CN207891915U - Piping lane wall rapid construction device - Google Patents

Piping lane wall rapid construction device Download PDF

Info

Publication number
CN207891915U
CN207891915U CN201820136792.9U CN201820136792U CN207891915U CN 207891915 U CN207891915 U CN 207891915U CN 201820136792 U CN201820136792 U CN 201820136792U CN 207891915 U CN207891915 U CN 207891915U
Authority
CN
China
Prior art keywords
door frame
frame support
template
plate
piping lane
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820136792.9U
Other languages
Chinese (zh)
Inventor
刘祥群
刘强高
肖刚
祝金川
梅晓东
连海蛟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Cggc Foundation Engineering Co Ltd
China Gezhouba Group Co Ltd
Original Assignee
Cggc Foundation Engineering Co Ltd
China Gezhouba Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Cggc Foundation Engineering Co Ltd, China Gezhouba Group Co Ltd filed Critical Cggc Foundation Engineering Co Ltd
Priority to CN201820136792.9U priority Critical patent/CN207891915U/en
Application granted granted Critical
Publication of CN207891915U publication Critical patent/CN207891915U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses piping lane wall rapid construction devices, it includes the plate device for pouring formwork erection, the plate device is mounted on the door frame support device for fixed form device, the bottom of the door frame support device is equipped with the running gear for driving entire door frame support device movement, and the telescopic awning device and guard bar device for rain-proof are equipped at the top of door frame support device.Such device is not limited in the construction process by weather, can automatically walk, can solve, using the appearance qualities such as concrete faulting of slab ends, spillage, screw hole caused by wooden model be more, to reduce labor intensity and material input, improve construction efficiency.

Description

Piping lane wall rapid construction device
Technical field
The utility model is related to underground pipe gallery technical field of construction, more particularly, to a kind of piping lane wall rapid construction Device is suitable for the rapid construction of underground pipe gallery wall.
Background technology
Underground pipe gallery concrete main body structure wall surface requirements reach clear-water concrete effect, currently, general main Body structural concrete wall construction is using traditional plank sheathing and Screw arbor with nut at both-ends as formwork erection mode, and the construction time is long, expense of taking a lot of work When and Surface Quality of Concrete it is poor.
Utility model content
The utility model provides piping lane wall rapid construction device, and such device is not limited in the construction process by weather, Can automatically walk, can solve using the appearance qualities such as concrete faulting of slab ends, spillage, screw hole caused by wooden model be more, Labor intensity and material input are reduced, construction efficiency is improved.
In order to realize above-mentioned technical characteristic, what the purpose of this utility model was realized in:Piping lane wall rapid construction Device, it includes the plate device for pouring formwork erection, and the plate device is mounted on the door frame branch for fixed form device On support arrangement, the bottom of the door frame support device is equipped with the running gear for driving entire door frame support device movement, Telescopic awning device and guard bar device for rain-proof is installed at the top of door frame support device.
The plate device includes template, and the template uses Combined formwork, is consolidated using flanged plate between polylith template It is fixed to be connected, it is fixed by bolts connected between the flanged plate, the outer wall of the template is fixed with that more cross are stupefied, and the cross is stupefied External vertical cross-fixing have more it is perpendicular stupefied, fixed by more water-stopping pull rod tensioning between two pieces of templates positioned opposite, institute It states and is fixed with multiple lifting lifting lugs on the side wall of template.
The door frame support device includes bottom girder, and the bottom girder is fixedly mounted in bottom support plate, the bottom Support plate support is mounted on running gear, and the top braces of the bottom girder are equipped with truss structure, the truss structure and More inclinations or horizontally disposed batter brace device are installed between plate device, are equipped at the top of the truss structure Head piece is equipped with more mounting seat for lifting lug on the head piece, and the bottom of the mounting seat for lifting lug is equipped with davit, described to hang The other end of column and the template of plate device are fixedly linked.
The running gear includes movable motor, and rail wheel, the track are equipped on the output shaft of the movable motor Wheel matches walking with track, and the movable motor is fixedly mounted on the bottom girder bottom of door frame support device.
The track uses rail, and is fixedly mounted on bottom plate by foundation bolt, passes through clamping plate between more tracks It is connected and fixed.
The guard bar device includes the more fence uprights arranged vertically, and the fence upright is fixedly mounted on door frame support On the head piece of device.
The telescopic awning device includes awning telescopic rod, and flexible awning is equipped at the top of the awning telescopic rod.
The batter brace device includes intermediate draw bar, and the center of the intermediate draw bar is machined with through-hole, in intermediate draw bar Both ends be separately installed with nut set, the nut is put on is equipped with stretching screw rod, the stretching spiral shell by screw-driven cooperation The other end of bar is fixed with connection otic placode, and pin shaft hole is machined in the connection otic placode, and the connection otic placode is filled with template respectively It sets and is connected with door frame support device.
The utility model has the advantages that:
1, it can be conveniently used for the integral construction of piping lane wall by using above-mentioned apparatus, and can once install more Gallery wall form is saved, while improving the installation process of template, shortens the formwork erection time, the labour for reducing operating personnel is strong Degree, and the consistency poured is good, and Surface Quality of Concrete is good.
2, whole device is supported by running gear, and then door frame support device can be easily driven to walk, Plate device is supported by door frame support device, pouring for follow-up wall can easily be carried out by plate device, After the wall of a bid section pours completion, it may be convenient to pouring for next bid section wall is carried out, in moving process, It only needs to start running gear.
Description of the drawings
The utility model is described in further detail with reference to the accompanying drawings and examples.
Fig. 1 is the utility model entirety sectional view.
Fig. 2 is the utility model door frame support device left view.
Fig. 3 is the utility model plate device left view.
Fig. 4 is the utility model batter brace apparatus structure schematic diagram.
In figure:Plate device 1, door frame support device 2, running gear 3, telescopic awning device 4, guard bar device 5;
Template 101, flanged plate 102, horizontal stupefied 103, perpendicular stupefied 104, bolt 105, water-stopping pull rod 106, lifting lifting lug 107;
Bottom support plate 201, bottom girder 202, truss structure 203, head piece 204, mounting seat for lifting lug 205, davit 206;
Movable motor 301, output shaft 302, rail wheel 303, track 304;
Fence upright 501;
Pin shaft hole 601, connection otic placode 602 stretch screw rod 603, nut set 604, intermediate draw bar 605, through-hole 606.
Specific implementation mode
The embodiment of the utility model is described further below in conjunction with the accompanying drawings.
Embodiment 1:
As shown in Figs 1-4, piping lane wall rapid construction device, it includes the plate device 1 for pouring formwork erection, the mould Panel assembly 1 is mounted on the door frame support device 2 for fixed form device 1, and the bottom of the door frame support device 2 is equipped with Running gear 3 for driving entire door frame support device 2 to move, is equipped at the top of door frame support device 2 for rain-proof Telescopic awning device 4 and guard bar device 5.Above-mentioned constructing device, in the course of work, by running gear 3 to entirely filling Set and be supported, so can easily drive door frame support device 2 walk, by door frame support device 2 to plate device 1 into Row support, can easily carry out pouring for follow-up wall by plate device 1, it is completed when the wall of a bid section pours Afterwards, it may be convenient to pouring for next bid section wall is carried out, in moving process, it is only necessary to start running gear 3.
Further, the plate device 1 includes template 101, and the template 101 uses Combined formwork, polylith template It is fixedly linked using flanged plate 102 between 101, is fixedly linked using bolt 105 between the flanged plate 102, the template 101 Outer wall be fixed with more cross stupefied 103, the external vertical cross-fixing of the cross stupefied 103 has more perpendicular stupefied 104, two pieces of opposite cloth It is fixed by more 106 tensioning of water-stopping pull rod between the template 101 set, multiple liftings is fixed on the side wall of the template 101 Lifting lug 107.By using above-mentioned plate device 1, in the course of work, by used between polylith template 101 flanged plate 102 into Row is assembled, and then forms monoblock large form, then the large form for pouring wall is made of monoblock large form, and then facilitates subsequent It pours, is attached with door frame support device 2 by the way that the lifting lifting lug 107 is convenient, and pass through the water-stopping pull rod 106 two pieces of adjacent templates 101 can be fixed.
Further, the door frame support device 2 includes bottom girder 202, and the bottom girder 202 is fixedly mounted on bottom branch On fagging 201, the support of the bottom support plate 201 is mounted on running gear 3, and the top braces of the bottom girder 202 are installed There is truss structure 203, more inclinations or horizontally disposed truss are installed between the truss structure 203 and plate device 1 The top of bracing device 6, the truss structure 203 is equipped with head piece 204, and more lifting lugs are equipped on the head piece 204 The bottom of mounting base 205, the mounting seat for lifting lug 205 is equipped with davit 206, the other end and the plate device 1 of the davit 206 Template 101 be fixedly linked.To can effectively it be connected between plate device 1 and running gear 3 by door frame support device 2 It connects, facilitates formwork erection process, and be also convenient for the movement of follow-up entire template.
Further, the running gear 3 includes movable motor 301, is pacified on the output shaft 302 of the movable motor 301 Equipped with rail wheel 303, the rail wheel 303 matches walking with track 304, and the movable motor 301 is fixedly mounted on door frame 202 bottom of bottom girder of support device 2.By above-mentioned running gear 3, in the course of work, driven by movable motor 301 defeated Shaft 302, then rail wheel 303 is driven by output shaft 302, and then entire door frame support device 2 and mould are driven by rail wheel 303 Panel assembly 1 moves, and improves its construction efficiency.
Further, the track 304 uses rail, and is fixedly mounted on bottom plate by foundation bolt, more tracks It is connected and fixed by clamping plate between 304.
Further, the guard bar device 5 includes the more fence uprights 501 arranged vertically, and the fence upright 501 is solid Dingan County is on the head piece 204 of door frame support device 2.It can play the role of protection by the guard bar device 5.
Further, the telescopic awning device 4 includes awning telescopic rod 402, the top of the awning telescopic rod 402 Flexible awning 401 is installed.It can play the role of good rain-proof by the telescopic awning device 4, ensure that construction Process is not influenced by rainy.
Further, the batter brace device 6 includes intermediate draw bar 605, and the center of the intermediate draw bar 605 is machined with Through-hole 606 is separately installed with nut set 604 at the both ends of intermediate draw bar 605, is matched by screw-driven on the nut set 604 Conjunction, which is equipped with, stretches screw rod 603, and the other end for stretching screw rod 603 is fixed with connection otic placode 602, the connection otic placode 602 On be machined with pin shaft hole 601, the connection otic placode 602 is connected with plate device 1 and door frame support device 2 respectively.The course of work In, it can will be tensioned between plate device 1 and door frame support device 2 by the batter brace device 6, and then ensure that pair Template is fixed well, ensure that the quality that the later stage pours.
Embodiment 2:
The construction method of piping lane wall rapid construction device, includes the following steps described in any one:
Step1:Rigging device 1, running gear 3, door frame support device 2, telescopic awning device 4 and guard bar device 5, and by assembling combination between the device of above-mentioned merogenesis;
Step2:The height of plate device 1 is adjusted, absolute altitude is detected, the lead screw length of davit 206 is adjusted, reaches requirement height Degree, it is connected by being bolted between multiple single-unit templates 101, and piece mixed up weld it is solid, by the surface of template 101 into Row deashing, derusting and brush oil processing;
Step3:The sundries and dabbing led on wall are removed, double faced adhesive tape is sticked, first the left side template movement patch of per pass wall Closely to by reinforcing bar, both ends bulkhead is installed, places water-stopping pull rod 106, it is reserved that water-stopping pull rod both ends are through at left and right side template respectively In hole, 106 liang of end nuts of water-stopping pull rod are tightened close to reinforcing bar, watertight rubber pad are made to be adjacent to template 101 by mobile right side template;
Step4:Cabin inside dimension and wall straight cis degree are adjusted, plumb bob, adjustment left and right are hung up respectively at the both ends of midfeather The horizontally disposed batter brace device 6 in both sides keeps wall form 101 vertical, is drawing elongated cotton rope, is hanging on template both ends, is adjusting The whole horizontally disposed batter brace device 6 of left and right side, makes all batter brace devices 6 all in holding state;
Step5:Based on adjusting middle wall body template, respectively to the left, be simutaneously arranged positioning rule to the right, between certain Away from template position of upper is equidistantly put in, adjustment batter brace device 6 makes left and right stretching screw rod 603 close up, fixed form exists It is required that position, for controlling template spacing between making positioning rule just be positioned over twice wall;
Step6:Step5, adjustment exterior wall batter brace device 6 are repeated based on the wall form of left and right again, and places and determines Position ruler, complies with the design requirement of piping lane cabin clear spacing;After whole, check batter brace device 6 whether in branch Support state, and then hold out against template;
Step7:Awning is retracted to minimum, casting concrete, when concreting pours by several times according to layering, first constructs After midfeather certain altitude, then identical height is symmetrically poured successively to both sides mid-board, abutment wall, cycle pours high to design Journey, interval time control are principle not generating the cold seam of concrete construction;
Step8:Form removal waits for that walls concrete reaches design strength 30%, removes horizontally disposed 6 He of batter brace device Water-stopping pull rod 106 starts 3 moving die plate of running gear and is detached from wall to next bid section, carries out pouring for next bid section.
The new template 101 used for the first time sprays a thin layer oil film in panel front;The match ratio of the oil film is new bavin Oil:New machine oil is 7:3, after oil film air-dries, wiped clean black dirt, then uniform brushing aqueous demoulding agent, it is answered after rain drop erosion Brush is mended in time;Wall 20-30cm high joint parts are led in wall before molding and paste sponge strip, to prevent rotten of the foot of a wall spillage, adjacent forms Between piece use double-sided adhesive tape, piece be not more than 1.5mm.
Embodiment 3:
Step 1:
The group of the plate device 1, running gear 3, door frame support device 2, telescopic awning device 4 and guard bar device 5 Dress process detailed process is:Running gear 3 is assembled, the bottom girder 202 of installation door rack supporting device 2 assembles truss structure 203, The reliability of inspection door rack supporting device 2 installs davit and plate device 1, and gap is eliminated in leveling, checks flatness, checks spiral shell Whether bolt locks, and installs railing and awning.
Step 2:
Steelframe track is installed, the surveying setting-out on bottom plate spreads frame track, foundation bolt is used in combination to fix, with folder between rail Plate is connected firmly;
Bottom girder is lifted, above-mentioned apparatus integrally divides 3 sections, second section is completed again after the completion of a section.Running gear spiral shell On bottom girder, lifting bottom girder is placed on track bolt, and is supported on its left and right with flitch temporarily, keeps its stable, then hang Fill other longerons, Zhi Wen, after four foundation longerons in place after, inspection is adjusted, make its four it is concordant.
Truss hoisting structure 203, because each chamber size is inconsistent, truss structure 203 and head piece 204 are different, select institute Truss structure 203 and head piece 204 are needed, first hanging wheel is mounted on head piece 204, then truss structure 203 and head piece 204 are connected with, and by its integral hoisting on bottom girder, one group of head piece 204 is respectively installed at bottom girder both ends, tight with bolt Gu, correction after, folding remove the temporary support lumps of wood.
Template is lifted, template is selected, davit 206 is installed into template in oral pore, lifting template is into standing on ground in cabin It is against wall steel bar, is bundled temporarily with iron wire, is existed after template is hung in cabin entirely, then remaining stand column and beam hanging wheel integral hoisting On bottom girder, in installation batter brace device 6, after fastening, it is hung on crossbeam hanging wheel with crane lifting template, reinforces each section Connecting screw, that is, complete the installation of a segment.Lateral leading screw is installed, trolley is debugged, each spot size is satisfied by inspection Construction requirement.According to above-mentioned steps, remaining template system installation is completed.
Movable motor is installed, and after completing first segment installation, installs motor, and add butter in gear-box, wiring, experiment After positive and negative rotation, then motor on gearbox.
Above-described embodiment is used for illustrating the utility model, rather than limits the utility model, in this practicality In novel spirit and scope of the claims, to any modifications and changes that the utility model is made, this reality is both fallen within With novel protection domain.

Claims (8)

1. piping lane wall rapid construction device, it is characterised in that:It includes the plate device for pouring formwork erection(1), the mould Panel assembly(1)Mounted on for fixed form device(1)Door frame support device(2)On, the door frame support device(2)Bottom Portion is equipped with for driving entire door frame support device(2)Mobile running gear(3), in door frame support device(2)Top Telescopic awning device for rain-proof is installed(4)And guard bar device(5).
2. piping lane wall rapid construction device according to claim 1, it is characterised in that:The plate device(1)Including Template(101), the template(101)Using Combined formwork, polylith template(101)Between use flanged plate(102)Stationary phase Even, the flanged plate(102)Between use bolt(105)It is fixedly linked, the template(101)Outer wall to be fixed with more cross stupefied (103), the cross is stupefied(103)External vertical cross-fixing have more it is perpendicular stupefied(104), two pieces of templates positioned opposite(101) Between pass through more water-stopping pull rods(106)Tensioning is fixed, the template(101)Side wall on be fixed with multiple lifting lifting lugs (107).
3. piping lane wall rapid construction device according to claim 1, it is characterised in that:The door frame support device(2) Including bottom girder(202), the bottom girder(202)It is fixedly mounted on bottom support plate(201)On, the bottom support plate (201)Support is mounted on running gear(3)On, the bottom girder(202)Top braces truss structure is installed(203), institute State truss structure(203)And plate device(1)Between be equipped with more tilt or horizontally disposed batter brace device(6), The truss structure(203)Top head piece is installed(204), the head piece(204)On the installation of more lifting lugs is installed Seat(205), the mounting seat for lifting lug(205)Bottom davit is installed(206), the davit(206)The other end and template Device(1)Template(101)It is fixedly linked.
4. piping lane wall rapid construction device according to claim 1, it is characterised in that:The running gear(3)Including Movable motor(301), the movable motor(301)Output shaft(302)On rail wheel is installed(303), the rail wheel (303)With track(304)Match walking, the movable motor(301)It is fixedly mounted on door frame support device(2)Bottom girder (202)Bottom.
5. piping lane wall rapid construction device according to claim 4, it is characterised in that:The track(304)Using steel Rail, and be fixedly mounted on bottom plate by foundation bolt, more tracks(304)Between be connected and fixed by clamping plate.
6. piping lane wall rapid construction device according to claim 1, it is characterised in that:The guard bar device(5)Including The more fence uprights arranged vertically(501), the fence upright(501)It is fixedly mounted on door frame support device(2)Top it is horizontal Beam(204)On.
7. piping lane wall rapid construction device according to claim 1, it is characterised in that:The telescopic awning device (4)Including awning telescopic rod(402), the awning telescopic rod(402)Top flexible awning is installed(401).
8. piping lane wall rapid construction device according to claim 3, it is characterised in that:The batter brace device(6) Including intermediate draw bar(605), the intermediate draw bar(605)Center be machined with through-hole(606), in intermediate draw bar(605)Two End is separately installed with nut set(604), the nut set(604)It is upper that stretching screw rod is equipped with by screw-driven cooperation(603), The stretching screw rod(603)The other end be fixed with connection otic placode(602), the connection otic placode(602)On be machined with pin shaft hole (601), the connection otic placode(602)Respectively with plate device(1)With door frame support device(2)It is connected.
CN201820136792.9U 2018-01-26 2018-01-26 Piping lane wall rapid construction device Active CN207891915U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820136792.9U CN207891915U (en) 2018-01-26 2018-01-26 Piping lane wall rapid construction device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820136792.9U CN207891915U (en) 2018-01-26 2018-01-26 Piping lane wall rapid construction device

Publications (1)

Publication Number Publication Date
CN207891915U true CN207891915U (en) 2018-09-21

Family

ID=63545330

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820136792.9U Active CN207891915U (en) 2018-01-26 2018-01-26 Piping lane wall rapid construction device

Country Status (1)

Country Link
CN (1) CN207891915U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108118718A (en) * 2018-01-26 2018-06-05 中国葛洲坝集团股份有限公司 Piping lane wall rapid construction device and method
CN111305103A (en) * 2020-02-27 2020-06-19 中建科工集团有限公司 Rapid construction method of ETC portal frame

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108118718A (en) * 2018-01-26 2018-06-05 中国葛洲坝集团股份有限公司 Piping lane wall rapid construction device and method
CN111305103A (en) * 2020-02-27 2020-06-19 中建科工集团有限公司 Rapid construction method of ETC portal frame

Similar Documents

Publication Publication Date Title
CN105365042B (en) A kind of preparation method of prefabricated small box girder
CN211646021U (en) External mold mobile device is pour to case roof beam
CN109403374A (en) Factorial construction method for open trench tunnel integral tunnel lining
CN113235472B (en) Concrete placement platform truck is contained to apron
CN106193584B (en) A kind of self-supporting combined large steel model and its wall construction method of preventing fires
CN209040547U (en) A kind of building engineering construction floor structure
CN206299394U (en) A kind of tunneling subway station side wall self-propelled hydraulic lining trolley
CN207891915U (en) Piping lane wall rapid construction device
CN202596743U (en) Formwork trolley for underground tunnel pull-rod-free side wall construction
CN110394885A (en) A kind of integrated hydraulic formula template prefabricated applied to box culvert
CN108442405A (en) A kind of piping lane support construction based on Urban Underground pipe gallery
CN101660357A (en) Machinery for installing light partition battens
CN111113628B (en) Construction method for spraying prefabricated T-shaped beam
CN108118718A (en) Piping lane wall rapid construction device and method
CN214993219U (en) Concrete placement platform truck is contained to apron
CN111733872B (en) Pipe gallery construction method
CN117418858A (en) Box culvert full-section pouring self-propelled hydraulic steel template supporting unit and system
CN205532629U (en) All -hydraulic central ditch die carrier
CN210217063U (en) Plate joint filling device for light wall plate
CN109230279A (en) A kind of building-construction lifting device
CN104675184A (en) Double-cantilever full-folding sun and rain shelter
CN114908684A (en) Construction method of suspended casting box girder cradle method
CN207598256U (en) A kind of piping lane low-cost die vehicle
CN208699830U (en) A kind of building-construction lifting device
CN208280166U (en) A kind of piping lane support construction based on Urban Underground pipe gallery

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant