Prior art keywords
prefabricated
railway
saving equipment
roof beam
section steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620959497.4U
Other languages
Chinese (zh)
Inventor
朱智泉
常付军
王昌裕
胡鹏飞
梅军
李娜
李晓毅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Engineering Co Ltd of China Railway Seventh Group Co Ltd
Original Assignee
Wuhan Engineering Co Ltd of China Railway Seventh Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Engineering Co Ltd of China Railway Seventh Group Co Ltd filed Critical Wuhan Engineering Co Ltd of China Railway Seventh Group Co Ltd
Priority to CN201620959497.4U priority Critical patent/CN205969410U/en
Application granted granted Critical
Publication of CN205969410U publication Critical patent/CN205969410U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model relates to a prefabricated energy -saving equipment of railway T roof beam belongs to the rail traffic infrastructure field. A be equipped with in the channel -section steel and compare that prefabricated energy -saving equipment of railway T roof beam, the prefabricated pedestal upper portion both sides opening of T roof beam is outside the rubber tube that the channel -section steel size is big, still be equipped with the steel sheet on the channel -section steel, it has pre -buried tub of draw bar of PVC to open in the concrete of the prefabricated pedestal lower part of T roof beam, and the pull rod passes pre -buried tub of draw bar of PVC with the side form board of the prefabricated pedestal both sides of T roof beam, and make through the nut the side form board with the rubber tube is closely laminated, with the side form board is connected the support frame lower extreme has contacted supporting role and has been connected with the walking wheel through folding mechanism with ground. Its advantage is: the utility model provides a prefabricated energy -saving equipment of railway T roof beam can prevent lou thick liquid, and the installation is simple, and the side form board is dismantled easily.

Description

The prefabricated energy-saving equipment of railway T-beam
Technical field
This utility model is related to a kind of railway traffic infrastructure equipment, and the prefabricated energy-conservation of more particularly, to a kind of railway T-beam sets Standby.
Background technology
In railway T-beam prefabrication process, generally using double faced adhesive tape plasm stopping technique to solve T girder prefabricated pedestal and side template it Between spillage problem, this complex process, paste easy fold, molding beam slab irregularity, and double faced adhesive tape can not reuse, remove Double faced adhesive tape workload is big, also needs to multiple form removal matched moulds, in this course to T beam form during T is beam prefabricated simultaneously Tool proposes higher requirement, especially side template, higher to its intensity requirement as the critical piece bearing weight, repeatedly tears open Unload also extremely inconvenience, these all affect construction speed, increase construction cost.
Utility model content
Technical problem to be solved in the utility model is to provide one kind to be prevented from spillage for above-mentioned prior art, peace Dress is simple, the prefabricated energy-saving equipment of side template easy-off railway T-beam.
The technical scheme that this utility model is adopted is as follows:
This utility model is related to a kind of prefabricated energy-saving equipment of railway T-beam, belongs to railway traffic infrastructure field.A kind of ferrum The beam prefabricated energy-saving equipment of road T, both-side opening outside channel-section steel in T girder prefabricated pedestal top is built with the rubber bigger than described channel-section steel size Sebific duct, described channel-section steel is additionally provided with steel plate, has PVC built-in pipe tie rod hole, draw in the concrete of described T girder prefabricated pedestal bottom Bar passes through the side template of described PVC built-in pipe tie rod hole and described T girder prefabricated pedestal both sides, and makes described side template by nut Fit tightly with described rubber tube, the support frame as described above lower end being connected with described side template is contacted with ground and plays a supportive role, and It is connected with road wheel by fold mechanism.
Further, support frame as described above is triangle support frame, including being interconnected to the three of right angled triangle by end points Root post.
Further, it is additionally provided with the support column of several described columns of connection inside support frame as described above.
Further, the tire of described road wheel is that abrasive rubber is made.
The prefabricated energy-saving equipment of a kind of railway T-beam that this utility model provides, has following advantages:
The prefabricated energy-saving equipment of a kind of railway T-beam that this utility model provides, T girder prefabricated pedestal both sides is respectively provided with embedded The channel-section steel of rubber tube, extrudes rubber tube by the side template that the nut at fastening pull rod two ends makes T girder prefabricated pedestal both sides, makes both Fit tightly and reach sealing effectiveness, mortar leakage prevention, and also rubber tube is reusable, saves production cost, and side template props up simultaneously The structure of support can strengthen sealing effectiveness, good sealing effect using firm triangular structure, and can ensure T beam side The use intensity of plate, avoids reusing the malformation causing as far as possible, and road wheel and bracing frame pass through folding machine simultaneously Structure connects, and is folded into horizontal direction when pouring by vertical direction, is conducive to bracing frame to support, described in form removal knockout course Road wheel, perpendicular to ground, is moved easily side template.
Brief description
Below in conjunction with the drawings and specific embodiments, this utility model is described in further detail.According to following explanation and power Sharp claim, advantages and features of the present utility model will become apparent from.It should be noted that, accompanying drawing all in the form of very simplification and All using non-accurately ratio, only in order to purpose that is convenient, lucidly aiding in illustrating this utility model embodiment.
Fig. 1 is the structure chart of the prefabricated energy-saving equipment of railway T-beam described in this utility model one embodiment;
Wherein, 1-T girder prefabricated pedestal, 2- channel-section steel, 3- rubber tube, 4- steel plate, 5-PVC built-in pipe tie rod hole, 6- pull bar, 7- Side template, 8- nut, 9- bracing frame, 10- column, 11- support column, 12- fold mechanism, 13- road wheel.
Specific embodiment
Below in conjunction with the accompanying drawings 1 and embodiment technical scheme is specifically addressed.
Embodiment
A kind of prefabricated energy-saving equipment of railway T-beam, the outside channel-section steel 2 of T girder prefabricated pedestal 1 top both-side opening is built with than institute State the rubber tube 3 of big 3mm to the 6mm of channel-section steel 2 size, described channel-section steel 2 is additionally provided with steel plate 4, described T girder prefabricated pedestal 1 bottom PVC built-in pipe tie rod hole 5 is had, pull bar 6 passes through described PVC built-in pipe tie rod hole 5 and described T girder prefabricated pedestal 1 in concrete The side template 7 of both sides, and so that described side template 7 is fitted tightly with described rubber tube 3 by nut 8, it is connected with described side template 7 Support frame as described above 9 lower end contact with ground and play a supportive role, and be connected with road wheel 13 by fold mechanism 12.
Further, support frame as described above 9 is triangle support frame, including being interconnected to the three of right angled triangle by end points Root post 10.
Further, it is additionally provided with the support column 11 of several described columns of connection inside support frame as described above 9.
Further, the tire of described road wheel 13 is that abrasive rubber is made.
The prefabricated energy-saving equipment of a kind of railway T-beam that this utility model provides, has following advantages:
T girder prefabricated pedestal 1 both sides are respectively provided with the channel-section steel 2 of embedded rubber tube 3, by the nut 8 at fastening pull rod 6 two ends Make the side template 7 of T girder prefabricated pedestal 1 both sides extrude rubber tube 3, so that both is fitted tightly and reach sealing effectiveness, mortar leakage prevention, and And rubber tube 3 is reusable, save production cost, the structure of the bracing frame 9 of side template 7 adopts firm triangle knot simultaneously Structure can strengthen sealing effectiveness, good sealing effect, and can ensure the use intensity of T side template 7, avoids weight as far as possible Again using the malformation causing, road wheel 13 is connected by fold mechanism 12 with bracing frame 9, when pouring by Vertical Square simultaneously To being folded into horizontal direction, be conducive to bracing frame 9 to support, install or form removal knockout course described in road wheel 13 perpendicular to Ground, is moved easily side template 7.
During use, road wheel 13 is folded into horizontal direction by vertical direction by fold mechanism 12, strengthens bracing frame 9 Support, extrudes rubber tube 3 by the side template 7 that the nut 8 at fastening pull rod 6 two ends makes T girder prefabricated pedestal 1 both sides simultaneously, makes both Fit tightly and reach sealing effectiveness, bracing frame 9 can strengthen sealing effectiveness, ensure the use intensity of side template 7 simultaneously, it is to avoid weight Again using the malformation causing, described in installation or form removal knockout course, road wheel 13, perpendicular to ground, is moved easily Side template 7.
Obviously, those skilled in the art can carry out various changes to utility model and modification is new without deviating from this practicality The spirit and scope of type.So, if of the present utility model these modification and modification belong to this utility model claim and its Within the scope of equivalent technologies, then this utility model is also intended to including these changes and modification.

Claims (4)

1. a kind of prefabricated energy-saving equipment of railway T-beam it is characterised in that:In the outside channel-section steel of T girder prefabricated pedestal top both-side opening Equipped with the rubber tube bigger than described channel-section steel size, described channel-section steel is additionally provided with steel plate, the concrete of described T girder prefabricated pedestal bottom Inside have PVC built-in pipe tie rod hole, pull bar passes through the side form of described PVC built-in pipe tie rod hole and described T girder prefabricated pedestal both sides Plate, and make described side template fit tightly with described rubber tube by nut, the bracing frame lower end being connected with described side template with Ground contact plays a supportive role, and is connected with road wheel by fold mechanism.
2. the prefabricated energy-saving equipment of railway T-beam according to claim 1 it is characterised in that:Support frame as described above props up for triangle Support, including three root posts being interconnected to right angled triangle by end points.
3. the prefabricated energy-saving equipment of railway T-beam according to claim 2 it is characterised in that:It is additionally provided with inside support frame as described above Several connect the support column of described column.
4. the prefabricated energy-saving equipment of railway T-beam according to claim 1 it is characterised in that:The tire of described road wheel is resistance to Rubber milling is made.
CN201620959497.4U 2016-08-26 2016-08-26 Prefabricated energy -saving equipment of railway T roof beam Expired - Fee Related CN205969410U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620959497.4U CN205969410U (en) 2016-08-26 2016-08-26 Prefabricated energy -saving equipment of railway T roof beam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620959497.4U CN205969410U (en) 2016-08-26 2016-08-26 Prefabricated energy -saving equipment of railway T roof beam

Publications (1)

Publication Number Publication Date
CN205969410U true CN205969410U (en) 2017-02-22

Family

ID=58036583

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620959497.4U Expired - Fee Related CN205969410U (en) 2016-08-26 2016-08-26 Prefabricated energy -saving equipment of railway T roof beam

Country Status (1)

Country Link
CN (1) CN205969410U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111852037A (en) * 2020-07-07 2020-10-30 中交二航局第四工程有限公司 Construction method of short-line method section beam prefabrication whole plant
CN113263599A (en) * 2021-05-21 2021-08-17 中交第二航务工程局有限公司 General beam-making pedestal for prefabricated T-shaped beam and construction method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111852037A (en) * 2020-07-07 2020-10-30 中交二航局第四工程有限公司 Construction method of short-line method section beam prefabrication whole plant
CN113263599A (en) * 2021-05-21 2021-08-17 中交第二航务工程局有限公司 General beam-making pedestal for prefabricated T-shaped beam and construction method

Similar Documents

Publication Publication Date Title
CN203080911U (en) Inner formwork for concrete walls at deformation joint
CN102758640A (en) Metro tunnel lining trolley steel template system
CN201386251Y (en) Transverse unit of beam column bracket
CN203701581U (en) Movable modularized building template
CN205969410U (en) Prefabricated energy -saving equipment of railway T roof beam
CN202280463U (en) Universal lining trolley for tunnel construction
CN206545386U (en) Sheet metal forming formwork drops in a kind of toilet
CN206189301U (en) Portable antidetonation environmental protection and energy saving type municipal administration warning device
CN101122116B (en) Tunnel-passing box beam flange plate back pouring method and special die carrier device for the same
CN202000265U (en) Concrete construction formwork for high pier of bridge
CN105155838B (en) A kind of quick detachable high-strength building formwork
CN207891915U (en) Piping lane wall rapid construction device
CN208803487U (en) Piping lane new type formwork trolley
CN106640136A (en) Plate sealing mechanism used for tunnel lining trolley
CN203795459U (en) Foundation structure of tower crane for high-altitude roofs
CN206319887U (en) A kind of modular variable cross-section tunnel lining trolley
CN206667741U (en) A kind of construction template
CN204532374U (en) The multi-functional chassis of metro station construction
CN206859263U (en) A kind of large formwork construction device of subway station side wall
CN107190976A (en) A kind of construction formwork for placing
CN103821110A (en) Box culvert inner form steel form trolley
CN202037695U (en) Inner die structure for hydraulic box girders
CN206844642U (en) A kind of construction formwork for placing
CN206309403U (en) A kind of shrouding mechanism for tunnel lining trolley
CN201850510U (en) Inverted triangular support of cast-in-situ box girder

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170222