | Tower crane inserted lift scaffold's operation protection platform | |
CN104727324B (en) | Irregular basement construction method for supporting | |
CN205024600U (en) | A work platform that is used for bridge aquatic pile foundation to be under construction | |
CN206986907U (en) | A kind of side slope down-the-hole drill drilling operation platform | |
CN107740405A (en) | For the disposition operating platform in artificial digging pile borehole operation | |
CN106120810B (en) | Anti-collapse protective device in a kind of hole | |
CN206986902U (en) | A kind of new foundation pit support device | |
CN206071096U (en) | The underpinning device of load bearing wall in brick mix structure | |
CN205444961U (en) | Tool room safety protection canopy with double -deck shed roof structure | |
CN203475801U (en) | Telescopic steel platform for elevator shaft | |
CN110645847A (en) | Shield for protecting hand grenade fragments and explosion shock waves | |
CN107419733A (en) | A kind of side slope down-the-hole drill drilling operation platform | |
CN206220461U (en) | A kind of packaged type I-steel hoistway operation platform | |
CN202401472U (en) | Interlocking type wall panel | |
CN211573546U (en) | Protection device for tunnel rockburst section and construction trolley with same | |
CN211369459U (en) | Soft platform of steel construction | |
CN210216457U (en) | Soft soil foundation deep foundation pit supporting structure | |
CN107795272A (en) | A kind of blasthole perforating device for inclined-plane palisades | |
CN208010373U (en) | The anti-safe canopy of roof fall | |
CN102605787A (en) | Device for inhibiting foundation soil from disturbing during removing of steel sheet piles and application method thereof | |
CN107299756A (en) | A kind of hanging basket rail support system for casta region | |
CN206693236U (en) | A kind of link for pile pulling |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |