CN205955158U - Outer work platform of modular adsorption tower - Google Patents
Outer work platform of modular adsorption tower Download PDFInfo
- Publication number
- CN205955158U CN205955158U CN201620909415.5U CN201620909415U CN205955158U CN 205955158 U CN205955158 U CN 205955158U CN 201620909415 U CN201620909415 U CN 201620909415U CN 205955158 U CN205955158 U CN 205955158U
- Authority
- CN
- China
- Prior art keywords
- adsorption tower
- job platform
- supporting beam
- platform
- tower
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The utility model particularly relates to an outer work platform of modular adsorption tower, characterized by: this platform includes picture peg, supporting beam, stand, walks platen and safety rope, be equipped with the floor along its hoop on the outer wall of single adsorption tower tower section module, all be equipped with the slot on each floor, the picture peg also be the annular arrange and insert in in the slot of floor, the top level of picture peg is equipped with the supporting beam, the vertical stand that sets up in the outside of supporting beam, and the wire rope handling hole is offered at each stand top, thereby walks the platen and lay form a work platform in the plane on the supporting beam, and the safety rope passes all stand subassembly top wire rope handling holes in this plane in proper order. This work platform adopts above -mentioned design, one -course work platform through the mode setting of pegging graft on the body of single adsorption tower tower section module, have that occupation space is little, the dismouting is efficient and the safe convenient advantage of construction. After whole work platform shaping, still be provided with the safe edge safety rope and prevent perpendicularly weighing down the rope, effectively guarantee the safety of constructor operation on the platform.
Description
Technical field
This utility model is related to mechanical and electric equipment installation field, the outer job platform of specifically a kind of modular adsorption tower.
Background technology
In activated carbon smoke eliminator, adsorption tower is nucleus equipment, and it is mainly by Ta Jie and various interior external member overlap joint
Form.In+8.9m~+38.5m, each connecting portion mainly passes through to be welded to connect the installed height mark of adsorption tower.This is accomplished by arranging
High-altitude working platform is to complete the installation task of each absolute altitude aspect.Traditional work platform is mainly made up of console model scaffold,
Traditional console model scaffold has that dismounting operation high cost, efficiency be low, temporary space is many.And inhale with modularity
The appearance of attached tower construction method for hanging, traditional console model scaffold is more and more obvious as the shortcoming of job platform.
Content of the invention
The purpose of this utility model is, provides a kind of outer job platform adapting to modularity adsorption tower hoisting technology.
In order to achieve the above object, this utility model is realized in:
A kind of outer job platform of modular adsorption tower, this platform include plate assembly, supporting beam assembly, columns assemblies,
Walk platen component and safety rope;It is provided with floor along its ring on the outer wall of single adsorption tower tower section module, each floor is equipped with
Slot, plate assembly is also ringwise arranged and is inserted in the slot of described each floor;The top horizontal of each plate assembly is provided with and props up
Bolster assembly, the outside upright setting columns assemblies of each supporting beam assembly, each columns assemblies top opens up lacing hole, walks platen paving
It is located on each supporting beam assembly thus forming the job platform in a plane, safety rope sequentially passes through all columns in this plane
Assembly top lacing hole.
The outer job platform of described modular adsorption tower, also includes cat ladder, described cat ladder is vertically set on each adsorption tower
On the outer heel post of the inner frame of tower section module, thus the job platform connection by upper strata lower floor.
The outer job platform of described modular adsorption tower, job platform starts to spread from the top of adsorption tower bottom steel construction
If.
The outer job platform of described modular adsorption tower, each section of cat ladder and heel post outside adsorption tower tower section module inner frame
Between interval setting bracing frame.
This job platform adopts above-mentioned design, and the job platform of monolayer is arranged on single adsorption tower tower by way of grafting
On the body of section module, it has, and the little, disassembly efficiency of taking up room is high and the convenient advantage of construction safety.In whole job platform
After molding, it is additionally provided with safe edge safety rope and vertical fall prevention rope, and the safety of workmen on platform operation can be effectively ensured.
Brief description
Fig. 1 is the side view of monolayer job platform.
Fig. 2 is the combination diagram of job platform in same aspect.
Fig. 3 is job platform vertically vertical ladder composition figure.
Specific embodiment
Further illustrate this utility model below by way of specific embodiment.
As shown in Figure 1 and Figure 2, the outer job platform of a kind of modular adsorption tower, this platform includes plate assembly 3, backbar
Assembly 4, columns assemblies 5, walk platen component 7 and safety rope;It is provided with rib along its ring on the outer wall of single adsorption tower tower section module 1
Plate 2, each floor 2 is equipped with slot, and plate assembly 3 is also ringwise arranged and inserted in the slot of described each floor 2;Each plate
The top horizontal of assembly 3 is provided with supporting beam assembly 4, the outside upright setting columns assemblies 5 of each supporting beam assembly 4, each column group
Part 5 top opens up lacing hole 6, walk platen 7 be laid on each backbar group 4 upper thus forming the job platform in a plane,
Safety rope sequentially passes through all columns assemblies 5 top lacing holes 6 in this plane.
As shown in figure 3, the outer job platform of described modular adsorption tower, also include cat ladder 8, described cat ladder 8 vertically sets
Put on the outer heel post of inner frame of each adsorption tower tower section module 1, thus the job platform connection by upper strata lower floor.
The outer job platform of described modular adsorption tower, job platform starts to spread from the top of adsorption tower bottom steel construction
If.
The outer job platform of described modular adsorption tower, each section of cat ladder 8 is outer with adsorption tower tower section module 1 inner frame edge-on
Interval setting bracing frame 9 between post.
In actual job, the outer job platform of above-mentioned modular adsorption tower can be using following construction method:
1)The processing and fabricating of each building block of job platform
A. the processing of platform support.Platform support is as shown in figure 1, be made up of socket joint piece, crossbeam, vertical rod.Wherein socket joint piece
Formed by the steel plate cutting of δ 10mm, a size of 220mm(L)x75mm(w).Crossbeam is made by 8# channel-section steel, long 600mm.Vertical rod by
L50x5 equal leg angle makes, long 800mm, and top processing Ф 12 installing hole is used for wearing safety rope.These three parts are all using welding
Mode connects.
B. adsorption tower tower section socket joint hole machined.Pre- in the top floor horizontal plane patch absorption tower wall of two alien invasion of adsorption tower
First process 75mm(L)x12mm(W socket joint hole), single tower section respectively processes a socket joint hole in left and right margins 300 position.One
Set adsorption tower amounts to 10 layers, and every layer of 4 tower section add up to 40 tower sections.A set of activated carbon smoke eliminator has two sets of absorption
Tower, therefore 80 tower sections altogether, therefore need to process 160 socket joint holes.
C. vertical vertical ladder processing.Often set adsorption tower divides 4 independent absorbing units, and each unit is by longitudinally 2 groups of absorption
Ta Tajie forms, and is isolated by inner frame, vertical cat ladder is arranged on outside inner frame outer column between unit.For reducing personnel in height
Displacement between place's absorbing unit, respectively arranges a vertical ladder, often set adsorption tower one side setting 3 is straight on each inner frame
Cat ladder, two-sided amount to 6, each is divided into upper and lower two parts with inner frame, a whole set of smoke eliminator arrange altogether 12 vertically straight
Cat ladder.Vertical ladder adopts Ф 14 reinforcement fabrication, step pitch 600mm, the long 12m of each vertical ladder.
2)Job platform is installed
A. first two single tower sections are assembled into an integral module by truss, as shown in Fig. 2 tower section module hoisting
Before, on ground, platform support is inserted tower section corresponding socket joint in the hole, Ta Jienei is walked platen and tower internode is walked platen placement and put down
On platform support, tower section inside and outside walk platen iron wire colligation fixed, so just complete the peace of single tower section modular platform node
Dress.
B. platform nodes put in place with tower section module hoisting.
3)The installation of vertical cat ladder
As shown in figure 3, vertical cat ladder is arranged on the outer heel post of adsorption tower inner frame 4, inner frame 4 has three, every point
Upper and lower two sections, often save 12m.Before lifting inner frame, by the stair bracket being attached on inner frame, erecting and welding is good in advance, will make
The vertical cat ladder performing is fixed on stair bracket side, is fixed with bracket crossbeam colligation with cat ladder hook, vertical ladder at bracket
Put in place with inner frame lifting.
4)Safety rope is arranged
As shown in figure 3, after the completion for the treatment of that tower section, inner frame are respectively mounted, operating personnel is along vertical ladder to each layer adsorption tower tower section
Tower section in Fig. 2 is walked on platen, the safety rope of each layer tower section job platform is worn installing hole in Fig. 1 draws and be set to position.
5)Vertical fall prevention rope is installed
Operating personnel vertical cat ladder up to adsorption tower top along along Fig. 3, in every group of absorbing unit and the setting of vertical ladder upper end
Fall prevention rope, each adsorption tower side amounts to 6 fall prevention ropes of setting.
So far complete whole adsorption tower job platform system to install.
Claims (4)
1. a kind of outer job platform of modular adsorption tower, is characterized in that:This platform includes plate assembly, supporting beam assembly, stands
Column assembly, walk platen component and safety rope;It is provided with floor along its ring, on each floor on the outer wall of single adsorption tower tower section module
It is equipped with slot, plate assembly is also ringwise arranged and inserted in the slot of described each floor;The top horizontal of each plate assembly
It is provided with supporting beam assembly, the outside upright setting columns assemblies of each supporting beam assembly, each columns assemblies top opens up lacing hole, walks
Platen is laid on each supporting beam assembly thus forming the job platform in a plane, and safety rope sequentially passes through institute in this plane
There is columns assemblies top lacing hole.
2. the outer job platform of modular adsorption tower according to claim 1, is characterized in that:Also include cat ladder, described climb
Ladder is vertically set on the outer heel post of inner frame of each adsorption tower tower section module, thus the job platform connection by upper strata lower floor.
3. the outer job platform of modular adsorption tower according to claim 1, is characterized in that:Job platform is from adsorption tower
The top of portion's steel construction starts to lay.
4. the outer job platform of modular adsorption tower according to claim 2, is characterized in that:Each section of cat ladder and adsorption tower tower
Interval setting bracing frame between the outer heel post of section module inner frame.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620909415.5U CN205955158U (en) | 2016-08-22 | 2016-08-22 | Outer work platform of modular adsorption tower |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620909415.5U CN205955158U (en) | 2016-08-22 | 2016-08-22 | Outer work platform of modular adsorption tower |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205955158U true CN205955158U (en) | 2017-02-15 |
Family
ID=57976388
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620909415.5U Active CN205955158U (en) | 2016-08-22 | 2016-08-22 | Outer work platform of modular adsorption tower |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205955158U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107227839A (en) * | 2017-07-10 | 2017-10-03 | 中冶建筑研究总院有限公司 | A kind of integrated Construction of Supporting security platform and installation method |
-
2016
- 2016-08-22 CN CN201620909415.5U patent/CN205955158U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107227839A (en) * | 2017-07-10 | 2017-10-03 | 中冶建筑研究总院有限公司 | A kind of integrated Construction of Supporting security platform and installation method |
CN107227839B (en) * | 2017-07-10 | 2024-02-06 | 中冶建筑研究总院有限公司 | Integrated support construction safety platform and installation method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106958346B (en) | Intelligent attached lifting scaffold equipment for curved surface super high-rise building and construction method | |
CN1028556C (en) | Building construction system | |
CN106437130A (en) | Inner roof external climbing type formwork construction platform for super high-rise building construction | |
CN106400951B (en) | A kind of level and vertical structure method for synchronously constructing of super high-rise building | |
US10392794B2 (en) | Structure and method of making the same | |
CN104763109B (en) | Quick construction method for pressed bottom tile of large-span steel structure factory building roof | |
CN201367728Y (en) | Derrick-less hydraulic slip form device used for reinforced concrete water tower supporting tube construction | |
CN104929353A (en) | Detachable stepwise automatic climbing operating platform for elevator shafts | |
CN205955158U (en) | Outer work platform of modular adsorption tower | |
CN105442853A (en) | Long-span deformed steel truss and floor steel structure installation and construction method | |
CN104878867A (en) | Ceiling joist and double-layer construction platform integrated structure and manufacturing method thereof | |
CN104612391B (en) | Construction of prevention work platform for skyscraper | |
CN105625732B (en) | Superelevation overhanging steel structure truss support free construction method | |
CN104847108A (en) | Hydraulic climbing formwork structure and construction method of hydraulic climbing formwork structure | |
CN205617770U (en) | Limit construction operation platform is faced to movable type of encorbelmenting | |
CN212802428U (en) | Portable lifting scaffold | |
CN204754150U (en) | Dish -type node formula scaffold | |
CN204402001U (en) | For the mobile operating platform system that structure for steel structure roof inner slab is installed | |
CN1041199A (en) | The out-mould scaffold of super-high buildings integral elevating system | |
CN208604911U (en) | A kind of novel suspention beam bracket | |
CN207003972U (en) | A kind of portable construction operation platform | |
CN111749450A (en) | Safety protection construction method for large-span cast-in-situ dome | |
CN104594631A (en) | Construction process for constructing prilling tower spraying layer by slide mold device dragging construction platform | |
CN105178602A (en) | Building construction system | |
CN104196229B (en) | Safety climbing ladder and installation method thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20190730 Address after: 201900 Shanghai city Baoshan District Tieli Road No. 2469 Co-patentee after: China Twenty Metallurgical Group Co., Ltd. Patentee after: Shanghai twenty Metallurgical Construction Co., Ltd. Address before: 201900 Shanghai city Baoshan District Tieli Road No. 2469 Patentee before: Shanghai twenty Metallurgical Construction Co., Ltd. |
|
TR01 | Transfer of patent right |