A kind of double face slab loose rock dam and construction method thereof
Technical field
The invention belongs to hydraulic engineering technical field, particularly relate to a kind of double face slab loose rock dam and construction method thereof.
Background technology
Rock appears at the mining area of the California, USA Sierra Nevada fifties in 19th century the earliest, and loose rock dam at that time adopt wooden boards antiseepage.Through the development in more than 150 years, modern rock is Concrete Face Rockfill Dam substantially, and because it has the advantages that cost is low, the duration is short, Concrete Face Rockfill Dam obtains vigorous growth, successfully builds the high dam of 200m level.Rock forms primarily of three parts: face slab for water retaining, antiseepage ground structure and enrockment dam body; Face slab for water retaining is the main permeation-inhibiting members of loose rock dam, and panel is connected with antiseepage ground structure by periphery fissure.
The method of several building earth and rockfill dam is had: the construction method 1) adopting self-compacting concrete material building concrete dam in prior art, the method is mainly used in the dam structure that building has larger concrete seepage-proofing body, as concrete core-wall loose rock dam, concrete gravity dam etc.; 2) panel adopting composite panel material to make and impervious body construction method thereof, this earth and rockfill dam adopts a kind of composite material to replace concrete to make panel, its composite material face working procedure is complicated, and need design impervious body to assist antiseepage, long in time limit and seepage capability is difficult to ensure; 3) face slab for water retaining be made up of glass screed and frp layer and construction method thereof, this barrier sheet essence also belongs to a kind of composite material face, and its execution conditions require higher, and construction is complicated.Meanwhile, set up dam according to existing embankment, or set up dam on existing earthquake accumulation body basis, in these special places, the main building material of dam is not fill according to dam work designing requirement, and it fills indices and can not grasp completely.
Summary of the invention
Goal of the invention: the object of the present invention is to provide a kind of double face slab loose rock dam, strengthens dam body intensity and antiseepage, is applicable to existing embankment and sets up dam, has on accumulation body basis and set up dam and newly-built dam engineering; The object of the present invention is to provide the construction method of these double face slab loose rock dam.
Technical scheme: for achieving the above object, the present invention adopts following technical scheme:
A kind of double face slab loose rock dam, it comprises enrockment accumulation body, concrete slab, geomembrane and high polymer composite panel, cover high polymer composite panel at the upstream side of described enrockment accumulation body, high polymer composite panel covers geomembrane, oversite concrete panel on geomembrane.
Described enrockment accumulation body cross section is trapezoidal shape.
Described concrete slab is built by reinforcing bar and self-compacting concrete and is formed; The reinforcement ratio of concrete slab is 60 ~ 100kg/m3.
Described high polymer composite panel is made up of the high polymer be filled in accumulation body and enrockment; The thickness of high polymer composite panel is not less than 50cm.
The construction method of described double face slab loose rock dam, comprises the following steps:
1) enrockment is piled up
Embankment or earthquake enrockment accumulation body are carried out heavy type roll, form trapezoidal dam body;
2) slip casting
Axial perpendicular to dam at the upstream side of trapezoidal dam body, be in tilted layout high polymer grouting pipe, lays one deck geomembrane in high polymer grouting pipe outer side covers; Outside geomembrane, build the template of concrete slab, put into steel mesh reinforcement in template inside, in steel mesh reinforcement, insert the cast of concrete grouting pipe from secret room concrete, form concrete slab; High polymer is injected toward high polymer grouting pipe inside, chemical reaction is there is in high polymer in high polymer grouting pipe inside, volume expansion, high polymer composite panel is formed together with enrockment by the hole of the injected hole filling periphery enrockment of periphery, the thickness of high polymer composite panel is not less than 50cm, and the enrockment be covered with by high polymer composite panel is enrockment accumulation body;
3) stripping
The template of dismounting concrete slab.
Beneficial effect: compared with prior art, double face slab loose rock dam of the present invention can build dam on existing embankment or earthquake accumulation body basis, require relatively low to filling of dam body accumulation body, avoid conventional panels loose rock dam needs the higher loaded filter filling compactness and have antiseepage effect in the process of filling; The advantages such as concrete slab adopts reinforcing bar and self-compacting concrete to build and forms, and can effectively reduce the concrete heat of hydration, and construction link is few; Adopt high polymer composite panel, strengthen the seepage capability of dam body, avoid constructing loaded filter and transition zone at panel rear, construction is simple; Between double face slab, lay geomembrane, can effectively stop self-compacting concrete to flow in accumulation body, for the high polymer composite panel forming even intensity provides guarantee; Construction method speed of application of the present invention is fast, and technique is simple, is suitable for applying, possesses good practicality.
Accompanying drawing explanation
Fig. 1 is the generalized section of double face slab loose rock dam;
Fig. 2 is concrete slab floor map;
Fig. 3 is high polymer panel plane schematic diagram;
Fig. 4 is dam body local A enlarged diagram.
Detailed description of the invention
Below in conjunction with the drawings and specific embodiments, the present invention is described further.
As shown in Fig. 1 ~ 4, a kind of double face slab loose rock dam comprise enrockment accumulation body 1, concrete slab 2, geomembrane 3 and high polymer composite panel 4, high polymer composite panel 4 is covered at the upstream side of enrockment accumulation body 1, high polymer composite panel 4 covers geomembrane 3, oversite concrete panel 2 on geomembrane 3.
Wherein, the cross section of enrockment accumulation body 1 is trapezoidal shape, and concrete slab 2 is built by reinforcing bar 5 and self-compacting concrete 6 and formed; The reinforcement ratio of concrete slab is 60 ~ 100kg/m3.High polymer composite panel 4 is made up of the high polymer 7 be filled in accumulation body and enrockment; The thickness of high polymer composite panel 4 is not less than 50cm.
The construction method of double face slab loose rock dam, comprises the following steps:
1) enrockment is piled up
Embankment or earthquake enrockment accumulation body are carried out heavy type roll, form trapezoidal dam body; Carry out slope trimming according to the intensity parameter of embankment and earthquake dam body materials simultaneously;
2) slip casting
Axially to be in tilted layout high polymer grouting pipe 8 perpendicular to dam at the upstream side of trapezoidal dam body, the spacing 5 ~ 10m between adjacent high polymer grouting pipe 8, lays one deck geomembrane 3 in high polymer grouting pipe 8 outer side covers; Outside geomembrane 3, build the template of concrete slab 2, put into steel mesh reinforcement 5 in template inside, in steel mesh reinforcement 5, insert the cast of concrete grouting pipe from secret room concrete 6, form concrete slab 2; High polymer 7 is injected toward high polymer grouting pipe 8 inside, chemical reaction is there is in high polymer 7 in high polymer grouting pipe 8 inside, volume expansion, high polymer composite panel 4 is formed together with enrockment by the hole of the injected hole 9 filling periphery enrockment of periphery, the thickness of high polymer composite panel 4 is not less than 50cm, and the enrockment be covered with by high polymer composite panel 4 is enrockment accumulation body 1;
3) stripping
The template of dismounting concrete slab 2.