CN107740405A - For the disposition operating platform in artificial digging pile borehole operation - Google Patents

For the disposition operating platform in artificial digging pile borehole operation Download PDF

Info

Publication number
CN107740405A
CN107740405A CN201710990632.0A CN201710990632A CN107740405A CN 107740405 A CN107740405 A CN 107740405A CN 201710990632 A CN201710990632 A CN 201710990632A CN 107740405 A CN107740405 A CN 107740405A
Authority
CN
China
Prior art keywords
frame component
component pipe
body frame
pipe
side wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710990632.0A
Other languages
Chinese (zh)
Inventor
黄涛涛
桂和怀
朱冠旻
单长孝
李凯
杨尚兴
许克克
吴明春
童宝
陈晨
周志祥
徐鹏飞
张鹏程
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Anhui Power Transmission and Transformation Engineering Co Ltd
Original Assignee
State Grid Corp of China SGCC
Anhui Power Transmission and Transformation Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Anhui Power Transmission and Transformation Engineering Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201710990632.0A priority Critical patent/CN107740405A/en
Publication of CN107740405A publication Critical patent/CN107740405A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/32Safety or protective measures for persons during the construction of buildings
    • E04G21/3204Safety or protective measures for persons during the construction of buildings against falling down

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • General Engineering & Computer Science (AREA)
  • Earth Drilling (AREA)

Abstract

The present invention relates to a kind of safety device for artificial digging pile borehole process, specifically, is related to a kind of disposition operating platform being used in artificial digging pile borehole operation.It includes the operating platform body being used at artificial digging pile aperture, and pail passage is provided with the middle part of operating platform body;Operating platform body includes support frame, and protective screen plate is provided with support frame;Support frame is surrounded by multiple installing plates, and installation through-hole is equipped with any installing plate.The present invention can be preferably to protecting operating personnel during the borehole of artificial digging pile.

Description

For the disposition operating platform in artificial digging pile borehole operation
Technical field
The present invention relates to a kind of safety device for artificial digging pile borehole process, specifically, it is related to one kind For the disposition operating platform in artificial digging pile borehole operation.
Background technology
Hand-dug pile foundation because its construction method is convenient, without large-scale construction equipment the features such as, and be widely used in In various engineering fields, it is particularly suitable as the structure base of the landform such as mountain area, hills.But in artificial digging pile Higher high falling, falling object from high altitude equivalent risk in borehole operation process be present, this is near coal-mine and hole bottom operating personnel person Safety causes serious threat.It is the safety meaning by lifting construction personnel mostly in the work progress of existing artificial digging pile Know and be equipped with conventional security protection articles for use to evade the security risk in operation process, but such safeguard procedures obviously can not be compared with Solve the hidden danger such as high falling during borehole, falling object from high altitude well.
The content of the invention
Present disclosure is to provide a kind of disposition operating platform being used in artificial digging pile borehole operation, its Certain or some defects of prior art can be overcome.
According to the disposition operating platform being used in artificial digging pile borehole operation of the present invention, it includes being used to set Operating platform body at artificial digging pile aperture, operating platform body middle part are provided with pail passage;Operating platform body bag Support frame is included, protective screen plate is provided with support frame;Support frame is surrounded by multiple installing plates, and installation is equipped with any installing plate Through hole.
In the present invention, operating platform body can be located at the aperture of artificial digging pile, pass through connector and installing plate Coordinate, preferably support frame can be fixed, so that operating platform body more can firmly be located at excavated by manual work At the aperture of hole stake;Pass through the cooperation of protective screen plate and support frame so that operating platform body can have preferably strong simultaneously Degree and lighter weight, preferably protect so that operating platform body can provide and enable workmen preferably Operation is carried out above operating platform body;In addition, the setting of protective screen plate, also make it that operating platform body will not be to excavated by manual work Light and ventilation in the stake of hole cause large effect.
Operating platform body can be located at the aperture of artificial digging pile by the present invention in actual use by connector Place, carrying native machine can be set up in above operating platform body, and carrying native bucket can pass in and out at pail passage, so as to ensure that borehole Operation is normally carried out.
By the above-mentioned construction of the present invention, the falling from high altitude risk of ground operation personnel can be preferably reduced, and can The falling object from high altitude that is effectively prevented from aperture and to the injury caused by the operating personnel of underground.
Preferably, inside left's frame, left body frame, right body frame and inside right forward's frame, protective screen plate that support frame includes being sequentially connected have It is multiple and be respectively arranged inside left's frame, left body frame, right body frame and inside right forward's frame.Pass through this kind of splicing structure so that of the invention Operating platform body can be easy to make, transport and assemble.
Preferably, inside left's frame, left body frame, right body frame and inside right forward's frame form by square steel pipe welded, inside left's frame and the right side The integrally constructed symmetrical isosceles trapezoid shape of sub-frame, left body frame and the integrally constructed symmetrical rectangle of right body frame Shape;
Inside left's frame is included from first inside left's frame component pipe and second inside left's frame component pipe left and that the right side be arranged in parallel successively, the The length of one inside left's frame component pipe is less than the length of second inside left's frame component pipe;The both ends of first inside left's frame component pipe are left with second The 3rd inside left's frame component pipe and the 4th inside left's frame component pipe are respectively equipped between the both ends of sub-frame component pipe;
Left body frame is included from the first left body frame component pipe and the second left body frame component pipe left and that the right side be arranged in parallel successively, the The length of one left body frame component pipe, the second left body frame component pipe and second inside left's frame component pipe is identical;First left body frame component pipe Both ends side wall and the second left body frame component pipe both ends side wall between be provided with the 3rd left body frame component pipe and the 4th with being respectively perpendicular Left body frame component pipe;The 5th left body frame component pipe and the 6th left master are respectively equipped with the right side wall at the second left body frame component pipe both ends Frame component pipe, the 7th spaced left body frame component pipe and the are also vertically provided with the right side wall of the second left body frame component pipe Eight left body frame component pipes;The both ends left side wall of one the 9th left body frame component pipe respectively with the 5th left body frame component pipe and the 7th left master The right part connection of frame component pipe, the both ends left side wall of 1 the tenth left body frame component pipe respectively with the 6th left body frame component pipe and the The right part connection of eight left body frame component pipes;The first half bore is formed between 7th left body frame component pipe and the 8th left body frame component pipe;
Right body frame is included from the first right body frame component pipe and the second right body frame component pipe right and that a left side be arranged in parallel successively, the The length of one right body frame component pipe, the second right body frame component pipe and the second left body frame component pipe is identical;First right body frame component pipe Both ends side wall and the second right body frame component pipe both ends side wall between be provided with the 3rd right body frame component pipe and the 4th with being respectively perpendicular Right body frame component pipe;The 5th right body frame component pipe and the 6th right master are respectively equipped with the left side wall at the second right body frame component pipe both ends Frame component pipe, the 7th spaced right body frame component pipe and the are also vertically provided with the left side wall of the second right body frame component pipe Eight right body frame component pipes;The both ends right side wall of one the 9th right body frame component pipe respectively with the 5th right body frame component pipe and the 7th right master The left part connection of frame component pipe, the both ends right side wall of 1 the tenth right body frame component pipe respectively with the 6th right body frame component pipe and the The left part connection of eight right body frame component pipes;The second half bore is formed between 7th right body frame component pipe and the 8th right body frame component pipe, Second half bore and the first half bore are collectively forming pail passage;
Inside right forward's frame is included from first inside right forward's frame component pipe and second inside right forward's frame component pipe right and that a left side be arranged in parallel successively, the The length of one inside right forward's frame component pipe is less than the length of second inside right forward's frame component pipe;The both ends of first inside right forward's frame component pipe are right with second The 3rd inside right forward's frame component pipe and the 4th inside right forward's frame component pipe are respectively equipped between the both ends of sub-frame component pipe.
In the present invention, inside left's frame, left body frame, the above-mentioned construction of right body frame and inside right forward's frame so that operating platform body can Making and convenient material drawing can be easy to, so as to which cost of manufacture is relatively low;In addition, pass through this kind construct so that inside left's frame, left body frame, Right body frame and inside right forward's frame can possess preferable strength and stiffness.
Preferably, also it is interval with the 5th to be parallel to each other between first inside left's frame component pipe and second inside left's frame component pipe The respective end difference of inside left's frame component pipe and the 6th inside left's frame component pipe, the 5th inside left's frame component pipe and the 6th inside left's frame component pipe It is vertical at the right side wall at first inside left's frame component pipe both ends.So that inside left's frame can further possess preferably Strength and stiffness.
Preferably, spaced the is also vertically provided between the first left body frame component pipe and the second left body frame component pipe 11 left body frame component pipes and the 12nd left body frame component pipe.So that left body frame can further possess preferably Strength and stiffness.
Preferably, spaced the is also vertically provided between the first right body frame component pipe and the second right body frame component pipe 11 right body frame component pipes and the 12nd right body frame component pipe.So that right body frame can further possess preferably Strength and stiffness.
Preferably, also it is interval with the 5th to be parallel to each other between first inside right forward's frame component pipe and second inside right forward's frame component pipe The respective end difference of inside right forward's frame component pipe and the 6th inside right forward's frame component pipe, the 5th inside right forward's frame component pipe and the 6th inside right forward's frame component pipe It is vertical at the right side wall at first inside right forward's frame component pipe both ends.So that inside right forward's frame can further possess preferably Strength and stiffness.
Preferably, the multiple installing plate is respectively arranged at the left side wall of first inside left's frame component pipe, the 3rd left body frame At the upper side wall of component pipe and the 5th left body frame component pipe, the lower wall of the 4th left body frame component pipe and the 6th left body frame component pipe Place, the 3rd right body frame component pipe and the 5th right body frame component pipe upper side wall at, the 4th right body frame component pipe and the 6th right body frame At the lower wall of component pipe and at the right side wall of first inside right forward's frame component pipe.So as to rational in infrastructure, and it is easy to make.
Preferably, the respective end of the 3rd inside left's frame component pipe and the 4th inside left's frame component pipe is all connected to second inside left's frame At the left side wall of component pipe, the respective end of the 3rd inside right forward's frame component pipe and the 4th inside right forward's frame component pipe is all connected to second inside right forward's frame At the right side wall of component pipe;It is sequentially connected between inside left's frame, left body frame, right body frame and inside right forward's frame by connecting bolt, even Patching pin includes pinboard, and pinboard side compartment of terrain is provided with 2 latch posts, the first jack is penetratingly provided with latch post;The Two inside left's frame component pipes, the first left body frame component pipe, the first right body frame component pipe and second inside right forward's frame component pipe both ends at, At the upper end of nine left body frame component pipes and the 9th right body frame component pipe, and the tenth left body frame component pipe and the tenth right body frame component The second jack corresponding with the first jack is equipped with the lower end of pipe.So as to preferably realize inside left's frame, left body frame, right body frame Being sequentially connected between inside right forward's frame.
Preferably, installing plate is used to coordinate with holdfast, holdfast includes end head, and vertically a plug is set in the middle part of end head Portion, end head and intercalation part form by round steel interception, and intercalation part distal tip end is provided with oblique raft.So as to make simple and be easy to Use.
Brief description of the drawings
Fig. 1 is the schematic diagram of the operating platform body in embodiment 1;
Fig. 2 is the schematic diagram of the support frame in embodiment 1;
Fig. 3 is the schematic diagram of inside left's frame in embodiment 1;
Fig. 4 is the schematic diagram of the left body frame in embodiment 1;
Fig. 5 is the schematic diagram of the right body frame in embodiment 1;
Fig. 6 is the schematic diagram of inside right forward's frame in embodiment 1;
Fig. 7 is the schematic diagram in embodiment 1;
Fig. 8 is the schematic diagram in embodiment 1.
Embodiment
To further appreciate that present disclosure, the present invention is described in detail in conjunction with the accompanying drawings and embodiments.It should be understood that , embodiment be only the present invention is explained and and it is non-limiting.
Embodiment 1
A kind of disposition operating platform being used in artificial digging pile borehole operation is present embodiments provided, it is being protected While card borehole operation is normally carried out, additionally it is possible to the high falling of ground operation personnel is effectively prevented, and can be effectively Avoid the falling object from high altitude at aperture and to the injury caused by the operating personnel of underground.
As shown in figure 1, the disposition operating platform of the present embodiment includes being used at artificial digging pile aperture Operating platform body 100, the middle part of operating platform body 100 are provided with pail passage 130;Operating platform body 100 includes support frame 110, protective screen plate 120 is provided with support frame 110;Support frame 110 is surrounded by multiple installing plates 140, at any installing plate 140 It is equipped with installation through-hole 141.
In the present embodiment, installing plate 140 is using long 10cm, wide 4cm, thick 0.2cm steel plate, and installation through-hole 141 is through peace Loading board 140, and the aperture of installation through-hole 141 is 2.5cm.
As shown in Fig. 2 support frame 110 includes inside left's frame 111, left body frame 112, right body frame 113 and the inside right forward being sequentially connected Frame 114, protective screen plate 120 have multiple and are respectively arranged inside left's frame 111, left body frame 112, right body frame 113 and inside right forward's frame 114.
In the present embodiment, inside left's frame 111, left body frame 112, right body frame 113 and inside right forward's frame 114 are 4cm*4cm* by parameter The square steel pipe welded of 0.3 (length, width and the thickness of cross section) forms, and inside left's frame 111 and inside right forward's frame 114 are integrally constructed Symmetrical isosceles trapezoid shape, the left integrally constructed symmetrical oblong-shaped of body frame 112 and right body frame 113.
As shown in figure 3, inside left's frame 111 is included from left and right first inside left's frame component pipe 310 be arrangeding in parallel successively and the Two inside left's frame component pipes 320, the length of first inside left's frame component pipe 310 are less than the length of second inside left's frame component pipe 320;First The 3rd inside left's frame component pipe 330 is respectively equipped between the both ends of inside left's frame component pipe 310 and the both ends of second inside left's frame component pipe 320 With the 4th inside left's frame component pipe 340.
In addition, to be parallel to each other is also interval between first inside left's frame component pipe 310 and second inside left's frame component pipe 320 Five inside left's frame component pipes 350 and the 6th inside left's frame component pipe 360, the 5th inside left's frame component pipe 350 and the 6th inside left's frame component pipe 360 respective end is respectively perpendicular at the right side wall at the both ends of first inside left's frame component pipe 310.
As shown in figure 4, left body frame 112 is included from left and right the first left body frame component pipe 410 be arrangeding in parallel successively and the Two left body frame component pipes 420, the first left body frame component pipe 410, the second left body frame component pipe 420 and second inside left's frame component pipe 320 length is identical;Between the both ends side wall of first left body frame component pipe 410 and the both ends side wall of the second left body frame component pipe 420 It is provided with the 3rd left 431 and the 4th left body frame component pipe 432 of body frame component pipe with being respectively perpendicular;Second left 420 liang of body frame component pipe The 5th left 441 and the 6th left body frame component pipe 442 of body frame component pipe, the second left body frame component pipe are respectively equipped with the right side wall at end The 7th spaced left 451 and the 8th left body frame component pipe 452 of body frame component pipe is also vertically provided with 420 right side wall; The both ends left side wall of one the 9th left body frame component pipe 461 respectively with the 5th left 441 and the 7th left body frame component pipe of body frame component pipe 451 right part connection, the both ends left side wall of 1 the tenth left body frame component pipe 462 respectively with the 6th left body frame component pipe 442 and The right part connection of 8th left body frame component pipe 452;Shape between 7th left 451 and the 8th left body frame component pipe 452 of body frame component pipe Into the first half bore 470.
In addition, also vertically it is provided between the first left 410 and second left body frame component pipe 420 of body frame component pipe spaced 11st left the 481 and the 12nd left body frame component pipe 482 of body frame component pipe.
As shown in figure 5, right body frame 113 is included from right and left the first right body frame component pipe 510 be arrangeding in parallel successively and the Two right body frame component pipes 520, the first right body frame component pipe 510, the second right 520 and second left body frame component pipe of body frame component pipe 420 length is identical;Between the both ends side wall of first right body frame component pipe 510 and the both ends side wall of the second right body frame component pipe 520 It is provided with the 3rd right 531 and the 4th right body frame component pipe 532 of body frame component pipe with being respectively perpendicular;Second right 520 liang of body frame component pipe The 5th right 541 and the 6th right body frame component pipe 542 of body frame component pipe, the second right body frame component pipe are respectively equipped with the left side wall at end The 7th spaced right 551 and the 8th right body frame component pipe 552 of body frame component pipe is also vertically provided with 520 left side wall; The both ends right side wall of one the 9th right body frame component pipe 561 respectively with the 5th right 541 and the 7th right body frame component pipe of body frame component pipe 551 left part connection, the both ends right side wall of 1 the tenth right body frame component pipe 562 respectively with the 6th right body frame component pipe 542 and The left part connection of 8th right body frame component pipe 552;Shape between 7th right 551 and the 8th right body frame component pipe 552 of body frame component pipe Into the second half bore 570, the second half bore 570 and the first half bore 470 are collectively forming pail passage 130.
In addition, also vertically it is provided between the first right 510 and second right body frame component pipe 520 of body frame component pipe spaced 11st right the 581 and the 12nd right body frame component pipe 582 of body frame component pipe.
As shown in fig. 6, inside right forward's frame 114 is included from right and left first inside right forward's frame component pipe 610 be arrangeding in parallel successively and the Two inside right forward's frame component pipes 620, the length of first inside right forward's frame component pipe 610 are less than the length of second inside right forward's frame component pipe 620;First The 3rd inside right forward's frame component pipe 630 is respectively equipped between the both ends of inside right forward's frame component pipe 610 and the both ends of second inside right forward's frame component pipe 620 With the 4th inside right forward's frame component pipe 640.
In addition, to be parallel to each other is also interval between first inside right forward's frame component pipe 610 and second inside right forward's frame component pipe 620 Five inside right forward's frame component pipes 650 and the 6th inside right forward's frame component pipe 660, the 5th inside right forward's frame component pipe 650 and the 6th inside right forward's frame component pipe 660 respective end is respectively perpendicular at the right side wall at the both ends of first inside right forward's frame component pipe 610.
In the present embodiment, the multiple installing plate 140 is respectively arranged at the left side wall of first inside left's frame component pipe 310, At the upper side wall of three left 431 and the 5th left body frame component pipes 441 of body frame component pipe, the 4th left body frame component pipe 432 and the 6th it is left At the lower wall of body frame component pipe 442, at the upper side wall of the 3rd right 531 and the 5th right body frame component pipe 541 of body frame component pipe, At the lower wall of four right 532 and the 6th right body frame component pipes 542 of body frame component pipe and first inside right forward's frame component pipe 610 the right side Side-walls.
In the present embodiment, the respective end of the 3rd inside left's frame component pipe 330 and the 4th inside left's frame component pipe 340 is all connected to At the left side wall of two inside left's frame component pipes 320, the respective end of the 3rd inside right forward's frame component pipe 630 and the 4th inside right forward's frame component pipe 640 It is all connected at the right side wall of second inside right forward's frame component pipe 620;Inside left's frame 111, left body frame 112, right body frame 113 and inside right forward's frame It is sequentially connected between 114 by connecting bolt 115.
As shown in fig. 7, connecting bolt 115 includes pinboard 710, the side compartment of terrain of pinboard 710 is provided with 2 latch posts 720, the first jack 721 is penetratingly provided with latch post 720;Second inside left's frame component pipe 320, the first left body frame component pipe 410, At the both ends of first right body frame component pipe 510 and second inside right forward's frame component pipe 620, the 9th left body frame component pipe 461 and the 9th is right At the upper end of body frame component pipe 561, and at the lower end of the tenth left 462 and the tenth right body frame component pipe 562 of body frame component pipe it is equal Provided with 721 corresponding second jack 150 of the first jack.
In the present embodiment, pinboard 710 is using long 9cm, wide 3cm, thick 0.2cm steel plate, and latch post 720 is from 3cm*3cm* Interception forms at 0.3cm rectangular steel tube, and 720 long 15cm of latch post, the first length of the jack 721 away from pinboard 710 is 10cm, The second corresponding distance of the jack 150 away from corresponding assembly tube end is also 10cm, the first jack 721 and the second jack 150 Aperture is 1cm.
As shown in figure 8, installing plate 140 is used to coordinate with holdfast 210, holdfast 210 includes end head 810, in end head 810 Portion vertically sets an intercalation part 820, end head 810 and intercalation part 820 and formed by a diameter of 2cm round steel interception, intercalation part 820 The end of distal tip 810 is provided with oblique raft 821.
In the present embodiment, 810 long 8cm of end head, 82 long 20cm of intercalation part.
In the present embodiment, protective screen plate 120 includes bar mat, and bar mat surrounding is welded with the framework formed by angle steel.
The disposition operating platform of the present embodiment when in use, is spliced, afterwards by connecting bolt 115 first It is fixed using holdfast 210, native frame will be put forward afterwards and be located at the top of operating platform body 100, pail can be passed through by carrying native bucket Passage 130 passes in and out, so as to ensure that being normally carried out for borehole operation.
Schematically the present invention and embodiments thereof are described above, this describes no restricted, institute in accompanying drawing What is shown is also one of embodiments of the present invention, and actual structure is not limited thereto.So if common skill of this area Art personnel are enlightened by it, without departing from the spirit of the invention, without designing and the technical scheme for creativeness Similar frame mode and embodiment, protection scope of the present invention all should be belonged to.

Claims (10)

1. for the disposition operating platform in artificial digging pile borehole operation, it is characterised in that:Including for located at people Operating platform body (100) at work caisson aperture, operating platform body (100) middle part are provided with pail passage (130);Operation Platform body (100) includes support frame (110), and support frame (110) place is provided with protective screen plate (120);Support frame (110) surrounding is set There are multiple installing plates (140), any installing plate (140) place is equipped with installation through-hole (141).
2. the disposition operating platform according to claim 1 being used in artificial digging pile borehole operation, its feature It is:Support frame (110) includes inside left's frame (111), left body frame (112), right body frame (113) and the inside right forward's frame being sequentially connected (114), protective screen plate (120) has multiple and is respectively arranged on inside left's frame (111), left body frame (112), right body frame (113) and inside right forward Frame (114) place.
3. the disposition operating platform according to claim 2 being used in artificial digging pile borehole operation, its feature It is:Inside left's frame (111), left body frame (112), right body frame (113) and inside right forward's frame (114) form by square steel pipe welded, left Sub-frame (111) and the integrally constructed symmetrical isosceles trapezoid shape of inside right forward's frame (114), left body frame (112) and right body frame (113) Integrally constructed symmetrical oblong-shaped;
Inside left's frame (111) is included from the right first inside left's frame component pipe (310) be arrangeding in parallel successively in a left side and second inside left's frame group Part pipe (320), the length of first inside left's frame component pipe (310) are less than the length of second inside left's frame component pipe (320);First inside left The 3rd inside left's frame component pipe is respectively equipped between the both ends of frame component pipe (310) and the both ends of second inside left's frame component pipe (320) And the 4th inside left's frame component pipe (340) (330);
Left body frame (112) is included from right the first left body frame component pipe (410) be arrangeding in parallel successively in a left side and the second left body frame group Part pipe (420), the first left body frame component pipe (410), the second left body frame component pipe (420) and second inside left's frame component pipe (320) Length it is identical;Between the both ends side wall of first left body frame component pipe (410) and the both ends side wall of the second left body frame component pipe (420) It is provided with the 3rd left body frame component pipe (431) and the 4th left body frame component pipe (432) with being respectively perpendicular;Second left body frame component pipe (420) it is respectively equipped with the 5th left body frame component pipe (441) and the 6th left body frame component pipe (442) at the right side wall at both ends, second Spaced the 7th left body frame component pipe (451) and the 8th is also vertically provided with the right side wall of left body frame component pipe (420) Left body frame component pipe (452);The both ends left side wall of one the 9th left body frame component pipe (461) respectively with the 5th left body frame component pipe (441) right part with the 7th left body frame component pipe (451) connects, the both ends left side wall of 1 the tenth left body frame component pipe (462) The right part with the 6th left body frame component pipe (442) and the 8th left body frame component pipe (452) is connected respectively;7th left body frame component The first half bore (470) is formed between pipe (451) and the 8th left body frame component pipe (452);
Right body frame (113) is included from left the first right body frame component pipe (510) be arrangeding in parallel successively in the right side and the second right body frame group Part pipe (520), the first right body frame component pipe (510), the second right body frame component pipe (520) and the second left body frame component pipe (420) Length it is identical;Between the both ends side wall of first right body frame component pipe (510) and the both ends side wall of the second right body frame component pipe (520) It is provided with the 3rd right body frame component pipe (531) and the 4th right body frame component pipe (532) with being respectively perpendicular;Second right body frame component pipe (520) it is respectively equipped with the 5th right body frame component pipe (541) and the 6th right body frame component pipe (542) at the left side wall at both ends, second Spaced the 7th right body frame component pipe (551) and the 8th is also vertically provided with the left side wall of right body frame component pipe (520) Right body frame component pipe (552);The both ends right side wall of one the 9th right body frame component pipe (561) respectively with the 5th right body frame component pipe (541) left part with the 7th right body frame component pipe (551) connects, the both ends right side wall of 1 the tenth right body frame component pipe (562) The left part with the 6th right body frame component pipe (542) and the 8th right body frame component pipe (552) is connected respectively;7th right body frame component The second half bore (570), the second half bore (570) and the first half bore are formed between pipe (551) and the 8th right body frame component pipe (552) (470) it is collectively forming pail passage (130);
Inside right forward's frame (114) is included from the left first inside right forward's frame component pipe (610) be arrangeding in parallel successively in the right side and second inside right forward's frame group Part pipe (620), the length of first inside right forward's frame component pipe (610) are less than the length of second inside right forward's frame component pipe (620);First inside right forward The 3rd inside right forward's frame component pipe is respectively equipped between the both ends of frame component pipe (610) and the both ends of second inside right forward's frame component pipe (620) And the 4th inside right forward's frame component pipe (640) (630).
4. the disposition operating platform according to claim 3 being used in artificial digging pile borehole operation, its feature It is:It is left that the 5th to be parallel to each other is also interval between first inside left's frame component pipe (310) and second inside left's frame component pipe (320) Sub-frame component pipe (350) and the 6th inside left's frame component pipe (360), the 5th inside left's frame component pipe (350) and the 6th inside left's frame component The respective end of pipe (360) is respectively perpendicular at the right side wall at first inside left frame component pipe (310) both ends.
5. the disposition operating platform according to claim 3 being used in artificial digging pile borehole operation, its feature It is:The spaced the tenth is also vertically provided between first left body frame component pipe (410) and the second left body frame component pipe (420) One left body frame component pipe (481) and the 12nd left body frame component pipe (482).
6. the disposition operating platform according to claim 3 being used in artificial digging pile borehole operation, its feature It is:The spaced the tenth is also vertically provided between first right body frame component pipe (510) and the second right body frame component pipe (520) One right body frame component pipe (581) and the 12nd right body frame component pipe (582).
7. the disposition operating platform according to claim 3 being used in artificial digging pile borehole operation, its feature It is:It is right that the 5th to be parallel to each other is also interval between first inside right forward's frame component pipe (610) and second inside right forward's frame component pipe (620) Sub-frame component pipe (650) and the 6th inside right forward's frame component pipe (660), the 5th inside right forward's frame component pipe (650) and the 6th inside right forward's frame component The respective end of pipe (660) is respectively perpendicular at the right side wall at first inside right forward frame component pipe (610) both ends.
8. the disposition operating platform according to claim 3 being used in artificial digging pile borehole operation, its feature It is:The multiple installing plate (140) is respectively arranged at the left side wall of first inside left's frame component pipe (310), the 3rd left body frame group At part pipe (431) and the upper side wall of the 5th left body frame component pipe (441), the 4th left body frame component pipe (432) and the 6th left body frame At the lower wall of component pipe (442), at the upper side wall of the 3rd right body frame component pipe (531) and the 5th right body frame component pipe (541), At the lower wall of 4th right body frame component pipe (532) and the 6th right body frame component pipe (542) and first inside right forward's frame component pipe (610) at right side wall.
9. the disposition operating platform according to claim 3 being used in artificial digging pile borehole operation, its feature It is:The respective end of 3rd inside left's frame component pipe (330) and the 4th inside left's frame component pipe (340) is all connected to second inside left's frame group At the left side wall of part pipe (320), the respective end of the 3rd inside right forward's frame component pipe (630) and the 4th inside right forward's frame component pipe (640) connects It is connected at the right side wall of second inside right forward's frame component pipe (620);Inside left's frame (111), left body frame (112), right body frame (113) and inside right forward It is sequentially connected between frame (114) by connecting bolt (115), connecting bolt (115) includes pinboard (710), pinboard (710) side compartment of terrain is provided with 2 latch posts (720), and latch post (720) place is penetratingly provided with the first jack (721);Second is left Sub-frame component pipe (320), the first left body frame component pipe (410), the first right body frame component pipe (510) and second inside right forward's frame component pipe (620) at both ends, at the upper end of the 9th left body frame component pipe (461) and the 9th right body frame component pipe (561), and the tenth left It is equipped with and the first jack (721) corresponding second at the lower end of body frame component pipe (462) and the tenth right body frame component pipe (562) Jack (150).
10. the disposition operating platform according to claim 1 being used in artificial digging pile borehole operation, its feature It is:Installing plate (140) is used to coordinate with holdfast (210), and holdfast (210) includes end head (810), end head (810) middle part A vertical intercalation part (820), end head (810) and the intercalation part (820) of setting forms by round steel interception, intercalation part (820) distal end Head (810) end is provided with oblique raft (821).
CN201710990632.0A 2017-10-23 2017-10-23 For the disposition operating platform in artificial digging pile borehole operation Pending CN107740405A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710990632.0A CN107740405A (en) 2017-10-23 2017-10-23 For the disposition operating platform in artificial digging pile borehole operation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710990632.0A CN107740405A (en) 2017-10-23 2017-10-23 For the disposition operating platform in artificial digging pile borehole operation

Publications (1)

Publication Number Publication Date
CN107740405A true CN107740405A (en) 2018-02-27

Family

ID=61238057

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710990632.0A Pending CN107740405A (en) 2017-10-23 2017-10-23 For the disposition operating platform in artificial digging pile borehole operation

Country Status (1)

Country Link
CN (1) CN107740405A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3159172U (en) * 2010-01-28 2010-05-13 勝義 玉重 Fall prevention safety fence for solar power generation panel installation construction
CN206034941U (en) * 2016-08-24 2017-03-22 中建五局土木工程有限公司 Bored concrete pile stake hole is with protection screen panel
CN206299140U (en) * 2016-11-28 2017-07-04 云南工程建设总承包公司 A kind of construction multipurpose safety protective screen plate
CN106948606A (en) * 2017-03-30 2017-07-14 中建四局第五建筑工程有限公司 Cover type artificial digging pile aperture means of defence and its device
CN207376614U (en) * 2017-10-23 2018-05-18 安徽送变电工程有限公司 For the disposition operating platform in artificial digging pile borehole operation

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3159172U (en) * 2010-01-28 2010-05-13 勝義 玉重 Fall prevention safety fence for solar power generation panel installation construction
CN206034941U (en) * 2016-08-24 2017-03-22 中建五局土木工程有限公司 Bored concrete pile stake hole is with protection screen panel
CN206299140U (en) * 2016-11-28 2017-07-04 云南工程建设总承包公司 A kind of construction multipurpose safety protective screen plate
CN106948606A (en) * 2017-03-30 2017-07-14 中建四局第五建筑工程有限公司 Cover type artificial digging pile aperture means of defence and its device
CN207376614U (en) * 2017-10-23 2018-05-18 安徽送变电工程有限公司 For the disposition operating platform in artificial digging pile borehole operation

Similar Documents

Publication Publication Date Title
CN205654349U (en) Device based on interconnection removes shield zone cataract or glaucoma impenetrability foreign matter
CN207376614U (en) For the disposition operating platform in artificial digging pile borehole operation
CN106407552B (en) A kind of design method promoting the anti-collapse ability of RC frame core wall structure
CN205088933U (en) Tower crane inserted lift scaffold's operation protection platform
CN104727324B (en) Irregular basement construction method for supporting
CN205024600U (en) A work platform that is used for bridge aquatic pile foundation to be under construction
CN206986907U (en) A kind of side slope down-the-hole drill drilling operation platform
CN107740405A (en) For the disposition operating platform in artificial digging pile borehole operation
CN106120810B (en) Anti-collapse protective device in a kind of hole
CN206986902U (en) A kind of new foundation pit support device
CN206071096U (en) The underpinning device of load bearing wall in brick mix structure
CN205444961U (en) Tool room safety protection canopy with double -deck shed roof structure
CN203475801U (en) Telescopic steel platform for elevator shaft
CN110645847A (en) Shield for protecting hand grenade fragments and explosion shock waves
CN107419733A (en) A kind of side slope down-the-hole drill drilling operation platform
CN206220461U (en) A kind of packaged type I-steel hoistway operation platform
CN202401472U (en) Interlocking type wall panel
CN211573546U (en) Protection device for tunnel rockburst section and construction trolley with same
CN211369459U (en) Soft platform of steel construction
CN210216457U (en) Soft soil foundation deep foundation pit supporting structure
CN107795272A (en) A kind of blasthole perforating device for inclined-plane palisades
CN208010373U (en) The anti-safe canopy of roof fall
CN102605787A (en) Device for inhibiting foundation soil from disturbing during removing of steel sheet piles and application method thereof
CN107299756A (en) A kind of hanging basket rail support system for casta region
CN206693236U (en) A kind of link for pile pulling

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination