CN105696701B - A kind of suitable slope shear wall building development platform and its construction method - Google Patents
A kind of suitable slope shear wall building development platform and its construction method Download PDFInfo
- Publication number
- CN105696701B CN105696701B CN201610030443.4A CN201610030443A CN105696701B CN 105696701 B CN105696701 B CN 105696701B CN 201610030443 A CN201610030443 A CN 201610030443A CN 105696701 B CN105696701 B CN 105696701B
- Authority
- CN
- China
- Prior art keywords
- shear wall
- vierendeel girder
- slope
- platform
- wall
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/02—Structures consisting primarily of load-supporting, block-shaped, or slab-shaped elements
- E04B1/04—Structures consisting primarily of load-supporting, block-shaped, or slab-shaped elements the elements consisting of concrete, e.g. reinforced concrete, or other stone-like material
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/20—Securing of slopes or inclines
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Architecture (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Paleontology (AREA)
- General Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Bulkheads Adapted To Foundation Construction (AREA)
Abstract
The invention discloses a kind of suitable slope shear wall to build development platform, including the embedded shear wall (1) being be arranged in parallel along slope, shear wall (1) lower end is placed in the stable Rock And Soil of side slope (4), and shear wall (1) upper end is located at same level height;Shear wall (1) upper end is provided with Vierendeel girder (2), is connected between Vierendeel girder (2) and shear wall (1) for armored concrete;Vierendeel girder (2) upper end is provided with platform (3), is connected between platform (3) and Vierendeel girder (2) for armored concrete.Beneficial effect is:1. it is more much smaller than directly excavating along the section of domatic trend, therefore excavation area is small, construction side slope disturbance is small.2. shear wall is larger along slope aspect width, very high vertical bearing capacity can be provided.3. shear wall can also resist side slope downward sliding power to a certain extent, be advantageous to the stabilization of side slope.4. platform upper can make full use of side slope with building constructions thing, compared with directly excavating construction, quantities is small, construction is simple, safe.
Description
Technical field
The present invention relates to the development platform of side slope building, relate in particular to a kind of suitable slope shear wall build development platform and
Its construction method.
Background technology
Natural slope and Artificial Side-slope are referred to as side slope.China mountain region, plateau, hills area account for the 70% of area.
In recent years, as city is with the fast development of construction, many engineering constructions are had to mountain development, the utilization of side slope
Also it is on the increase.Under the premise of rational engineering design, it is tight that the utilization of side slope can not only alleviate land used to a certain extent
The problem of opening, moreover it is possible to which side slope disaster plays certain preventive and therapeutic effect.
Existing side slope development and utilization scheme mainly has excavation and landfill two ways.Excavate primarily to meeting engineering
Building needs, and side slope Rock And Soil carries out large area removal, can typically form steeper excavation face, the disturbance of this method side slope
Greatly, quantities is big, construction period length, it is also necessary to carries out supporting to excavation face, engineering cost is higher.Landfill be side slope landform compared with
The construction materials such as lower rock, soil are accumulated, and this method side slope environment has a great influence, and quantities is big, and landfill is constructed
Technical requirements are higher, and engineering cost is higher, and easily produce the secondary disasters such as landslide.
The content of the invention
The purpose of the present invention is to overcome the shortcomings of the prior art, there is provided a kind of suitable slope shear wall building development platform and
Its construction method, the platform not only can effectively be utilized with side slope, and can reduce construction volume, shorten construction when
Between, reduce cost, and can side slope play certain AsA -GSH cycle.
A kind of suitable slope shear wall building development platform of the present invention, including along the embedded shear wall 1 that slope be arranged in parallel, shearing
The lower end of wall 1 is placed in the stable Rock And Soil of side slope 4, and the upper end of shear wall 1 is located at same level height;The upper end of shear wall 1 is provided with
Vierendeel girder 2, connected between Vierendeel girder 2 and shear wall 1 for armored concrete;The upper end of Vierendeel girder 2 is provided with platform 3, platform 3 and framework
Connected between beam 2 for armored concrete.
The shear wall 1 is along the in a row distribution of domatic trend, and each row's amount of shear walls, spacing are according to site condition and specifically
Engine request determines that the longitudinal axis of shear wall 1 is consistent with slope aspect.
The upper end of Vierendeel girder 2 be located at same level height, Vierendeel girder 2 divide for crossbeam and longeron, its crossbeam direction it is vertical
Slope aspect is distributed, and longeron direction is distributed along slope aspect.
A kind of construction method of suitable slope shear wall building development platform of the present invention, comprises the following steps:
1st, the position of shear wall is determined, then excavates groove along slope aspect in shearing wall chase section;
2nd, after channel excavation, according to the construction technology of diaphragm wall, the steel reinforcement cage tied is put into groove, according to work
Range request pours the concrete of design height, and the wall of below ground pours to be poured according to the construction technology of diaphram wall
Build, wall more than ground is poured according to the construction technology of shear wall, forms integral embedded type shear wall, shear wall top
The splice of the reserved certain length in Vierendeel girder position is being poured in advance;
3rd, after shear wall is formed, according to the construction technology of Vierendeel girder, pre- in shear wall upper end pours position placement bundle
Good steel reinforcement cage, Vierendeel girder steel reinforcement cage are connected with the splice that shear wall top is reserved using welding manner or bind mode,
According to engine request casting concrete, Vierendeel girder is formed, the splice of certain length is reserved on Vierendeel girder top;
4th, after Vierendeel girder is formed, according to the construction technology of platform, the steel reinforcement cage tied, platform are disposed at the top of Vierendeel girder
Steel reinforcement cage is connected with Vierendeel girder top reserved steel bar joint using welding manner or bind mode, then casting concrete, is formed
Integral-type platform.
The shear wall construction process uses hopping sequence method, i.e., along sequence construction odd number shear wall, then it is even along sequence construction
Number shear wall.
Compared with prior art, the beneficial effects of the present invention are:
1st, it is more much smaller than directly excavation, rectangular-shaped excavation along the section of domatic trend, therefore side slope disturbance of constructing is small;
Simultaneously using hopping sequence method construction shear wall, the level of disruption of side slope can be preferably minimized;
2nd, shear wall excavation volume is small, therefore quantities is small, construction is simple, and engineering cost is low;
3rd, shear wall is larger along slope aspect width, can provide very high vertical bearing capacity;
4th, the arrangement of reinforcement in shear wall can be provided along the larger horizontal resist forces of vertical wall, ensure superstructure in earthquake etc. no
Stability under the conditions of profit;
5th, shear wall can also resist side slope downward sliding power to a certain extent, be advantageous to the stabilization of side slope;
6th, platform upper can with building constructions thing, can side slope effectively utilized.
Brief description of the drawings
Fig. 1 is the overall structure diagram of the present invention;
Fig. 2 is the front view of the present invention;
Fig. 3 is the left view of the present invention;
Fig. 4 is the top view of the present invention.
In figure, 1 is shear wall, and 2 be Vierendeel girder, and 3 be platform, and 4 be side slope.
Embodiment
The present invention is further described below in conjunction with the accompanying drawings.As Figure 1-Figure 4, a kind of suitable slope shear wall building is opened
Platform is sent out, including along the embedded shear wall 1 that slope be arranged in parallel, the lower end of shear wall 1 is placed in the stable Rock And Soil of side slope 4, cut
The upper end of power wall 1 is located at same level height;The upper end of shear wall 1 is provided with Vierendeel girder 2, is reinforcing bar between Vierendeel girder 2 and shear wall 1
Concrete connects, and bar connecting mode is using welding or bind;The upper end of Vierendeel girder 2 is provided with platform 3, platform 3 and Vierendeel girder 2 it
Between for armored concrete connect, bar connecting mode using welding or bind.
The shear wall 1 is along the in a row distribution of domatic trend, and each row's amount of shear walls, spacing are according to site condition and specifically
Engine request determines that the longitudinal axis of shear wall 1 is consistent with slope aspect.
The upper end of Vierendeel girder 2 be located at same level height, Vierendeel girder 2 divide for crossbeam and longeron, its crossbeam direction it is vertical
Slope aspect is distributed, and longeron direction is distributed along slope aspect.The rectangular cross-section section of Vierendeel girder 2, sectional dimension determine according to engine request.
A kind of construction method of suitable slope shear wall building development platform of the present invention, comprises the following steps:
(1)First according to side slope geologic condition and engineering design requirements, the position of shear wall is determined, is then shearing wall chase
Section excavate before, constructed along shear wall longitudinal axis position and lead wall, if shear wall length is larger, along side slope direction forward and backward height difference compared with
Greatly, it can be constructed using segmentation and lead wall, segmentation pours process, leads wall and is poured using cast-in-place concrete or armored concrete.Lead wall
Main function is:Ensure the physical dimension and shape of shear walls design;Notch Tu Bi is protected not destroy.
(2)Groove section excavation is carried out using mud off, the geological conditions and walling depth that should regard geological conditions are selected properly
Construction machinery, for example with rotary cutting Multi-drill bit, guide plate grab bucket, impact drill etc..
(3)After channel excavation, the steel reinforcement cage of hoisting Design requirement in groove, steel reinforcement cage checks mark after inserting groove
Whether height meets design requirement.
(4)Carried out using tremie method by underwater gliders method, but be to prevent before concrete perfusion is started with conduit
Mud is mixed into concrete, and a pipe close can be hung in conduit, extrudes mud in pipe by the concrete pressure poured into.
(5)The wall of below ground is poured according to construction of diaphragm wall technique, pours after finishing, and wall more than ground is pressed
Continue to pour according to shear wall construction technique, until reach designed elevation, shear wall top pours Vierendeel girder junction and reserved pre-
The splice of certain length.
(6)After shear wall is formed, according to the construction technology of Vierendeel girder, pre- in shear wall upper end pours position placement mould
Tool, Vierendeel girder long axis direction are distributed according to design requirement along slope aspect distribution and vertical slope aspect, and Vierendeel girder is in overall.
(7)The steel reinforcement cage tied is put into mould, the splice that Vierendeel girder steel reinforcement cage is reserved with shear wall top is adopted
Connected with welding manner or bind mode.
(8)According to engine request casting concrete, Vierendeel girder is formed, the reinforcing bar that certain length is reserved on Vierendeel girder top connects
Head.
(9)After Vierendeel girder is formed, according to the construction technology of platform, the steel reinforcement cage tied is disposed at the top of Vierendeel girder, is put down
Platform steel reinforcement cage is connected with Vierendeel girder top reserved steel bar joint using welding manner or bind mode, and then casting concrete, makes
Platform upper surface is horizontal, forms Integral-type platform.
The shear wall construction process uses hopping sequence method, i.e., along sequence construction 1,3,5,7 ... number shear wall, then along sequentially
Construction 2,3,4,6 ... number shear wall.
Claims (5)
1. a kind of suitable slope shear wall builds development platform, it is characterised in that:Including the embedded shear wall being be arranged in parallel along slope
(1), shear wall (1) lower end is placed in the stable Rock And Soil of side slope (4), and shear wall (1) upper end is located at same level height;Shearing
Wall (1) upper end is provided with Vierendeel girder (2), is connected between Vierendeel girder (2) and shear wall (1) for armored concrete;On Vierendeel girder (2)
End is provided with platform (3), is connected between platform (3) and Vierendeel girder (2) for armored concrete.
It is 2. as claimed in claim 1 along slope shear wall building development platform, it is characterised in that:The shear wall (1) is along domatic
In a row distribution, the longitudinal axis of shear wall (1) are consistent with slope aspect for trend.
It is 3. as claimed in claim 1 along slope shear wall building development platform, it is characterised in that:Vierendeel girder (2) the upper end position
In same level height, Vierendeel girder (2) is divided into crossbeam and longeron, the vertical slope aspect distribution in its crossbeam direction, and longeron direction is along slope aspect
Distribution.
4. along the construction method of slope shear wall building development platform as described in claim any one of 1-3, it is characterised in that including
Following steps:
(1) position of shear wall is determined, then excavates groove along slope aspect in shearing wall chase section;
(2) after channel excavation, according to the construction technology of diaphragm wall, the steel reinforcement cage tied is put into groove, according to engineering
It is required that pouring the concrete of design height, the wall of below ground pours to be poured according to the construction technology of diaphram wall,
Wall more than ground is poured according to the construction technology of shear wall, forms integral embedded type shear wall, shear wall top exists
The pre- splice for pouring Vierendeel girder position and reserving certain length;
(3) after shear wall is formed, according to the construction technology of Vierendeel girder, pre- in shear wall upper end pours what position placement tied
Steel reinforcement cage, Vierendeel girder steel reinforcement cage are connected with the splice that shear wall top is reserved using welding manner or bind mode, according to
Engine request casting concrete, forms Vierendeel girder, and the splice of certain length is reserved on Vierendeel girder top;
(4) after Vierendeel girder is formed, according to the construction technology of platform, the steel reinforcement cage tied, platform steel are disposed at the top of Vierendeel girder
Muscle cage is connected with Vierendeel girder top reserved steel bar joint using welding manner or bind mode, then casting concrete, is formed whole
Body formula platform.
5. construction method as claimed in claim 4, it is characterised in that:The shear wall construction process uses hopping sequence method, i.e. edge
Sequence construction odd number shear wall, then along sequence construction even number shear wall.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610030443.4A CN105696701B (en) | 2016-01-15 | 2016-01-15 | A kind of suitable slope shear wall building development platform and its construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610030443.4A CN105696701B (en) | 2016-01-15 | 2016-01-15 | A kind of suitable slope shear wall building development platform and its construction method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105696701A CN105696701A (en) | 2016-06-22 |
CN105696701B true CN105696701B (en) | 2017-11-10 |
Family
ID=56226478
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610030443.4A Expired - Fee Related CN105696701B (en) | 2016-01-15 | 2016-01-15 | A kind of suitable slope shear wall building development platform and its construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105696701B (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110067259A (en) * | 2019-04-23 | 2019-07-30 | 广州市市政工程设计研究总院有限公司 | A kind of side slope antiskid wall construction |
CN114855774A (en) * | 2022-04-24 | 2022-08-05 | 四川省公路规划勘察设计研究院有限公司 | Frame type anti-slide pile and pouring device thereof |
CN115233721A (en) * | 2022-06-23 | 2022-10-25 | 中铁大桥勘测设计院集团有限公司 | Wall type horizontal thrust resisting foundation structure and construction method |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3925994A (en) * | 1973-06-21 | 1975-12-16 | Fodervaevnader Ab | System of armouring earth |
CN2310092Y (en) * | 1997-09-21 | 1999-03-10 | 湘潭工学院 | Reinforced concrete lattice type soil-stop wall |
CN1235227A (en) * | 1999-02-02 | 1999-11-17 | 重庆市设计院 | Retaining wall for foundation construction |
CN101029490A (en) * | 2007-04-02 | 2007-09-05 | 西南交通大学 | Method for preventing and managing rock/upper side slope |
CN102691294A (en) * | 2012-05-15 | 2012-09-26 | 安宜建设集团有限公司 | Construction method of underground continuous wall |
CN205296390U (en) * | 2016-01-15 | 2016-06-08 | 武汉大学 | In same direction as sloping shear force wall building development platform |
-
2016
- 2016-01-15 CN CN201610030443.4A patent/CN105696701B/en not_active Expired - Fee Related
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3925994A (en) * | 1973-06-21 | 1975-12-16 | Fodervaevnader Ab | System of armouring earth |
CN2310092Y (en) * | 1997-09-21 | 1999-03-10 | 湘潭工学院 | Reinforced concrete lattice type soil-stop wall |
CN1235227A (en) * | 1999-02-02 | 1999-11-17 | 重庆市设计院 | Retaining wall for foundation construction |
CN101029490A (en) * | 2007-04-02 | 2007-09-05 | 西南交通大学 | Method for preventing and managing rock/upper side slope |
CN102691294A (en) * | 2012-05-15 | 2012-09-26 | 安宜建设集团有限公司 | Construction method of underground continuous wall |
CN205296390U (en) * | 2016-01-15 | 2016-06-08 | 武汉大学 | In same direction as sloping shear force wall building development platform |
Also Published As
Publication number | Publication date |
---|---|
CN105696701A (en) | 2016-06-22 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105696427B (en) | The construction method and its road structure of a kind of consolidation process newly built railway karst foundation | |
CN110017144B (en) | Loess tunnel three-step construction method considering substrate reinforcement treatment | |
CN1837506B (en) | Construction method for excavating box-shape structure over an operating tunnel | |
CN102653945B (en) | Foundation reinforcing and replacing structure and construction method thereof | |
CN105862930B (en) | A kind of protection structure to creating existing tunnel below underground engineering | |
CN104652443B (en) | Construction method of the interim horizontal support of deep basal pit as permanent structure beam | |
CN103422510B (en) | Steel pipe frame type cofferdam structure and construction method | |
CN106930321B (en) | The construction method of underground structure is built in a kind of stake of pipe-jacking with large diameter combination hole | |
CN105201001B (en) | Composite seepage-proofing structure of large karst cave in karst region and construction method thereof | |
CN112554198B (en) | Construction method of deep foundation pit protection structure adjacent to high-rise building | |
CN203782684U (en) | Anti-skid pile provided with crossbeam | |
CN112663694B (en) | Construction method for lifting and rectifying building on silt geology | |
CN105804760A (en) | Super-large section tunnel drilling and blasting method in-situ expansion construction structure and construction method | |
CN104894926B (en) | Retaining structure and its construction method on the high embankment of existing railway | |
CN105696701B (en) | A kind of suitable slope shear wall building development platform and its construction method | |
CN102953737A (en) | Construction method for inverted arch of VI-level water-enriched surrounding rock tunnel | |
CN206070508U (en) | Device for reinforcing foundation | |
CN109610473A (en) | A kind of construction method of the large-scale pool structure foundation pit supporting system of municipal administration | |
CN106592605A (en) | Construction method of foundation pit bracing with tri-axial stirring piles overlapped with reinforced concrete cast-in-place piles to be driven | |
CN115539048A (en) | Construction method for shallow-buried bias tunnel portal | |
CN203593996U (en) | Structural body for preventing and controlling starting of trench debris flows | |
CN103866787B (en) | A kind of spacious reverse masonry method concrete cut that digs builds construction technology | |
CN211285725U (en) | Basin hills abrupt slope area high-rise building synthesizes earthquake-resistant structure | |
CN205669211U (en) | A kind of prefabricated Gravity Retaining Wall | |
CN104314045B (en) | Especially big high-order mud-rock flow stake beam combination structure and prevention and controls |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20171110 Termination date: 20210115 |