CN205976550U - Cluster hangs instrument of girder steel - Google Patents

Cluster hangs instrument of girder steel Download PDF

Info

Publication number
CN205976550U
CN205976550U CN201620794505.4U CN201620794505U CN205976550U CN 205976550 U CN205976550 U CN 205976550U CN 201620794505 U CN201620794505 U CN 201620794505U CN 205976550 U CN205976550 U CN 205976550U
Authority
CN
China
Prior art keywords
girder steel
hangs
string
instrument
gimbal lever
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620794505.4U
Other languages
Chinese (zh)
Inventor
石文井
于建伟
邢亮
薛瑞
肖兆正
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Co Ltd
Original Assignee
China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Co Ltd filed Critical China Construction Eighth Engineering Division Co Ltd
Priority to CN201620794505.4U priority Critical patent/CN205976550U/en
Application granted granted Critical
Publication of CN205976550U publication Critical patent/CN205976550U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to a cluster hangs instrument of girder steel, include: the balancing pole, the structure of balancing pole is lifted by crane in the confession, lifts by crane the top that the balancing pole was located to the structure, the cluster that supplies the cluster to hang the girder steel hangs the structure, and the cluster hangs the bottom that the balancing pole was located to the structure, and set firmly in the bearing structure of the bottom of balancing pole. The utility model discloses cluster hangs instrument of girder steel establishes through the top at the balancing pole and lifts by crane the structure, establishes with the rope hook and to lift by crane the structure to be connected with the couple of tower crane, thereby can lift by crane the balancing pole, establish the cluster in the bottom of balancing pole and hang the structure, hang a plurality of girder steel clusters through the rope and hang under the structure at the cluster, hoist the operation together to can very big degree improve work efficiency, reduction of erection time, reduce construction cost. Unload when not using behind the hook, usable bearing structure directly places in ground, conveniently stacks.

Description

String hangs the instrument of girder steel
Technical field
This utility model is related to the realm of building construction, and espespecially a kind of string hangs the instrument of girder steel.
Background technology
The realm of building construction, construction of super highrise building usually need lifted girder steel, transport in high level and apply Work.But in existing way, the girder steel string in once lifting hangs quantity and is only 3, balance bar body itself is heavier in addition, increases The lifting time, thus the lifting number of times of steel girder erection is more, construction cost is led to increase, the duration is longer.When not needing to carry out During the construction operation of girder steel, the gimbal lever is taken off and places, but gimbal lever bottom is not provided with any knot being available for and supporting Structure, the stacking after hook unloads in the gimbal lever is extremely inconvenient.
Utility model content
The purpose of this utility model is to overcome the defect of prior art, provides a kind of string to hang the instrument of girder steel, solves existing There is the less efficient problem of hoisting steel beam in technology.
The technical scheme realizing above-mentioned purpose is:String is provided to hang the instrument of girder steel, including:
The gimbal lever;
For lifting by crane the hoisting structure of the described gimbal lever, described hoisting structure is located at the top of the described gimbal lever;
The string hanging girder steel for string hangs structure, and described string hangs the bottom located at the described gimbal lever for the structure;And
It is fixedly arranged on the supporting construction of the bottom of the described gimbal lever.
This utility model string hangs the beneficial effect of the instrument of girder steel:
The instrument that this utility model string hangs girder steel sets hoisting structure by the top in the gimbal lever, sets this lifting with rope hook Structure, and be connected with the hook of tower crane, so as to lift by crane the gimbal lever;Set string in the bottom of the gimbal lever and hang structure, will by rope Multiple girder steel strings are hung in string and hang under structure, carry out lifting operation together, improve work efficiency, shorten work so as to high degree Phase, reduce construction cost.When not using after unloading hook, available supporting construction is placed directly in ground, convenient stacking.
This utility model string hangs further improvement is that of the instrument of girder steel, and the described gimbal lever is I-shaped structure, described work The web of word structure is installed with multiple stiffeners.
This utility model string hangs further improvement is that of the instrument of girder steel, and described hoisting structure is be provided with perforate a pair First hanger, described first hanger is fixedly arranged on the two ends at described gimbal lever top.
This utility model string hangs further improvement is that of the instrument of girder steel, and described string hangs structure and includes:
It is provided with a pair second hangers of perforate, described second hanger is located at the two ends of described gimbal lever bottom;And
The snap ring wearing for rope, described snap ring is fixedly connected with described second hanger.
This utility model string hangs further improvement is that of the instrument of girder steel, and described snap ring is U-shaped ring, is worn by bolt Being fixedly connected of described U-shaped ring and described second hanger is realized in described U-shaped ring and the perforate of described second hanger.
This utility model string hangs further improvement is that of the instrument of girder steel, and described supporting construction is A type bracing frame, described A type bracing frame includes the support bar of a pair of angled setting and the connecting rod being connected between the pair of support bar.
Brief description
Fig. 1 hangs the front view of the instrument of girder steel for this utility model string.
Fig. 2 hangs the side view of the instrument of girder steel for this utility model string.
Fig. 3 hangs the use schematic diagram of the instrument of girder steel for this utility model string.
Fig. 4 is the enlarged diagram of the A in Fig. 3.
Specific embodiment
The utility model is described in further detail with specific embodiment below in conjunction with the accompanying drawings.
Refering to Fig. 1 it is shown that this utility model string hangs the front view of the instrument of girder steel.Refering to Fig. 2 it is shown that this practicality is new Type string hangs the side view of the instrument of girder steel.In conjunction with shown in Fig. 1 and Fig. 2, the instrument that this utility model string hangs girder steel includes:The gimbal lever 1st, hoisting structure 2, string hang structure 3 and supporting construction 4, and wherein the gimbal lever 1 is as main force structure.Hoisting structure 2 sets In the top of the gimbal lever, it is used for the gimbal lever 1 of slinging, string hangs the bottom located at the gimbal lever 1 for the structure 3, and supporting construction 4 is located at balance The bottom of bar 1, when the gimbal lever 1 does not use, directly passes through supporting construction 4 located at ground.This utility model string hangs steel The instrument of beam sets hoisting structure by the top in the gimbal lever, sets this hoisting structure with rope hook, and is connected with the hook of tower crane, So as to the gimbal lever of slinging;Set string in the bottom of the gimbal lever and hang structure, multiple girder steel strings are hung in by string by rope and hang in structure, Carry out lifting operation together, improve work efficiency, reduction of erection time so as to high degree, reduce construction cost.Do not make after unloading hook Used time, available supporting construction is placed directly in ground, convenient stacking.
Refering to Fig. 3 it is shown that this utility model string hangs the use schematic diagram of the instrument of girder steel.In conjunction with Fig. 1, Fig. 2 and Fig. 3 institute Show, the gimbal lever 1 is I-steel, I-steel includes two blocks of flange plates and the web being connected between this two blocks of flange plates, I-steel Web at be provided with multiple stiffeners 10, improve the structural strength of I-steel by stiffener 10, and with two blocks of steel plates 11 by work Word steel is closed so that the bearing capacity of whole I-steel increases it is not easy to fracture is it is ensured that safety.
Hoisting structure 2 is a pair first hangers, and the first hanger is provided with and wears fixing perforate, the first hanger weldering for rope Connect the two ends being fixed on the gimbal lever 1 top.In conjunction with shown in Fig. 3, rise to the bait in the hook 5 of tower crane and set rope 50, rope 50 is worn respectively If the first hanger fixation, thus the gimbal lever 1 is hung under hook 5, increased the area of the attachment of lifting girder steel, increase Add the number of disposable lifting girder steel.
Refering to Fig. 4 it is shown that the enlarged diagram of A in Fig. 3.In conjunction with shown in Fig. 1, Fig. 2, Fig. 3 and Fig. 4, string hangs structure 3 Including:A pair second hangers 30 and a pair of snap ring 31, the wherein second hanger 30 is provided with perforate, and the second hanger 30 is located at the gimbal lever 1 The two ends of bottom, snap ring 31 wears and is fixed on the second hanger 30, and snap ring 31 is used for wearing for rope, and multiple girder steel strings are hung by rope Get up, thus multiple girder steel is connected to string and hangs under structure 3, and followed by the gimbal lever 1 and rise lifting together with the hook 5 of tower crane.
In the present embodiment, snap ring is the U-shaped ring being provided with through hole, wears opening of U-shaped ring and the second hanger 30 by bolt Being fixedly connected of U-shaped ring and the second hanger 30 is realized in hole.Rope 6 is worn on U-shaped ring, girder steel binding is fixed up by rope 6, from And by the second hanger 30 and snap ring 31, girder steel string is hung in below the gimbal lever 1, followed by the gimbal lever 1 and lift by crane together.
Put well for convenience of the instrument heap when not in use this utility model string being hung girder steel, in the setting of the bottom of the gimbal lever 1 Supporting construction 4, the instrument that this utility model string hangs girder steel directly passes through supporting construction 4 located at ground.In the present embodiment In, supporting construction 4 is a pair of A type bracing frame, and A type bracing frame includes the support bar 40 of a pair of angled setting and is connected to a pair Connecting rod 41 between strut.
The construction method that below this utility model string is hung with the instrument of girder steel explains:
Hang the instrument of girder steel according to construction requirement this utility model string that completes.In conjunction with shown in Fig. 3, with rope by one Individual girder steel string is hung in together, and the rope of the girder steel of the top is worn in U-shaped ring, is bolted on the second hanger. The two ends of adjustment girder steel make girder steel evenly hang under the gimbal lever.
Wear the first hanger above the gimbal lever with rope, the first hanger is connected with the hook of tower crane, thus utilizing tower Hang and hoisting construction is carried out to girder steel.
After the completion of construction, rope is taken off so that the instrument that this utility model string hangs girder steel directly passes through supporting construction It is positioned on ground.
This utility model string hangs having the beneficial effect that of the instrument of girder steel:
The instrument that this utility model string hangs girder steel sets hoisting structure by the top in the gimbal lever, sets this lifting with rope hook Structure, and be connected with the hook of tower crane, so as to lift by crane the gimbal lever;Set string in the bottom of the gimbal lever and hang structure, will by rope Multiple girder steel strings are hung in string and hang under structure, carry out lifting operation together, improve work efficiency, shorten work so as to high degree Phase, reduce construction cost.When not using after unloading hook, available supporting construction is placed directly in ground, convenient stacking.
Above in association with accompanying drawing embodiment, this utility model is described in detail, those skilled in the art can root According to described above, this utility model is made with many variations example.Thus, some details in embodiment should not be constituted to this practicality New restriction, this utility model is by the scope being defined using appended claims as protection domain of the present utility model.

Claims (6)

1. a kind of string hangs the instrument of girder steel it is characterised in that including:
The gimbal lever;
For lifting by crane the hoisting structure of the described gimbal lever, described hoisting structure is located at the top of the described gimbal lever;
The string hanging girder steel for string hangs structure, and described string hangs the bottom located at the described gimbal lever for the structure;And
It is fixedly arranged on the supporting construction of the bottom of the described gimbal lever.
2. string as claimed in claim 1 hangs the instrument of girder steel it is characterised in that the described gimbal lever is I-shaped structure, described work The web of word structure is installed with multiple stiffeners.
3. string as claimed in claim 1 hangs the instrument of girder steel it is characterised in that described hoisting structure is be provided with perforate a pair First hanger, described first hanger is fixedly arranged on the two ends at described gimbal lever top.
4. string as claimed in claim 1 hangs the instrument of girder steel it is characterised in that described string hangs structure includes:
It is provided with a pair second hangers of perforate, described second hanger is located at the two ends of described gimbal lever bottom;And
The snap ring wearing for rope, described snap ring is fixedly connected with described second hanger.
5. string as claimed in claim 4 hangs the instrument of girder steel it is characterised in that described snap ring is U-shaped ring, is worn by bolt Being fixedly connected of described U-shaped ring and described second hanger is realized in described U-shaped ring and the perforate of described second hanger.
6. string as claimed in claim 1 hangs the instrument of girder steel it is characterised in that described supporting construction is A type bracing frame, described A type bracing frame includes the support bar of a pair of angled setting and the connecting rod being connected between the pair of support bar.
CN201620794505.4U 2016-07-27 2016-07-27 Cluster hangs instrument of girder steel Active CN205976550U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620794505.4U CN205976550U (en) 2016-07-27 2016-07-27 Cluster hangs instrument of girder steel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620794505.4U CN205976550U (en) 2016-07-27 2016-07-27 Cluster hangs instrument of girder steel

Publications (1)

Publication Number Publication Date
CN205976550U true CN205976550U (en) 2017-02-22

Family

ID=58026458

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620794505.4U Active CN205976550U (en) 2016-07-27 2016-07-27 Cluster hangs instrument of girder steel

Country Status (1)

Country Link
CN (1) CN205976550U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113264443A (en) * 2021-05-11 2021-08-17 中铁二局集团有限公司 Tandem type hoisting method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113264443A (en) * 2021-05-11 2021-08-17 中铁二局集团有限公司 Tandem type hoisting method

Similar Documents

Publication Publication Date Title
CN103663142B (en) Tailing mechanism and translation tailing hoisting method
CN206267139U (en) A kind of pile foundation steel bar cage positioning and concrete pouring support
CN207192616U (en) A kind of gantry crane for preventing that goods from rocking
CN205976550U (en) Cluster hangs instrument of girder steel
CN206665952U (en) A kind of novel hanging tool
CN206693061U (en) A kind of hoisting device for main cable saddle of suspension bridge lifting
CN202704895U (en) Articulated boom of crawler crane
CN203855294U (en) Lifting structure of box-type substation
CN207511723U (en) A kind of flat arm tower crane supporting beam transporting device of new construction inner climbing type
CN206607837U (en) A kind of single-stranded cucurbit mounting structure of combined type lifted for climbing frame
CN206969989U (en) A kind of pile foundation reinforcement cage hoisting equipment
CN205187695U (en) Steel construction has hoisted gallows
CN208814490U (en) A kind of novel drainage ditch cover plate hanging apparatus
CN208234393U (en) A kind of multifunctional hanging tool for bridge prefabrication lifting component
CN207986495U (en) A kind of Bridge High-pier main reinforcement hanging apparatus
CN209493209U (en) A kind of prefabricated small box girder dismounting templated porous formula balance hanger
CN205575373U (en) Improved generation 1000MW unit generator stator hoist device
CN110316649A (en) A kind of suspender and hanging method suitable for irregular truss
CN202337658U (en) Energy storage hoisting device for heavy objects
CN207608203U (en) A kind of T beams suspender
CN201236098Y (en) Combined pressure bar sling
CN205973583U (en) Flip -chip of assembled steel board cabin is with hoist and mount subassembly
CN213387394U (en) Foundation bolt hoisting device
CN205741935U (en) The mounting and positioning device of Wavelike steel webplate
CN202609835U (en) Counterweight device for crane

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant