CN208734344U - Collapsible tunneled central ditch construction template - Google Patents
Collapsible tunneled central ditch construction template Download PDFInfo
- Publication number
- CN208734344U CN208734344U CN201821100018.9U CN201821100018U CN208734344U CN 208734344 U CN208734344 U CN 208734344U CN 201821100018 U CN201821100018 U CN 201821100018U CN 208734344 U CN208734344 U CN 208734344U
- Authority
- CN
- China
- Prior art keywords
- groups
- inverted arch
- lining cutting
- ditch
- heavy
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The utility model discloses a kind of collapsible tunneled central ditch construction templates, it is very heavy including bed die, stringer, side form and support, stringer is fixed on bed die, two groups of side forms are hinged with bed die two sides respectively, it is lining cutting central water ditch state when two groups of side forms fold, when lining cutting central water ditch state supports very heavy both ends to be hingedly connected on two groups of side forms, and whens two groups of side forms expansion is lining cutting inverted arch state, very heavy one end is supported to be articulated on side form when lining cutting inverted arch state, the other end is articulated on stringer.The utility model can allow central ditch template sufficiently to be used, it is extensible structure by central ditch stencil design, the weight of inverted arch template is reduced as part inverted arch template in inverted arch construction, the utilization rate for improving central ditch template, reduces the state basic policy using environmental emission reduction of steel.
Description
Technical field
The utility model relates to a kind of constructing tunnel templates more particularly to a kind of collapsible tunneled central ditch construction to use
Template.
Background technique
Modern tunnel structure is complicated, is filled concrete construction after inverted arch concrete construction, at this moment needs to pour
Outpour central ditch.
Current construction method is: excavation operation is carried out first in front of tunnel;Then inverted arch lining cutting work is carried out at rear
Industry: preparation of construction → inverted arch excavates base treatment → preliminary bracing laying waterproof layer → reinforcing bar binding, installation inverted arch template → and faces upward
Arch filling concrete → inverted arch demoulding (removing inverted arch template) → Central drain surveying and locating → Central drain formwork erection → inverted arch is filled out
It fills filling concrete → maintenance to intensity and meets machine-walking → end.
The central ditch template of existing use, as China Patent Publication No. 206769954U discloses a kind of tunneled central U
Shape gutter concrete-pouring template support construction and formwork for placing, publication date 2017-12-19, including two along the same as always
The extensible member of line direction setting is equipped with revolving part, the inner end of one of extensible member and the positive spiral shell of revolving part between two extensible members
Line connection, the inner end of another extensible member are connect with revolving part left-hand thread, and the outer end of extensible member is respectively equipped with top tight pieces.
But the central ditch template used in the prior art is fixed structure, is only used for fill concrete construction, does not have
It is fully used, utilization rate is lower.
Summary of the invention
The purpose of the utility model is to overcome the above problems of the existing technology, provide a kind of collapsible tunneled central
Ditch construction template.The utility model can allow central ditch template sufficiently to be used, and being by central ditch stencil design can
The structure of expansion reduces the weight of inverted arch template as part inverted arch template in inverted arch construction, improves central ditch mould
The utilization rate of plate reduces the state basic policy using environmental emission reduction of steel.
To achieve the above object, the technical solution adopted in the utility model is as follows:
A kind of collapsible tunneled central ditch construction template, it is characterised in that: including bed die, stringer, side form and support
Very heavy, stringer is fixed on bed die, and two groups of side forms are hinged with bed die two sides respectively, is lining cutting center when two groups of side forms fold
Ditch state, when lining cutting central water ditch state, support very heavy both ends to be hingedly connected on two groups of side forms, and whens two groups of side forms expansion is
Lining cutting inverted arch state, when lining cutting inverted arch state, support very heavy one end to be articulated on side form, and the other end is articulated on stringer.
Two groups of side forms are symmetricly set on bed die two sides.
The bed die is one group, and two sides are hinged with the hinge ear on two groups of side forms respectively.
The very heavy support that both ends are hingedly connected on two groups of side forms when the lining cutting ditch is 9.
It is 19 that it is very heavy, which to be articulated with support that the other end on side form is articulated on stringer, for one end when the lining cutting inverted arch.
Electric block is used when the side form folds, electric block is fixed on stringer, the steel cable of electric block with
The cucurbit hinge ear connection being arranged on side form.
The electric block is 8.
Using utility model has the advantages that
After the utility model, central ditch template is allowed sufficiently to be used, is that can open up by central ditch stencil design
The structure opened reduces the weight of inverted arch template as part inverted arch template in inverted arch construction, improves central ditch template
Utilization rate, reduce the state basic policy using environmental emission reduction of steel.
Detailed description of the invention
Fig. 1 is the utility model top view;
Structural schematic diagram when Fig. 2 is the utility model lining cutting inverted arch state;
Structural schematic diagram when Fig. 3 is the utility model lining cutting central water ditch state;
Fig. 4 is positive structure diagram of being constructed using the utility model fill concrete;
Fig. 5 is positive structure diagram of being constructed using the utility model lining cutting inverted arch;
Fig. 6 is the tunnel molding cross-section diagram after the completion of being constructed using the utility model.
In the figure, it is marked as 1, bed die, 2, stringer, 3, side form, 4, support very heavy, 5, electric block, 6, cucurbit cut with scissors ear, 7, face upward
Encircle concrete, 8, inverted arch fill concrete, 9, central ditch.
Specific embodiment
Embodiment 1
A kind of collapsible tunneled central ditch construction template, including bed die 1, stringer 2, side form 3 and support very heavy 4, are indulged
Beam 2 is fixed on bed die 1, and two groups of side forms 3 are hinged with 1 two sides of bed die respectively, and two groups of side forms 3 are lining cutting central water when folding
Ditch state, when lining cutting central water ditch state, support very heavy 4 both ends to be hingedly connected on two groups of side forms 3, and two groups of side forms 3 are when being unfolded
Lining cutting inverted arch state, when lining cutting inverted arch state, support very heavy 4 one end to be articulated on side form 3, and the other end is articulated on stringer 2.
In the present embodiment, two groups of side forms 3 are symmetricly set on 1 two sides of bed die.
In the present embodiment, the bed die 1 is one group, and two sides are hinged with the hinge ear on two groups of side forms 3 respectively.
In the present embodiment, both ends are hingedly connected on two groups of side forms 3 when the lining cutting central water ditch state support very heavy 4
It is 9.
In the present embodiment, one end is articulated with the other end on side form 3 and is articulated with the branch on stringer 2 when the lining cutting inverted arch state
Supportting very heavy is 19.
In the present embodiment, electric block 5 is used when the side form 3 folds, electric block 5 is fixed on stringer 2, electricity
The cucurbit hinge ear 6 being fixedly installed on the steel cable and side form of dynamic cucurbit 5 connects.
In the present embodiment, the electric block 5 is 8.
Embodiment 2
The present embodiment combination attached drawing is described further the utility model.
As shown, central ditch template is by bed die 1(1 group), the stringer 2(1 group being installed on bed die 1), it is articulated with bottom
The side form 3(2 group of 1 two sides of mould), the very heavy 4(9 part of support that both ends are articulated on side form 3 when lining cutting ditch), one when lining cutting inverted arch
End is articulated with the very heavy 4(19 part of support that the other end is articulated on stringer 2 on side form 3), fold 5 groups of electric block when side form 3
At (8).
The working principle of the utility model is as follows:
When inverted arch lining cutting, central ditch template is fixed, side form 3 is unfolded by electric block, installs support thousand
Jin 4 carries out inverted arch concrete lining;After equal inverted arch concrete seven final set, support very heavy 4 is removed, side is packed up by electric block 5
Mould 3 installs support very heavy 4, carries out the center inverted arch fill concrete 8(ditch 9) lining cutting.
Claims (7)
1. a kind of collapsible tunneled central ditch construction template, it is characterised in that: including bed die (1), stringer (2), side form (3)
With support very heavy (4), stringer (2) is fixed on bed die (1), and two groups of side forms (3) are hinged with bed die (1) two sides respectively, and two
It is lining cutting central water ditch state when group side form (3) folds, when lining cutting central water ditch state supports very heavy (4) both ends to be hingedly connected to
On two groups of side forms (3), when two groups of side forms (3) expansion is lining cutting inverted arch state, and when lining cutting inverted arch state supports very heavy (4) one end to cut with scissors
It is connected on side form (3), the other end is articulated on stringer (2).
2. collapsible tunneled central ditch construction template according to claim 1, it is characterised in that: two groups of side forms
(3) bed die (1) two sides are symmetricly set on.
3. collapsible tunneled central ditch construction template according to claim 2, it is characterised in that: the bed die (1)
It is one group, two sides are hinged with the hinge ear on two groups of side forms (3) respectively.
4. collapsible tunneled central ditch construction template according to claim 3, it is characterised in that: the lining cutting ditch
When the support very heavy (4) that is hingedly connected on two groups of side forms (3) of both ends be 9.
5. collapsible tunneled central ditch construction template according to claim 4, it is characterised in that: the lining cutting inverted arch
It is 19 that Shi Yiduan, which is articulated with the support very heavy (4) that the other end is articulated on stringer (2) on side form (3),.
6. collapsible tunneled central ditch construction template according to claim 5, it is characterised in that: the side form (3)
Electric block (5) are used when folding, electric block (5) is fixed on stringer (2), the steel cable and side form of electric block (5)
(3) cucurbit hinge ear (6) connection being arranged on.
7. collapsible tunneled central ditch construction template according to claim 6, it is characterised in that: the electric block
It (5) is 8.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821100018.9U CN208734344U (en) | 2018-07-12 | 2018-07-12 | Collapsible tunneled central ditch construction template |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821100018.9U CN208734344U (en) | 2018-07-12 | 2018-07-12 | Collapsible tunneled central ditch construction template |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208734344U true CN208734344U (en) | 2019-04-12 |
Family
ID=66025451
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821100018.9U Active CN208734344U (en) | 2018-07-12 | 2018-07-12 | Collapsible tunneled central ditch construction template |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208734344U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111535835A (en) * | 2020-05-27 | 2020-08-14 | 李军 | Template system for inverted arch stack bridge abutment |
CN112031835A (en) * | 2020-09-04 | 2020-12-04 | 四川公路桥梁建设集团有限公司 | Tunnel inverted arch filling and central ditch integral rapid construction method |
-
2018
- 2018-07-12 CN CN201821100018.9U patent/CN208734344U/en active Active
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111535835A (en) * | 2020-05-27 | 2020-08-14 | 李军 | Template system for inverted arch stack bridge abutment |
CN112031835A (en) * | 2020-09-04 | 2020-12-04 | 四川公路桥梁建设集团有限公司 | Tunnel inverted arch filling and central ditch integral rapid construction method |
CN112031835B (en) * | 2020-09-04 | 2022-07-01 | 四川公路桥梁建设集团有限公司 | Tunnel inverted arch filling and central ditch integral rapid construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107119715B (en) | A kind of application method of pipe gallery entirety mould bases | |
CN206538790U (en) | Interior mould trolley is used in a kind of cast-in-place pipe gallery construction | |
CN205935641U (en) | Template formwork system of aluminum alloy shear force wall | |
CN105365042A (en) | Manufacturing method of small prefabricated box girder | |
CN103195450B (en) | Hydraulic pressure tunnel invert operation trolley and inverted arch construction method | |
CN207212365U (en) | A kind of wall arch is separable can Monolithic lining chassis | |
CN208734344U (en) | Collapsible tunneled central ditch construction template | |
CN205676844U (en) | A kind of for one-piece casting trench furrow bank with the molding sliding formwork of base plate | |
CN103774561B (en) | The job execution of speedway prefabricated small box girder frock method streamlined | |
CN111594228B (en) | Lining of round water delivery tunnel steel mould trolley and construction method | |
CN104533450B (en) | One-time-concreting construction method of inverted arch low wall of single-track tunnel | |
CN205243003U (en) | Prefabricated U -shaped segment girder template of stub matching | |
CN103352710A (en) | Suspension overturn type tunnel inverted arch formwork trolley and construction method thereof | |
CN204041080U (en) | General formula needle beam lining trolley in a kind of | |
CN205778918U (en) | Loess tunnel excavation and just formwork build concrete construction combined type chassis | |
CN104005775B (en) | Tunnel invert backfill construction integrated template and construction technology thereof | |
CN106050268B (en) | Round rectangle section tunnel concrete liner telescoping steel form | |
CN206419032U (en) | A kind of side and roof arch band mid-board lining cutting chassis | |
CN203394540U (en) | Suspension overturning inverted arch formwork trolley for tunnels | |
CN109869164A (en) | Combination hydraulic formwork jumbo pours the construction method of porous separate tunnel | |
CN201574763U (en) | Hydraulic lining trolley | |
CN109519197A (en) | A kind of sliding formwork just dual-purpose trolley of lining excavation supporting and its application | |
CN109610509A (en) | A kind of the adjustable die system and construction method of pipe gallery automatic control section | |
CN108425686A (en) | Tunnel portal expanding reach secondary lining applies method | |
CN202164548U (en) | Deck type mobile formwork bridge-building machine dedicated to double T type bridge construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |