CN205976442U - Outer wall steel pipe scaffold puts up isolating device - Google Patents
Outer wall steel pipe scaffold puts up isolating device Download PDFInfo
- Publication number
- CN205976442U CN205976442U CN201620868663.XU CN201620868663U CN205976442U CN 205976442 U CN205976442 U CN 205976442U CN 201620868663 U CN201620868663 U CN 201620868663U CN 205976442 U CN205976442 U CN 205976442U
- Authority
- CN
- China
- Prior art keywords
- angle iron
- iron frame
- bar
- steel pipe
- joist
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
The utility model relates to an outer wall steel pipe scaffold puts up isolating device. It includes joist pole, contact pole, rectangle angle iron frame, rectangle angle iron frame's centre is equipped with steel wire mesh sheet, one side of rectangle angle iron frame is equipped with 2~3 lantern rings, the lantern ring cup joints on the contact pole, the rectangle angle iron frame shelve on the joist pole, the contact pole is parallel to each other with the joist pole and fixes respectively on the scaffold frame. The utility model discloses solve other isolating measures defect not in place is not just protected to easily fixable, easy destruction betterly, the utility model has the characteristics of ann tears open with convenient to use, keeps apart and targets in place, reuse.
Description
Technical field
This utility model belong to exterior wall steel pipe scaffold erection construction field and in particular to a kind of exterior wall steel pipe scaffold every
From device.
Background technology
The operating surface gap of typically reserved 300mm~500mm, work between job site exterior wall steel pipe scaffold and wall face
Injure by a crashing object it is more likely that can be fallen down from operating surface gap by falling object above when people works on scaffold.Therefore, typically outside
Between wall steel pipe scaffold and wall face, isolating and protecting measure is set every four rows.
Current job site exterior wall steel pipe scaffold partition method has multiple, conventional methods to have:1st, ommatidium is adopted to put down
Net is isolated although cost is not high, easy for installation, but plain net is easily broken by weight, blunt, does not have protective action.2、
Isolated using old template, cost is not also high, but this template and steel pipe scaffold are not fixed easily, and torn open without authorization by workman
Often do not reset after removing, produce potential safety hazard.3rd, it is arranged side by side using several steel pipes and isolated, although this method is simple,
But still there is small-gap suture between steel pipe, and workman still needs to reset for convenience of after operation dismounting.
Content of the invention
The purpose of this utility model is to overcome defect present in prior art, provides a kind of convenient to assemble and disassemble, turnover to make
With, safe and reliable exterior wall steel pipe scaffold isolating device.
This utility model is realized in:A kind of exterior wall steel pipe scaffold isolating device it is characterised in that:Including joist
Bar, contact bar, rectangular angle iron frame, the centre of described rectangular angle iron frame is provided with steel fabric sheet, described rectangular angle iron frame
Side is provided with 2 ~ 3 collars, and the described collar is socketed on described contact bar, and described rectangular angle iron frame is shelved on described joist bar
On, described contact bar is parallel to each other and is separately fixed on scaffold with joist bar.
The centre of described rectangular angle iron frame is provided with the support bar being connected with described steel fabric sheet, the two ends of described support bar
It is fixed on the inner side edge of described rectangular angle iron frame.
The width of described rectangular angle iron frame is 300 ~ 450mm, the length of described rectangular angle iron frame is 1500 ~
1800mm.
Being smaller than between the mesh of described steel fabric sheet or be equal to 25mm.
Described contact bar, the diameter of joist bar are respectively 48mm, and length is respectively 4500 ~ 6000mm.
The beneficial effects of the utility model are:Preferably solve other quarantine measures not to be fixed easily, be easily destroyed and protect
Defect not in place, this utility model has the characteristics that peace is torn open and puts in place, reuses with easy to use, isolation.
Brief description
Fig. 1 is this utility model structural representation.
Fig. 2 is overlooking the structure diagram when this utility model is connected with scaffold.
Wherein:1st, joist bar;2nd, contact bar;3rd, rectangular angle iron frame;4th, steel fabric sheet;5th, the collar;6th, support bar;7th, foot
Hand cradle;71st, little cross bar;72nd, interior vertical rod.
Specific embodiment
According to Fig. 1, Fig. 2, this utility model includes joist bar 1, contact bar 2, rectangular angle iron frame 3, described rectangle angle steel
The centre of framework 3 is provided with steel fabric sheet 4, and the centre of described rectangular angle iron frame 3 is provided with the support being connected with described steel fabric sheet 4
Bar 6, the two ends of described support bar 6 are fixed on the inner side edge of described rectangular angle iron frame 3, and described support bar 6 can be by short angle
Steel is constituted, and acts primarily as the effect reinforced and support described steel fabric sheet 4.The side of described rectangular angle iron frame 3 is provided with 2 ~ 3 sets
Ring 5, the described collar 5 is socketed on described contact bar 2, and described rectangular angle iron frame 3 is shelved on described joist bar 1, described
Tie-rod 2 and joist bar 1 are parallel to each other and are separately fixed on scaffold 7.The width of described rectangular angle iron frame 3 be 300 ~
450mm, the length of described rectangular angle iron frame 3 is 1500 ~ 1800mm.Being smaller than between the mesh of described steel fabric sheet 4 or
Equal to 25mm.Described contact bar 2, the diameter of joist bar 1 are respectively 48mm, and length is respectively 4500 ~ 6000mm.
When this utility model uses, described joist bar 1 fastener is horizontally fixed on the little cross bar 71 of scaffold 7.Will
Contact bar 2 penetrates in the described collar 5, and contact bar 2 fastener is fixed in vertical rod 72 in scaffold, makes described rectangle angle steel
Framework 3 is located at the top of described joist bar 1, completes to install.Described rectangular angle iron frame 3 passes through the described collar 5 can be along described
Tie-rod 2 is rotated up.External wall construction for easy to operate when, can by the collar 5 by this utility model along contact bar 2 make rotating shaft to
Upper pulling, puts down reset after completing work again, is used conveniently and safely, is difficult to be removed.
Claims (5)
1. a kind of exterior wall steel pipe scaffold isolating device it is characterised in that:Including joist bar, contact bar, rectangular angle iron frame, institute
The centre stating rectangular angle iron frame is provided with steel fabric sheet, and the side of described rectangular angle iron frame is provided with 2 ~ 3 collars, the described collar
It is socketed on described contact bar, described rectangular angle iron frame is shelved on described joist bar, described contact bar is mutual with joist bar
Parallel and be separately fixed on scaffold.
2. the exterior wall steel pipe scaffold isolating device according to claim 1 it is characterised in that:Described rectangular angle iron frame
Centre be provided with the support bar being connected with described steel fabric sheet, the two ends of described support bar are fixed on described rectangular angle iron frame
On inner side edge.
3. the exterior wall steel pipe scaffold isolating device according to claim 1 it is characterised in that:Described rectangular angle iron frame
Width be 300 ~ 450mm, the length of described rectangular angle iron frame is 1500 ~ 1800mm.
4. the exterior wall steel pipe scaffold isolating device according to claim 1 it is characterised in that:The net of described steel fabric sheet
Eye between being smaller than or be equal to 25mm.
5. the exterior wall steel pipe scaffold isolating device according to claim 1 it is characterised in that:Described contact bar, joist
The diameter of bar is respectively 48mm, and length is respectively 4500 ~ 6000mm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620868663.XU CN205976442U (en) | 2016-08-12 | 2016-08-12 | Outer wall steel pipe scaffold puts up isolating device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620868663.XU CN205976442U (en) | 2016-08-12 | 2016-08-12 | Outer wall steel pipe scaffold puts up isolating device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205976442U true CN205976442U (en) | 2017-02-22 |
Family
ID=59977996
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620868663.XU Active CN205976442U (en) | 2016-08-12 | 2016-08-12 | Outer wall steel pipe scaffold puts up isolating device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205976442U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110331850A (en) * | 2019-07-22 | 2019-10-15 | 浙江奔腾市政园林建设工程有限公司 | Masking device and its application method for gap between scaffold and external wall |
CN113846797A (en) * | 2021-09-24 | 2021-12-28 | 台州立昌工程建设有限公司 | Concrete wallboard and joint construction process thereof |
-
2016
- 2016-08-12 CN CN201620868663.XU patent/CN205976442U/en active Active
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110331850A (en) * | 2019-07-22 | 2019-10-15 | 浙江奔腾市政园林建设工程有限公司 | Masking device and its application method for gap between scaffold and external wall |
CN110331850B (en) * | 2019-07-22 | 2021-03-30 | 浙江奔腾市政园林建设工程有限公司 | Shielding device for gap between scaffold and building outer wall and using method thereof |
CN113846797A (en) * | 2021-09-24 | 2021-12-28 | 台州立昌工程建设有限公司 | Concrete wallboard and joint construction process thereof |
CN113846797B (en) * | 2021-09-24 | 2022-08-23 | 台州立昌工程建设有限公司 | Concrete wallboard and joint construction process thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108005374A (en) | Clear up the hanging basket construction method of glass curtain wall | |
CN205976442U (en) | Outer wall steel pipe scaffold puts up isolating device | |
CN103206074A (en) | Elevator shaft template construction method, platform and support | |
CN206538998U (en) | A kind of cradle for constructional engineering | |
CN107524284A (en) | A kind of regularization pylon protection system and installation method | |
CN107165281A (en) | A kind of high-altitude long-span overhung steel platform mould bases construction | |
CN206722368U (en) | One kind is used to protect frame system outside the working regularization of assembled architecture | |
CN203374008U (en) | Elevator shaft titling plane protective structure | |
CN204627010U (en) | A kind of outer guard net being applicable to climbing frame | |
KR101215065B1 (en) | Demolition device for chimney | |
CN207245149U (en) | External scaffolding sets up auxiliary installation device | |
CN105926917B (en) | Steel structure cornices exterior trim surface construction suspension platform and its building method and method for dismounting | |
CN103321438A (en) | Large cantilever unit type protective canopy suitable for high-rise building construction | |
CN204126290U (en) | Elevator shaft horizontal protective device | |
CN206554484U (en) | Temporary operating platform tripod | |
CN206220461U (en) | A kind of packaged type I-steel hoistway operation platform | |
CN206016300U (en) | Construction of prevention work structure in a kind of tool-type elevator | |
CN202324680U (en) | Protection device of elevator shaft | |
CN205713050U (en) | A kind of scaffold protection network of municipal works | |
CN205476556U (en) | Horizontal protector of construction scaffolding operating layer | |
CN205422060U (en) | Interim storehouse in portable building site | |
CN105908986B (en) | A kind of construction method of design of glass lighting roof protective frame | |
CN205875771U (en) | A face limit protector for high -rise building | |
CN201818034U (en) | Movable operation platform | |
CN204282850U (en) | Steel work-concrete combined floor reserved opening protective net frame |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |