CN102605787A - Device for inhibiting foundation soil from disturbing during removing of steel sheet piles and application method thereof - Google Patents

Device for inhibiting foundation soil from disturbing during removing of steel sheet piles and application method thereof Download PDF

Info

Publication number
CN102605787A
CN102605787A CN2012100492929A CN201210049292A CN102605787A CN 102605787 A CN102605787 A CN 102605787A CN 2012100492929 A CN2012100492929 A CN 2012100492929A CN 201210049292 A CN201210049292 A CN 201210049292A CN 102605787 A CN102605787 A CN 102605787A
Authority
CN
China
Prior art keywords
steel sheet
jetting
sheet pile
towards
foundation soil
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012100492929A
Other languages
Chinese (zh)
Inventor
赵兴山
王吉顶
葛峰
沈淦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Provincial Construction Group Co Ltd
Original Assignee
Jiangsu Provincial Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Provincial Construction Group Co Ltd filed Critical Jiangsu Provincial Construction Group Co Ltd
Priority to CN2012100492929A priority Critical patent/CN102605787A/en
Publication of CN102605787A publication Critical patent/CN102605787A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

The invention relates to a device for inhibiting foundation soil from disturbing during removing of steel sheet piles and an application method of the device. The device comprises a water tank, a high-pressure water pump, a high-pressure soft tube and a water jetting gun. The water tank is connected with the high-pressure water pump by a connecting tube; an outlet end of the high-pressure water pump is connected with the high-pressure soft tube and is connected with the water jetting gun by the high-pressure soft tube; and a tail end of the water jetting gun is a water jetting gun head with a special structure. When being constructed and applied, other construction tools must be provided, including a hoisting device for hanging the water jetting gun to perform the punching operation, a steel sheet pile pulling device, proper yellow sands and a transport handcart. The soil body in the steel sheet pile is changed into yellow sands by devices such as the high-pressure water pump, the high-pressure soft tube, the water jetting gun and so on; thus, when the steel sheet pile is pulled out, the soil body is not taken out, meanwhile, the yellow sands can fill the gap produced during removing of the steel sheet pile immediately and effectively; the disturbing of the foundation soil is avoided and the environmental impact problem caused by removal of the steel sheet pile in the prior art is solved basically.

Description

A kind of device and application process thereof that can suppress the foundation soil disturbance when pulling out steel sheet pile
Technical field
The invention belongs to technical field of civil engineering; Relate to the construction of ground foundation engineering and surrounding enviroment protection; Especially relating to steel sheet pile and go along with sb. to guard him the control construction of engineering and environmental hazard, specifically, is a kind of device and application process thereof that can suppress the foundation soil disturbance when pulling out steel sheet pile.
Background technology
The bracing of foundation pit body of underground engineering construction is to bear the soil pressure that pit earthwork excavation produced and the interim barricade of water pressure.The kind of bracing of foundation pit body is a lot, mainly contains steel sheet pile, reinforced concrete sheet pile, cement mixing method, cast-in-place concrete pile and diaphragm wall etc.Base pit engineering design consideration varying environment condition and construction characteristic are selected various envelope structures for use.In recent years, cement mixing method, cast-in-place concrete pile and diaphragm wall are as " disposable " structure of bracing of foundation pit, although its construction costs is higher, owing to engineering safety better is widely used.But the steel sheet pile space enclosing structure that ancient, traditional on the contrary repeated multiple times is used then more and more " is treated coldly " more and more marginalisation.
Steel sheet pile has longer developing history as foundation pit enclosure structure, once is the extensive use of various countries institute, and in China, the application of various large-scale " channel-section steels ", " Larsen " formula steel sheet pile (its section structure is shown in accompanying drawing 1) is also more common.The steel sheet pile fender body has a series of advantage, cheaper, reusable, pollution-free like space enclosing structure dependable performance, cost, as not have other cement class fender bodies requirement in the length of time, and it is convenient to construct.Yet, when pulling out, can cause steel sheet pile the disturbance of ground, and to the influence of surrounding enviroment, be its deadly defect, therefore influenced its application and development.
When steel sheet pile is pulled out to the disturbance of ground; Mainly be since steel sheet pile in the soil body in the uphill process; Taken a part of soil body of steel sheet pile " intraperitoneal " (in steel sheet pile) out of, the soil body that soil body viscosity is taken out of more greatly is many more, thereby in foundation soil, forms certain gap; Near it then displacement thereupon, sedimentation of the soil body plugs the gap with this.Wriggling, displacement, sedimentation that this foundation soil body is inner then can influence near underground utilities, building, produce displacement, sedimentation, make harm such as underground utilities damage, building sedimentation, inclination.
How to overcome steel sheet pile and pull out ground disturbance that is caused and the surrounding environment safety problem of bringing thus, let the steel sheet pile construction advantage manifest more, walk out the predicament of application, development, become important topic anxious to be solved in the ground foundation engineering construction.
Summary of the invention
The objective of the invention is to overcome the deficiency or the defective of prior art; A kind of device and application process thereof that can suppress the foundation soil disturbance when pulling out steel sheet pile is provided; Utilize high-pressure hydraulic pump, high-pressure hose and jetting towards equipment such as rifles, the soil body in the steel sheet pile is replaced as yellow ground, when pulling out steel sheet pile; The soil body just can not taken out of; Yellow ground can be filled the space that produces when steel sheet pile is pulled out timely and effectively simultaneously, has avoided the disturbance of foundation soil to the full extent, has fundamentally solved the ambient influnence problem that causes when steel sheet pile is pulled out in the past.
To achieve these goals, the present invention has adopted following technical scheme:
A kind of device that can suppress the foundation soil disturbance when pulling out steel sheet pile is characterized in that it comprises that water tank, high-pressure hydraulic pump, high-pressure hose and jetting are towards rifle;
Described water tank links to each other with the arrival end of high-pressure hydraulic pump through tube connector;
The described high-pressure hydraulic pump port of export links to each other towards rifle with described jetting through high-pressure hose;
Also comprise and hang jetting carries out the punching operation towards rifle crane gear, steel sheet pile pile pulling equipment and an amount of yellow ground and transport trolleys.
The above-mentioned device that can suppress the foundation soil disturbance when pulling out steel sheet pile, wherein,
Described jetting towards rifle comprise from top to bottom the U type bend pipe that links to each other successively, jetting towards gun barrel and jetting towards the rifle head; Described high-pressure hose links to each other towards the gun barrel rounding off with jetting through this U type bend pipe.
Described jetting comprises that towards the rifle head being positioned at jetting uses steel floor with the jetting that is welded on this conial tube top of next-door neighbour towards at least two pairs of reamings on the gun barrel outer wall towards the conial tube of gun barrel lower end.
Said jetting is provided with several spray-holes towards the conial tube of rifle head.
Described conial tube top is provided with at least two pairs of downward-sloping jetting holes along its radial symmetric; Described conial tube bottom is provided with a vertical jetting hole between two parties.
The profile of said steel floor assumes diamond in shape, and the side weld of one of which bar is connected on the outer wall that parallels towards the axis of gun barrel with jetting, two adjacent limits parallel downward-sloping and and jetting be about 45 ° angle towards forming between the axis of gun barrel.
Described at least two pairs of reamings distribute with the outer wall sustained height radial symmetric of steel floor along said jetting towards gun barrel.
Said jetting is towards the external diameter>=50mm of gun barrel ,≤100mm.
The clear distance in the Outside Dimensions≤steel sheet pile abdominal cavity of two steel floors that said jetting is oppositely arranged on the outer wall of gun barrel.
The axis in said inclination jetting hole and jetting are about 45 ° angle towards forming between the axis of gun barrel.
The aperture in said vertical jetting hole is slightly larger than the aperture in inclination jetting hole.
The aperture in described vertical jetting hole is about Ф 8mm; The aperture in said inclination jetting hole is about Ф 6mm.
Described water tank is capacity>=2m 3Steel water tank.
Described high-pressure hydraulic pump is the multistage high-pressure hydraulic pump of water pressure >=0.8MPa.
Described yellow ground is advisable with medium coarse sand.
Said jetting is a crane with enough brachiums and elevating capacity towards the equipment of hanging of rifle.
A kind of application process that can suppress the device of foundation soil disturbance when pulling out steel sheet pile is characterized in that it comprises following construction operation step:
One. water, electricity, road threeway;
Two. water tank is in place;
Three. water pump is installed;
Four. high-pressure hose and jetting are in place towards rifle;
Five. punching in the steel sheet pile;
Six. fill yellow ground in the steel sheet pile;
Seven. pull out steel sheet pile.
Owing to adopted above-mentioned technical scheme, the present invention compared with prior art has following advantage and good effect:
1, since the key equipment-jetting that the present invention relates to towards the rifle head; The reasonable setting in five different parts jetting holes on it; Make that entering into jetting both can spray towards the water under high pressure in the rifle vertically downward; Can be again simultaneously be about 45 ° angle to tilting to spray all round, wash the soil body from different directions open;
Jetting on the rifle head at least two pairs of reamings with the setting of rhombus steel floor, make jetting towards rifle when washing away the soil body, reaming is carried out in the punching in the steel sheet pile has been played critical effect, guaranteed the displacement of yellow ground effectively to the soil body.
2, the present invention utilizes high-pressure hydraulic pump, high-pressure hose and jetting towards equipment such as rifles; The soil body in the steel sheet pile is replaced as yellow ground, and when pulling out steel sheet pile, the soil body can not taken out of; Yellow ground can be filled the space that produces when steel sheet pile is pulled out timely and effectively simultaneously; Therefore avoided the disturbance of foundation soil, fundamentally solved the ambient influnence problem that causes when steel sheet pile is pulled out in the past, and then realized the purpose of safe construction.
The present invention has cleared away a big technology barrier for applying of steel sheet pile, makes the foundation pit enclosure method that this structural performance is reliable, construction is convenient and economic inject new vitality, hews out the prospect that further develops.
  
Description of drawings
Through following examples and combine the description of its accompanying drawing, can further understand purpose, specific structural features and the advantage of its invention.In the accompanying drawing,
Fig. 1 is the general structure sketch map of the present invention's device of suppressing the foundation soil disturbance;
Fig. 2 be among Fig. 1 jetting towards the structure for amplifying sketch map of rifle;
Fig. 3 be among Fig. 2 jetting towards the structure for amplifying sketch map of rifle head;
Fig. 4 is positioned at the conial tube structure for amplifying sketch map of jetting towards rifle head lower end among Fig. 3;
Fig. 5 is the cross section structure for amplifying sketch map of Fig. 1 light plate stake;
Fig. 6 is the constructing operation FB(flow block) of its application process of device that the present invention relates to.
Among the figure:
The 1-water tank; The 2-high-pressure hydraulic pump; The 3-high-pressure hose; The 4-jetting is towards rifle; 41-U type bend pipe; The 42-jetting is towards gun barrel; The 43-jetting is towards the rifle head; 431-steel floor; The 432-jetting is towards the conial tube of rifle head lower end; 432a-inclination jetting hole; The vertical jetting of 432b-hole; 5-hangs equipment; The 6-steel sheet pile; The 7-tube connector;
The S-yellow ground; The C-trolley; The clear distance in H-steel sheet pile abdominal cavity.
The specific embodiment
Referring to Fig. 1, cooperate referring to Fig. 2~Fig. 5, a kind of device that can suppress the foundation soil disturbance when pulling out steel sheet pile that the present invention relates to comprises that mainly water tank 1, high-pressure hydraulic pump 2, high-pressure hose 3 and jetting are towards rifle 4; Water tank 1 links to each other with the arrival end of high-pressure hydraulic pump 2 through tube connector 7; High-pressure hydraulic pump 2 ports of export link to each other towards rifle 4 with jetting through high-pressure hose 3.
In addition, comprise that also the jetting of hanging as shown in fig. 1 carries out the crane gear 5 of punching operation, the pile pulling equipment of steel sheet pile 6 and an amount of yellow ground S and transport trolleys C towards rifle 4.
As shown in Figure 2, jetting towards rifle 4 comprise from top to bottom the U type bend pipe 41 that links to each other successively, jetting towards gun barrel 42 and jetting towards rifle head 43; High-pressure hose 3 links to each other towards gun barrel 42 rounding ofves with jetting through this U type bend pipe 41.
As shown in Figure 3, jetting comprises towards rifle head 43 and is positioned at least two pair reamings of jetting on towards the conial tube of gun barrel 42 lower ends 432 and the jetting that is welded on next-door neighbour's conial tube 432 tops towards gun barrel 42 outer walls with steel floor 431.
42 outer wall sustained height radial symmetric distributes along jetting towards gun barrel with steel floor 431 at least two pairs of reamings.
The jetting that the present invention relates to is towards rifle head 43, and the conial tube 432 of its lower end is provided with several spray-holes, or claims several nozzles.
As shown in Figure 4, the top of conial tube 432 is provided with at least two couples of downward-sloping jetting hole 432a along its radial symmetric; The bottom of conial tube 432 is provided with a vertical jetting hole 432b between two parties.
The jetting that the present invention relates to generally can adopt>=50mm towards the external diameter of gun barrel 42, the steel pipe of≤100mm.
Like Fig. 2, shown in Figure 3, the profile of steel floor 431 assumes diamond in shape, and one of which bar limit is fixed on the outer wall that parallels towards the axis of gun barrel 42 with jetting, two adjacent limits parallel downward-sloping and and jetting be about 45 ° angle towards forming between the axis of gun barrel 42.
Outside Dimensions≤steel sheet pile 6 Intraabdominal clear distance H of two steel floors 431 that jetting is oppositely arranged on the outer wall of gun barrel 42.
The axis of inclination jetting hole 432a and jetting are about 45 ° angle towards forming between the axis of gun barrel 42.
Jetting is on rifle head 43, and the aperture of the vertical jetting hole 432b that is provided with on its conial tube 432 is slightly larger than the aperture of inclination jetting hole 432a.
In the present embodiment, the aperture of 1 the vertical jetting hole 432b that is provided with on the conial tube 432 is about Ф 8mm; The aperture of 4 inclination jetting hole 432a is about Ф 6mm.
The water tank 1 that apparatus of the present invention relate to is capacity>=2m 3Steel water tank, be as the criterion with the normal operation of keeping high-pressure hydraulic pump 2.
The high-pressure hydraulic pump 2 that this device relates to is the multistage high-pressure hydraulic pump of water pressure >=0.8MPa.
The yellow ground S that this device relates to is usually to select for use medium coarse sand to be advisable.The jetting that this device relates to is a crane with enough brachiums and elevating capacity towards the equipment of hanging 5 of rifle 4.
The present invention relates to pull out steel sheet pile the time can suppress the application process of the device of foundation soil disturbance, mainly comprise following construction operation step:
One. water, electricity, road threeway;
Two. water tank is in place;
Three. water pump is installed;
Four. high-pressure hose and jetting are in place towards rifle;
Five. punching in the steel sheet pile;
Six. fill yellow ground in the steel sheet pile;
Seven. pull out steel sheet pile.
The technology principle that the present invention relates to is following:
After the soil body in the steel sheet pile 6 is replaced as yellow ground; Owing to almost do not have cementation between yellow ground S and the steel sheet pile 6; Can not move, can not occur that the soil body is taken out of and in ground, produce the situation in space, make foundation soil keep stablizing motionless with the effect of increasing of steel sheet pile 6.
After steel sheet pile 6 was extracted from foundation soil, after its original occupied " space " was vacated, yellow ground is " cover " promptly, had prevented that " space " produces, and also just can not cause the change of soil body position.
In brief, after the soil bodys in the steel sheet pile 6 were replaced as yellow ground, because the characteristic of yellow ground S, it can not brought out by steel sheet pile 6, can also timely and effectively adds among the space that is occurred, and foundation soil also just can not be by disturbance.
The soil body is implemented by the job practices of yellow ground S displacement in two steps in the steel sheet pile 6:
At first, adopt jetting to wash the soil body in the steel sheet pile 6 open, form the hole of the about 300mm of diameter towards rifle 4 inject high pressure water.Hole is because the water pressure and the native arching action soil body are metastable.
And then in second step, in hole, insert yellow ground S exactly, displacement has also just been accomplished.
The soil body of being replaced is discharged in steel sheet pile 6 along with constantly washing away of water under high pressure naturally.
The special-purpose jetting that the present invention relates to is following towards the structure design feature of rifle 4:
In order effectively the soil bodys in the steel sheet pile 6 to be washed open, control punching hole diameter well, guarantee that the soil bodys in the steel sheet pile 6 can in time and obtain replacing up hill and dale, the present invention has designed special-purpose jetting towards rifle 4.
As shown in Figure 2, jetting is that a jetting is towards rifle head 43 towards the end of gun barrel 42; Jetting comprises towards rifle head 43 and is positioned at least two pair reamings of jetting on towards the conial tube of gun barrel 42 lower ends 432 and the jetting that is welded on next-door neighbour's conial tube 432 tops towards gun barrel 42 outer walls with steel floor 431.
Its radial symmetric of tube wall upper edge, upper end of conial tube 432 is provided with at least two couples of downward-sloping jetting hole 432a; The bottom of conial tube 432 is provided with at least one vertical jetting hole 432b between two parties; Jetting is connected with two pairs of reamings that radially are symmetrically distributed with steel floor 431 on the outer wall of gun barrel 42 near conial tube 432.
Jetting is a U type bend pipe 41 towards the top of rifle 4, can make jetting towards gun barrel 42 and high-pressure hose 3 rounding ofves and be connected to the port of export of high-pressure hydraulic pump 2, and it can reduce head loss preferably.
Jetting is distributed with 5 jetting holes and two pairs on the rifle head 43 along its external diameter>=Ф 50mm, " guarantor aperture " steel floor 431 that the jetting of≤100mm is uniformly distributed with towards the outer wall radial symmetric of gun barrel 42.
Embodiment 1
As shown in Figure 3, the jetting hole is pressed 1+4 and is distributed, and wherein 1 aperture jetting hole 432b that is Ф 8mm is arranged on the bottom dead center position of conial tube 432, and water under high pressure sprays vertically downward; The jetting hole 432a that other 4 apertures are Ф 6mm is arranged on the upper end tube wall of conial tube 432, and its jetting direction and horizon or jetting are 45 ° angle between the axis of gun barrel 42 and conial tube 432, and water under high pressure is to tilting to spray all round.
Jetting is welded with two pairs like Fig. 2 or " guarantor aperture " steel floor 431 shown in Figure 3 on rifle head 43; Its specification is: 5mm * 112.5mm * 150mm; Steel floor 431 is welded on its external diameter>=50mm at the sustained height radial equipartition, and the jetting of≤100mm is on the outer wall of gun barrel 42.The clear distance H in the two steel floor that is oppositely arranged 431 its Outside Dimensions≤steel sheet pile abdominal cavities is about 300mm (this size can be carried out the matching adjustment according to the specification of different steel sheet piles), guarantees that promptly institute's punching hole dia is equivalent to the Intraabdominal clear distance H of steel sheet pile.
The present invention relates to pull out steel sheet pile the time can suppress the application process of the device of foundation soil disturbance, its constructing operation flow process is referring to Fig. 6.
Required main construction resource distribution is roughly following:
Main mechanical and material:
Capacity is not less than 2m 3Steel water tank, supply multistage high-pressure hydraulic pump water;
Multistage high-pressure hydraulic pump, water pressure >=0.8MPa;
Jetting is towards the high-pressure hose of rifle and connection high-pressure hydraulic pump;
Yellow ground (in slightly be advisable) and transport trolleys;
Pile pulling equipment (vibrations, static(al) formula all can);
Crane is hung jetting towards rifle punching operation.
Construction operation personnel configuration:
The squad leader holds concurrently and commands: 1 people;
Hoistman: 1 people;
Water pump operative employee: 1 people;
Jetting is towards the rifle operative employee: 1 people;
General worker: about 4 people, mainly fill out the yellow ground operation.
Main construction point is roughly following:
1, the base pit engineering agent structure is accomplished, and behind the backfilling of earthwork, or after other ground foundation engineering completion, by the constructure scheme requirement, can carry out steel sheet pile and pull out operation;
2, punching preparation of construction work in the steel sheet pile:
Water tank, water pump are in place, and the water source is taken over and discharged water to water tank; Water pump connects electricity, and is connected towards rifle with water tank, jetting;
3, yellow ground is marched into the arena, and is ready to trolley;
4, to hang jetting in place towards rifle for crane;
5, punching operation: jetting inserts middle part, steel sheet pile abdominal cavity towards rifle; Operating personnel will touch steel sheet pile inwall steel plate towards " guarantor aperture " steel floor of rifle head; Open water pump; Jetting is washed the soil body open towards rifle along steel sheet pile inwall steel plate, in steel sheet pile, form the hole of the about Ф 300mm of diameter, has removed the soil body in the guiding principle sheet pile basically.The hole degree of depth can be generally less than steel sheet pile length according to the constructure scheme requirement;
6, extract jetting towards rifle;
7, in the punching of soil body institute, insert yellow ground rapidly, and hole is filled up.
Soil body displacement work is all accomplished in every steel sheet pile, can begin to carry out steel sheet pile and pull out operation.
Steel sheet pile is pulled out, and can adopt static(al) pile pulling or vibrations pile monkey (must consider the ambient conditions permission) pile pulling.The pile pulling sequence of operation adopts " instigation method ", suitably controls pile pulling speed, balanced operation in order.
Do not have the soil body to adhere to when extracting through soil body displacement back steel sheet pile, smooth surface is smooth.In case occur unusually, find to have the soil body to adhere to, answer Suspend Job, analyze reason, adopt remedial measures, guarantee that steel sheet pile pulls out and do not have the soil body to take out of.
Steel sheet pile is pulled out as ground foundation engineerings such as bracing of foundation pit and is constructed and should under engineering monitoring, carry out, and grasps the surrounding enviroment situation of change at any time, carries out information-aided construction.In case reporting to the police appears in monitoring, should stop construction immediately, researchs and analyses engineering, ambient conditions, formulates and take related technical measures, guarantees ground foundation engineering construction safeties such as foundation ditch.

Claims (17)

1. the device that can suppress the foundation soil disturbance when pulling out steel sheet pile is characterized in that it comprises that water tank, high-pressure hydraulic pump, high-pressure hose and jetting are towards rifle;
Described water tank links to each other with the arrival end of high-pressure hydraulic pump through tube connector;
The described high-pressure hydraulic pump port of export links to each other towards rifle with described jetting through high-pressure hose;
Also comprise and hang jetting carries out the punching operation towards rifle crane gear, steel sheet pile pile pulling equipment and an amount of yellow ground and transport trolleys.
2. the device that can suppress the foundation soil disturbance when pulling out steel sheet pile according to claim 1 is characterized in that, described jetting towards rifle comprise the U type bend pipe that links to each other successively from top to bottom, jetting towards gun barrel and jetting towards the rifle head; Described high-pressure hose links to each other towards the gun barrel rounding off with jetting through this U type bend pipe.
3. the device that can suppress the foundation soil disturbance when pulling out steel sheet pile according to claim 2; It is characterized in that described jetting comprises that towards the rifle head being positioned at jetting uses steel floor with the jetting that is welded on this conial tube top of next-door neighbour towards at least two pairs of reamings on the gun barrel outer wall towards the conial tube of gun barrel lower end.
4. the device that can suppress the foundation soil disturbance when pulling out steel sheet pile according to claim 3 is characterized in that said jetting is provided with several spray-holes towards the conial tube of rifle head.
5. according to claim 3 or the 4 described devices that can suppress the foundation soil disturbance when pulling out steel sheet pile, it is characterized in that described conial tube top is provided with at least two pairs of downward-sloping jetting holes along its radial symmetric; Described conial tube bottom is provided with a vertical jetting hole between two parties.
6. according to claim 3 or the 4 described devices that can suppress the foundation soil disturbance when pulling out steel sheet pile; It is characterized in that; The profile of said steel floor assumes diamond in shape; The side weld of one of which bar is connected on the outer wall that parallels towards the axis of gun barrel with jetting, two adjacent limits parallel downward-sloping and and jetting be about 45 ° angle towards forming between the axis of gun barrel.
7. according to claim 3 or the 4 described devices that can suppress the foundation soil disturbance when pulling out steel sheet pile, it is characterized in that described at least two pairs of reamings distribute with the outer wall sustained height radial symmetric of steel floor along said jetting towards gun barrel.
8. the device that can suppress the foundation soil disturbance when pulling out steel sheet pile according to claim 1 is characterized in that said jetting is towards the external diameter>=50mm of gun barrel ,≤100mm.
9. according to claim 3 or the 4 described devices that can suppress the foundation soil disturbance when pulling out steel sheet pile, it is characterized in that the clear distance in the Outside Dimensions≤steel sheet pile abdominal cavity of two steel floors that said jetting is oppositely arranged on the outer wall of gun barrel.
10. the device that can suppress the foundation soil disturbance when pulling out steel sheet pile according to claim 5 is characterized in that, the axis in said inclination jetting hole and jetting are about 45 ° angle towards forming between the axis of gun barrel.
11., it is characterized in that the aperture in said vertical jetting hole is slightly larger than the aperture in inclination jetting hole according to claim 5 or the 10 described devices that can suppress the foundation soil disturbance when pulling out steel sheet pile.
12. the device that can suppress the foundation soil disturbance when pulling out steel sheet pile according to claim 11 is characterized in that the aperture in described vertical jetting hole is about Ф 8mm; The aperture in said inclination jetting hole is about Ф 6mm.
13. the device that can suppress the foundation soil disturbance when pulling out steel sheet pile according to claim 1 is characterized in that described water tank is capacity>=2m 3Steel water tank.
14. the device that can suppress the foundation soil disturbance when pulling out steel sheet pile according to claim 1 is characterized in that described high-pressure hydraulic pump is the multistage high-pressure hydraulic pump of water pressure >=0.8MPa.
15. the device that can suppress the foundation soil disturbance when pulling out steel sheet pile according to claim 1 is characterized in that described yellow ground is advisable with medium coarse sand.
16. the device that can suppress the foundation soil disturbance when pulling out steel sheet pile according to claim 1 is characterized in that said jetting is a crane with enough brachiums and elevating capacity towards the equipment of hanging of rifle.
17. a kind of application process that can suppress the device of foundation soil disturbance when pulling out steel sheet pile according to claim 1 is characterized in that it comprises following construction operation step:
One. water, electricity, road threeway;
Two. water tank is in place;
Three. water pump is installed;
Four. high-pressure hose and jetting are in place towards rifle;
Five. punching in the steel sheet pile;
Six. fill yellow ground in the steel sheet pile;
Seven. pull out steel sheet pile.
CN2012100492929A 2012-02-29 2012-02-29 Device for inhibiting foundation soil from disturbing during removing of steel sheet piles and application method thereof Pending CN102605787A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012100492929A CN102605787A (en) 2012-02-29 2012-02-29 Device for inhibiting foundation soil from disturbing during removing of steel sheet piles and application method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012100492929A CN102605787A (en) 2012-02-29 2012-02-29 Device for inhibiting foundation soil from disturbing during removing of steel sheet piles and application method thereof

Publications (1)

Publication Number Publication Date
CN102605787A true CN102605787A (en) 2012-07-25

Family

ID=46523520

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012100492929A Pending CN102605787A (en) 2012-02-29 2012-02-29 Device for inhibiting foundation soil from disturbing during removing of steel sheet piles and application method thereof

Country Status (1)

Country Link
CN (1) CN102605787A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104594349A (en) * 2014-08-12 2015-05-06 朱启贵 Hydraulic lifting construction method for recycling steel casing in pile foundation engineering
CN108360520A (en) * 2018-02-02 2018-08-03 中国十七冶集团有限公司 The constructing device of impacting with high pressure ability of swimming Larsen steel sheet pile
CN108867645A (en) * 2018-09-04 2018-11-23 江苏山水环境建设集团股份有限公司 Nearby Structure Larsen steel sheet pile pulls out construction method in pattern foundation pit supporting structure
CN118704553A (en) * 2024-08-29 2024-09-27 济南金曰公路工程有限公司 Hole filling equipment after underground pipe gallery engineering steel sheet pile is pulled out

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5334308A (en) * 1976-09-11 1978-03-30 Minoru Kuroda Pile extracting method in use of water jet
JPS59228528A (en) * 1983-06-09 1984-12-21 Hiromasa Tanabe Water charging type steel sheet pile drawer
CN101368386A (en) * 2007-08-16 2009-02-18 江苏华东建设基础工程总公司 Pile extractor and construction method for pile extraction
CN101538857A (en) * 2009-04-10 2009-09-23 黄河水利委员会河南黄河河务局 Pile extraction construction method
CN202466591U (en) * 2012-02-29 2012-10-03 赵兴山 Device for suppressing disturbance of foundation soil during removal of steel plate pile

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5334308A (en) * 1976-09-11 1978-03-30 Minoru Kuroda Pile extracting method in use of water jet
JPS59228528A (en) * 1983-06-09 1984-12-21 Hiromasa Tanabe Water charging type steel sheet pile drawer
CN101368386A (en) * 2007-08-16 2009-02-18 江苏华东建设基础工程总公司 Pile extractor and construction method for pile extraction
CN101538857A (en) * 2009-04-10 2009-09-23 黄河水利委员会河南黄河河务局 Pile extraction construction method
CN202466591U (en) * 2012-02-29 2012-10-03 赵兴山 Device for suppressing disturbance of foundation soil during removal of steel plate pile

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104594349A (en) * 2014-08-12 2015-05-06 朱启贵 Hydraulic lifting construction method for recycling steel casing in pile foundation engineering
CN108360520A (en) * 2018-02-02 2018-08-03 中国十七冶集团有限公司 The constructing device of impacting with high pressure ability of swimming Larsen steel sheet pile
CN108867645A (en) * 2018-09-04 2018-11-23 江苏山水环境建设集团股份有限公司 Nearby Structure Larsen steel sheet pile pulls out construction method in pattern foundation pit supporting structure
CN118704553A (en) * 2024-08-29 2024-09-27 济南金曰公路工程有限公司 Hole filling equipment after underground pipe gallery engineering steel sheet pile is pulled out

Similar Documents

Publication Publication Date Title
CN100591859C (en) Pile pulling construction method for pile pulling machine
CN102561404B (en) Steel reinforced concrete column type joint and construction method of underground diaphragm wall using same
CN107090851B (en) The inverted side-wall construction method of downtown area open cut groove
CN205225278U (en) Rich water -soluble chamber tunnel bottom steel -pipe pile reinforcing construction structure
CN110359467A (en) A kind of construction method that base pit engineering high-pressure rotary jet grouting pile is reinforced
CN203795446U (en) Steel-plate concrete caisson
CN102605787A (en) Device for inhibiting foundation soil from disturbing during removing of steel sheet piles and application method thereof
CN201074340Y (en) Pile-drawing machine
CN104120723B (en) Downwash static pressure pile-sinking method
CN203716046U (en) Steel trestle for earthwork transportation of foundation pit
CN111593741A (en) Pipeline groove supporting device and construction method
CN202466591U (en) Device for suppressing disturbance of foundation soil during removal of steel plate pile
CN204816068U (en) Utilize portable sedimentation tank to filter spray set of foundation ditch precipitation
CN111022068A (en) Construction method for enabling pipe-jacking tunnel to penetrate existing building downwards and construction working face of construction method
CN110821512A (en) Loess tunnel entrance opening section pre-reinforcing and excavating construction method passing through landslide body
CN102359395A (en) Method for plugging large-scale water-inrush burst-mud burst hole of tunnel fault
CN206308700U (en) A kind of Traffic Engineering Construction slope protection device
CN106836215A (en) Inside and outside hydraulic pressure autobalance steel pile casting
CN203846517U (en) Vertical anchor bolt supporting structure
CN111827305A (en) Anti-damage reinforcing mechanism and method for geotechnical engineering
CN206815338U (en) Hydraulic sheeting operation fluidic device
CN107829426A (en) A kind of restructuring bankrupt of diaphram wall, forming method and its top of a wall part
CN220133987U (en) Inclined shaft internal protection equipment
CN113152489B (en) Structure for inducing accumulation body to slide and construction method thereof
CN215925976U (en) Sand-blowing filling system for casing layer between main pipeline and casing pipe

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20120725