CN102359395A - Method for plugging large-scale water-inrush burst-mud burst hole of tunnel fault - Google Patents

Method for plugging large-scale water-inrush burst-mud burst hole of tunnel fault Download PDF

Info

Publication number
CN102359395A
CN102359395A CN2011102210227A CN201110221022A CN102359395A CN 102359395 A CN102359395 A CN 102359395A CN 2011102210227 A CN2011102210227 A CN 2011102210227A CN 201110221022 A CN201110221022 A CN 201110221022A CN 102359395 A CN102359395 A CN 102359395A
Authority
CN
China
Prior art keywords
tunnel
mud
burst
fault
block wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2011102210227A
Other languages
Chinese (zh)
Other versions
CN102359395B (en
Inventor
林福地
韩文军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Eryuan Engineering Group Co Ltd CREEC
China Railway 12th Bureau Group Co Ltd
Fourth Engineering Co Ltd of China Railway 12th Bureau Group Co Ltd
Original Assignee
China Railway 12th Bureau Group Co Ltd
Fourth Engineering Co Ltd of China Railway 12th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 12th Bureau Group Co Ltd, Fourth Engineering Co Ltd of China Railway 12th Bureau Group Co Ltd filed Critical China Railway 12th Bureau Group Co Ltd
Priority to CN201110221022.7A priority Critical patent/CN102359395B/en
Publication of CN102359395A publication Critical patent/CN102359395A/en
Application granted granted Critical
Publication of CN102359395B publication Critical patent/CN102359395B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention discloses a method for plugging a large-scale water-inrush burst-mud burst hole of a tunnel fault, which comprises the following steps: 1. building a temporary plugging wall on a burst-mud body slope toe on one end of a main tunnel filled by the burst mud; 2. constructing one roundabout pilot tunnel channel on the outer side of a tunnel side wall in front of the temporary plugging wall, and causing the roundabout pilot tunnel channel to bypass to reach a tunnel arch crown in front of the fault; 3. upwards building a roundabout pilot tunnel workroom on the tunnel arch crown in front of the fault; 4. downwards building mutually-interlocked vertical jet-grouting piles from the bottom of the pilot tunnel workroom to serve as a main tunnel plugging wall; and 5. opening the temporary plugging wall to clean the burst mud once. The method has the characteristics of low cost, time and labor saving and the like, and is safe and reliable. When the burst mud in the 120m of the tunnel fault is cleaned, all burst mud can be successfully cleaned after constructing for two months. Compared with the scheme in the prior art that grouting and reinforcement are carried out by sections, the method is characterized in that efficacy is improved by more than four times, cost is saved by 50%, and no unsafe accidents appear. The method can be widely applied to the projects of plugging the large-scale water-inrush burst-mud burst hole and cleaning the burst mud in the tunnel fault.

Description

A kind of tunnel extensive gushing water of tomography gushes the method for blocking of mud crevasse
Technical field
The present invention relates to construction of tunnel, be specifically related to the extensive gushing water of a kind of deep tunnel tomography and gush mud crevasse method for blocking.
Background technology
It is one of the most serious construction of tunnel geological disaster that the tunnel gushing water gushes mud.Major part occurs in karst and grows the area, also has part to occur in water-rich fault zone.It is in the constructing tunnel process that the tunnel gushing water gushes mud, and because of the tunnel excavation stress release, the underground water in the aquifer overcomes resistances such as water barrier, tomography and fissure zone under the head pressure effect, wraps up silt particle, pours in the phenomenon in tunnel suddenly, is called gushing water and gushes mud.Gush mud and can regard the attendant phenomenon of gushing water as.
Gush the mud accident in case gushing water takes place in the constructing tunnel, gush mud and follow gushing water to bury equipment, stop up the tunnel, have a strong impact on engineering construction.Gush the processing of mud section for gushing water, generally take the principle of " first desilting is implemented shutoff near crevasse, post-reinforcing through " to handle.Implement shutoff for desilting near crevasse, consider the stability and the construction safety that gush the mud body, prior art generally then adopts grouting and reinforcing 15-20m; Excavation 10-15m; Reserve 5m as block wall, carry out the grouting and reinforcing and the excavation of next circulation according to this, progressively advance to crevasse.
Existing crevasse blocking technology by circulation grouting and reinforcing excavation is applicable to that the less gushing water of scale gushes mud, and there is significant disadvantages in the crevasse shutoff for larger gushing water gushes mud:
1, gush length that mud floods length to need to implement the cycle-index of grouting and reinforcing just many, expend long in time limit;
2, it is big to gush the quantity of mud, and the volume of grouting and reinforcing is corresponding also big, the labor human and material resources.
Summary of the invention
The purpose of this invention is to provide a kind of safety, fast, effectively, the lower-cost tunnel extensive gushing water of tomography gushes mud crevasse method for blocking.
Cause extensive gushing water to gush the shortcoming that desilting is time-consuming near crevasse enforcement shutoff, take a lot of work, require great effort in order to overcome prior art; Technical scheme of the present invention is to solve like this: a kind of tunnel extensive gushing water of tomography gushes mud crevasse method for blocking, is undertaken by following step:
1) gushes the mud body toe place of gushing that the mud tomography gushed positive hole one end of mud filling at gushing water and build interim block wall;
2) construct a circuitous base tunnel passage around vault 5m place, tunnel in interim block wall the place ahead 10m, the tunnel side wall outside again to tomography the place ahead;
3) vault 5m place upwards build circuitous base tunnel service depot through circuitous base tunnel passage in the tunnel in tomography the place ahead;
4) through the vertical vertical rotary churning pile of the bottom of the base tunnel service depot mutual interlock of downward construction, as the block wall of shutoff positive hole crevasse;
5) open the disposable cleaning of interim block wall and gush mud to vertical churning block wall the place ahead.
The present invention compared with prior art, it is low, time saving and energy saving to have a cost; Characteristics such as safe and reliable gushing in mud cleaning, the crevasse shutoff work progress of tunnel L7 tomography 120m, adopt the present invention's construction only with all completion smoothly in 2 months; Compare with the scheme of taking the prior art segmentation to implement grouting and reinforcing, effect improves more than 3 times, cost savings about 50%; Any dangerous accident do not occur, can be widely used in the extensive gushing water of tunnel tomography crevasse shutoff of gushing mud and the engineering of gushing the mud cleaning.
Description of drawings
Fig. 1 is interim block wall and circuitous base tunnel plane arrangement structure sketch map;
Fig. 2 is circuitous base tunnel skiagraph;
Fig. 3 is I-I sectional drawing of Fig. 1;
Fig. 4 vertically reinforces the positive hole of shutoff for vertical churning and gushes mud crevasse floor map;
Fig. 5 is II-II sectional drawing of Fig. 4;
Fig. 6 is III-III sectional drawing of Fig. 4;
Fig. 7 is vertical churning boring plan structure sketch map.
Each numbering explanation among the figure: 1 gushing water gushes positive hole, 3 interim block walls, 4 circuitous base tunnel passages, 5 circuitous base tunnel service depots, the vertical vertical rotary churning pile of 6 mutual interlocks that mud tomography, 2 is gushed the mud filling.
The specific embodiment
Accompanying drawing is embodiments of the invention.
Below in conjunction with accompanying drawing summary of the invention is described further:
Embodiment 1
Referring to figs. 1 through shown in Figure 6, a kind of tunnel extensive gushing water of tomography gushes mud crevasse method for blocking, is undertaken by following step:
1), gushes the mud toe place of gushing that mud tomography 1 gushed positive hole 2 one ends of mud filling and build interim block wall 3 at gushing water;
2), make a circulation base tunnel passage 4 around vault 5m place, tunnel in interim block wall 3 the place ahead 10m, the construction of the tunnel side wall outside again to tomography the place ahead;
3), upwards build circuitous base tunnel service depot 5 in vault 5m place in the tunnel in tomography the place ahead through circuitous base tunnel passage 4;
4), through the vertical vertical rotary churning pile 6 of the bottom of the base tunnel service depot 5 mutual interlock of downward construction, as the block wall 6 of shutoff positive hole crevasse;
5), open interim block wall 3 disposable cleanings and gush mud to vertical churning block wall 6 the place aheads.
Fig. 5, shown in Figure 6 wherein, at the vault in positive hole 2 upwards at a distance of 5m place excavation base tunnel service depot 5 at least, be passed down through again at the bottom of the arch of base tunnel service depot 5 positive hole 2 and positive hole 2 tunnel road surfaces downwards 2m place be equipped with vertically vertical rotary churning pile 6 of mutual interlock.
Fig. 7 is the vertical vertical churning boring plan structure sketch map of mutual interlock.
The vertical vertical churning diameter 60cm of this mutual interlock, interlock 10cm each other between stake adopts equilateral triangle to arrange, each other after the interlock as the block wall of shutoff positive hole crevasse.Block wall thickness 5m, promptly along tunnel line direction 5m, the block wall width is identical with tunnel maximum excavation width.
Embodiment 2
1, earlier the positive hole of filling gush the mud body toe interim block wall of constructing, interim block wall adopts the C30 plain concrete, thickness 2m, width is identical with tunnel width;
2, make a circulation the base tunnel passage around vault 5m place, tunnel in interim block wall the place ahead 10m, the construction of tunnel side wall right side again to tomography the place ahead, and the construction working chamber that makes progress, service depot and fault boundary and tunnel vault remain with the thick weak weathering safety laccolite of 5m;
3, the vertical rotary churning pile block wall of the mutual interlock of the construction shutoff crevasse downwards in the service depot, vertical rotary churning pile are passed through and are aligned the hole behind the tunnel vault safety laccolite and gush the mud body and solidify improvement, and get into 2m under the tunnel road surface, form block wall shutoff crevasse each other after the interlock;
4, down, gushing mud and can once clear up safely and fast and put in place between block wall to the crevasse block wall temporarily in block wall protection.

Claims (1)

1. the extensive gushing water of tunnel tomography gushes mud crevasse method for blocking, it is characterized in that being undertaken by following step:
1), gushes the mud body toe place of gushing that mud tomography (1) gushed positive hole (2) one ends of mud filling and build interim block wall (3) at gushing water;
2), at interim block wall (3) the place ahead 10m, a tunnel side wall outside construction circuitous base tunnel passage (4), around the tunnel vault to tomography the place ahead, circuitous base tunnel passage (4) exceeds vault apart from 5m;
3), upwards build circuitous base tunnel service depot (5) in vault 5m place in the tunnel in tomography the place ahead through circuitous base tunnel passage (4);
4), lay the vertical vertical rotary churning pile of mutual interlock through the bottom of base tunnel service depot (5), as the block wall (6) of shutoff positive hole crevasse;
5), open the disposable cleaning of interim block wall (3) and gush mud to vertical churning block wall (6) the place ahead.
CN201110221022.7A 2011-08-03 2011-08-03 Method for plugging large-scale water-inrush burst-mud burst hole of tunnel fault Active CN102359395B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110221022.7A CN102359395B (en) 2011-08-03 2011-08-03 Method for plugging large-scale water-inrush burst-mud burst hole of tunnel fault

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110221022.7A CN102359395B (en) 2011-08-03 2011-08-03 Method for plugging large-scale water-inrush burst-mud burst hole of tunnel fault

Publications (2)

Publication Number Publication Date
CN102359395A true CN102359395A (en) 2012-02-22
CN102359395B CN102359395B (en) 2014-03-19

Family

ID=45584767

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110221022.7A Active CN102359395B (en) 2011-08-03 2011-08-03 Method for plugging large-scale water-inrush burst-mud burst hole of tunnel fault

Country Status (1)

Country Link
CN (1) CN102359395B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104060999A (en) * 2014-03-03 2014-09-24 中国水电顾问集团贵阳勘测设计研究院有限公司 Method and structure for treating tunnel collapse
CN109139104A (en) * 2018-11-16 2019-01-04 中铁二十局集团第六工程有限公司 One kind passes through that clastic rock steep dip is inverse to rush rich water tomography tunnel drainage construction method
CN110985041A (en) * 2019-12-31 2020-04-10 中铁隧道局集团有限公司 Construction method for processing sudden surge of separated double-hole tunnel
CN112502777A (en) * 2020-12-08 2021-03-16 中铁隧道局集团有限公司 Method for treating tunnel inrush roof fall and door closing

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006233626A (en) * 2005-02-25 2006-09-07 National Institute Of Advanced Industrial & Technology Tunnel structure
JP2010013913A (en) * 2008-07-02 2010-01-21 Kanazawa Seisakusho:Kk Water cutoff and protection device of tunnel penetrating through active fault or the like
CN101638987A (en) * 2009-07-24 2010-02-03 中铁二十一局集团有限公司 Tunnel construction method for crossing high-pressure water-enriched fracture zone with curtain grouting and grout stopping wall
CN101781889A (en) * 2010-01-29 2010-07-21 中铁四局集团第五工程有限公司 H-shaped waterproof curtain construction process
CN101922302A (en) * 2010-08-30 2010-12-22 中铁第四勘察设计院集团有限公司 Fault processing method of high pressure water enrichment area

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006233626A (en) * 2005-02-25 2006-09-07 National Institute Of Advanced Industrial & Technology Tunnel structure
JP2010013913A (en) * 2008-07-02 2010-01-21 Kanazawa Seisakusho:Kk Water cutoff and protection device of tunnel penetrating through active fault or the like
CN101638987A (en) * 2009-07-24 2010-02-03 中铁二十一局集团有限公司 Tunnel construction method for crossing high-pressure water-enriched fracture zone with curtain grouting and grout stopping wall
CN101781889A (en) * 2010-01-29 2010-07-21 中铁四局集团第五工程有限公司 H-shaped waterproof curtain construction process
CN101922302A (en) * 2010-08-30 2010-12-22 中铁第四勘察设计院集团有限公司 Fault processing method of high pressure water enrichment area

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
岳伟: "突水突泥风险隧道施工技术", 《内江科技》 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104060999A (en) * 2014-03-03 2014-09-24 中国水电顾问集团贵阳勘测设计研究院有限公司 Method and structure for treating tunnel collapse
CN109139104A (en) * 2018-11-16 2019-01-04 中铁二十局集团第六工程有限公司 One kind passes through that clastic rock steep dip is inverse to rush rich water tomography tunnel drainage construction method
CN110985041A (en) * 2019-12-31 2020-04-10 中铁隧道局集团有限公司 Construction method for processing sudden surge of separated double-hole tunnel
CN110985041B (en) * 2019-12-31 2021-04-20 中铁隧道局集团有限公司 Construction method for processing sudden surge of separated double-hole tunnel
CN112502777A (en) * 2020-12-08 2021-03-16 中铁隧道局集团有限公司 Method for treating tunnel inrush roof fall and door closing

Also Published As

Publication number Publication date
CN102359395B (en) 2014-03-19

Similar Documents

Publication Publication Date Title
CN105696427B (en) The construction method and its road structure of a kind of consolidation process newly built railway karst foundation
CN105781571A (en) Construction method for soft rock deformation tunnel lining support dismantling-replacing arch
CN106400813A (en) Foundation pit support system and construction method thereof
CN102953737B (en) Construction method for inverted arch of VI-level water-enriched surrounding rock tunnel
CN103306289A (en) Foundation pit piled anchor dado concrete anchor cable top beam structure and construction method thereof
CN102251777A (en) Large-scale karst cavity treatment method for karst tunnel
CN105714831A (en) Abnormal-shape double-row pile for supporting foundation pit side wall and construction method of abnormal-shape double-row pile
CN103898916A (en) Mini-pile combined support structure and construction method thereof
CN102359395B (en) Method for plugging large-scale water-inrush burst-mud burst hole of tunnel fault
CN101614126A (en) A kind of job practices of directly cutting guard post for tunnel end well by shield machine
CN108708284B (en) A kind of steel trestle construction method for resisting flood discharge bed scour
CN105544508A (en) Cast-in-place pile applicable to karst region having communicating channels
CN107587512A (en) The construction method of foundation pit enclosure structure under a kind of karst and/or cranny development stratum
CN109973115B (en) Construction method for drainage of vault of tunnel in karst area
CN208280969U (en) Shield tunnel gravity type sealing plugging structure
CN204753262U (en) A fender structure on high embankment of existing railway
CN104594297A (en) Double-deck concrete faced rock-fill dam and construction method thereof
CN203796288U (en) Water seepage prevention structure used for shield entrance door employing SMW piles
CN104088296B (en) Soft clay area basement adds a layer construction method
CN107165641B (en) High inclination-angle ladder way opposite direction excavating construction method in thin layer breaking up hard rock stratum
CN203007961U (en) Gabion cofferdam structure
CN206477341U (en) A kind of foundation pit support system
CN210395378U (en) Slope protection device
CN105696701B (en) A kind of suitable slope shear wall building development platform and its construction method
CN206873466U (en) One kind is used for footrill flume section safeguard structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: CHINA RAILWAY 12TH BUREAU GROUP CO., LTD. CHINA RA

Free format text: FORMER OWNER: CHINA RAILWAY 12TH BUREAU GROUP CO., LTD.

Effective date: 20130711

C41 Transfer of patent application or patent right or utility model
C53 Correction of patent of invention or patent application
CB03 Change of inventor or designer information

Inventor after: Lin Fudi

Inventor after: Han Wenjun

Inventor after: Wang Haidong

Inventor after: Lin Bentao

Inventor after: You Xu

Inventor before: Lin Fudi

Inventor before: Han Wenjun

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: LIN FUDI HAN WENJUN TO: LIN FUDI HAN WENJUN WANG HAIDONG LIN BENTAO YOU XU

TA01 Transfer of patent application right

Effective date of registration: 20130711

Address after: 710021 Shaanxi province xujiawan Xi'an Weiyang Hongqi Road No. 3

Applicant after: THE 4TH ENGINEERING CO., LTD. OF CHINA RAILWAY 12TH BUREAU Group

Applicant after: CHINA RAILWAY 12TH BUREAU GROUP Co.,Ltd.

Applicant after: CHINA RAILWAY ERYUAN ENGINEERING GROUP Co.,Ltd.

Address before: 710021 Shaanxi province xujiawan Xi'an Weiyang Hongqi Road No. 3

Applicant before: THE 4TH ENGINEERING CO., LTD. OF CHINA RAILWAY 12TH BUREAU Group

Applicant before: CHINA RAILWAY 12TH BUREAU GROUP Co.,Ltd.

GR01 Patent grant
GR01 Patent grant