CN208803487U - Piping lane new type formwork trolley - Google Patents
Piping lane new type formwork trolley Download PDFInfo
- Publication number
- CN208803487U CN208803487U CN201821379473.7U CN201821379473U CN208803487U CN 208803487 U CN208803487 U CN 208803487U CN 201821379473 U CN201821379473 U CN 201821379473U CN 208803487 U CN208803487 U CN 208803487U
- Authority
- CN
- China
- Prior art keywords
- support
- backform
- side support
- independent
- new type
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
The utility model provides a kind of piping lane new type formwork trolley, belong to pipe gallery technical field, including template, supporting mechanism and independent support, wherein template includes backform and side form, backform include be located in the middle it is late tear portion open and evening be set tear morning of portion two sides open and tear portion open;Supporting mechanism includes the adjustable Left-side support of spacing and height and Right side support, is fixedly installed side form on the outside of Left-side support and Right side support, top respectively with to tear portion open corresponding morning of backform two sides;Independent bearing height is adjustable, and the evening for being used to support backform tears portion open.After the utility model can permit maintenance a period of time, such as 3-5 days, side form is removed in advance and the morning of backform tears portion open, and is moved to next construction section and constructs again, and the evening portion of tearing open for only reserving independent support and backform continued maintenance to 14 days.Compared with ability demoulding after the prior art has integrally conserved 14 days, all transfer efficients are substantially increased, the duration is shortened, have ensured the progress of project entirety.
Description
Technical field
The utility model belongs to pipe gallery technical field, is to be related to a kind of piping lane new type formwork trolley more specifically.
Background technique
Formwork jumbo is in constructing tunnel according to the difference of tunnel Internal periphery shape, tunnel lining concreting mode
Difference, mould is poured a kind of special-purpose machinery construction equipment of tunnel lining building concrete plate, in railway, highway, water conservancy and hydropower etc.
Engineering construction in be widely used.It can be to avoid construction interference using formwork jumbo, it is often more important that substantially increase tunnel
Interior lining construction quality, while also improving the mechanization degree of constructing tunnel.Although formwork jumbo pattern multiplicity, it is tied
Structure is essentially identical, is all made of several major: template part, door frame body portion, running gear, supporting mechanism, translation system and
Other auxiliary equipments.
Formwork jumbo currently on the market is mostly telescoping steel form and wooden model trolley, and wherein the supporting mechanism of telescoping steel form uses
Steel pipe expires hall support frame, and weight weight is complicated for operation, and working rack template consumption is big;The materials such as wooden model trolley flitch
Put into excessive, inadequate low-carbon environment-friendly.Moreover, both formwork jumbos needed after casting concrete maintenance 14 days, could demoulding after
Continuous to construct forward, turn around time is long, longer so as to cause the duration.
Utility model content
The purpose of this utility model is to provide a kind of piping lane new type formwork trolley, with solve it is existing in the prior art because
Duration longer technical problem caused by turn around time is long.
In order to achieve the above purposes, the technical solution adopted by the utility model is: provides a kind of piping lane new type formwork trolley, packet
Include: template, the template include backform and side form, the backform include be located in the middle it is late tear portion open and be arranged tear portion open in the evening
The morning of two sides tears portion open;Supporting mechanism, the supporting mechanism include the adjustable Left-side support of spacing and height and Right side support,
Side form is fixedly installed on the outside of the Left-side support and the Right side support, morning of the top respectively with the backform two sides tears open
Portion is corresponding;With independent support, the independent bearing height is adjustable, and the evening for being used to support the backform tears portion open.
Further, the template is plastic composites template.
Further, the steel truss that the Left-side support and the Right side support are an integral structure.
Further, connecting rod, the connecting rod are fixedly installed on the Left-side support and the Right side support
On be provided with U-shaped connector, be fixedly connected by the U-shaped connector with the side form.
Further, multiple intermediate screw rods are provided between the Left-side support and the Right side support, bottom is provided with
Collet and pulley, the collet and pulley are provided with adjusting screw rod.
Further, the independent branch support is provided with jacking, and bottom is provided with independent collet and independent sheaves, described
Jacking, independent collet and independent sheaves are provided with adjusting screw rod.
The beneficial effect of piping lane new type formwork trolley provided by the utility model is:
Compared with prior art, the utility model piping lane new type formwork trolley, after can permit maintenance a period of time, such as
3-5 days, side form was removed in advance and the morning of backform tears portion open, and is moved to next construction section and constructs again, only reserves independent support
Continue maintenance to 14 days with the evening portion of tearing open of backform.Compared with ability demoulding after the prior art has integrally conserved 14 days, substantially increase
All transfer efficients, shorten the duration, have ensured the progress of project entirety.
Detailed description of the invention
It, below will be to embodiment or the prior art in order to illustrate more clearly of the technical scheme in the embodiment of the utility model
Attached drawing needed in description is briefly described, it should be apparent that, the accompanying drawings in the following description is only that this is practical new
Some embodiments of type for those of ordinary skill in the art without any creative labor, can be with
It obtains other drawings based on these drawings.
Fig. 1 is the structural schematic diagram of piping lane new type formwork trolley provided by the embodiment of the utility model;
Fig. 2 is to tear portion open in the reserved independent support of piping lane new type formwork trolley provided by the embodiment of the utility model and the evening of backform
The schematic diagram of maintenance.
Wherein, each appended drawing reference in figure:
1- backform;11- evening tears portion open;12- early tears portion open;2- side form;31- Left-side support;32- Right side support;4- is independently supported;
Screw rod among 5-;6- collet;7- pulley;8- jacking;9- independence collet;10- independent sheaves.
Specific embodiment
In order to which technical problem to be solved in the utility model, technical solution and beneficial effect is more clearly understood, with
Lower combination accompanying drawings and embodiments, the present invention will be further described in detail.It should be appreciated that specific reality described herein
It applies example to be only used to explain the utility model, is not used to limit the utility model.
Also referring to Fig. 1 and Fig. 2, now piping lane new type formwork trolley provided by the utility model is illustrated.Piping lane
New type formwork trolley, including template, supporting mechanism and independent support 4, wherein template includes backform 1 and side form 2, and backform 1 includes
Be located in the middle it is late tear portion 11 open and evening be set tear morning of 11 two sides of portion open and tear portion 12 open;Supporting mechanism includes that spacing and height are adjustable
The outside of the Left-side support 31 and Right side support 32 of section, Left-side support 31 and Right side support 32 is fixedly installed side form 2, top part
Not with to tear portion 12 open corresponding morning of 1 two sides of backform;Independent 4 height of support is adjustable, and the evening for being used to support backform 1 tears portion 11 open.
The utility model also provides a kind of construction technology of piping lane formwork jumbo, and piping lane formwork jumbo is that above-mentioned piping lane is new
Type formwork jumbo, comprising the following steps:
Step 1: installation template, the spacing by adjusting Left-side support and Right side support are completed side form location and installation, are passed through
The height for adjusting Left-side support and Right side support completes backform location and installation, the independent support of finally installation;
Step 2: casting concrete;
Step 3: side form demoulding reduces the spacing of Left-side support and Right side support, completes side form demoulding;
Step 4: backform demoulding reduces the height of Left-side support and Right side support, and the morning for removing backform two sides tears portion open, completes
Backform demoulding;
Step 5: turnover, mobile Left-side support and Right side support with side form to next construction section reserve independent support
Continue to conserve with the evening portion of tearing open of backform.
Piping lane new type formwork trolley provided by the utility model, after can permit maintenance a period of time, such as 3-5 days, first
The morning that row removes side form and backform tears portion open, and is moved to next construction section and constructs again, only reserves independent support and backform
Evening tears portion 11 open and continues maintenance to 14 days.Compared with ability demoulding after the prior art has integrally conserved 14 days, turnover effect is substantially increased
Rate shortens the duration, has ensured the progress of project entirety.
Further, a kind of specific embodiment as piping lane new type formwork trolley provided by the utility model, template
For plastic composites template, light-weight, assembled efficiency is fast, it is simple to reinforce, and comparison punching block, wooden model reduce weight, saves
The investment of the materials such as flitch reduces the labor intensity of worker, improves construction efficiency, very while guaranteeing molding effect
Low-carbon energy-saving is just realized, civilized construction has ensured the duration progress of project entirety.
Further, a kind of specific embodiment as piping lane new type formwork trolley provided by the utility model, left side
The steel truss that support and Right side support are an integral structure, steel pipe compared with the prior art expires hall support frame, easy to operate,
Installation effectiveness is fast, while guaranteeing molding effect, reduces the labor intensity of worker, improves construction efficiency, further contracts
The short duration.
Further, a kind of specific embodiment as piping lane new type formwork trolley provided by the utility model, left side
Support and Right side support on be fixedly installed connecting rod, U-shaped connector is provided on connecting rod, by U-shaped connector with
Side form is fixedly connected.Specifically, connecting rod is square steel, and U-shaped connector is arranged on square steel, and U-shaped connector covers on square steel, so
Square steel back cord is welded on Left-side support and Right side support afterwards, the opening of U-shaped connector is towards side form, and the connection with side form
Male cooperation is then fixed together by pin shaft, to complete being fixedly connected for rigidity supporting mechanism and plastic template.It will work as
It is also so not limited to a kind of this form, it can also be stupefied for flitch time.
Further, also referring to Fig. 1 and Fig. 2, as piping lane new type formwork trolley provided by the utility model one
Kind specific embodiment, is provided with multiple intermediate screw rods 5, the collet that bottom is provided between Left-side support 31 and Right side support 32
6 and pulley 7, collet 6 and pulley 7 be provided with adjusting screw rod.Spacing is adjusted by intermediate lead screw, is adjusted by the collet 6 of bottom
Section height.The setting of pulley 7 is convenient for overall movement.When bottom needs to support, respective adjusting screw rod is adjusted, so that collet 6 is fallen
Ground withdraws pulley 7, when needing mobile, reversely adjusts respective adjusting screw rod, and pulley 7 lands, and withdraws collet 6.
Further, also referring to Fig. 1 and Fig. 2, as piping lane new type formwork trolley provided by the utility model one
Kind specific embodiment, independent 4 top of support are provided with jacking 8, and bottom is provided with independent collet 9 and independent sheaves 10, jacking
8, independent collet 9 and independent sheaves 10 are provided with adjusting screw rod.When installation independently supports 4, backform 1 has been mounted to position, leads to
The adjusting screw rod of jacking 8 and independent collet 9 is overregulated, so that independent support 4 supports to place.When bottom needs to support, adjust
Corresponding adjusting screw rod lands independent collet 9, withdraws independent sheaves 10, when needing mobile, reversely adjusts corresponding adjusting
Screw rod withdraws independent collet 9 so that independent sheaves 10 are landed.
Specifically, the step of construction technology of piping lane formwork jumbo provided by the utility model can refine are as follows:
Step 1: installation template completes side form location and installation by adjusting intermediate screw rod, by the adjusting silk for adjusting collet
Bar completes backform location and installation, the independent support of finally installation;
Step 2: casting concrete;
Step 3: side form demoulding, pulley landing reduce the spacing of Left-side support and Right side support by adjusting intermediate screw rod,
Side form demoulding is completed, intermediate screw rod is removed;
Step 4: pulley is packed up in backform demoulding, and the adjusting screw rod by adjusting collet reduces Left-side support and Right side support
Height, the morning for removing backform two sides tears portion 12 open, completes backform demoulding;
Step 5: turnover, pulley landing, mobile Left-side support and Right side support with side form are reserved to next construction section
The evening of independent support and backform tears portion 11 open and continues to conserve.
The above is only the preferred embodiment of the utility model only, is not intended to limit the utility model, all at this
Made any modifications, equivalent replacements, and improvements etc., should be included in the utility model within the spirit and principle of utility model
Protection scope within.
Claims (6)
1. piping lane new type formwork trolley characterized by comprising
Template, the template include backform and side form, and the backform includes being located in the middle late to tear portion open and setting is torn open in the evening
The morning of portion two sides tears portion open;
Supporting mechanism, the supporting mechanism include the adjustable Left-side support of spacing and height and Right side support, the left side
It is fixedly installed side form on the outside of support and the Right side support, it is corresponding that top tears portion open with the morning of the backform two sides respectively;
With independent support, the independent bearing height is adjustable, and the evening for being used to support the backform tears portion open.
2. piping lane new type formwork trolley as described in claim 1, it is characterised in that: the template is plastic composites mould
Plate.
3. piping lane new type formwork trolley as claimed in claim 2, it is characterised in that: the Left-side support and the Right side support
The steel truss being an integral structure.
4. piping lane new type formwork trolley as claimed in claim 3, it is characterised in that: the Left-side support and the Right side support
On be fixedly installed connecting rod, U-shaped connector is provided on the connecting rod, passes through the U-shaped connector and the side
Mould is fixedly connected.
5. piping lane new type formwork trolley as described in claim 1, it is characterised in that: the Left-side support and the Right side support
Between be provided with multiple intermediate screw rods, the collet and pulley that bottom is provided with, the collet and pulley are provided with adjusting screw rod.
6. piping lane new type formwork trolley as described in claim 1, it is characterised in that: the independent branch support is provided with top
Support, bottom are provided with independent collet and independent sheaves, and the jacking, independent collet and independent sheaves are provided with adjusting screw rod.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821379473.7U CN208803487U (en) | 2018-08-24 | 2018-08-24 | Piping lane new type formwork trolley |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821379473.7U CN208803487U (en) | 2018-08-24 | 2018-08-24 | Piping lane new type formwork trolley |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208803487U true CN208803487U (en) | 2019-04-30 |
Family
ID=66235647
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821379473.7U Active CN208803487U (en) | 2018-08-24 | 2018-08-24 | Piping lane new type formwork trolley |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208803487U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108951704A (en) * | 2018-08-24 | 2018-12-07 | 中铁十七局集团第三工程有限公司 | Piping lane new type formwork trolley and its construction technology |
CN110629640A (en) * | 2019-10-09 | 2019-12-31 | 中铁二十一局集团第三工程有限公司 | Automatic moving device for road bridge deck concrete construction vibration beam |
-
2018
- 2018-08-24 CN CN201821379473.7U patent/CN208803487U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108951704A (en) * | 2018-08-24 | 2018-12-07 | 中铁十七局集团第三工程有限公司 | Piping lane new type formwork trolley and its construction technology |
CN110629640A (en) * | 2019-10-09 | 2019-12-31 | 中铁二十一局集团第三工程有限公司 | Automatic moving device for road bridge deck concrete construction vibration beam |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201486572U (en) | Multi-reducing lining mould plate trolley | |
CN201943045U (en) | Automatic-moving hydraulic cantilever gantry concrete placement device for wave wall | |
CN202991062U (en) | Multi-section lining trolley | |
CN101298839B (en) | Tunnel concrete lining formwork apparatus | |
CN102022123B (en) | Integral lining method for tunnel with altered diameter by model board trolley | |
CN208803487U (en) | Piping lane new type formwork trolley | |
CN205134939U (en) | Hydraulic pressure creeping formwork system suitable for inboard narrow and small region in space of a core section of thick bamboo | |
CN207003479U (en) | Cast-in-place city utility tunnel whole formwork system | |
CN103352710A (en) | Suspension overturn type tunnel inverted arch formwork trolley and construction method thereof | |
CN207161110U (en) | Self-walking type moving trolley for tunnel roof with horseshoe-shaped cross section in construction open excavation | |
CN102561193A (en) | Construction technology of closure section for rotary continuous beam for overpass electrified railway and hanging basket thereof | |
CN110714785A (en) | Pipe gallery top plate construction trolley, trolley set and construction method | |
CN201648978U (en) | Tied arch support of bridge location cast-in-situ prestressed concrete continuous beam | |
CN108951704A (en) | Piping lane new type formwork trolley and its construction technology | |
CN201228554Y (en) | Tunnel concrete lining formwork apparatus | |
CN200991949Y (en) | Box-beam internal mould | |
CN203702178U (en) | Bottom end supercharged type small-height tunnel lining trolley | |
CN108005114A (en) | A kind of piping lane pours mould | |
CN209603182U (en) | A kind of adjustable die system of pipe gallery automatic control section | |
CN208734344U (en) | Collapsible tunneled central ditch construction template | |
CN207775925U (en) | A kind of piping lane pours mold | |
CN103195448B (en) | A kind of tunnel concrete longitudinal joint treatment method and equipment | |
CN208803852U (en) | Movable maintenance rack for tunnel two-lining concrete | |
CN210256628U (en) | Self-adaptive outer mold system for prefabricating concrete | |
CN202509461U (en) | Pumping concrete distribution device for aqueduct-making machine |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |