CN105507144A - Bridge external anti-collision guardrail and safety construction method thereof - Google Patents

Bridge external anti-collision guardrail and safety construction method thereof Download PDF

Info

Publication number
CN105507144A
CN105507144A CN201510877879.2A CN201510877879A CN105507144A CN 105507144 A CN105507144 A CN 105507144A CN 201510877879 A CN201510877879 A CN 201510877879A CN 105507144 A CN105507144 A CN 105507144A
Authority
CN
China
Prior art keywords
drill rod
sleeve pipe
cableway
cableways
guardrail
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510877879.2A
Other languages
Chinese (zh)
Inventor
李强战
王宏伟
杜瑞峰
吴桥
黄超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
THIRD ENGINEERING Co Ltd OF CCCC SECOND HIGHWAY ENGINEERING BUREAU
Original Assignee
THIRD ENGINEERING Co Ltd OF CCCC SECOND HIGHWAY ENGINEERING BUREAU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by THIRD ENGINEERING Co Ltd OF CCCC SECOND HIGHWAY ENGINEERING BUREAU filed Critical THIRD ENGINEERING Co Ltd OF CCCC SECOND HIGHWAY ENGINEERING BUREAU
Priority to CN201510877879.2A priority Critical patent/CN105507144A/en
Publication of CN105507144A publication Critical patent/CN105507144A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/10Railings; Protectors against smoke or gases, e.g. of locomotives; Maintenance travellers; Fastening of pipes or cables to bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The invention discloses a bridge external anti-collision guardrail. The bridge external anti-collision guardrail comprises protective cableways, a plurality of steel chisels and a plurality of sleeves. The sleeves are embedded into the edge of an anti-collision guardrail formwork, the bottoms of the steel chisels are inserted into the sleeves, and the protective cableways are arranged between the adjacent steel chisels. A method for carrying out construction through the bridge external anti-collision guardrail is provided. The method includes the following steps that during first-time use, a constructor enables the two cableways to penetrate through round holes in the top ends and the middles of the steel chisels, and the steel chisels are connected together in series; the steel chisels are inserted into the sleeves; the two ends of each of the two cableways are fixed to the formwork through buckles, and the cableways are straightened; when guardrail concrete is poured, the constructor wears a safety belt, buckles a hanging buckle of the safety belt on the cableways and walks front and back along the cableways, and the concrete is poured; after the guardrail concrete is poured, the buckles are taken down, the steel chisels are pulled out of the sleeves, and safety and convenience of aloft work can be guaranteed.

Description

The outer anticollision barrier of a kind of bridge and safe construction method thereof
Technical field
The present invention relates to the outer guardrail construction field of bridge, particularly the outer anticollision barrier of a kind of bridge and safe construction method thereof.
Background technology
In the outer anticollision barrier work progress of bridge, guardrail concreting is a dangerous job, belongs to work high above the ground.General anticollision barrier height is all at about 1.2 meters, and concreting, when vibrating, the template that constructor needs to stand in anticollision barrier is constructed, safety belt is put in common safety precautions, but when concrete pouring construction, constructor will move in template, very inconvenient.
Summary of the invention
Technical problem to be solved by this invention is to provide the outer anticollision barrier of a kind of bridge and safe construction method thereof, can ensure high-altitude working safety, convenient, to solve the above-mentioned multinomial defect caused in prior art.
For achieving the above object, the invention provides following technical scheme: the outer anticollision barrier of a kind of bridge, comprise protection cableway, drill rod and sleeve pipe, described sleeve pipe is provided with multiple, it is embedded in the edge of crash barrier template, drill rod is provided with multiple, inserts in sleeve pipe bottom it, and protection cableway is arranged between adjacent drill rod.
Preferably, described protection cableway arranges twice altogether, is made up of two hawsers.
Preferably, the two ends of described hawser arrange buckle, and the sidewall of described drill rod is provided with multiple circular hole, and buckle is stuck in circular hole.
Preferably, the bottom of described drill rod is exceeding position reinforcement welding kelly of sleeve pipe.
Use the outer anticollision barrier of bridge to carry out a method of constructing, comprise the following steps:
1), when using first, constructor is each passed through the circular hole at drill rod top and middle part with two cableways, is cascaded by drill rod;
2) before guardrail concreting, according to the position of sleeve pipe, drill rod is inserted in sleeve pipe, ensures that the height that drill rod exceeds template is 1.2m;
3) the two ends buckle of two cableways is fixed in template, and makes cableway exceptionally straight;
4) when building guardrail concrete, constructor has worn safety belt, and is buckled on cableway by buckling of safety belt, and constructor walks before and after cableway, concreting;
5) after guardrail concreting completes, take off buckle, drill rod is extracted in sleeve pipe, the drill rod being installed with cableway is deposited, when using next time, directly drill rod can be inserted in sleeve pipe and continue to use.
The beneficial effect of above technical scheme is adopted to be: the outer guardrail construction safety protection of bridge of the present invention, make constructor when ensureing safety, can move along cableway, make the construction of bridge outer guardrail very convenient, do not need, by buckling unloading back and forth, hang up on safety belt, in the outer guardrail high-altitude working safety of guarantee bridge, to provide a kind of well method.
Accompanying drawing explanation
Fig. 1 is structural representation of the present invention;
Fig. 2 is the view that it uses.
Wherein, 1--crash barrier template, 2--hawser, 3--drill rod, 4--sleeve pipe, 5--buckle, 6--circular hole, 7--safety belt, 8--safety belt buckle.
Detailed description of the invention
The preferred embodiment of the present invention is described in detail below in conjunction with accompanying drawing.
Fig. 1 shows the specific embodiment of the present invention: the outer anticollision barrier of a kind of bridge, comprise protection cableway, drill rod 3 and sleeve pipe 4, described sleeve pipe 4 is provided with multiple, it is embedded in the edge of crash barrier template 1, drill rod 3 is provided with multiple, insert in sleeve pipe 4 bottom it, protection cableway is arranged between adjacent drill rod 3.
Protection cableway arranges twice altogether, is made up of two hawsers 2; The two ends of hawser 2 arrange buckle 5, and the sidewall of described drill rod 3 is provided with multiple circular hole 6, and buckle 5 is stuck in circular hole 6; The bottom of drill rod 3 is exceeding position reinforcement welding kelly of sleeve pipe 4.
The cableway used in guard cable adopts the chemical fibre hawser 2 that diameter is 8mm, has the advantages that intensity is high, wear-resisting; Drill rod 3 round steel that diameter is 20mm is made, and round steel is cut into the rod member that length is 1.4m.In one end of rod member, the position of distance termination 20cm, in the vertical direction of rod member, the reinforcing bar of a welding long 5cm.In the other end of rod member and the position of distance termination 60cm, each welding internal diameter is the annulus of 14mm; The internal diameter of sleeve pipe 4 is 22mm, is highly 20cm, is welded on the outside of guardrail template, and the top mouth of sleeve pipe 4 is equal with template; The position needing welding used, requires firm welding.
Use the outer anticollision barrier of bridge to carry out a method of constructing, comprise the following steps:
1), when using first, constructor is each passed through the circular hole 6 at drill rod 3 top and middle part with two cableways, is cascaded by drill rod 3;
2) before guardrail concreting, according to the position of sleeve pipe 4, be inserted into by drill rod 3 in sleeve pipe 4, the height that guarantee drill rod 3 exceeds template is 1.2m;
3) the two ends buckle 5 of two cableways is fixed in template, and makes cableway exceptionally straight;
4) when building guardrail concrete, constructor has worn safety belt 7, and safety belt is buckled 8 on cableway, and constructor walks before and after cableway, concreting;
5) after guardrail concreting completes, take off buckle 5, drill rod 3 is extracted in sleeve pipe 4, the drill rod 3 being installed with cableway is deposited, when using next time, directly drill rod 3 can be inserted in sleeve pipe 4 and continue to use.
The outer guardrail construction safety protection of bridge of the present invention, make constructor when ensureing safety, can move along cableway, make the construction of bridge outer guardrail very convenient, do not need, by buckling unloading back and forth, hang up on safety belt, in the outer guardrail high-altitude working safety of guarantee bridge, to provide a kind of well method.
Above-described is only the preferred embodiment of the present invention, it should be pointed out that for the person of ordinary skill of the art, and without departing from the concept of the premise of the invention, can also make some distortion and improvement, these all belong to protection scope of the present invention.

Claims (5)

1. the outer anticollision barrier of bridge, is characterized in that, comprises protection cableway, drill rod and sleeve pipe, described sleeve pipe is provided with multiple, and it is embedded in the edge of crash barrier template, and drill rod is provided with multiple, insert bottom it in sleeve pipe, protection cableway is arranged between adjacent drill rod.
2. the outer anticollision barrier of bridge according to claim 1, it is characterized in that, described protection cableway arranges twice altogether, is made up of two hawsers.
3. the outer anticollision barrier of bridge according to claim 1, it is characterized in that, the two ends of described hawser arrange buckle, and the sidewall of described drill rod is provided with multiple circular hole, and buckle is stuck in circular hole.
4. the outer anticollision barrier of bridge according to claim 1, it is characterized in that, the bottom of described drill rod is exceeding position reinforcement welding kelly of sleeve pipe.
5. use the outer anticollision barrier of the bridge described in claim 1 to 4 any one to carry out a method of constructing, it is characterized in that, comprise the following steps:
1), when using first, constructor is each passed through the circular hole at drill rod top and middle part with two cableways, is cascaded by drill rod;
2) before guardrail concreting, according to the position of sleeve pipe, drill rod is inserted in sleeve pipe, ensures that the height that drill rod exceeds template is 1.2m;
3) the two ends buckle of two cableways is fixed in template, and makes cableway exceptionally straight;
4) when building guardrail concrete, constructor has worn safety belt, and is buckled on cableway by buckling of safety belt, and constructor walks before and after cableway, concreting;
5) after guardrail concreting completes, take off buckle, drill rod is extracted in sleeve pipe, the drill rod being installed with cableway is deposited, when using next time, directly drill rod can be inserted in sleeve pipe and continue to use.
CN201510877879.2A 2015-12-04 2015-12-04 Bridge external anti-collision guardrail and safety construction method thereof Pending CN105507144A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510877879.2A CN105507144A (en) 2015-12-04 2015-12-04 Bridge external anti-collision guardrail and safety construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510877879.2A CN105507144A (en) 2015-12-04 2015-12-04 Bridge external anti-collision guardrail and safety construction method thereof

Publications (1)

Publication Number Publication Date
CN105507144A true CN105507144A (en) 2016-04-20

Family

ID=55715423

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510877879.2A Pending CN105507144A (en) 2015-12-04 2015-12-04 Bridge external anti-collision guardrail and safety construction method thereof

Country Status (1)

Country Link
CN (1) CN105507144A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106836798A (en) * 2017-01-23 2017-06-13 中建四局第三建筑工程有限公司 A kind of Xin Jiamo construction methods and guard bar structure
CN108374337A (en) * 2018-05-16 2018-08-07 中交路桥北方工程有限公司 A kind of bridge deck concrete anticollision barrier construction safety ensuring equipment
CN113481872A (en) * 2021-08-16 2021-10-08 陕西路桥集团有限公司 Structure and construction method for safety guardrail on bent cap
CN115387220A (en) * 2022-08-05 2022-11-25 中国十七冶集团有限公司 Concrete pouring construction method for edge anti-collision guardrail
CN118257203A (en) * 2024-05-30 2024-06-28 贵州省公路工程集团有限公司 Bridge anti-collision guardrail template and safety rope passing detection equipment and detection method

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101255764A (en) * 2008-04-11 2008-09-03 江苏省华建建设股份有限公司 High altitude placing steel pole inner concrete operating platform frame
CN201125565Y (en) * 2007-08-14 2008-10-01 浙江大东吴集团建设有限公司 Guardrail
CN202023167U (en) * 2011-01-24 2011-11-02 北京道从交通科技有限公司 Improved movable anti-collision steel pipe cable barrier
CN203346832U (en) * 2013-07-11 2013-12-18 深圳市正道公路工程有限公司 Movable guardrail capable of being rapidly assembled and disassembled
CN203361676U (en) * 2013-07-30 2013-12-25 黄读礼 Temporary protective guard for building construction
CN103669889A (en) * 2012-08-31 2014-03-26 五冶集团上海有限公司 High-altitude safety fence for steel structure assembling and manufacturing method of high-altitude safety fence
JP2014145219A (en) * 2013-01-30 2014-08-14 Sekisui Jushi Co Ltd Movable type guard fence and guard fence using the same
CN204151690U (en) * 2014-10-11 2015-02-11 江苏省交通工程集团有限公司 Bridge guardrail builds safety device

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201125565Y (en) * 2007-08-14 2008-10-01 浙江大东吴集团建设有限公司 Guardrail
CN101255764A (en) * 2008-04-11 2008-09-03 江苏省华建建设股份有限公司 High altitude placing steel pole inner concrete operating platform frame
CN202023167U (en) * 2011-01-24 2011-11-02 北京道从交通科技有限公司 Improved movable anti-collision steel pipe cable barrier
CN103669889A (en) * 2012-08-31 2014-03-26 五冶集团上海有限公司 High-altitude safety fence for steel structure assembling and manufacturing method of high-altitude safety fence
JP2014145219A (en) * 2013-01-30 2014-08-14 Sekisui Jushi Co Ltd Movable type guard fence and guard fence using the same
CN203346832U (en) * 2013-07-11 2013-12-18 深圳市正道公路工程有限公司 Movable guardrail capable of being rapidly assembled and disassembled
CN203361676U (en) * 2013-07-30 2013-12-25 黄读礼 Temporary protective guard for building construction
CN204151690U (en) * 2014-10-11 2015-02-11 江苏省交通工程集团有限公司 Bridge guardrail builds safety device

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106836798A (en) * 2017-01-23 2017-06-13 中建四局第三建筑工程有限公司 A kind of Xin Jiamo construction methods and guard bar structure
CN108374337A (en) * 2018-05-16 2018-08-07 中交路桥北方工程有限公司 A kind of bridge deck concrete anticollision barrier construction safety ensuring equipment
CN113481872A (en) * 2021-08-16 2021-10-08 陕西路桥集团有限公司 Structure and construction method for safety guardrail on bent cap
CN115387220A (en) * 2022-08-05 2022-11-25 中国十七冶集团有限公司 Concrete pouring construction method for edge anti-collision guardrail
CN118257203A (en) * 2024-05-30 2024-06-28 贵州省公路工程集团有限公司 Bridge anti-collision guardrail template and safety rope passing detection equipment and detection method
CN118257203B (en) * 2024-05-30 2024-08-02 贵州省公路工程集团有限公司 Bridge anti-collision guardrail template and safety rope passing detection equipment and detection method

Similar Documents

Publication Publication Date Title
CN105507144A (en) Bridge external anti-collision guardrail and safety construction method thereof
CN204151690U (en) Bridge guardrail builds safety device
CN102140800B (en) Quick, safe and environment-friendly method for constructing non-excavated anti-slide pile
CN104234716B (en) The packed cofferdam method of mining by the way of filling
CN104047620A (en) Underground tunnel large dynamic water plugging method
CN203270578U (en) Underground pile foundation pulling device with steel wire rope sleeve clamp
CN106337687B (en) Mine slant chute portable sectional supporting method
CN103742159A (en) Construction method for large soluble-collapse type karst cave with tunnels passing through
CN206052712U (en) A kind of Novel drilling pile head is pre-buried to exempt from the overall quick lift of ring cutting that drills
CN209260722U (en) A kind of foundation pit concrete breast beam fast dismounting device
CN206902554U (en) A kind of Collison fence for bridge safety device
CN204850515U (en) Steel construction faces limit protector
CN106638573B (en) Ke Xunhuanliyong steel reinforcement cage suspends installation method in midair
CN213061713U (en) Bridge concrete anticollision barrier pours safety device
CN203203486U (en) Blockage removal device for effectively removing ore-pass blockage
CN204947485U (en) A kind of auxiliary tunnel inner cable walks the device of lining trolley
CN204418173U (en) Anchor cable docks with anchor point to buckle to be hung or rock anchor anchorage structures that anchor point can reuse
CN203213631U (en) Protective handrail close to edge
CN203769702U (en) Novel orifice protection device
CN104384404B (en) A kind of steel reinforcement cage spreading construction method and interim fixing hook
CN205742030U (en) A kind of flexible guardrail ribbing device
CN203296719U (en) Operation hoisting equipment hand-squeezing prevention device
CN202090936U (en) Device for quickly loading resin capsules
CN205820529U (en) A kind of non-bending steel cable steel wire separator
CN206468014U (en) A kind of concreting workbench

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20160420