CN106948606A - Cover type artificial digging pile aperture means of defence and its device - Google Patents
Cover type artificial digging pile aperture means of defence and its device Download PDFInfo
- Publication number
- CN106948606A CN106948606A CN201710201795.6A CN201710201795A CN106948606A CN 106948606 A CN106948606 A CN 106948606A CN 201710201795 A CN201710201795 A CN 201710201795A CN 106948606 A CN106948606 A CN 106948606A
- Authority
- CN
- China
- Prior art keywords
- framework
- operation hole
- digging pile
- protective framework
- protective
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 230000001681 protective effect Effects 0.000 claims abstract description 51
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 33
- 239000010959 steel Substances 0.000 claims abstract description 33
- 238000010276 construction Methods 0.000 claims description 8
- 239000004567 concrete Substances 0.000 claims description 7
- 238000009434 installation Methods 0.000 claims description 6
- 239000011148 porous material Substances 0.000 claims description 6
- 241000282326 Felis catus Species 0.000 claims description 5
- 238000009423 ventilation Methods 0.000 claims description 5
- 230000001680 brushing effect Effects 0.000 claims description 3
- 239000003973 paint Substances 0.000 claims description 3
- 238000007789 sealing Methods 0.000 claims description 3
- 239000002893 slag Substances 0.000 claims description 3
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 claims 2
- 210000000988 bone and bone Anatomy 0.000 claims 1
- 229910052742 iron Inorganic materials 0.000 claims 1
- 239000002689 soil Substances 0.000 claims 1
- 238000003466 welding Methods 0.000 claims 1
- 238000000034 method Methods 0.000 abstract description 8
- 238000004519 manufacturing process Methods 0.000 abstract description 3
- 238000010923 batch production Methods 0.000 abstract description 2
- 238000010586 diagram Methods 0.000 description 3
- 230000001012 protector Effects 0.000 description 3
- 230000002787 reinforcement Effects 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 2
- 230000015572 biosynthetic process Effects 0.000 description 1
- 210000000481 breast Anatomy 0.000 description 1
- 230000007123 defense Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 230000009466 transformation Effects 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/32—Safety or protective measures for persons during the construction of buildings
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Piles And Underground Anchors (AREA)
Abstract
The invention discloses a kind of cover type artificial digging pile aperture means of defence and its device, it is made up of the protective framework (7) along artificial digging pile (11) aperture outer guard device square steel, protective framework (7) is sealed with steel plate (3) in hoist engine (13) side, its excess-three side is sealed protective framework (7) with wire netting (2);Aperture is arranged above rectangle operation hole (1), operation hole on framework (8), is connected by the position in rectangle operation hole (1) square steel fabrication process hole on framework (8) in the opposite side for side of slagging tap with hinge (5) with protective framework (7).The present invention is a kind of protection for exit method safer, easy to use compared to Traditional Man caisson protection for exit, this method use can batch production processing protection for exit device be arranged on aperture fore shaft on, device middle setting operation hole, improves the security and convenience of artificial digging pile protection.
Description
Technical field
The present invention relates to Construction Safety safeguard structure field, and in particular to prevents in a kind of cover type artificial digging pile aperture
Maintaining method and its device.
Background technology
In manual digging pile construction, traditional protection for exit form is that aperture surrounding sets railing enclosing, on aperture
The larger bar-mat reinforcement of portion's covering spacing;And bar-mat reinforcement is moved away applying man-hour requirement, is wasted time and energy;Railing enclosing is not easy to hole slag
Sling and transport, and installing/dismounting is cumbersome.
Therefore remove and install simple, it is ensured that construction safety, the protection for exit device of efficiency, are the masters of current construction
Topic.It is badly in need of a kind of convenient, effective artificial digging pile aperture safeguard structure device in the prior art.
The content of the invention
It is existing to solve it is an object of the invention to provide a kind of cover type artificial digging pile aperture means of defence and its device
The deficiency of technology.
What the present invention was realized in:
The present invention is a kind of cover type artificial digging pile aperture means of defence first, the artificial digging pile by hoist engine from
Its side is slagged tap, and the protective framework along artificial digging pile aperture outer guard device is made up of square steel first, the one of hoist engine
Side is sealed protective framework with steel plate, and its excess-three side is sealed protective framework with wire netting;Set directly over artificial digging pile aperture
Rectangle operation hole is put, the position square steel fabrication process hole on framework in rectangle operation hole will be made in the opposite side for side of slagging tap with hinge
Industry hole on framework is connected with protective framework, and the side that hinge is not connected with operation hole on framework is fixed with a reinforced steel bar ring;Slagging tap
Side sheared-off part wire netting, sets pore to be used for the installation of ventilation shaft, soft cat ladder or vibrating spear.
When pouring locked concrete in corner embedded U-shaped snap ring, protective framework is fixed with U-shaped card ring, in construction,
Pull-up reinforced steel bar ring makes operation hole on framework be rotated around hinge, opens rectangle operation hole;Pull-up reinforced steel bar ring of not constructing makes operation hole on framework
Rotated around hinge, close rectangle operation hole.
In protective framework and operation hole on framework brushing reflectorised paint.
The protector that the present invention is used is such, and it includes the protective framework of rectangular frame or truss structure, protection
The middle part of skeleton by hinge connects one provided with unlimited rectangle operation hole in the side in rectangle operation hole on protective framework
The side that hinge is not connected with the operation hole on framework of rectangular frame structure, operation hole on framework is fixed with a reinforced steel bar ring;Setting
The side for having hoist engine sets steel plate to seal protective framework, and its excess-three side sets wire netting to seal protective framework.
The protective framework is fixed by the U-shaped card ring being embedded on the locked concrete of artificial digging pile.
Pore provided with an installation for being used for ventilation shaft, soft cat ladder or vibrating spear on the wire netting for side of slagging tap.
It is provided with and is vertically prevented by what square steel made along position of the rectangle operation hole periphery in addition to side of slagging tap in protective framework
Shield skeleton (, vertical protective framework welds wire netting.
The present invention is a kind of protection for exit side safer, easy to use compared to Traditional Man caisson protection for exit
Method, this method use can batch production processing protection for exit device be arranged on aperture fore shaft on, device middle setting make
Industry hole, improves the security and convenience of artificial digging pile protection.The device convenient material drawing, connection are simple, firm, can be pre- in advance
System, can play safety protection function to aperture well.Installation, easy removal.No matter in terms of construction safety or apply
, can be better than traditional defense form from the aspect of work efficiency rate.
Brief description of the drawings
Fig. 1 is the overall structure diagram of the present invention;
Fig. 2 is the protective framework and operation hole on framework schematic diagram of the present invention, and operation hole is closed mode in figure;
Fig. 3 is the protective framework and operation hole on framework schematic diagram of the present invention, and operation hole is open mode in figure;
Fig. 4 is the elevation of the present invention;
The U-shaped card ring that Fig. 5 is the present invention sets plan;
The U-shaped card ring that Fig. 6 is the present invention sets profile.
Description of reference numerals:1- rectangle operations hole, 2-2- wire nettings, 3- steel plates, the vertical protective frameworks of 4-, 5- hinges, 6-
Reinforced steel bar ring, 7- protective frameworks, 8- operation hole on framework, 9- pores, 10-U type snap rings, 11- artificial digging piles, 12- locked concretes,
13- hoist engines, 14- breast wall concretes.
Embodiment
The present invention is described in further detail with reference to the accompanying drawings and examples.
Embodiment 1:
As shown in Figure 1, Figure 2 and Figure 3, first, the main body of this protector of the invention includes rectangular frame or truss
The protective framework 7 of structure, the middle part of protective framework 7 is provided with unlimited rectangle operation hole 1, and rectangle operation hole 1 is located exactly at manually
Directly over the aperture of caisson 11, a rectangle frame connected on protective framework 7 by hinge 5 in the side in rectangle operation hole 1
The side that hinge 5 is not connected with the operation hole on framework 8 of frame structure, operation hole on framework 8 is fixed with a reinforced steel bar ring 6 as one
Draw ring, for the pull-up of operation hole on framework 8 to be rotated around hinge;Steel plate 3 is laid in the side provided with hoist engine 13 by protective framework
7 sealings, its excess-three side sets wire netting 2 to seal protective framework 7.
In addition, provided with one for the installation of ventilation shaft, soft cat ladder or vibrating spear on the wire netting 2 for side of slagging tap
Pore 9.In protective framework 7 and the brushing reflectorised paint of operation hole on framework 8 to be used as alarming sign.
As shown in figure 4, being provided with protective framework 7 along position of the periphery of rectangle operation hole 1 in addition to side of slagging tap by square steel
The vertical protective framework 4 made, vertical protective framework 4 welds wire netting 2.
As shown in Figure 5 and Figure 6, protective framework 7 is U-shaped on the locked concrete 12 of artificial digging pile 11 by being embedded in
Snap ring 10 is fixed on the ground.
The present invention is implemented:
The present invention is to cover fore shaft and stake holes using prefabricated device all standing formula when using, and is set in device middle
Rectangle operation hole 1 carries out borehole operation.
Specifically, the planar dimension of present apparatus protective framework 7 is slightly larger than fore shaft, is positioned on fore shaft, above aperture
In protective range, the rectangle protection network that square steel is constituted with wire netting 2 (10mm × 10mm), steel plate 3, middle setting rectangle operation
Hole 1;Square steel constitutes the protective framework 7 of protector, is connected close to the side steel plate 3 of hoist engine 13 with protective framework 7, protects
Card hangs the safety of slag work, and its excess-three side wire netting 2 is connected with protective framework 7;The square steel fabrication process hole of rectangle operation hole 1
Skeleton 8, slagging tap, opposite side hinge 5 is connected with protective framework 7, and operation hole on framework 8 is slagged tap side welded reinforcement ring 6, closing
It can be ridden on protective framework 7 during operation hole on framework 8.
In construction, pull-up reinforced steel bar ring 6 makes operation hole on framework 8 be rotated around hinge 5, opens rectangle operation hole 1.Such as Fig. 2 institutes
Show.
When not constructing, pull-up reinforced steel bar ring 6 makes operation hole on framework 8 be rotated around hinge 5, closes rectangle operation hole 1.Such as Fig. 3 institutes
Show.
Certainly, it is the concrete application example of the present invention above, the present invention also has other embodiments, all using equivalent
Replacement or the technical scheme of equivalent transformation formation, all fall within protection domain of the presently claimed invention.
Claims (7)
1. a kind of cover type artificial digging pile aperture means of defence, the artificial digging pile (11) is by hoist engine (13) from its side
Slag tap, it is characterised in that:The protective framework (7) along artificial digging pile (11) aperture outer guard device is made up of square steel first,
Protective framework (7) is sealed with steel plate (3) in the side of hoist engine (13), its excess-three side is with wire netting (2) by protective framework (7)
Sealing;Artificial digging pile (11) aperture is arranged above rectangle operation hole (1), and the position in rectangle operation hole (1) is constituted with square steel
Operation hole on framework (8), is connected, operation by operation hole on framework (8) in the opposite side for side of slagging tap with hinge (5) with protective framework (7)
The side that hinge (5) is not connected with hole on framework (8) is fixed with a reinforced steel bar ring (6);In side sheared-off part wire netting of slagging tap
(2), setting pore (9) is used for the installation of ventilation shaft, soft cat ladder or vibrating spear.
2. cover type artificial digging pile aperture means of defence according to claim 1, it is characterised in that:Mixed pouring fore shaft
It is with U-shaped card ring (10) that protective framework (7) is fixed in corner embedded U-shaped snap ring (10) during solidifying soil (12), in construction, pull-up
Reinforced steel bar ring (6) makes operation hole on framework (8) be rotated around hinge (5), opens rectangle operation hole (1);Pull-up reinforced steel bar ring (6) of not constructing makes
Operation hole on framework (8) is rotated around hinge (5), is closed rectangle operation hole (1).
3. cover type artificial digging pile aperture means of defence according to claim 1, it is characterised in that:In the protection bone
Frame (7) and operation hole on framework (8) brushing reflectorised paint.
4. a kind of cover type digging pile hole mouth protecting device, it is characterised in that:It includes rectangular frame or truss structure
Protective framework (7), the middle part of protective framework (7) leads to provided with unlimited rectangle operation hole (1) in the side in rectangle operation hole (1)
Cross on the operation hole on framework (8) that hinge (5) connects a rectangular frame structure on protective framework (7), operation hole on framework (8) not
The side of connection hinge (5) is fixed with a reinforced steel bar ring (6);Set steel plate (3) anti-in the side provided with hoist engine (13)
Skeleton (7) sealing is protected, its excess-three side sets wire netting (2) to seal protective framework (7).
5. cover type digging pile hole mouth protecting device according to claim 4, it is characterised in that:The protective framework
(7) it is fixed by the U-shaped card ring (10) being embedded on the locked concrete (12) of artificial digging pile (11).
6. cover type digging pile hole mouth protecting device according to claim 4, it is characterised in that:In the iron of side of slagging tap
Pore (9) of the silk screen (2) provided with an installation for being used for ventilation shaft, soft cat ladder or vibrating spear.
7. cover type digging pile hole mouth protecting device according to claim 4, it is characterised in that:In protective framework
(7) the vertical protective framework (4) made by square steel is provided with along position of rectangle operation hole (1) periphery in addition to side of slagging tap, is erected
To protective framework (4) welding wire netting (2).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710201795.6A CN106948606A (en) | 2017-03-30 | 2017-03-30 | Cover type artificial digging pile aperture means of defence and its device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710201795.6A CN106948606A (en) | 2017-03-30 | 2017-03-30 | Cover type artificial digging pile aperture means of defence and its device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106948606A true CN106948606A (en) | 2017-07-14 |
Family
ID=59475812
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710201795.6A Pending CN106948606A (en) | 2017-03-30 | 2017-03-30 | Cover type artificial digging pile aperture means of defence and its device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106948606A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107740405A (en) * | 2017-10-23 | 2018-02-27 | 安徽送变电工程有限公司 | For the disposition operating platform in artificial digging pile borehole operation |
CN107882037A (en) * | 2017-10-31 | 2018-04-06 | 中国电建集团华东勘测设计院有限公司 | Antiskid pile concreting protector and friction pile casting method |
Citations (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH06299565A (en) * | 1993-04-14 | 1994-10-25 | Katsuya Hiraoka | Method for constructing wall and retaining wall |
JPH10219680A (en) * | 1997-02-10 | 1998-08-18 | Nishimatsu Constr Co Ltd | Work execution method of cast-in-place concrete pile |
JP2010031544A (en) * | 2008-07-29 | 2010-02-12 | East Japan Railway Co | Hole wall protecting method of cast in place pile |
CN201981534U (en) * | 2010-12-09 | 2011-09-21 | 湖南省第三工程有限公司 | Orifice protective cover |
TW201211366A (en) * | 2010-09-07 | 2012-03-16 | Yi-Cheng Tseng | Opening security box |
CN202755679U (en) * | 2012-08-13 | 2013-02-27 | 云南建工水利水电建设有限公司 | Safety protective cover |
CN203129128U (en) * | 2013-02-01 | 2013-08-14 | 中国十七冶集团有限公司 | Pile hole protective cage |
CN203475860U (en) * | 2013-09-17 | 2014-03-12 | 中建四局第六建筑工程有限公司 | Combined hole covering piece |
CN203755711U (en) * | 2013-12-16 | 2014-08-06 | 中国建筑第四工程局有限公司 | Light tool type hole pile protection device |
CN204001998U (en) * | 2014-06-04 | 2014-12-10 | 上海爱逸建筑科技有限公司 | Anticorrosion protective screening fence easy to assemble |
JP2015127462A (en) * | 2013-12-27 | 2015-07-09 | 株式会社Nbcメッシュテック | Dispersion preventing net |
CN204982865U (en) * | 2015-08-03 | 2016-01-20 | 湖南省通平高速公路建设开发有限公司 | Pile foundation is through processing apparatus in rich water -soluble hole |
CN205713184U (en) * | 2016-04-26 | 2016-11-23 | 温州乐发教育科技有限公司 | A kind of safety protection device of municipal road foundation pit |
CN205776221U (en) * | 2016-06-23 | 2016-12-07 | 中铁十二局集团有限公司 | The portable protective baffle plate of artificial digging pile |
CN206015666U (en) * | 2016-08-31 | 2017-03-15 | 中铁二十局集团第四工程有限公司 | Subway station large-diameter bored pile stake holes locking notch structure |
CN207032904U (en) * | 2017-03-30 | 2018-02-23 | 中建四局第五建筑工程有限公司 | Cover type digging pile hole mouth protecting device |
-
2017
- 2017-03-30 CN CN201710201795.6A patent/CN106948606A/en active Pending
Patent Citations (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH06299565A (en) * | 1993-04-14 | 1994-10-25 | Katsuya Hiraoka | Method for constructing wall and retaining wall |
JPH10219680A (en) * | 1997-02-10 | 1998-08-18 | Nishimatsu Constr Co Ltd | Work execution method of cast-in-place concrete pile |
JP2010031544A (en) * | 2008-07-29 | 2010-02-12 | East Japan Railway Co | Hole wall protecting method of cast in place pile |
TW201211366A (en) * | 2010-09-07 | 2012-03-16 | Yi-Cheng Tseng | Opening security box |
CN201981534U (en) * | 2010-12-09 | 2011-09-21 | 湖南省第三工程有限公司 | Orifice protective cover |
CN202755679U (en) * | 2012-08-13 | 2013-02-27 | 云南建工水利水电建设有限公司 | Safety protective cover |
CN203129128U (en) * | 2013-02-01 | 2013-08-14 | 中国十七冶集团有限公司 | Pile hole protective cage |
CN203475860U (en) * | 2013-09-17 | 2014-03-12 | 中建四局第六建筑工程有限公司 | Combined hole covering piece |
CN203755711U (en) * | 2013-12-16 | 2014-08-06 | 中国建筑第四工程局有限公司 | Light tool type hole pile protection device |
JP2015127462A (en) * | 2013-12-27 | 2015-07-09 | 株式会社Nbcメッシュテック | Dispersion preventing net |
CN204001998U (en) * | 2014-06-04 | 2014-12-10 | 上海爱逸建筑科技有限公司 | Anticorrosion protective screening fence easy to assemble |
CN204982865U (en) * | 2015-08-03 | 2016-01-20 | 湖南省通平高速公路建设开发有限公司 | Pile foundation is through processing apparatus in rich water -soluble hole |
CN205713184U (en) * | 2016-04-26 | 2016-11-23 | 温州乐发教育科技有限公司 | A kind of safety protection device of municipal road foundation pit |
CN205776221U (en) * | 2016-06-23 | 2016-12-07 | 中铁十二局集团有限公司 | The portable protective baffle plate of artificial digging pile |
CN206015666U (en) * | 2016-08-31 | 2017-03-15 | 中铁二十局集团第四工程有限公司 | Subway station large-diameter bored pile stake holes locking notch structure |
CN207032904U (en) * | 2017-03-30 | 2018-02-23 | 中建四局第五建筑工程有限公司 | Cover type digging pile hole mouth protecting device |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107740405A (en) * | 2017-10-23 | 2018-02-27 | 安徽送变电工程有限公司 | For the disposition operating platform in artificial digging pile borehole operation |
CN107882037A (en) * | 2017-10-31 | 2018-04-06 | 中国电建集团华东勘测设计院有限公司 | Antiskid pile concreting protector and friction pile casting method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207032904U (en) | Cover type digging pile hole mouth protecting device | |
CN106948606A (en) | Cover type artificial digging pile aperture means of defence and its device | |
Rathi et al. | Demolition of buildings—an overview | |
EP2992974A1 (en) | Final disposal plant | |
CN107604938A (en) | A kind of security device chassis attachment means | |
CN206784971U (en) | A kind of job site periphery high voltage wire protector | |
CN206941595U (en) | Rotary digging stake irrigates concrete catheter connection device | |
CN204938684U (en) | Building hoist safety door | |
CN105401580A (en) | Concrete pouring construction method for underground gallery | |
CN102864942A (en) | Manufacturing method for security protective cover | |
CN107435539A (en) | Vertical shaft Tunnel Blasting construction protection device and its construction method | |
CN207295477U (en) | A kind of bridge lower part construction safety protection column | |
CN209760286U (en) | Anti-leakage structure of tower crane foundation | |
JP3096294B1 (en) | Dustproof device and construction method | |
CN210031545U (en) | Orifice protection device for bridge pile hole | |
CN208650046U (en) | The control of pile crown absolute altitude and protective device | |
CN208792738U (en) | A kind of upper and lower safety climbing ladder of bridge pier column binder pouring construction | |
CN209585667U (en) | Prefabricated assembled safety enclosure | |
CN203905051U (en) | High-voltage wire protection device for subway construction | |
CN206571183U (en) | A kind of post angle protection component for being applicable different size concrete column | |
CN207147511U (en) | A kind of Tailings Dam monitors point protection device on-line | |
JP2011149704A (en) | Radiation controlled area through-processing method in nuclear facilities | |
CN106440986A (en) | Safety protection device for supporting beam blasting and dismantling and using method thereof | |
CN207063192U (en) | A kind of Grouting Pipe interface protection box and its constructing structure | |
CN207658909U (en) | A kind of construction elevator cage door |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170714 |