CN207891915U - Piping lane wall rapid construction device - Google Patents
Piping lane wall rapid construction device Download PDFInfo
- Publication number
- CN207891915U CN207891915U CN201820136792.9U CN201820136792U CN207891915U CN 207891915 U CN207891915 U CN 207891915U CN 201820136792 U CN201820136792 U CN 201820136792U CN 207891915 U CN207891915 U CN 207891915U
- Authority
- CN
- China
- Prior art keywords
- door frame
- frame support
- template
- plate
- piping lane
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model discloses piping lane wall rapid construction devices, it includes the plate device for pouring formwork erection, the plate device is mounted on the door frame support device for fixed form device, the bottom of the door frame support device is equipped with the running gear for driving entire door frame support device movement, and the telescopic awning device and guard bar device for rain-proof are equipped at the top of door frame support device.Such device is not limited in the construction process by weather, can automatically walk, can solve, using the appearance qualities such as concrete faulting of slab ends, spillage, screw hole caused by wooden model be more, to reduce labor intensity and material input, improve construction efficiency.
Description
Technical field
The utility model is related to underground pipe gallery technical field of construction, more particularly, to a kind of piping lane wall rapid construction
Device is suitable for the rapid construction of underground pipe gallery wall.
Background technology
Underground pipe gallery concrete main body structure wall surface requirements reach clear-water concrete effect, currently, general main
Body structural concrete wall construction is using traditional plank sheathing and Screw arbor with nut at both-ends as formwork erection mode, and the construction time is long, expense of taking a lot of work
When and Surface Quality of Concrete it is poor.
Utility model content
The utility model provides piping lane wall rapid construction device, and such device is not limited in the construction process by weather,
Can automatically walk, can solve using the appearance qualities such as concrete faulting of slab ends, spillage, screw hole caused by wooden model be more,
Labor intensity and material input are reduced, construction efficiency is improved.
In order to realize above-mentioned technical characteristic, what the purpose of this utility model was realized in:Piping lane wall rapid construction
Device, it includes the plate device for pouring formwork erection, and the plate device is mounted on the door frame branch for fixed form device
On support arrangement, the bottom of the door frame support device is equipped with the running gear for driving entire door frame support device movement,
Telescopic awning device and guard bar device for rain-proof is installed at the top of door frame support device.
The plate device includes template, and the template uses Combined formwork, is consolidated using flanged plate between polylith template
It is fixed to be connected, it is fixed by bolts connected between the flanged plate, the outer wall of the template is fixed with that more cross are stupefied, and the cross is stupefied
External vertical cross-fixing have more it is perpendicular stupefied, fixed by more water-stopping pull rod tensioning between two pieces of templates positioned opposite, institute
It states and is fixed with multiple lifting lifting lugs on the side wall of template.
The door frame support device includes bottom girder, and the bottom girder is fixedly mounted in bottom support plate, the bottom
Support plate support is mounted on running gear, and the top braces of the bottom girder are equipped with truss structure, the truss structure and
More inclinations or horizontally disposed batter brace device are installed between plate device, are equipped at the top of the truss structure
Head piece is equipped with more mounting seat for lifting lug on the head piece, and the bottom of the mounting seat for lifting lug is equipped with davit, described to hang
The other end of column and the template of plate device are fixedly linked.
The running gear includes movable motor, and rail wheel, the track are equipped on the output shaft of the movable motor
Wheel matches walking with track, and the movable motor is fixedly mounted on the bottom girder bottom of door frame support device.
The track uses rail, and is fixedly mounted on bottom plate by foundation bolt, passes through clamping plate between more tracks
It is connected and fixed.
The guard bar device includes the more fence uprights arranged vertically, and the fence upright is fixedly mounted on door frame support
On the head piece of device.
The telescopic awning device includes awning telescopic rod, and flexible awning is equipped at the top of the awning telescopic rod.
The batter brace device includes intermediate draw bar, and the center of the intermediate draw bar is machined with through-hole, in intermediate draw bar
Both ends be separately installed with nut set, the nut is put on is equipped with stretching screw rod, the stretching spiral shell by screw-driven cooperation
The other end of bar is fixed with connection otic placode, and pin shaft hole is machined in the connection otic placode, and the connection otic placode is filled with template respectively
It sets and is connected with door frame support device.
The utility model has the advantages that:
1, it can be conveniently used for the integral construction of piping lane wall by using above-mentioned apparatus, and can once install more
Gallery wall form is saved, while improving the installation process of template, shortens the formwork erection time, the labour for reducing operating personnel is strong
Degree, and the consistency poured is good, and Surface Quality of Concrete is good.
2, whole device is supported by running gear, and then door frame support device can be easily driven to walk,
Plate device is supported by door frame support device, pouring for follow-up wall can easily be carried out by plate device,
After the wall of a bid section pours completion, it may be convenient to pouring for next bid section wall is carried out, in moving process,
It only needs to start running gear.
Description of the drawings
The utility model is described in further detail with reference to the accompanying drawings and examples.
Fig. 1 is the utility model entirety sectional view.
Fig. 2 is the utility model door frame support device left view.
Fig. 3 is the utility model plate device left view.
Fig. 4 is the utility model batter brace apparatus structure schematic diagram.
In figure:Plate device 1, door frame support device 2, running gear 3, telescopic awning device 4, guard bar device 5;
Template 101, flanged plate 102, horizontal stupefied 103, perpendicular stupefied 104, bolt 105, water-stopping pull rod 106, lifting lifting lug 107;
Bottom support plate 201, bottom girder 202, truss structure 203, head piece 204, mounting seat for lifting lug 205, davit 206;
Movable motor 301, output shaft 302, rail wheel 303, track 304;
Fence upright 501;
Pin shaft hole 601, connection otic placode 602 stretch screw rod 603, nut set 604, intermediate draw bar 605, through-hole 606.
Specific implementation mode
The embodiment of the utility model is described further below in conjunction with the accompanying drawings.
Embodiment 1:
As shown in Figs 1-4, piping lane wall rapid construction device, it includes the plate device 1 for pouring formwork erection, the mould
Panel assembly 1 is mounted on the door frame support device 2 for fixed form device 1, and the bottom of the door frame support device 2 is equipped with
Running gear 3 for driving entire door frame support device 2 to move, is equipped at the top of door frame support device 2 for rain-proof
Telescopic awning device 4 and guard bar device 5.Above-mentioned constructing device, in the course of work, by running gear 3 to entirely filling
Set and be supported, so can easily drive door frame support device 2 walk, by door frame support device 2 to plate device 1 into
Row support, can easily carry out pouring for follow-up wall by plate device 1, it is completed when the wall of a bid section pours
Afterwards, it may be convenient to pouring for next bid section wall is carried out, in moving process, it is only necessary to start running gear 3.
Further, the plate device 1 includes template 101, and the template 101 uses Combined formwork, polylith template
It is fixedly linked using flanged plate 102 between 101, is fixedly linked using bolt 105 between the flanged plate 102, the template 101
Outer wall be fixed with more cross stupefied 103, the external vertical cross-fixing of the cross stupefied 103 has more perpendicular stupefied 104, two pieces of opposite cloth
It is fixed by more 106 tensioning of water-stopping pull rod between the template 101 set, multiple liftings is fixed on the side wall of the template 101
Lifting lug 107.By using above-mentioned plate device 1, in the course of work, by used between polylith template 101 flanged plate 102 into
Row is assembled, and then forms monoblock large form, then the large form for pouring wall is made of monoblock large form, and then facilitates subsequent
It pours, is attached with door frame support device 2 by the way that the lifting lifting lug 107 is convenient, and pass through the water-stopping pull rod
106 two pieces of adjacent templates 101 can be fixed.
Further, the door frame support device 2 includes bottom girder 202, and the bottom girder 202 is fixedly mounted on bottom branch
On fagging 201, the support of the bottom support plate 201 is mounted on running gear 3, and the top braces of the bottom girder 202 are installed
There is truss structure 203, more inclinations or horizontally disposed truss are installed between the truss structure 203 and plate device 1
The top of bracing device 6, the truss structure 203 is equipped with head piece 204, and more lifting lugs are equipped on the head piece 204
The bottom of mounting base 205, the mounting seat for lifting lug 205 is equipped with davit 206, the other end and the plate device 1 of the davit 206
Template 101 be fixedly linked.To can effectively it be connected between plate device 1 and running gear 3 by door frame support device 2
It connects, facilitates formwork erection process, and be also convenient for the movement of follow-up entire template.
Further, the running gear 3 includes movable motor 301, is pacified on the output shaft 302 of the movable motor 301
Equipped with rail wheel 303, the rail wheel 303 matches walking with track 304, and the movable motor 301 is fixedly mounted on door frame
202 bottom of bottom girder of support device 2.By above-mentioned running gear 3, in the course of work, driven by movable motor 301 defeated
Shaft 302, then rail wheel 303 is driven by output shaft 302, and then entire door frame support device 2 and mould are driven by rail wheel 303
Panel assembly 1 moves, and improves its construction efficiency.
Further, the track 304 uses rail, and is fixedly mounted on bottom plate by foundation bolt, more tracks
It is connected and fixed by clamping plate between 304.
Further, the guard bar device 5 includes the more fence uprights 501 arranged vertically, and the fence upright 501 is solid
Dingan County is on the head piece 204 of door frame support device 2.It can play the role of protection by the guard bar device 5.
Further, the telescopic awning device 4 includes awning telescopic rod 402, the top of the awning telescopic rod 402
Flexible awning 401 is installed.It can play the role of good rain-proof by the telescopic awning device 4, ensure that construction
Process is not influenced by rainy.
Further, the batter brace device 6 includes intermediate draw bar 605, and the center of the intermediate draw bar 605 is machined with
Through-hole 606 is separately installed with nut set 604 at the both ends of intermediate draw bar 605, is matched by screw-driven on the nut set 604
Conjunction, which is equipped with, stretches screw rod 603, and the other end for stretching screw rod 603 is fixed with connection otic placode 602, the connection otic placode 602
On be machined with pin shaft hole 601, the connection otic placode 602 is connected with plate device 1 and door frame support device 2 respectively.The course of work
In, it can will be tensioned between plate device 1 and door frame support device 2 by the batter brace device 6, and then ensure that pair
Template is fixed well, ensure that the quality that the later stage pours.
Embodiment 2:
The construction method of piping lane wall rapid construction device, includes the following steps described in any one:
Step1:Rigging device 1, running gear 3, door frame support device 2, telescopic awning device 4 and guard bar device
5, and by assembling combination between the device of above-mentioned merogenesis;
Step2:The height of plate device 1 is adjusted, absolute altitude is detected, the lead screw length of davit 206 is adjusted, reaches requirement height
Degree, it is connected by being bolted between multiple single-unit templates 101, and piece mixed up weld it is solid, by the surface of template 101 into
Row deashing, derusting and brush oil processing;
Step3:The sundries and dabbing led on wall are removed, double faced adhesive tape is sticked, first the left side template movement patch of per pass wall
Closely to by reinforcing bar, both ends bulkhead is installed, places water-stopping pull rod 106, it is reserved that water-stopping pull rod both ends are through at left and right side template respectively
In hole, 106 liang of end nuts of water-stopping pull rod are tightened close to reinforcing bar, watertight rubber pad are made to be adjacent to template 101 by mobile right side template;
Step4:Cabin inside dimension and wall straight cis degree are adjusted, plumb bob, adjustment left and right are hung up respectively at the both ends of midfeather
The horizontally disposed batter brace device 6 in both sides keeps wall form 101 vertical, is drawing elongated cotton rope, is hanging on template both ends, is adjusting
The whole horizontally disposed batter brace device 6 of left and right side, makes all batter brace devices 6 all in holding state;
Step5:Based on adjusting middle wall body template, respectively to the left, be simutaneously arranged positioning rule to the right, between certain
Away from template position of upper is equidistantly put in, adjustment batter brace device 6 makes left and right stretching screw rod 603 close up, fixed form exists
It is required that position, for controlling template spacing between making positioning rule just be positioned over twice wall;
Step6:Step5, adjustment exterior wall batter brace device 6 are repeated based on the wall form of left and right again, and places and determines
Position ruler, complies with the design requirement of piping lane cabin clear spacing;After whole, check batter brace device 6 whether in branch
Support state, and then hold out against template;
Step7:Awning is retracted to minimum, casting concrete, when concreting pours by several times according to layering, first constructs
After midfeather certain altitude, then identical height is symmetrically poured successively to both sides mid-board, abutment wall, cycle pours high to design
Journey, interval time control are principle not generating the cold seam of concrete construction;
Step8:Form removal waits for that walls concrete reaches design strength 30%, removes horizontally disposed 6 He of batter brace device
Water-stopping pull rod 106 starts 3 moving die plate of running gear and is detached from wall to next bid section, carries out pouring for next bid section.
The new template 101 used for the first time sprays a thin layer oil film in panel front;The match ratio of the oil film is new bavin
Oil:New machine oil is 7:3, after oil film air-dries, wiped clean black dirt, then uniform brushing aqueous demoulding agent, it is answered after rain drop erosion
Brush is mended in time;Wall 20-30cm high joint parts are led in wall before molding and paste sponge strip, to prevent rotten of the foot of a wall spillage, adjacent forms
Between piece use double-sided adhesive tape, piece be not more than 1.5mm.
Embodiment 3:
Step 1:
The group of the plate device 1, running gear 3, door frame support device 2, telescopic awning device 4 and guard bar device 5
Dress process detailed process is:Running gear 3 is assembled, the bottom girder 202 of installation door rack supporting device 2 assembles truss structure 203,
The reliability of inspection door rack supporting device 2 installs davit and plate device 1, and gap is eliminated in leveling, checks flatness, checks spiral shell
Whether bolt locks, and installs railing and awning.
Step 2:
Steelframe track is installed, the surveying setting-out on bottom plate spreads frame track, foundation bolt is used in combination to fix, with folder between rail
Plate is connected firmly;
Bottom girder is lifted, above-mentioned apparatus integrally divides 3 sections, second section is completed again after the completion of a section.Running gear spiral shell
On bottom girder, lifting bottom girder is placed on track bolt, and is supported on its left and right with flitch temporarily, keeps its stable, then hang
Fill other longerons, Zhi Wen, after four foundation longerons in place after, inspection is adjusted, make its four it is concordant.
Truss hoisting structure 203, because each chamber size is inconsistent, truss structure 203 and head piece 204 are different, select institute
Truss structure 203 and head piece 204 are needed, first hanging wheel is mounted on head piece 204, then truss structure 203 and head piece
204 are connected with, and by its integral hoisting on bottom girder, one group of head piece 204 is respectively installed at bottom girder both ends, tight with bolt
Gu, correction after, folding remove the temporary support lumps of wood.
Template is lifted, template is selected, davit 206 is installed into template in oral pore, lifting template is into standing on ground in cabin
It is against wall steel bar, is bundled temporarily with iron wire, is existed after template is hung in cabin entirely, then remaining stand column and beam hanging wheel integral hoisting
On bottom girder, in installation batter brace device 6, after fastening, it is hung on crossbeam hanging wheel with crane lifting template, reinforces each section
Connecting screw, that is, complete the installation of a segment.Lateral leading screw is installed, trolley is debugged, each spot size is satisfied by inspection
Construction requirement.According to above-mentioned steps, remaining template system installation is completed.
Movable motor is installed, and after completing first segment installation, installs motor, and add butter in gear-box, wiring, experiment
After positive and negative rotation, then motor on gearbox.
Above-described embodiment is used for illustrating the utility model, rather than limits the utility model, in this practicality
In novel spirit and scope of the claims, to any modifications and changes that the utility model is made, this reality is both fallen within
With novel protection domain.
Claims (8)
1. piping lane wall rapid construction device, it is characterised in that:It includes the plate device for pouring formwork erection(1), the mould
Panel assembly(1)Mounted on for fixed form device(1)Door frame support device(2)On, the door frame support device(2)Bottom
Portion is equipped with for driving entire door frame support device(2)Mobile running gear(3), in door frame support device(2)Top
Telescopic awning device for rain-proof is installed(4)And guard bar device(5).
2. piping lane wall rapid construction device according to claim 1, it is characterised in that:The plate device(1)Including
Template(101), the template(101)Using Combined formwork, polylith template(101)Between use flanged plate(102)Stationary phase
Even, the flanged plate(102)Between use bolt(105)It is fixedly linked, the template(101)Outer wall to be fixed with more cross stupefied
(103), the cross is stupefied(103)External vertical cross-fixing have more it is perpendicular stupefied(104), two pieces of templates positioned opposite(101)
Between pass through more water-stopping pull rods(106)Tensioning is fixed, the template(101)Side wall on be fixed with multiple lifting lifting lugs
(107).
3. piping lane wall rapid construction device according to claim 1, it is characterised in that:The door frame support device(2)
Including bottom girder(202), the bottom girder(202)It is fixedly mounted on bottom support plate(201)On, the bottom support plate
(201)Support is mounted on running gear(3)On, the bottom girder(202)Top braces truss structure is installed(203), institute
State truss structure(203)And plate device(1)Between be equipped with more tilt or horizontally disposed batter brace device(6),
The truss structure(203)Top head piece is installed(204), the head piece(204)On the installation of more lifting lugs is installed
Seat(205), the mounting seat for lifting lug(205)Bottom davit is installed(206), the davit(206)The other end and template
Device(1)Template(101)It is fixedly linked.
4. piping lane wall rapid construction device according to claim 1, it is characterised in that:The running gear(3)Including
Movable motor(301), the movable motor(301)Output shaft(302)On rail wheel is installed(303), the rail wheel
(303)With track(304)Match walking, the movable motor(301)It is fixedly mounted on door frame support device(2)Bottom girder
(202)Bottom.
5. piping lane wall rapid construction device according to claim 4, it is characterised in that:The track(304)Using steel
Rail, and be fixedly mounted on bottom plate by foundation bolt, more tracks(304)Between be connected and fixed by clamping plate.
6. piping lane wall rapid construction device according to claim 1, it is characterised in that:The guard bar device(5)Including
The more fence uprights arranged vertically(501), the fence upright(501)It is fixedly mounted on door frame support device(2)Top it is horizontal
Beam(204)On.
7. piping lane wall rapid construction device according to claim 1, it is characterised in that:The telescopic awning device
(4)Including awning telescopic rod(402), the awning telescopic rod(402)Top flexible awning is installed(401).
8. piping lane wall rapid construction device according to claim 3, it is characterised in that:The batter brace device(6)
Including intermediate draw bar(605), the intermediate draw bar(605)Center be machined with through-hole(606), in intermediate draw bar(605)Two
End is separately installed with nut set(604), the nut set(604)It is upper that stretching screw rod is equipped with by screw-driven cooperation(603),
The stretching screw rod(603)The other end be fixed with connection otic placode(602), the connection otic placode(602)On be machined with pin shaft hole
(601), the connection otic placode(602)Respectively with plate device(1)With door frame support device(2)It is connected.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820136792.9U CN207891915U (en) | 2018-01-26 | 2018-01-26 | Piping lane wall rapid construction device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820136792.9U CN207891915U (en) | 2018-01-26 | 2018-01-26 | Piping lane wall rapid construction device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207891915U true CN207891915U (en) | 2018-09-21 |
Family
ID=63545330
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820136792.9U Active CN207891915U (en) | 2018-01-26 | 2018-01-26 | Piping lane wall rapid construction device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207891915U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108118718A (en) * | 2018-01-26 | 2018-06-05 | 中国葛洲坝集团股份有限公司 | Piping lane wall rapid construction device and method |
CN111305103A (en) * | 2020-02-27 | 2020-06-19 | 中建科工集团有限公司 | Rapid construction method of ETC portal frame |
-
2018
- 2018-01-26 CN CN201820136792.9U patent/CN207891915U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108118718A (en) * | 2018-01-26 | 2018-06-05 | 中国葛洲坝集团股份有限公司 | Piping lane wall rapid construction device and method |
CN111305103A (en) * | 2020-02-27 | 2020-06-19 | 中建科工集团有限公司 | Rapid construction method of ETC portal frame |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105365042B (en) | A kind of preparation method of prefabricated small box girder | |
CN211646021U (en) | External mold mobile device is pour to case roof beam | |
CN109403374A (en) | Factorial construction method for open trench tunnel integral tunnel lining | |
CN113235472B (en) | Concrete placement platform truck is contained to apron | |
CN106193584B (en) | A kind of self-supporting combined large steel model and its wall construction method of preventing fires | |
CN209040547U (en) | A kind of building engineering construction floor structure | |
CN206299394U (en) | A kind of tunneling subway station side wall self-propelled hydraulic lining trolley | |
CN207891915U (en) | Piping lane wall rapid construction device | |
CN202596743U (en) | Formwork trolley for underground tunnel pull-rod-free side wall construction | |
CN110394885A (en) | A kind of integrated hydraulic formula template prefabricated applied to box culvert | |
CN108442405A (en) | A kind of piping lane support construction based on Urban Underground pipe gallery | |
CN101660357A (en) | Machinery for installing light partition battens | |
CN111113628B (en) | Construction method for spraying prefabricated T-shaped beam | |
CN108118718A (en) | Piping lane wall rapid construction device and method | |
CN214993219U (en) | Concrete placement platform truck is contained to apron | |
CN111733872B (en) | Pipe gallery construction method | |
CN117418858A (en) | Box culvert full-section pouring self-propelled hydraulic steel template supporting unit and system | |
CN205532629U (en) | All -hydraulic central ditch die carrier | |
CN210217063U (en) | Plate joint filling device for light wall plate | |
CN109230279A (en) | A kind of building-construction lifting device | |
CN104675184A (en) | Double-cantilever full-folding sun and rain shelter | |
CN114908684A (en) | Construction method of suspended casting box girder cradle method | |
CN207598256U (en) | A kind of piping lane low-cost die vehicle | |
CN208699830U (en) | A kind of building-construction lifting device | |
CN208280166U (en) | A kind of piping lane support construction based on Urban Underground pipe gallery |