CN201386251Y - Transverse unit of beam column bracket - Google Patents
Transverse unit of beam column bracket Download PDFInfo
- Publication number
- CN201386251Y CN201386251Y CN200920054626U CN200920054626U CN201386251Y CN 201386251 Y CN201386251 Y CN 201386251Y CN 200920054626 U CN200920054626 U CN 200920054626U CN 200920054626 U CN200920054626 U CN 200920054626U CN 201386251 Y CN201386251 Y CN 201386251Y
- Authority
- CN
- China
- Prior art keywords
- support
- post
- hydraulic cylinder
- slideway
- dolly
- Prior art date
Links
- 238000005266 casting Methods 0.000 claims abstract description 16
- 238000006073 displacement reactions Methods 0.000 claims description 14
- 239000003351 stiffeners Substances 0.000 claims description 4
- 240000006028 Sambucus nigra Species 0.000 claims description 3
- 238000010276 construction Methods 0.000 abstract description 12
- 281999990635 Foundations companies 0.000 abstract 3
- 238000010586 diagrams Methods 0.000 description 3
- 229910000831 Steel Inorganic materials 0.000 description 2
- 230000005484 gravity Effects 0.000 description 2
- 230000011218 segmentation Effects 0.000 description 2
- 239000010959 steel Substances 0.000 description 2
- 206010011376 Crepitations Diseases 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering processes Methods 0.000 description 1
- 239000000463 materials Substances 0.000 description 1
Abstract
Description
Technical field:
The utility model relates to the horizontal mobile device of the post and beam support that uses in the cast-in-place beam construction.
Background technology:
The highway section, many turnouts of speedway or railway or parallel highway section, the spacing of its each contiguous bridge is often less, by traditional laying method, its mounting rail pillar support needs dismounting, is carried to the contiguous bridge of next section position, after re-assemblying behind the bridge of having built one section turnout, could build once more, build dismounting, carrying and the Web beam pillar support finishing all turnouts and need repeated multiple times, its complicated operation, time-consuming, effort.
If a kind of Traverse Displacement Unit of post and beam support can be provided, it can be with the post and beam support under situation about not dismantling, whole traversing successively casting position to each contiguous bridge, each Duan Qiao is built, so just can greatly reduce workload and the time that the bridge erection of highway section, many turnouts is built, can significantly shorten the construction period of many contiguous bridges, reduce the low and raising efficiency of construction of construction cost.
The utility model content:
The purpose of this utility model is to provide a kind of Traverse Displacement Unit of post and beam support, under the situation that is implemented in removal bracket not, the casting position that post and beam support integral body is moved to each turnout is built, thereby the construction period that the bridge that shortens the highway section of being made up of multiple sections of adjacent bridges in highway section, many turnouts, parallel highway section etc. is built, the raising efficiency of construction.
A kind of Traverse Displacement Unit of post and beam support, the horizontal basis that comprises many brace summer pillar bracket upright post, the contiguous bridge casting position of each horizontal each section of base run-through, on every horizontal basis the flute profile slideway is installed, each flute profile slideway is parallel to each other equally, the same contiguous bridge casting position of each section that connects, the bottom of each column of post and beam support is pressed with dolly, insert in the flute profile slideway by dolly, can slide along slideway, the top of described dolly is the support platform that is used for support post, its bottom is for contacting rotating roller with slideway, on each horizontal basis hydraulic cylinder is installed all, one end of hydraulic cylinder connects dolly, and the other end is fixed on slideway or the horizontal basis.
The Traverse Displacement Unit of post and beam support described in the utility model, each of support column bottom all inserts in the flute profile slideway of the casting position that connects the contiguous bridge of each section by dolly, by driving hydraulic cylinder, can spur post and beam support integral body moves along the flute profile slideway, because the flute profile slideway connects the casting position of the contiguous bridge of each section, by the pulling hydraulic cylinder, can finish building of each bridge with support along the casting position that moves to each contiguous bridge in the flute profile slideway.It can be under the situation of removal bracket not, finish building of each bridge, reduce workload and time that the bridge erection in the highway section of being made up of multiple sections of adjacent bridges in highway section, many turnouts, parallel highway section etc. is built significantly, significantly shorten the construction period of many contiguous bridges, reduced the low and raising efficiency of construction of construction cost.
Description of drawings:
Fig. 1 is a kind of schematic diagram of Traverse Displacement Unit of post and beam support;
Fig. 2 is the traversing schematic diagram of post and beam support;
Fig. 3 is the partial schematic diagram of Traverse Displacement Unit.
The specific embodiment:
A kind of Traverse Displacement Unit of post and beam support, as Fig. 1, Fig. 2, Fig. 3, comprise horizontal basic 2 of many brace summer pillar bracket upright post 1, the contiguous bridge casting position of each horizontal each section of base run-through, on every horizontal basis flute profile slideway 3 is installed, each flute profile slideway is parallel to each other equally, the same contiguous bridge casting position of each section that connects, the bottom of each column 1 of post and beam support is pressed with dolly 4, insert in the flute profile slideway 3 by dolly 4, the top of dolly is the support platform 41 that is used for support post, and its bottom is for contacting rotating roller 42 with slideway.The roller of dolly bottom can be a plurality of, and the bottom that is installed on dolly side by side is rotatable.The roller of dolly bottom also can a plurality ofly form annular roller straps side by side, and roller is from rotatable, and roller strap integral body is also rotatable.On each horizontal basis hydraulic cylinder 5 is installed all, an end of hydraulic cylinder connects dolly 4, and the other end is fixed on slideway or the horizontal basis.
Described hydraulic cylinder can be the continuous hydraulic cylinder of midsequent, and an end of its hydraulic cylinder connects dolly, and the other end is fixed on the flute profile slideway by dismountable connector, is horizontally arranged with a plurality of fixed hole position or holders that are used for fixing hydraulic cylinder on the slideway.Before the trave lling girder pillar support, its hydraulic cylinder is in extended state, thereby in slideway, slide one section by shrinking hydraulic cylinder pulling dolly drive support, after the hydraulic cylinder contraction puts in place, the connector of dismounting hydraulic cylinder and flute profile slideway after the hydraulic cylinder stretching, is fixed in hydraulic cylinder on another fixing hole or holder of slideway front end with connector again, shrink hydraulic cylinder once more after fixing, can spur one section of support reach once more.By said structure, can along slideway progressively, the trave lling girder pillar support of segmentation, it moves more steady, can avoid can be good at the shift position of control bracket because of the excessive problem that can't accurately locate of the excessive once mobile inertia of support quality.And it passes through progressively, the pulling support of segmentation, also can realize that the long distance of support is mobile under the situation of using less hydraulic cylinder.
The gravity of post and beam support is very big, and when mobile, the pressure that flute profile slideway surface is subjected to is very big in the flute profile slideway for it, and its bottom surface is easy to generate crackle, and the application life of slideway is shorter.Simultaneously, the effect of gravity greatly also can make channel-section steel that bigger distortion takes place, and it has increased frictional force greatly, makes the comparatively difficulty that moves of support.In order to improve above-mentioned situation, improve the application life of flute profile slideway, reduce the deflection of flute profile slideway, can extra attached one deck stiffener 5 on the inside top surface of flute profile slideway, stiffener can be the plate that high-intensity steel plate or other high-strength material are made.Directly contact with dolly by stiffener, the intensity that it has strengthened the flute profile slideway can reduce the possibility that the flute profile slideway cracks, and has improved application life.The intensity on the inner surface of flute profile slideway improves simultaneously, and the deflection when support moves also can reduce, and support moves also just convenient.
Claims (6)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN200920054626U CN201386251Y (en) | 2009-04-15 | 2009-04-15 | Transverse unit of beam column bracket |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN200920054626U CN201386251Y (en) | 2009-04-15 | 2009-04-15 | Transverse unit of beam column bracket |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201386251Y true CN201386251Y (en) | 2010-01-20 |
Family
ID=41578780
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN200920054626U CN201386251Y (en) | 2009-04-15 | 2009-04-15 | Transverse unit of beam column bracket |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201386251Y (en) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102140779A (en) * | 2011-01-14 | 2011-08-03 | 中铁大桥局集团第六工程有限公司 | Movable cast-in-situ support and movable construction method of box girder cast-in-situ support |
CN103088758A (en) * | 2013-02-06 | 2013-05-08 | 中铁大桥局集团第八工程有限公司 | Steel girder rod piece assembling movable and telescopic high-strength bolt screwing platform |
CN104074142A (en) * | 2014-07-11 | 2014-10-01 | 四川川交路桥有限责任公司 | Box beam cast-in-place support whole-horizontal-moving construction method |
CN104612056A (en) * | 2014-12-10 | 2015-05-13 | 中铁第四勘察设计院集团有限公司 | Quick pushing and transverse moving method for integral frame bridge |
CN104929049A (en) * | 2015-06-15 | 2015-09-23 | 许昌学院 | Road and bridge combined type construction method |
CN105862600A (en) * | 2016-04-29 | 2016-08-17 | 钟爱华 | Multi-segment bridge casting equipment and construction method thereof |
CN106320179A (en) * | 2016-08-24 | 2017-01-11 | 广西长长路桥建设有限公司 | Construction method for whole translation of cast-in-situ support of prestressed concrete continuous box girder |
CN109457618A (en) * | 2018-12-11 | 2019-03-12 | 中交第二航务工程局有限公司 | A kind of concrete girder cast-in-situ construction method |
-
2009
- 2009-04-15 CN CN200920054626U patent/CN201386251Y/en not_active IP Right Cessation
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102140779A (en) * | 2011-01-14 | 2011-08-03 | 中铁大桥局集团第六工程有限公司 | Movable cast-in-situ support and movable construction method of box girder cast-in-situ support |
CN102140779B (en) * | 2011-01-14 | 2012-11-28 | 中铁大桥局集团第六工程有限公司 | Movable cast-in-situ support and movable construction method of box girder cast-in-situ support |
CN103088758A (en) * | 2013-02-06 | 2013-05-08 | 中铁大桥局集团第八工程有限公司 | Steel girder rod piece assembling movable and telescopic high-strength bolt screwing platform |
CN104074142A (en) * | 2014-07-11 | 2014-10-01 | 四川川交路桥有限责任公司 | Box beam cast-in-place support whole-horizontal-moving construction method |
CN104612056A (en) * | 2014-12-10 | 2015-05-13 | 中铁第四勘察设计院集团有限公司 | Quick pushing and transverse moving method for integral frame bridge |
CN104929049A (en) * | 2015-06-15 | 2015-09-23 | 许昌学院 | Road and bridge combined type construction method |
CN104929049B (en) * | 2015-06-15 | 2018-03-02 | 许昌学院 | Road and bridge combined type construction method |
CN105862600A (en) * | 2016-04-29 | 2016-08-17 | 钟爱华 | Multi-segment bridge casting equipment and construction method thereof |
CN106320179A (en) * | 2016-08-24 | 2017-01-11 | 广西长长路桥建设有限公司 | Construction method for whole translation of cast-in-situ support of prestressed concrete continuous box girder |
CN109457618A (en) * | 2018-12-11 | 2019-03-12 | 中交第二航务工程局有限公司 | A kind of concrete girder cast-in-situ construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203961992U (en) | Portable full framing chassis | |
CN206708778U (en) | A kind of construction site adjustable head lamp | |
CN201697897U (en) | Automatic under-floor ultrasonic defect detector for railway vehicle | |
CN203487822U (en) | Elevating rotary parking equipment with double tracks | |
CN201010858Y (en) | Device especially for bridge detecting and maintaining | |
CN107165192B (en) | A kind of pipe gallery segmentation brake type fashioned iron door frame and its construction | |
CN104533460B (en) | Support replacement formula formwork jumbo and the construction method of underpass concreting | |
CN103541744A (en) | Tire walking full-hydraulic lining trolley | |
CN105155423A (en) | Upward moving type movable formwork for continuous box girder construction | |
CN201003145Y (en) | Upward and self-walking type mobile die carrier | |
CN103758541B (en) | Anchor bar of waterproof plate in tunnels lays chassis and laying method thereof | |
CN204984438U (en) | Tunnel lining platform truck with adjustable | |
CN201474704U (en) | Needle beam type hydraulic steel mould carrier | |
CN202991063U (en) | Large-section tunnel hydraulic trolley | |
CN103074829B (en) | Railway switch changing construction method and railway switch track laying unit thereof | |
CN102296971B (en) | Lining method for tunnel emergency turnout strips and tunnel-lining trolley | |
CN105736016B (en) | Tunnel double-lining framework of steel reinforcement construction equipment and its application | |
CN105201249A (en) | Side movement type parking system | |
CN203021883U (en) | Wheel-track railway track laying unit | |
CN104632251A (en) | Integrally cast type mould plate trolley and construction method of concrete pouring of underground passage | |
CN100424322C (en) | Full circle once lining segregation type nose girder module bench and its construction method | |
CN202164546U (en) | High pier bridge construction platform | |
CN104631882A (en) | Avoidance-free dual-layer parking device | |
CN107119515B (en) | A kind of fast quick change plate system and method for rotation shifting in situ for fragment-free track slab replacement | |
CN104594918A (en) | Split integrated underground passage steel mold plate trolley and construction method thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
C14 | Grant of patent or utility model | ||
TR01 | Transfer of patent right |
Effective date of registration: 20100805 Address after: 100043 No. 35, Shijingshan Road, Beijing, Shijingshan District Co-patentee after: Harbin Railway Construction Group Co., Ltd. of China Railway 22 Bureau Group Patentee after: China Railway 22nd Construction Bureau Co., Ltd. Address before: 150006 No. 113 West straight street, Harbin, Heilongjiang Patentee before: Harbin Railway Construction Group Co., Ltd. of China Railway 22 Bureau Group |
|
C41 | Transfer of patent application or patent right or utility model | ||
ASS | Succession or assignment of patent right |
Owner name: CHINA RAILWAY 22TH BUREAU GROUP CO., LTD. Free format text: FORMER OWNER: HARBIN RAILWAY CONSTRUCTION GROUP CO., LTD. OF CHINA RAILWAY NO.22 BUREAU Effective date: 20100805 Owner name: HARBIN RAILWAY CONSTRUCTION GROUP CO., LTD. OF CHI |
|
COR | Change of bibliographic data |
Free format text: CORRECT: ADDRESS; FROM: 150006 NO.113, XIDAZHI STREET, HARBIN CITY, HEILONGJIANG PROVINCE TO: 100043 NO.35, SHIJINGSHAN ROAD, SHIJINGSHAN DISTRICT, BEIJING CITY |
|
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20100120 Termination date: 20180415 |
|
CF01 | Termination of patent right due to non-payment of annual fee |