CN104594297A - Double-deck concrete faced rock-fill dam and construction method thereof - Google Patents

Double-deck concrete faced rock-fill dam and construction method thereof Download PDF

Info

Publication number
CN104594297A
CN104594297A CN201410703396.6A CN201410703396A CN104594297A CN 104594297 A CN104594297 A CN 104594297A CN 201410703396 A CN201410703396 A CN 201410703396A CN 104594297 A CN104594297 A CN 104594297A
Authority
CN
China
Prior art keywords
concrete
high polymer
dam
enrockment
composite panel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410703396.6A
Other languages
Chinese (zh)
Other versions
CN104594297B (en
Inventor
杨贵
蒋裕丰
陈灵伟
胡鑫
郑延平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
YUSHUN ECOLOGICAL CONSTRUCTION Co Ltd
Nanjing Hehai Technology Co Ltd
Original Assignee
YUSHUN ECOLOGICAL CONSTRUCTION Co Ltd
Nanjing Hehai Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by YUSHUN ECOLOGICAL CONSTRUCTION Co Ltd, Nanjing Hehai Technology Co Ltd filed Critical YUSHUN ECOLOGICAL CONSTRUCTION Co Ltd
Priority to CN201410703396.6A priority Critical patent/CN104594297B/en
Publication of CN104594297A publication Critical patent/CN104594297A/en
Application granted granted Critical
Publication of CN104594297B publication Critical patent/CN104594297B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B7/00Barrages or weirs; Layout, construction, methods of, or devices for, making same
    • E02B7/02Fixed barrages
    • E02B7/04Dams across valleys
    • E02B7/06Earth-fill dams; Rock-fill dams

Abstract

The invention discloses a double-deck concrete faced rock-fill dam. The double-deck concrete faced rock-fill dam comprises a rock-fill accumulation body, a concrete face, geo-membrane and a super-polymer compound concrete face, the upper side of the rock-fill accumulation body is laterally covered with the super-polymer compound concrete face, the super-polymer compound concrete face is covered with the geo-membrane, and the geo-membrane is covered with the concrete face. The invention also discloses the double-deck concrete faced rock-fill dam construction method. According to the double-deck concrete faced rock-fill dam and the construction method thereof, the filling requirement to the accumulation body of a dam body is relatively lower, and it is avoided that a normal concrete faced rock-fill dam requires a higher degree of filling density and a loaded filter with impermeability in the process of filling; concrete hydration heat is effectively reduced, and construction links are few; the impermeability ability of the dam body is enhanced, and the loaded filter and a transition layer are not needed to be constructed on the back of concrete faces; the geo-membrane is arranged between double-deck concrete faces, and self compact concrete can be effectively protected from flowing into the accumulation body; the double-deck concrete faced rock-fill dam construction method has the advantages of being fast in construction speed, simple in process, suitable to popularize and apply and good in practicability.

Description

A kind of double face slab loose rock dam and construction method thereof
Technical field
The invention belongs to hydraulic engineering technical field, particularly relate to a kind of double face slab loose rock dam and construction method thereof.
Background technology
Rock appears at the mining area of the California, USA Sierra Nevada fifties in 19th century the earliest, and loose rock dam at that time adopt wooden boards antiseepage.Through the development in more than 150 years, modern rock is Concrete Face Rockfill Dam substantially, and because it has the advantages that cost is low, the duration is short, Concrete Face Rockfill Dam obtains vigorous growth, successfully builds the high dam of 200m level.Rock forms primarily of three parts: face slab for water retaining, antiseepage ground structure and enrockment dam body; Face slab for water retaining is the main permeation-inhibiting members of loose rock dam, and panel is connected with antiseepage ground structure by periphery fissure.
The method of several building earth and rockfill dam is had: the construction method 1) adopting self-compacting concrete material building concrete dam in prior art, the method is mainly used in the dam structure that building has larger concrete seepage-proofing body, as concrete core-wall loose rock dam, concrete gravity dam etc.; 2) panel adopting composite panel material to make and impervious body construction method thereof, this earth and rockfill dam adopts a kind of composite material to replace concrete to make panel, its composite material face working procedure is complicated, and need design impervious body to assist antiseepage, long in time limit and seepage capability is difficult to ensure; 3) face slab for water retaining be made up of glass screed and frp layer and construction method thereof, this barrier sheet essence also belongs to a kind of composite material face, and its execution conditions require higher, and construction is complicated.Meanwhile, set up dam according to existing embankment, or set up dam on existing earthquake accumulation body basis, in these special places, the main building material of dam is not fill according to dam work designing requirement, and it fills indices and can not grasp completely.
Summary of the invention
Goal of the invention: the object of the present invention is to provide a kind of double face slab loose rock dam, strengthens dam body intensity and antiseepage, is applicable to existing embankment and sets up dam, has on accumulation body basis and set up dam and newly-built dam engineering; The object of the present invention is to provide the construction method of these double face slab loose rock dam.
Technical scheme: for achieving the above object, the present invention adopts following technical scheme:
A kind of double face slab loose rock dam, it comprises enrockment accumulation body, concrete slab, geomembrane and high polymer composite panel, cover high polymer composite panel at the upstream side of described enrockment accumulation body, high polymer composite panel covers geomembrane, oversite concrete panel on geomembrane.
Described enrockment accumulation body cross section is trapezoidal shape.
Described concrete slab is built by reinforcing bar and self-compacting concrete and is formed; The reinforcement ratio of concrete slab is 60 ~ 100kg/m3.
Described high polymer composite panel is made up of the high polymer be filled in accumulation body and enrockment; The thickness of high polymer composite panel is not less than 50cm.
The construction method of described double face slab loose rock dam, comprises the following steps:
1) enrockment is piled up
Embankment or earthquake enrockment accumulation body are carried out heavy type roll, form trapezoidal dam body;
2) slip casting
Axial perpendicular to dam at the upstream side of trapezoidal dam body, be in tilted layout high polymer grouting pipe, lays one deck geomembrane in high polymer grouting pipe outer side covers; Outside geomembrane, build the template of concrete slab, put into steel mesh reinforcement in template inside, in steel mesh reinforcement, insert the cast of concrete grouting pipe from secret room concrete, form concrete slab; High polymer is injected toward high polymer grouting pipe inside, chemical reaction is there is in high polymer in high polymer grouting pipe inside, volume expansion, high polymer composite panel is formed together with enrockment by the hole of the injected hole filling periphery enrockment of periphery, the thickness of high polymer composite panel is not less than 50cm, and the enrockment be covered with by high polymer composite panel is enrockment accumulation body;
3) stripping
The template of dismounting concrete slab.
Beneficial effect: compared with prior art, double face slab loose rock dam of the present invention can build dam on existing embankment or earthquake accumulation body basis, require relatively low to filling of dam body accumulation body, avoid conventional panels loose rock dam needs the higher loaded filter filling compactness and have antiseepage effect in the process of filling; The advantages such as concrete slab adopts reinforcing bar and self-compacting concrete to build and forms, and can effectively reduce the concrete heat of hydration, and construction link is few; Adopt high polymer composite panel, strengthen the seepage capability of dam body, avoid constructing loaded filter and transition zone at panel rear, construction is simple; Between double face slab, lay geomembrane, can effectively stop self-compacting concrete to flow in accumulation body, for the high polymer composite panel forming even intensity provides guarantee; Construction method speed of application of the present invention is fast, and technique is simple, is suitable for applying, possesses good practicality.
Accompanying drawing explanation
Fig. 1 is the generalized section of double face slab loose rock dam;
Fig. 2 is concrete slab floor map;
Fig. 3 is high polymer panel plane schematic diagram;
Fig. 4 is dam body local A enlarged diagram.
Detailed description of the invention
Below in conjunction with the drawings and specific embodiments, the present invention is described further.
As shown in Fig. 1 ~ 4, a kind of double face slab loose rock dam comprise enrockment accumulation body 1, concrete slab 2, geomembrane 3 and high polymer composite panel 4, high polymer composite panel 4 is covered at the upstream side of enrockment accumulation body 1, high polymer composite panel 4 covers geomembrane 3, oversite concrete panel 2 on geomembrane 3.
Wherein, the cross section of enrockment accumulation body 1 is trapezoidal shape, and concrete slab 2 is built by reinforcing bar 5 and self-compacting concrete 6 and formed; The reinforcement ratio of concrete slab is 60 ~ 100kg/m3.High polymer composite panel 4 is made up of the high polymer 7 be filled in accumulation body and enrockment; The thickness of high polymer composite panel 4 is not less than 50cm.
The construction method of double face slab loose rock dam, comprises the following steps:
1) enrockment is piled up
Embankment or earthquake enrockment accumulation body are carried out heavy type roll, form trapezoidal dam body; Carry out slope trimming according to the intensity parameter of embankment and earthquake dam body materials simultaneously;
2) slip casting
Axially to be in tilted layout high polymer grouting pipe 8 perpendicular to dam at the upstream side of trapezoidal dam body, the spacing 5 ~ 10m between adjacent high polymer grouting pipe 8, lays one deck geomembrane 3 in high polymer grouting pipe 8 outer side covers; Outside geomembrane 3, build the template of concrete slab 2, put into steel mesh reinforcement 5 in template inside, in steel mesh reinforcement 5, insert the cast of concrete grouting pipe from secret room concrete 6, form concrete slab 2; High polymer 7 is injected toward high polymer grouting pipe 8 inside, chemical reaction is there is in high polymer 7 in high polymer grouting pipe 8 inside, volume expansion, high polymer composite panel 4 is formed together with enrockment by the hole of the injected hole 9 filling periphery enrockment of periphery, the thickness of high polymer composite panel 4 is not less than 50cm, and the enrockment be covered with by high polymer composite panel 4 is enrockment accumulation body 1;
3) stripping
The template of dismounting concrete slab 2.

Claims (5)

1. double face slab loose rock dam, it is characterized in that: it comprises enrockment accumulation body (1), concrete slab (2), geomembrane (3) and high polymer composite panel (4), high polymer composite panel (4) is covered at the upstream side of described enrockment accumulation body (1), high polymer composite panel (4) covers geomembrane (3), at the upper oversite concrete panel (2) of geomembrane (3).
2. double face slab loose rock dam according to claim 1, is characterized in that: described enrockment accumulation body (1) cross section is trapezoidal shape.
3. double face slab loose rock dam according to claim 1, is characterized in that: described concrete slab (2) is built by reinforcing bar (5) and self-compacting concrete (6) and formed; The reinforcement ratio of concrete slab is 60 ~ 100kg/m3.
4. double face slab loose rock dam according to claim 1, is characterized in that: described high polymer composite panel (4) is made up of the high polymer be filled in accumulation body (7) and enrockment; The thickness of high polymer composite panel (4) is not less than 50cm.
5. the construction method of the double face slab loose rock dam in claim 1 ~ 4 described in any one, its feature exists
In, comprise the following steps:
1) enrockment is piled up
Embankment or earthquake enrockment accumulation body are carried out heavy type roll, form trapezoidal dam body;
2) slip casting
Axial perpendicular to dam at the upstream side of trapezoidal dam body, be in tilted layout high polymer grouting pipe (8), lays one deck geomembrane (3) in high polymer grouting pipe (8) outer side covers; Build the template of concrete slab (2) in geomembrane (3) outside, put into steel mesh reinforcement (5) in template inside, in steel mesh reinforcement (5), insert the cast of concrete grouting pipe from secret room concrete (6), form concrete slab (2); High polymer (7) is injected toward high polymer grouting pipe (8) inside, chemical reaction is there is in high polymer (7) in high polymer grouting pipe (8) inside, volume expansion, high polymer composite panel (4) is formed together with enrockment by the hole of injected hole (9) the filling periphery enrockment of periphery, the thickness of high polymer composite panel (4) is not less than 50cm, and the enrockment be covered with by high polymer composite panel (4) is enrockment accumulation body (1);
3) stripping
The template of dismounting concrete slab (2).
CN201410703396.6A 2014-11-26 2014-11-26 A kind of double face slab rock-fill dams and construction method thereof Active CN104594297B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410703396.6A CN104594297B (en) 2014-11-26 2014-11-26 A kind of double face slab rock-fill dams and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410703396.6A CN104594297B (en) 2014-11-26 2014-11-26 A kind of double face slab rock-fill dams and construction method thereof

Publications (2)

Publication Number Publication Date
CN104594297A true CN104594297A (en) 2015-05-06
CN104594297B CN104594297B (en) 2016-12-07

Family

ID=53120324

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410703396.6A Active CN104594297B (en) 2014-11-26 2014-11-26 A kind of double face slab rock-fill dams and construction method thereof

Country Status (1)

Country Link
CN (1) CN104594297B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105178259A (en) * 2015-08-24 2015-12-23 中国科学院力学研究所 Joint designing method of cushion course and transition layer of concrete faced rockfill dam
CN105625272A (en) * 2016-01-30 2016-06-01 清华大学 3 D building system and method for earth-rock dam
CN107503322A (en) * 2017-07-19 2017-12-22 江西省水利科学研究院 A kind of preparation method for the earth and rockfill dam downstream patch slope concrete slab for filtering native draining
CN108797522A (en) * 2018-06-13 2018-11-13 靳恬静 A kind of dykes and dams blocking method
CN109629524A (en) * 2018-12-20 2019-04-16 重庆大学 A kind of FRP Combined concrete panel earth and rockfill dam and its construction method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000073339A (en) * 1998-06-15 2000-03-07 Natl Res Inst Of Agricultural Engineering Inspection gallery in fill-type dam and construction method of inspection gallery in fill-type dam
CN101058974A (en) * 2005-12-21 2007-10-24 中国水利水电第一工程局 Once forming construction technique for concrete panel rock fill dam bedding material and slope fixing mortar
CN101831889A (en) * 2010-05-05 2010-09-15 河海大学 Anti-seismic combination slab for earth and rockfill dam and construction method thereof
CN102561271A (en) * 2012-01-11 2012-07-11 河海大学 Polymer grout injected earth-rock dam and construction method thereof
CN103422473A (en) * 2013-07-10 2013-12-04 大连理工大学 Anti-seismic face plate structure for rock-fill dam with concrete face plate and method for constructing face plate anti-seismic structure

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000073339A (en) * 1998-06-15 2000-03-07 Natl Res Inst Of Agricultural Engineering Inspection gallery in fill-type dam and construction method of inspection gallery in fill-type dam
CN101058974A (en) * 2005-12-21 2007-10-24 中国水利水电第一工程局 Once forming construction technique for concrete panel rock fill dam bedding material and slope fixing mortar
CN101831889A (en) * 2010-05-05 2010-09-15 河海大学 Anti-seismic combination slab for earth and rockfill dam and construction method thereof
CN102561271A (en) * 2012-01-11 2012-07-11 河海大学 Polymer grout injected earth-rock dam and construction method thereof
CN103422473A (en) * 2013-07-10 2013-12-04 大连理工大学 Anti-seismic face plate structure for rock-fill dam with concrete face plate and method for constructing face plate anti-seismic structure

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105178259A (en) * 2015-08-24 2015-12-23 中国科学院力学研究所 Joint designing method of cushion course and transition layer of concrete faced rockfill dam
CN105625272A (en) * 2016-01-30 2016-06-01 清华大学 3 D building system and method for earth-rock dam
CN107503322A (en) * 2017-07-19 2017-12-22 江西省水利科学研究院 A kind of preparation method for the earth and rockfill dam downstream patch slope concrete slab for filtering native draining
CN108797522A (en) * 2018-06-13 2018-11-13 靳恬静 A kind of dykes and dams blocking method
CN109629524A (en) * 2018-12-20 2019-04-16 重庆大学 A kind of FRP Combined concrete panel earth and rockfill dam and its construction method

Also Published As

Publication number Publication date
CN104594297B (en) 2016-12-07

Similar Documents

Publication Publication Date Title
CN111119935B (en) Multi-layer grouting reinforcement method for surrounding rock of soft and broken roadway structure
CN204253054U (en) Mountain tunnel stake arch cap excavation method comprehensive support structure
CN104594297A (en) Double-deck concrete faced rock-fill dam and construction method thereof
CN102561271B (en) Polymer grout injected earth-rock dam and construction method thereof
CN101280568A (en) Station pit construction method forming protection for neighboring operated subway interval tunnel
CN204023501U (en) A kind of reinforcement Anti-seeping technology structure for earth and rockfill dam
CN103422510B (en) Steel pipe frame type cofferdam structure and construction method
CN203174616U (en) Clay foundation rain falling and water saving system
CN105201001B (en) Composite seepage preventing structure for large karst cave in karst region and construction method thereof
CN104631475A (en) Safe and fast construction method of down-traversing river shallow depth bored tunnel
CN111119128B (en) Danger-removing, reinforcing and seepage-proofing method for natural rock-fill dam of barrier lake
CN108797641A (en) A kind of structure and its construction method of Underground Subway Station construction period full station sealing
CN202969393U (en) Ribbing load reduction structure of road high hill culvert
CN104452829A (en) Piled raft foundation anti-floating structure and construction method
CN110965595A (en) Raft foundation building lifting reinforcement structure and method under corrosive geological environment
CN107119695A (en) A kind of operation support body and construction method for cancelling outer wall of basement backfill
WO2013117089A1 (en) Semi-assembled ecotype debris dam for mudflow and construction method thereof
CN205617390U (en) A softer side of sears layer excavation supporting system for loess area
CN104895121A (en) Transverse partition method for reducing ground surface settlement and building structure deformation of underground structure construction
CN204753262U (en) A fender structure on high embankment of existing railway
CN101285302B (en) Method for reinforcing caisson of concrete dam
CN205382942U (en) Multilayer underground space curtain posture subsurface excavated construction's supporting construction under existing facility
CN104131535B (en) A kind of composite reinforced earth and rockfill dam earthquake resistant structure of high polymer and construction method thereof
CN103233447B (en) High concrete face rockfill dam seismic strengthening structure and construction method thereof
CN109826230A (en) A kind of town road pipeline reinforcement protection structure and its construction method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP02 Change in the address of a patent holder

Address after: 315099, Zhejiang Province, Haishu District, Zhongshan Ningbo West Road, No. 2 hang Long Center (15-9) (Yu Shun Ecological Construction Co., Ltd.)

Co-patentee after: Hehai Science & Technology Co., Ltd.

Patentee after: YUSHUN ECOLOGICAL CONSTRUCTION CO., LTD.

Address before: 7, building 487, building 17, Ning Xing Fortune Plaza, No. 315000, Cheng Cheng North Road, Zhejiang, Ningbo

Co-patentee before: Hehai Science & Technology Co., Ltd.

Patentee before: YUSHUN ECOLOGICAL CONSTRUCTION CO., LTD.

CP02 Change in the address of a patent holder