CN108951704A - Piping lane new type formwork trolley and its construction technology - Google Patents

Piping lane new type formwork trolley and its construction technology Download PDF

Info

Publication number
CN108951704A
CN108951704A CN201810974953.6A CN201810974953A CN108951704A CN 108951704 A CN108951704 A CN 108951704A CN 201810974953 A CN201810974953 A CN 201810974953A CN 108951704 A CN108951704 A CN 108951704A
Authority
CN
China
Prior art keywords
side support
support
backform
piping lane
independent
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810974953.6A
Other languages
Chinese (zh)
Inventor
王金鹏
万磊
王海东
郑春海
余斌
张新波
张铁议
薛广泽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Third Engineering Co Ltd of China Railway 17th Bureau Group Co Ltd
Original Assignee
Third Engineering Co Ltd of China Railway 17th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Third Engineering Co Ltd of China Railway 17th Bureau Group Co Ltd filed Critical Third Engineering Co Ltd of China Railway 17th Bureau Group Co Ltd
Priority to CN201810974953.6A priority Critical patent/CN108951704A/en
Publication of CN108951704A publication Critical patent/CN108951704A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/10Tunnels or galleries specially adapted to house conduits, e.g. oil pipe-lines, sewer pipes ; Making conduits in situ, e.g. of concrete ; Casings, i.e. manhole shafts, access or inspection chambers or coverings of boreholes or narrow wells

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Chemical & Material Sciences (AREA)
  • Oil, Petroleum & Natural Gas (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The present invention provides a kind of piping lane new type formwork trolley and its construction technologies, belong to pipe gallery technical field, piping lane new type formwork trolley includes template, supporting mechanism and independent support, wherein template includes backform and side form, backform include be located in the middle it is late tear portion open and evening be set tear morning of portion two sides open and tear portion open;Supporting mechanism includes the adjustable Left-side support of spacing and height and Right side support, is fixedly installed side form on the outside of Left-side support and Right side support, top respectively with to tear portion open corresponding morning of backform two sides;Independent bearing height is adjustable, and the evening for being used to support backform tears portion open.After the present invention can permit maintenance a period of time, such as 3-5 days, side form is removed in advance and the morning of backform tears portion open, and is moved to next construction section and constructs again, and the evening portion of tearing open for only reserving independent support and backform continued maintenance to 14 days.Compared with ability demoulding after the prior art has integrally conserved 14 days, all transfer efficients are substantially increased, the duration is shortened, have ensured the progress of project entirety.

Description

Piping lane new type formwork trolley and its construction technology
Technical field
The invention belongs to pipe gallery technical fields, more specifically, be related to a kind of piping lane new type formwork trolley and its Construction technology.
Background technique
Formwork jumbo is in constructing tunnel according to the difference of tunnel Internal periphery shape, tunnel lining concreting mode Difference, mould is poured a kind of special-purpose machinery construction equipment of tunnel lining building concrete plate, in railway, highway, water conservancy and hydropower etc. Engineering construction in be widely used.It can be to avoid construction interference using formwork jumbo, it is often more important that substantially increase tunnel Interior lining construction quality, while also improving the mechanization degree of constructing tunnel.Although formwork jumbo pattern multiplicity, it is tied Structure is essentially identical, is all made of several major: template part, door frame body portion, running gear, supporting mechanism, translation system and Other auxiliary equipments.
Formwork jumbo currently on the market is mostly telescoping steel form and wooden model trolley, and wherein the supporting mechanism of telescoping steel form uses Steel pipe expires hall support frame, and weight weight is complicated for operation, and working rack template consumption is big;The materials such as wooden model trolley flitch Put into excessive, inadequate low-carbon environment-friendly.Moreover, both formwork jumbos needed after casting concrete maintenance 14 days, could demoulding after Continuous to construct forward, turn around time is long, longer so as to cause the duration.
Summary of the invention
The purpose of the present invention is to provide a kind of piping lane new type formwork trolleys, existing in the prior art because of turnover to solve Duration longer technical problem caused by period is long.
To achieve the above object, the technical solution adopted by the present invention is that: a kind of piping lane new type formwork trolley is provided, comprising: Template, the template include backform and side form, the backform include be located in the middle it is late tear portion open and be arranged tear portion two open in the evening The morning of side tears portion open;Supporting mechanism, the supporting mechanism include the adjustable Left-side support of spacing and height and Right side support, institute It states and is fixedly installed side form on the outside of Left-side support and the Right side support, morning of the top respectively with the backform two sides tears portion open It is corresponding;With independent support, the independent bearing height is adjustable, and the evening for being used to support the backform tears portion open.
Further, the template is plastic composites template.
Further, the steel truss that the Left-side support and the Right side support are an integral structure.
Further, connecting rod, the connecting rod are fixedly installed on the Left-side support and the Right side support On be provided with U-shaped connector, be fixedly connected by the U-shaped connector with the side form.
Further, multiple intermediate screw rods are provided between the Left-side support and the Right side support, bottom is provided with Collet and pulley, the collet and pulley are provided with adjusting screw rod.
Further, the independent branch support is provided with jacking, and bottom is provided with independent collet and independent sheaves, described Jacking, independent collet and independent sheaves are provided with adjusting screw rod.
The beneficial effect of piping lane new type formwork trolley provided by the invention is:
Compared with prior art, piping lane new type formwork trolley of the present invention, after can permit maintenance a period of time, such as 3-5 It, removes side form in advance and the morning of backform tears portion open, and is moved to next construction section and constructs again, only reserves independent support and top Continue maintenance to 14 days in the evening portion of tearing open of mould.Compared with ability demoulding after the prior art has integrally conserved 14 days, turnover is substantially increased Efficiency shortens the duration, has ensured the progress of project entirety.
The invention also discloses a kind of construction technology of piping lane formwork jumbo, the piping lane formwork jumbo is above-mentioned piping lane New type formwork trolley, comprising the following steps:
Step 1: installation template, the spacing by adjusting Left-side support and Right side support are completed side form location and installation, are passed through The height for adjusting Left-side support and Right side support completes backform location and installation, the independent support of finally installation;
Step 2: casting concrete;
Step 3: side form demoulding reduces the spacing of the Left-side support and the Right side support, completes the side form demoulding;
Step 4: backform demoulding reduces the height of the Left-side support and the Right side support, removes the backform two sides Morning tear portion open, complete the backform demoulding;
Step 5: turnover, the mobile Left-side support with the side form and the Right side support to next construction section, The evening portion of tearing open for reserving the independent support and the backform continues to conserve.
Due to the construction that the construction technology of piping lane formwork jumbo provided by the invention is above-mentioned piping lane new type formwork trolley Technique, since above-mentioned piping lane new type formwork trolley has above-mentioned technical effect, using the piping lane mould of above-mentioned piping lane new type formwork trolley The construction technology of pallet vehicle also answers technical effect having the same.
Detailed description of the invention
It to describe the technical solutions in the embodiments of the present invention more clearly, below will be to embodiment or description of the prior art Needed in attached drawing be briefly described, it should be apparent that, the accompanying drawings in the following description is only of the invention some Embodiment for those of ordinary skill in the art without any creative labor, can also be according to these Attached drawing obtains other attached drawings.
Fig. 1 is the structural schematic diagram of piping lane new type formwork trolley provided in an embodiment of the present invention;
Fig. 2 is that the reserved independent support of piping lane new type formwork trolley provided in an embodiment of the present invention and the evening portion of tearing open of backform conserve Schematic diagram.
Wherein, each appended drawing reference in figure:
1- backform;11- evening tears portion open;12- early tears portion open;2- side form;31- Left-side support;32- Right side support;4- is independently supported; Screw rod among 5-;6- collet;7- pulley;8- jacking;9- independence collet;10- independent sheaves.
Specific embodiment
In order to which technical problems, technical solutions and advantages to be solved are more clearly understood, tie below Accompanying drawings and embodiments are closed, the present invention will be described in further detail.It should be appreciated that specific embodiment described herein is only To explain the present invention, it is not intended to limit the present invention.
Also referring to Fig. 1 and Fig. 2, now piping lane new type formwork trolley provided by the invention is illustrated.Piping lane is novel Formwork jumbo, including template, supporting mechanism and independent support 4, wherein template includes backform 1 and side form 2, and backform 1 includes being located at Intermediate evening tears portion 11 open and tears portion 12 open with the late morning for tearing 11 two sides of portion open is arranged in;Supporting mechanism includes that spacing and height are adjustable The steel truss that Left-side support 31 and Right side support 32, Left-side support 31 and Right side support 32 are an integral structure, Left-side support 31 and the outside of Right side support 32 be fixedly installed side form 2, top respectively with to tear portion 12 open corresponding morning of 1 two sides of backform;It is independent 4 height of support is adjustable, and the evening for being used to support backform 1 tears portion 11 open.
The present invention also provides a kind of construction technology of piping lane formwork jumbo, piping lane formwork jumbo is above-mentioned piping lane New-type mould Pallet vehicle, comprising the following steps:
Step 1: installation template, the spacing by adjusting Left-side support and Right side support are completed side form location and installation, are passed through The height for adjusting Left-side support and Right side support completes backform location and installation, the independent support of finally installation;
Step 2: casting concrete;
Step 3: side form demoulding reduces the spacing of Left-side support and Right side support, completes side form demoulding;
Step 4: backform demoulding reduces the height of Left-side support and Right side support, and the morning for removing backform two sides tears portion open, completes Backform demoulding;
Step 5: turnover, mobile Left-side support and Right side support with side form to next construction section reserve independent support Continue to conserve with the evening portion of tearing open of backform.
Piping lane new type formwork trolley provided by the invention, after can permit maintenance a period of time, such as 3-5 days, it tears open in advance It except the morning of side form and backform tears portion open, and is moved to next construction section and constructs again, the evening for only reserving independent support and backform tears open Continue maintenance to 14 days in portion 11.Compared with ability demoulding after the prior art has integrally conserved 14 days, all transfer efficients are substantially increased, are contracted The short duration, the progress of project entirety is ensured.
Further, a kind of specific embodiment as piping lane new type formwork trolley provided by the invention, template are modeling Property composite material template, light-weight, assembled efficiency is fast, it is simple to reinforce, and comparison punching block, wooden model reduce weight, saves flitch The investment of equal materials reduces the labor intensity of worker, improves construction efficiency while guaranteeing molding effect, really real Low-carbon energy-saving is showed, civilized construction has ensured the duration progress of project entirety.
Further, a kind of specific embodiment as piping lane new type formwork trolley provided by the invention, Left-side support The steel truss being an integral structure with Right side support, steel pipe compared with the prior art expires hall support frame, easy to operate, installation Efficiency is fast, while guaranteeing molding effect, reduces the labor intensity of worker, improves construction efficiency, further shorten Duration.
Further, a kind of specific embodiment as piping lane new type formwork trolley provided by the invention, Left-side support With connecting rod is fixedly installed on Right side support, U-shaped connector is provided on connecting rod, passes through U-shaped connector and side form It is fixedly connected.Specifically, connecting rod is square steel, and U-shaped connector is arranged on square steel, and U-shaped connector covers on square steel, then will Square steel back cord is welded on Left-side support and Right side support, and the opening of U-shaped connector is towards side form, and the connection bump with side form Cooperation, is then fixed together by pin shaft, to complete being fixedly connected for rigidity supporting mechanism and plastic template.It will certainly It is not limited to a kind of this form, it can also be stupefied for flitch time.
Further, a kind of tool also referring to Fig. 1 and Fig. 2, as piping lane new type formwork trolley provided by the invention Body embodiment is provided with multiple intermediate screw rods 5,6 He of collet that bottom is provided between Left-side support 31 and Right side support 32 Pulley 7, collet 6 and pulley 7 are provided with adjusting screw rod.Spacing is adjusted by intermediate lead screw, height is adjusted by the collet 6 of bottom Degree.The setting of pulley 7 is convenient for overall movement.When bottom needs to support, respective adjusting screw rod is adjusted, so that collet 6 lands, is received Pulley 7 is returned, when needing mobile, reversely adjusts respective adjusting screw rod, pulley 7 lands, and withdraws collet 6.
Further, a kind of tool also referring to Fig. 1 and Fig. 2, as piping lane new type formwork trolley provided by the invention Body embodiment, independent 4 top of support are provided with jacking 8, and bottom is provided with independent collet 9 and independent sheaves 10, jacking 8, solely Vertical collet 9 and independent sheaves 10 are provided with adjusting screw rod.When installation independently supports 4, backform 1 has been mounted to position, passes through tune The adjusting screw rod of jacking 8 and independent collet 9 is saved, so that independent support 4 supports to place.When bottom needs to support, adjusts and correspond to Adjusting screw rod independent collet 9 is landed, withdraw independent sheaves 10, when needing mobile, reversely adjust corresponding adjusting screw rod, Independent sheaves 10 are landed, and independent collet 9 is withdrawn.
Specifically, the step of construction technology of piping lane formwork jumbo provided by the invention can refine are as follows:
Step 1: installation template completes side form location and installation by adjusting intermediate screw rod, by the adjusting silk for adjusting collet Bar completes backform location and installation, the independent support of finally installation;
Step 2: casting concrete;
Step 3: side form demoulding, pulley landing reduce the spacing of Left-side support and Right side support by adjusting intermediate screw rod, Side form demoulding is completed, intermediate screw rod is removed;
Step 4: pulley is packed up in backform demoulding, and the adjusting screw rod by adjusting collet reduces Left-side support and Right side support Height, the morning for removing backform two sides tears portion 12 open, completes backform demoulding;
Step 5: turnover, pulley landing, mobile Left-side support and Right side support with side form are reserved to next construction section The evening of independent support and backform tears portion 11 open and continues to conserve.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all in essence of the invention Made any modifications, equivalent replacements, and improvements etc., should all be included in the protection scope of the present invention within mind and principle.

Claims (7)

1. piping lane new type formwork trolley characterized by comprising
Template, the template include backform and side form, and the backform includes being located in the middle late to tear portion open and setting is torn open in the evening The morning of portion two sides tears portion open;
Supporting mechanism, the supporting mechanism include the adjustable Left-side support of spacing and height and Right side support, the left side It is fixedly installed side form on the outside of support and the Right side support, it is corresponding that top tears portion open with the morning of the backform two sides respectively;
With independent support, the independent bearing height is adjustable, and the evening for being used to support the backform tears portion open.
2. piping lane new type formwork trolley as described in claim 1, it is characterised in that: the template is plastic composites mould Plate.
3. piping lane new type formwork trolley as claimed in claim 2, it is characterised in that: the Left-side support and the Right side support The steel truss being an integral structure.
4. piping lane new type formwork trolley as claimed in claim 3, it is characterised in that: the Left-side support and the Right side support On be fixedly installed connecting rod, U-shaped connector is provided on the connecting rod, passes through the U-shaped connector and the side Mould is fixedly connected.
5. piping lane new type formwork trolley as described in claim 1, it is characterised in that: the Left-side support and the Right side support Between be provided with multiple intermediate screw rods, the collet and pulley that bottom is provided with, the collet and pulley are provided with adjusting screw rod.
6. piping lane new type formwork trolley as described in claim 1, it is characterised in that: the independent branch support is provided with top Support, bottom are provided with independent collet and independent sheaves, and the jacking, independent collet and independent sheaves are provided with adjusting screw rod.
7. the construction technology of piping lane formwork jumbo, which is characterized in that the piping lane formwork jumbo is any one of claim 1-6 institute The piping lane new type formwork trolley stated, comprising the following steps:
Step 1: installation template, the spacing by adjusting Left-side support and Right side support complete side form location and installation, pass through adjusting The height of Left-side support and Right side support completes backform location and installation, the independent support of finally installation;
Step 2: casting concrete;
Step 3: side form demoulding reduces the spacing of the Left-side support and the Right side support, completes the side form demoulding;
Step 4: backform demoulding reduces the height of the Left-side support and the Right side support, removes the morning of the backform two sides It tears portion open, completes the backform demoulding;
Step 5: turnover, the mobile Left-side support with the side form and the Right side support to next construction section are reserved The evening portion of tearing open of the independent support and the backform continues to conserve.
CN201810974953.6A 2018-08-24 2018-08-24 Piping lane new type formwork trolley and its construction technology Pending CN108951704A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810974953.6A CN108951704A (en) 2018-08-24 2018-08-24 Piping lane new type formwork trolley and its construction technology

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810974953.6A CN108951704A (en) 2018-08-24 2018-08-24 Piping lane new type formwork trolley and its construction technology

Publications (1)

Publication Number Publication Date
CN108951704A true CN108951704A (en) 2018-12-07

Family

ID=64473187

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810974953.6A Pending CN108951704A (en) 2018-08-24 2018-08-24 Piping lane new type formwork trolley and its construction technology

Country Status (1)

Country Link
CN (1) CN108951704A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110761323A (en) * 2019-09-30 2020-02-07 中国二十冶集团有限公司 Underground comprehensive pipe gallery sliding formwork construction method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20080085606A (en) * 2007-03-20 2008-09-24 에스앤피시스템(주) A table form and a form system for slab using the above table form
KR101056249B1 (en) * 2011-03-07 2011-08-11 양현기 A structure for transporting the tunnel steel lining foam
CN104790979A (en) * 2015-03-24 2015-07-22 粤水电轨道交通建设有限公司 Combinable trolley and construction method thereof
CN106759487A (en) * 2017-02-14 2017-05-31 中国冶集团有限公司 Underground pipe gallery inner formwork system continuous-flow type construction method
CN208803487U (en) * 2018-08-24 2019-04-30 中铁十七局集团第三工程有限公司 Piping lane new type formwork trolley

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20080085606A (en) * 2007-03-20 2008-09-24 에스앤피시스템(주) A table form and a form system for slab using the above table form
KR101056249B1 (en) * 2011-03-07 2011-08-11 양현기 A structure for transporting the tunnel steel lining foam
CN104790979A (en) * 2015-03-24 2015-07-22 粤水电轨道交通建设有限公司 Combinable trolley and construction method thereof
CN106759487A (en) * 2017-02-14 2017-05-31 中国冶集团有限公司 Underground pipe gallery inner formwork system continuous-flow type construction method
CN208803487U (en) * 2018-08-24 2019-04-30 中铁十七局集团第三工程有限公司 Piping lane new type formwork trolley

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110761323A (en) * 2019-09-30 2020-02-07 中国二十冶集团有限公司 Underground comprehensive pipe gallery sliding formwork construction method

Similar Documents

Publication Publication Date Title
CN201908664U (en) Movable trestle bridge invert form board trolley
CN201943045U (en) Automatic-moving hydraulic cantilever gantry concrete placement device for wave wall
CN202991062U (en) Multi-section lining trolley
CN205134939U (en) Hydraulic pressure creeping formwork system suitable for inboard narrow and small region in space of a core section of thick bamboo
CN207003479U (en) Cast-in-place city utility tunnel whole formwork system
CN108374677B (en) Combined mechanical trolley device for coagulation construction of tunnel side ditch and bridge guardrail
CN110273695B (en) Tunnel secondary lining template trolley and stage type mould closing pouring method thereof
CN208803487U (en) Piping lane new type formwork trolley
CN114102846B (en) Segment beam double production line and segment beam rapid prefabricating process
CN103352710A (en) Suspension overturn type tunnel inverted arch formwork trolley and construction method thereof
CN110714785A (en) Pipe gallery top plate construction trolley, trolley set and construction method
CN109469204A (en) Fabricated steel reinforced concrete mixed frame structure based on superposed beams and construction method
CN108951704A (en) Piping lane new type formwork trolley and its construction technology
CN108005114A (en) A kind of piping lane pours mould
CN202164548U (en) Deck type mobile formwork bridge-building machine dedicated to double T type bridge construction
CN208899692U (en) Beam rigid connection node outside assembly concrete shear wall and face
CN218346803U (en) Construction structure of inverted cone round barrel concrete structure
CN206902987U (en) A kind of T-shaped shear wall with fore-set
CN201103104Y (en) Three supporting legs automatically spanning rotation type mobile mould frame bridging machine
CN206053965U (en) A kind of tunnel ditch cable trough construction trolley
CN204959653U (en) Channel mould board is planted to loose -leaf formula anticollision barrier
CN201614939U (en) Three-dimensional space curved surface steel mould trolley
CN210031563U (en) Quick construction equipment of mobilizable modularization box culvert
CN210599012U (en) Automatic setting mechanism for secondary lining end mold of tunnel
CN210256628U (en) Self-adaptive outer mold system for prefabricating concrete

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination