CN205476556U - Horizontal protector of construction scaffolding operating layer - Google Patents

Horizontal protector of construction scaffolding operating layer Download PDF

Info

Publication number
CN205476556U
CN205476556U CN201620036431.8U CN201620036431U CN205476556U CN 205476556 U CN205476556 U CN 205476556U CN 201620036431 U CN201620036431 U CN 201620036431U CN 205476556 U CN205476556 U CN 205476556U
Authority
CN
China
Prior art keywords
scaffold
operation layer
framework
building
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620036431.8U
Other languages
Chinese (zh)
Inventor
刘春朋
韩怀聪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction First Group Corp Ltd
Original Assignee
China Construction First Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction First Group Corp Ltd filed Critical China Construction First Group Corp Ltd
Priority to CN201620036431.8U priority Critical patent/CN205476556U/en
Application granted granted Critical
Publication of CN205476556U publication Critical patent/CN205476556U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a horizontal protector of construction scaffolding operating layer solves the troublesome poeration and the technical problem with high costs of the hard protection existence of current scaffold. Including the scaffold, be equipped with between scaffold and wall body and face limit protector, it comprises frame and the safety net of installing in the frame to face limit protector, the frame is through pole setting or the leger fixed connection of rotatory fastener with the scaffold, and the width of frame is greater than the interval between scaffold and the wall body for the overlap joint that faces the slope of limit protector plays the effect of protection on the wall body. When needs are dismantled, only need the rotatory fastener of operation to make the pole setting or the leger separation of facing limit protector and scaffold, then vertical carry drawing face limit protector, take out it between scaffold and wall body. The process of demolising is simple quick and can reuse, troublesome poeration and technical problem with high costs that the hard protection of having solved current scaffold exists.

Description

Scaffold operation layer horizontal protective device for building
Technical field
This utility model relates to technical field of building construction, particularly relates to a kind of scaffold operation layer horizontal protective device for building.
Background technology
Scaffold is the job platform of architecture construction, of a great variety, but must assure that the safety of construction.According to code requirement, the scaffold that architectural engineering uses, the distance between its vertical rod and body of wall is less than 300mm, and for ensureing construction safety, needs to increase preventer between scaffold and body of wall, and the distance of preventer distance body of wall cannot be greater than 150mm.
Such as, scaffold as shown in Figure 1, its transverse horizontal bar 11 extends a distance into D to body of wall 12 from scaffold, plays the effect of hard protection.
In building construction process, the outer wall template of the body of wall of operation layer of having constructed needs constantly to remove, for building new operation layer body of wall;This needs outer wall template, flitch back cord to be removed together with steel pipe back cord and be transported up to new operation layer.For realizing outer wall template, flitch back cord and the dismounting of steel pipe back cord and transport, it is desirable to the distance of the vertical rod distance body of wall of scaffold is minimum for 400mm, it is therefore necessary to increase hard protection between scaffold and body of wall.But after increase hard protection, it is not easy to dismounting and the transport of the materials such as outer wall template, when materials such as needs dismounting and transport outer wall templates, need first to remove hard protection, and existing scaffold hard protection troublesome poeration, and use can not be had enough to meet the need, this can reduce efficiency of construction, also can increase construction cost.
Summary of the invention
This utility model provides a kind of scaffold operation layer horizontal protective device for building, solves the troublesome poeration of the hard protection existence of existing scaffold and the technical problem that cost is high.
The purpose of this utility model is achieved through the following technical solutions:
Propose a kind of scaffold operation layer horizontal protective device for building, including scaffold, be equipped with between described scaffold and body of wall and face frontier defense protection unit;The described frontier defense protection unit that faces is made up of framework and the safety net being installed in framework;Described framework is connected by rotary buckle is fixing with the vertical rod of described scaffold or leger;And the width of described framework is more than the spacing between described scaffold and body of wall so that described in face that frontier defense protection unit tilts be overlapped on body of wall.
Further, described framework is made by square steel tube.
Further, described framework is formed by isometric two square steel tubes are parallel;Between two parallel square steel tubes, support bar is installed.
Further, described support bar is equidistantly or non-equidistance is installed between two parallel square steel tubes.
Further, described framework is rectangular frame.
Further, in described rectangular frame, reinforcing bar is installed.
Further, face frontier defense protection unit described in be placed on the upside of the top board of current operation layer.
This utility model embodiment technical scheme, its technique effect having or advantage be: the scaffold operation layer horizontal protective device for building that this utility model embodiment proposes, it is provided with between scaffold and body of wall and faces frontier defense protection unit, this faces frontier defense protection unit and is made up of framework and the safety net being installed in framework, it is connected with vertical rod or the leger of scaffold by rotary buckle, and its width is more than the distance between scaffold and body of wall, this makes this face after frontier defense protection unit can rotate up certain angle relative to scaffold horizontal direction, tilt is overlapped on body of wall, play the effect of protection;When needs are dismantled, only need to operate rotary buckle and make to face frontier defense protection unit and separate with vertical rod or the leger of scaffold, then frontier defense protection unit is faced in vertical lifting, it is taken out between scaffold and body of wall.Demolishing process is simple and quick and can reuse, and solves the troublesome poeration of the hard protection existence of existing scaffold and the technical problem that cost is high.
Preferably, this is faced frontier defense protection unit and is placed on the upside of the top board of current operation layer, playing protective action simultaneously, can not hinder lower floor completed body of wall outer wall template remove, when needing to move on to the template of dismounting upper strata use, only need to rotate and face frontier defense protection unit, make itself and scaffold level, concede the space between scaffold and body of wall, or removed, it is achieved reset again after the transport of the materials such as outer wall template or reinstall to use, accelerated the progress of construction, also reduce difficulty of construction, and then reduce construction cost.
Accompanying drawing explanation
Fig. 1 is the structure chart of a kind of scaffold hard protection of prior art;
Fig. 2 is the structure chart of the scaffold operation layer horizontal protective device for building that this utility model embodiment proposes;
Fig. 3 is the example structure figure facing frontier defense protection unit that this utility model embodiment proposes;
Fig. 4 is the example structure figure facing frontier defense protection unit that this utility model embodiment proposes;
Fig. 5 is the installation site schematic diagram of the scaffold operation layer horizontal protective device for building that this utility model embodiment proposes.
Detailed description of the invention
In order to make the purpose of this utility model, technical scheme and advantage clearer, below in conjunction with accompanying drawing, this utility model is described in further detail, it is clear that described embodiment is only a part of embodiment of this utility model rather than whole embodiments.Based on the embodiment in this utility model, all other embodiments that those of ordinary skill in the art are obtained under not making creative work premise, broadly fall into the scope of this utility model protection.
Below in conjunction with accompanying drawing, the technical scheme providing this utility model embodiment is described in detail.
As in figure 2 it is shown, the structure chart of the scaffold operation layer horizontal protective device for building proposed for this utility model embodiment, including scaffold 2, it is equipped with between scaffold 2 and body of wall 3 and faces frontier defense protection unit 4.
As shown in Figure 3 and Figure 4, face frontier defense protection unit to be made up of framework 41 and the safety net 42 being installed in framework;Framework 41 is fixed by rotary buckle 43 be connected with vertical rod 21 or the leger 22 of scaffold 2;And the width of framework 41 is more than spacing between scaffold 2 and body of wall 3 so that faces that frontier defense protection unit 4 tilts is overlapped on body of wall, plays the effect of protection.
The preferred rectangular frame of framework 41, but this utility model embodiment does not limit the shape of framework, it is also possible to for other polygons that are oval or that be designed to as required.Therefore, the width of framework described here, refer to the distance that the maximum of the width of framework is greater than between scaffold and body of wall so that faces that frontier defense protection unit can tilt is overlapped on body of wall.
The effect of rotary buckle 43 so that facing frontier defense protection unit vertical rod or leger on the one hand with scaffold and fix, on the other hand making to face frontier defense protection unit can rotate upwardly and downwardly by scaffold relatively.
After one layer of wall construction completes, when the outer wall template completing construction is removed transport to current layer use by needs, only need to operate rotary buckle to make to face frontier defense protection unit and separate with vertical rod or the leger of scaffold, then frontier defense protection unit is faced in vertical lifting, it is taken out between scaffold and body of wall, and then concede the space between scaffold and body of wall, the transport of the materials such as the convenient outer wall template removed.Demolishing process is simple and quick and can reuse, and solves the troublesome poeration of the hard protection existence of existing scaffold and the technical problem that cost is high.
As it is shown in figure 5, face the upside that frontier defense protection unit is preferably disposed at the top board 5 of current operation layer.Playing protective action simultaneously, can not hinder lower floor completed body of wall outer wall template remove, when needing to move on to the template of dismounting upper strata use, only need to rotate and face frontier defense protection unit so that it is with scaffold level, concede the space between scaffold and body of wall, or removed, it is achieved reset again after the transport of the materials such as outer wall template or reinstall to use, accelerated the progress of construction, also reduce difficulty of construction, and then reduce construction cost.
Framework is preferably used steel pipe, and especially square steel tube makes, it is ensured that faces the intensity of frontier defense protection unit, and then ensure that protection effect.
As it is shown on figure 3, be embodied as illustration for of framework, this framework is formed by isometric two square steel tubes 411 are parallel;Support bar 412 is installed between two parallel square steel tubes.Support bar 412 can equidistantly or non-equidistance is installed between two parallel square steel tubes.
As shown in Figure 4, another for framework is embodied as illustration, and this framework 41 is rectangular frame.Reinforcing bar 413 is installed in rectangular frame.
The scaffold operation layer horizontal protective device for building that above-mentioned this utility model embodiment proposes, use simple framework to add the structure design of safety net, not only realize the protective action of scaffold, also convenient dismounting and installation, and can reuse, it is possible to increase efficiency of construction and reduce construction cost.
Although having been described for preferred embodiment of the present utility model, but those skilled in the art once know basic creative concept, then these embodiments can be made other change and amendment.So, claims are intended to be construed to include preferred embodiment and fall into all changes and the amendment of this utility model scope.
Obviously, those skilled in the art can carry out various change and modification without deviating from spirit and scope of the present utility model to this utility model.So, if these amendments of the present utility model and modification belong within the scope of this utility model claim and equivalent technologies thereof, then this utility model is also intended to comprise these change and modification.

Claims (7)

1. a scaffold operation layer horizontal protective device for building, including scaffold, it is characterised in that be equipped with between described scaffold and body of wall and face frontier defense protection unit;
The described frontier defense protection unit that faces is made up of framework and the safety net being installed in framework;Described framework is connected by rotary buckle is fixing with the vertical rod of described scaffold or leger;And the width of described framework is more than the spacing between described scaffold and body of wall so that described in face that frontier defense protection unit tilts be overlapped on body of wall.
Scaffold operation layer horizontal protective device for building the most according to claim 1, it is characterised in that described framework is made by square steel tube.
Scaffold operation layer horizontal protective device for building the most according to claim 2, it is characterised in that described framework is formed by isometric two square steel tubes are parallel;Between two parallel square steel tubes, support bar is installed.
Scaffold operation layer horizontal protective device for building the most according to claim 3, it is characterised in that described support bar is equidistantly or non-equidistance is installed between two parallel square steel tubes.
Scaffold operation layer horizontal protective device for building the most according to claim 1, it is characterised in that described framework is rectangular frame.
Scaffold operation layer horizontal protective device for building the most according to claim 5, it is characterised in that be provided with reinforcing bar in described rectangular frame.
Scaffold operation layer horizontal protective device for building the most according to claim 1, it is characterised in that described in face frontier defense protection unit and be placed on the upside of the top board of current operation layer.
CN201620036431.8U 2016-01-15 2016-01-15 Horizontal protector of construction scaffolding operating layer Expired - Fee Related CN205476556U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620036431.8U CN205476556U (en) 2016-01-15 2016-01-15 Horizontal protector of construction scaffolding operating layer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620036431.8U CN205476556U (en) 2016-01-15 2016-01-15 Horizontal protector of construction scaffolding operating layer

Publications (1)

Publication Number Publication Date
CN205476556U true CN205476556U (en) 2016-08-17

Family

ID=56668712

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620036431.8U Expired - Fee Related CN205476556U (en) 2016-01-15 2016-01-15 Horizontal protector of construction scaffolding operating layer

Country Status (1)

Country Link
CN (1) CN205476556U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110331850A (en) * 2019-07-22 2019-10-15 浙江奔腾市政园林建设工程有限公司 Masking device and its application method for gap between scaffold and external wall
CN111042560A (en) * 2020-01-16 2020-04-21 王伟鹏 Scaffold reinforcing apparatus

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110331850A (en) * 2019-07-22 2019-10-15 浙江奔腾市政园林建设工程有限公司 Masking device and its application method for gap between scaffold and external wall
CN110331850B (en) * 2019-07-22 2021-03-30 浙江奔腾市政园林建设工程有限公司 Shielding device for gap between scaffold and building outer wall and using method thereof
CN111042560A (en) * 2020-01-16 2020-04-21 王伟鹏 Scaffold reinforcing apparatus

Similar Documents

Publication Publication Date Title
CN201158933Y (en) High-rise maintaining scaffold device with extruding structure
CN205476556U (en) Horizontal protector of construction scaffolding operating layer
CN203487803U (en) Safety protection structure for elevator shaft construction
CN203374008U (en) Elevator shaft titling plane protective structure
CN206053274U (en) The external scaffolding device of the perpendicular BAIYE outer visor of skyscraper and glass curtain wall dual-purpose
CN203271096U (en) Operating platform
CN203834926U (en) Formwork erecting structure for bare concrete basement exterior wall
CN204850515U (en) Steel construction faces limit protector
CN204174854U (en) A kind of vertical fragmentation Assembled rotary cat ladder
CN203961258U (en) Builder's jack foot guard structure
CN104775608A (en) Integrated lifting platform attached device for special layer high position
CN206189886U (en) Construction elevator protector
CN205894641U (en) Elevartor shaft lifting platform
CN206220534U (en) The pump line support meanss of concrete pumping equipment
CN104612166A (en) Combined supporting device and method for hole wall supporting
CN107816204A (en) The outer protective frame of skyscraper staggered floor balcony also serves as operating platform erection method
CN204163364U (en) A kind of elevator shaft formwork and operation steel platform
CN203097253U (en) Elevator shaft triangular support type formwork platform
CN109629811A (en) Detachable operating platform for steel pipe column
CN106906992A (en) A kind of scaffolding structure
CN202788017U (en) Horizontally-overhung rigid hermetic section steel protective shed for high-rise buildings
CN106703387A (en) Elevator shaft liftable operation platform
CN109402313B (en) Blast furnace downcomer bricklaying lining material transportation system and construction method
CN207362706U (en) Load carrying type hanging basket operating platform
CN207818141U (en) Platform is commented on before a kind of assembled class

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160817

Termination date: 20170115

CF01 Termination of patent right due to non-payment of annual fee