CN206015889U - A kind of Overlong Concrete Structure for avoiding crack and seepage - Google Patents

A kind of Overlong Concrete Structure for avoiding crack and seepage Download PDF

Info

Publication number
CN206015889U
CN206015889U CN201620936642.7U CN201620936642U CN206015889U CN 206015889 U CN206015889 U CN 206015889U CN 201620936642 U CN201620936642 U CN 201620936642U CN 206015889 U CN206015889 U CN 206015889U
Authority
CN
China
Prior art keywords
raft
raft plate
concrete
seepage
layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620936642.7U
Other languages
Chinese (zh)
Inventor
王珂
张甡
王法胜
万年泉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongqi Jiaojian Group Corp Ltd
Original Assignee
Zhongqi Jiaojian Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhongqi Jiaojian Group Corp Ltd filed Critical Zhongqi Jiaojian Group Corp Ltd
Priority to CN201620936642.7U priority Critical patent/CN206015889U/en
Application granted granted Critical
Publication of CN206015889U publication Critical patent/CN206015889U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The utility model discloses a kind of Overlong Concrete Structure for avoiding crack and seepage, including Vertical Pile, cushion cap, support column, soil matrix layer, raft plate bed course, waterproof construction layer, fish tail and waterproof layer, brick wall, coating, raft plate bar construction, raft board concrete, the cushion cap bottom surface is fixed with multiple Vertical Piles, top surface is fixed with support column, constitute pile foundation, it is fixed in soil matrix layer the pile foundation bottom, raft plate bed course is equipped with above the earth foundation, the brick wall for having a closure is built above the raft plate bed course, compared with prior art, the beneficial effects of the utility model are:This kind of a kind of Overlong Concrete Structure for avoiding crack and seepage, it is adaptable to Overlong Concrete Structure basement engineering, various civil air defense constructions and installations, waterworks, sewage treatment plant, power plant etc.;The technical barrier for not setting the crack and seepage of seam super long underground structure is efficiently solved, good economic benefit and social benefit can be achieved.

Description

A kind of Overlong Concrete Structure for avoiding crack and seepage
Technical field
The utility model is related to a kind of xoncrete structure, specially a kind of ultra-long concrete knot for avoiding crack and seepage Structure.
Background technology
Super large ultra-long concrete has the features such as scale of construction is big, structure stress is complicated, Local Loads are big, concrete strength is high, Crack is produced easily, the appearance of effective control xoncrete structure harmful cracks, need to be protected from design, selection, construction technology, finished product From the aspect of shield etc., using Comprehensive Crack-Resistance technology.The crack of armored concrete underground structure and seepage, become puzzlement reinforced concrete The significant problem of soil structure quality, particularly evident particularly with overlength underground reinforced concrete structure, Over-length Basement Structure is not Expansion joint how anti-crack and anti-seepage is set, is to put a good problem to study in face of the engineers and technicians.
Existing a kind of xoncrete structure is provided, can effectively solve the problem that the crack and seepage for not setting seam super long underground structure Technical barrier, reach good economic benefit and social benefit.
Utility model content
The purpose of this utility model is to provide a kind of Overlong Concrete Structure for avoiding crack and seepage, with solution State the problem proposed in background technology.
For achieving the above object, the utility model provides following technical scheme:A kind of overlength for avoiding crack and seepage Xoncrete structure, including Vertical Pile, cushion cap, support column, soil matrix layer, raft plate bed course, waterproof construction layer, fish tail and waterproof layer, brick wall, Coating, raft plate bar construction, raft board concrete, the cushion cap bottom surface are fixed with multiple Vertical Piles, and top surface is fixed with and props up Dagger, constitutes pile foundation, and the pile foundation bottom is fixed in soil matrix layer, is equipped with raft plate bed course, institute above the soil matrix layer State and above raft plate bed course, build the brick wall for having a closure, waterproof construction layer is sequentially provided with above the raft plate bed course in the brick wall and is prevented Water conservation layer, is provided with raft plate bar construction, the raft plate bar construction and the upper pilework above the fish tail and waterproof layer Support column is fixed, and fills raft board concrete in raft plate bar construction until flooding raft plate bar construction, the raft plate coagulation Native top is provided with coating.
Further, described coating is plastic sheeting, wet gunnysack or polyphenylene heat insulation slab.
Compared with prior art, the beneficial effects of the utility model are:A kind of this kind of overlength for avoiding crack and seepage Xoncrete structure, it is adaptable to Overlong Concrete Structure basement engineering, such as various water-proof concrete engineerings, basement, underground bin The concrete structures such as storehouse, city underground, tunnel;Various civil air defense constructions and installations, waterworks, sewage treatment plant, power plant etc.;Effectively The technical barrier for not setting the crack and seepage of seam super long underground structure is solved, good economic benefit and society's effect can be achieved Benefit.
Description of the drawings
Fig. 1 is the utility model overall structure figure;
In figure:1st, Vertical Pile, 2, cushion cap, 3, support column, 4, soil matrix layer, 5, raft plate bed course, 6, waterproof construction layer, 7, waterproof Protective layer, 8, brick wall, 9, coating, 10, raft plate bar construction, 11, raft board concrete.
Specific embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the utility model embodiment is carried out Clearly and completely describe, it is clear that described embodiment is only a part of embodiment of the utility model, rather than whole Embodiment.Embodiment in based on the utility model, those of ordinary skill in the art are not under the premise of creative work is made The every other embodiment for being obtained, belongs to the scope of the utility model protection.
Fig. 1 is referred to, the utility model provides a kind of technical scheme:A kind of ultra-long concrete for avoiding crack and seepage Structure, including Vertical Pile 1, cushion cap 2, support column 3, soil matrix layer 4, raft plate bed course 5, waterproof construction layer 6, fish tail and waterproof layer 7, brick wall 8th, coating 9, raft plate bar construction 10, raft board concrete 11,2 bottom surface of the cushion cap are fixed with multiple Vertical Piles 1, and top surface is solid Surely support column 3 is provided with, pile foundation is constituted, the pile foundation bottom is fixed in soil matrix layer 4, is equipped with above the soil matrix layer 4 Raft plate bed course 5, builds the brick wall 8 for having a closure, is set above the raft plate bed course 5 in the brick wall 8 successively above the raft plate bed course 5 There are waterproof construction layer 6 and fish tail and waterproof layer 7, above the fish tail and waterproof layer 7, be provided with raft plate bar construction 10, the raft slab muscle The support column 3 of structure 10 and the upper pilework is fixed, and fills raft board concrete 11 in raft plate bar construction 10 until by raft Plate bar construction 10 floods, and is provided with coating 9 above the raft board concrete 11;Described raft board concrete 11 by cement, sand, Stone, pumping admixture, flyash and polymer swelling fiber (SY-K) composition, the cement are the relatively low silicate cement of the heat of hydration Mud;On the basis of commerical ready-mixed concrete adding coal ash, pumping admixture, SY-K type polymer swelling fibers are filled.Polymer fiber Antimitotic agent is penetrated in concrete, as the good bonding of high molecular polymer and cohesive force uniformly can be mixed with concrete base-material Close, the density workability of Concrete Structure;Nearly 20 filametntary additions in cement mortar per cubic centimeter, in concrete sand Slurry is internally formed a kind of uniform unrest to support system, produces two grades of stiffening effects, contribute to slackening Plastic Shrinkage of Concrete and Stress during freeze thawing;Simultaneously countless filaments is formed disorderly to bracketing system in inside concrete, can effectively hinder aggregate Isolation, it is ensured that the water-retaining property of concrete early stage, so as to resist the formation of sedimentation crackle, mixes polymer fine compared with normal concrete Dimension anti-crack water-proof agent can effectively improve the anti-crack ability of concrete, while polymer swelling fiber anti-crack water-proof agent can strengthen The water proof anti-seepage ability of concrete, mixes a large amount of microfibres and can effectively suppress concrete early stage drying shrinkage fine fisssure in concrete And the generation and development of isolation crackle, particularly effectively suppress the generation of interconnected fracture, be evenly distributed in concrete phase each other A large amount of fibers of adhesion have played " support " aggregate, the bleed for reducing concrete surface and the isolation for gathering materials, so that In concrete, the voids content of a diameter of 50-100 nanometers is substantially reduced, and can be greatly enhanced impermeability;Described covering Layer 9 is plastic sheeting, wet gunnysack or polyphenylene heat insulation slab;While underplate concrete:Mix-design it is important that reduce the heat of hydration, For reducing the impacts of the shrinkage factor to distress in concrete such as hydration heat of concrete, refer to compression strength and durability on coagulation is met In the case of target, in folk prescription concrete, the consumption of the consumption of cement and Binder Materials should reduce as far as possible, as much as possible reduce water Mud consumption.SY-K swelling fiber anti-crack water-proof agents volume for (concrete and coal ash+breeze) total amount 8%.Hot weather construction concrete Presetting period substantially can shift to an earlier date, control concrete coagulating time, to concrete hydrating thermal control, the cold seam control of work progress System is all favourable, also can control the early strength development of concrete.Under normal temperature, the non-bulky concrete initial set time answers 12 little When more than;High temperature season (more than 28 DEG C of temperature) construct when and more than C5O concrete, answer more than 16 hours;Winter construction When, should not be early than 10 hours;When mass concrete should be condensed according to the situation of the actual concrete of temperature situation and scene Between adjustment.Concrete final setting time should not surpass 24 hours.In order to reduce the contraction of concrete, while improving impervious, control Water-cement ratio is particularly significant, should be by guaranteeing that from high-quality and efficient water reducer and control water-cement ratio the intensity of concrete meets design Require.
Although being described in detail to the utility model with reference to the foregoing embodiments, for those skilled in the art comes Say, which still can be modified to the technical scheme described in foregoing embodiments, or which part technical characteristic is entered Row equivalent, all within spirit of the present utility model and principle, any modification, equivalent substitution and improvements that is made etc. all should It is included within protection domain of the present utility model.

Claims (2)

1. a kind of Overlong Concrete Structure for avoiding crack and seepage, including Vertical Pile (1), cushion cap (2), support column (3), soil Basic unit (4), raft plate bed course (5), waterproof construction layer (6), fish tail and waterproof layer (7), brick wall (8), coating (9), raft slab muscle knot Structure (10), raft board concrete (11), it is characterised in that:Cushion cap (2) bottom surface is fixed with multiple Vertical Piles (1), and top surface is solid Surely support column (3) is provided with, pile foundation is constituted, the pile foundation bottom is fixed in soil matrix layer (4), above soil matrix layer (4) Raft plate bed course (5) is equipped with, the brick wall (8) for having a closure, the raft plate in brick wall (8) above raft plate bed course (5), is built Waterproof construction layer (6) and fish tail and waterproof layer (7) is sequentially provided with above bed course (5), is provided with raft plate above fish tail and waterproof layer (7) Bar construction (10), raft plate bar construction (10) are fixed with the support column (3) of the upper pilework, and raft plate bar construction (10) raft board concrete (11) is filled in until flooding raft plate bar construction (10), is provided with above raft board concrete (11) Coating (9).
2. a kind of Overlong Concrete Structure for avoiding crack and seepage according to claim 1, it is characterised in that:Described Coating (9) be plastic sheeting, wet gunnysack or polyphenylene heat insulation slab.
CN201620936642.7U 2016-08-25 2016-08-25 A kind of Overlong Concrete Structure for avoiding crack and seepage Expired - Fee Related CN206015889U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620936642.7U CN206015889U (en) 2016-08-25 2016-08-25 A kind of Overlong Concrete Structure for avoiding crack and seepage

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620936642.7U CN206015889U (en) 2016-08-25 2016-08-25 A kind of Overlong Concrete Structure for avoiding crack and seepage

Publications (1)

Publication Number Publication Date
CN206015889U true CN206015889U (en) 2017-03-15

Family

ID=58252616

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620936642.7U Expired - Fee Related CN206015889U (en) 2016-08-25 2016-08-25 A kind of Overlong Concrete Structure for avoiding crack and seepage

Country Status (1)

Country Link
CN (1) CN206015889U (en)

Similar Documents

Publication Publication Date Title
CN104402339B (en) The constructional method of pervious concrete
CN103643656B (en) High rock-fill dam membrane anti-seepage body on deep coverage layer and construction method of high rock-fill dam membrane anti-seepage body
CN109574585A (en) A kind of water-tight concrete and its construction method
CN100415079C (en) Vegetation ecological concrete precast block and preparation method thereof
CN101239810B (en) Garbage sanitary filling field covering material
CN102776897B (en) Wash apron anti-settling anti-cracking construction method and structure
CN105862889B (en) A kind of soil-slope bank protecting method
CN105298133A (en) Construction method to strengthen crack resistance of large-volume concrete baseplate
CN103290810A (en) Multifunctional composite carpet and ditch construction technology thereof
CN102029645A (en) Method for maintaining high-performance concrete under severe environment
CN106245864A (en) A kind of building roof permanent waterproof layer
CN102745961B (en) Mine mullock pervious concrete and preparation method thereof
CN103835523A (en) Ultra-long extra-large reinforced concrete structure engineering crack prevention process
CN108675711A (en) Ready-mixed concrete construction method under high and cold alternate freezing and thawing environment
CN106087880B (en) A kind of dam that 300 meter level is high and its construction technology
CN105174797A (en) Liquid permeation crystalline waterproof agent
CN107746286A (en) High permeability rate ceramic water-permeable brick and preparation method thereof
CN207017545U (en) Foam concrete heat-preserving roofing optimizes architectural construction and local structure
CN105274966B (en) A kind of cavernous body ecological revetment and its building method
CN206015889U (en) A kind of Overlong Concrete Structure for avoiding crack and seepage
CN101509246B (en) Anti-seepage antifreezing spray finishing method of polyurethane polymeric material for channel
CN108166455A (en) A kind of construction method and structure of High-cold regions excavation channel anti-freeze expansion
CN112812780B (en) Hydrophobic anti-scouring loess curing agent
CN205046589U (en) Waterproof structure of basement
CN107555929A (en) A kind of environmental high intensity water-permeable brick and preparation method thereof

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170315

Termination date: 20170825