CN205934922U - Vibration hammer equipment - Google Patents

Vibration hammer equipment Download PDF

Info

Publication number
CN205934922U
CN205934922U CN201620749861.4U CN201620749861U CN205934922U CN 205934922 U CN205934922 U CN 205934922U CN 201620749861 U CN201620749861 U CN 201620749861U CN 205934922 U CN205934922 U CN 205934922U
Authority
CN
China
Prior art keywords
vibration hammer
pulley assembly
hammer
construction
support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620749861.4U
Other languages
Chinese (zh)
Inventor
刘献刚
熊小林
付豫楹
张东海
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangxi Jiye Technology Group Co.,Ltd.
Original Assignee
刘献刚
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 刘献刚 filed Critical 刘献刚
Priority to CN201620749861.4U priority Critical patent/CN205934922U/en
Application granted granted Critical
Publication of CN205934922U publication Critical patent/CN205934922U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a the utility model provides a vibration hammer equipment, include: the support, a loose pulley assembly installs on the support, the vibration hammer, first end is connected with a loose pulley assembly, and the second end has the fixed knot who is used for fixed inner tube and outer tube to be constructed, still include: the 2nd loose pulley assembly installs on the support, the winding plant is installed on the support, the winding plant passes through the 2nd loose pulley assembly with vibration hammer is connected, and be suitable for right vertical decurrent power is applyed to the vibration hammer, the balancing weight, detachably connects the vibration hammer to realize that the construction noise is lower, the efficiency of construction is high, can adjust the hammer block dead weight in a flexible way in order to satisfy a requirement of being under construction.

Description

A kind of vibration hammer equipment
Technical field
The utility model is related to a kind of working equipment of building lot pile body, particularly to a kind of vibration hammer equipment.
Background technology
At present, have in prior art and multiple set for building pile body construction method with for the construction of this construction method Standby, these construction methods and equipment also respectively have pluses and minuses, such as, when making driven cast-in-place pile, can be closed using hammer hidden pipe and shake Dynamic immersed tube two ways, the former is used for general cohesive soil, muck soil, sand and artificial earth fill's ground, and the latter removes above model Enclose outer, it may also be used for slightly close and in close foundation of gravelly soil.The mode of hammer hidden pipe can produce loud noise, especially in city Construction, the noise of generation is larger on the living environment impact of surrounding, and vibration sinking tube then preferably decreases noise to living environment Impact, the scope of application is also larger.However, the vibration compaction method adopting in prior art is making bored concrete pile, using vibration Hammer equipment by hammer body be used for being molded the inner tube of stake holes or outer tube is connected, by way of vibration, inner and outer tubes are sunk with shape Become stake holes;For the more closely knit environment of soil property, in order to ensure construction speed it will usually improve the operating power of vibration hammer, with Form stake holes;When making the perfusion pile body expanding header structure with bottom, once the soil body is more closely knit, in concrete perfusion Afterwards and only with vibration hammer shake swaging pile bottom enlarged footing speed slower, if more powerful vibration hammer now will be changed Equipment, this may lead to the relatively costly of construction equipment, in addition, the difficulty again setting up plant equipment also can be larger, even if, more The hammer body changing more heavy weight vibration hammer is likely to not be inconsistent packer condition, and is likely to result in installation accident.Furthermore, existing Equipment in technology is had just to decide once have selected its weight of hammer body, if required using different hammers when shaking and being pressed into Body is conducted oneself with dignity into when meeting pile requirement, can only have corresponding mass hammer body and realizes by changing, so construction cost Can improve.
Utility model content
Therefore, the utility model will solve technical problem and is to propose a kind of construction noise relatively low, and efficiency of construction is high, can Hammer body deadweight is adjusted flexibly to meet the vibration hammer equipment of construction pile requirement.
For solving above-mentioned technical problem, the utility model proposes a kind of vibration hammer equipment, including:Support, first pulley Assembly, installs on the bracket;Vibration hammer, first end is connected with first pulley assembly, and the second end has for fixing inner tube Fixed structure with outer tube;Also include:Second pulley assembly, installs on the bracket;Winding plant, is arranged on described support On, described winding plant is connected with described vibration hammer by described second pulley assembly, and is suitable to described vibration hammer is applied to erect Directly downward power;Balancing weight, is detachably connected to described vibration hammer.
Above-mentioned vibration hammer equipment, wherein, also includes:Balancing weight mounting structure, on described vibration hammer, for realizing Described balancing weight is detachably connected with described vibration hammer.
Above-mentioned vibration hammer equipment, wherein, described vibration hammer is to exempt from synchronous vibration hammer.
Above-mentioned vibration hammer equipment, wherein, described fixed structure is hydraulically operated fixture.
Above-mentioned vibration hammer equipment, wherein, described balancing weight mounting structure is hanging structure.
The utility model has advantages below with respect to prior art:
1. a kind of vibration hammer equipment of the present utility model, including:Support, first pulley assembly, install and state on support;Vibration Hammer, first end is connected with first pulley assembly, and the second end has the fixed structure for fixing inner and outer tubes;Also include:The Two pulley assemblies, install on the bracket;Winding plant, installs on the bracket, described winding plant passes through described the Two pulley assemblies are connected with described vibration hammer, and are suitable to described vibration hammer is applied with power straight down;Balancing weight, removably It is connected to described vibration hammer.Above design, construction noise is relatively low;Further, since it is heavy in pressure that said inner tube and described outer tube are shaken Pipe to form stake bottom enlarged footing during, described winding plant passes through the described hammer body of described vibration hammer equipment to described interior Pipe and outer tube apply pressing force, such that being greatly improved to the pressure pressure that shakes of concrete, even if higher Under the construction environment of soil property density, still can quickly form the stake bottom enlarged footing that diameter meets design requirement, substantially reduce Construction period.Furthermore, by arranging the balancing weight being detachably connected with vibration hammer, hammer body deadweight can be adjusted flexibly in construction To meet the requirement of construction pile, it is to avoid the interim construction changed hammer body and bring is inconvenient, or even causes construction risk.
Brief description
In order that content of the present utility model is more likely to be clearly understood, it is embodied as below according to of the present utility model Example simultaneously combines accompanying drawing, the utility model is described in further detail, wherein:
Fig. 1 is the structural representation of the vibration hammer equipment of the utility model embodiment;
Fig. 2 is the structural representation of the vibration hammer part of the utility model embodiment.
Specific embodiment
Embodiment 1
As shown in figure 1, present embodiment discloses a kind of vibration hammer equipment, including:Support 1, first pulley assembly 5, install On described support 1;Vibration hammer 2, first end is connected with first pulley assembly 5, and the second end has the fixation for fixed sleeving 4 Structure, described sleeve pipe includes inner and outer tubes;Also include:Second pulley assembly 7, is arranged on described support 1;Winding plant 6, It is arranged on described support 1, described winding plant 6 is connected with described vibration hammer 2 by described second pulley assembly 7, and is suitable to Described vibration hammer 2 is applied with power straight down;Balancing weight (future marks herein), is detachably connected to described vibration hammer 2.
As shown in Fig. 2 the vibration hammer equipment of the present embodiment, preferably, also include:Balancing weight mounting structure 8, located at described On vibration hammer, for realizing being detachably connected of described balancing weight and described vibration hammer 2.
The vibration hammer equipment of the present embodiment, preferably, described vibration hammer 2 is to exempt from synchronous vibration hammer.
The vibration hammer equipment of the present embodiment, preferably, described fixed structure is hydraulically operated fixture.
The vibration hammer equipment of the present embodiment, preferably, described balancing weight mounting structure 8 is hanging structure.
Obviously, above-described embodiment is only intended to clearly illustrate example, and the not restriction to embodiment.Right For those of ordinary skill in the art, can also make on the basis of the above description other multi-forms change or Change.There is no need to be exhaustive to all of embodiment.And the obvious change thus extended out or Change among the protection domain created still in the utility model.

Claims (5)

1. a kind of vibration hammer equipment, including:
Support,
First pulley assembly, installs on the bracket;
Vibration hammer, first end is connected with first pulley assembly, and the second end has the fixed structure for fixing inner and outer tubes;
It is characterized in that, also include:
Second pulley assembly, installs on the bracket;
Winding plant, installs on the bracket, and described winding plant is by described second pulley assembly with described vibration hammer even Connect, and be suitable to described vibration hammer is applied with power straight down;
Balancing weight, is detachably connected to described vibration hammer.
2. vibration hammer equipment according to claim 1 is it is characterised in that also include:Balancing weight mounting structure, located at described On vibration hammer, for realizing being detachably connected of described balancing weight and described vibration hammer.
3. vibration hammer equipment according to claim 1 and 2 it is characterised in that:Described vibration hammer is to exempt from synchronous vibration hammer.
4. vibration hammer equipment according to claim 3 it is characterised in that:Described fixed structure is hydraulically operated fixture.
5. vibration hammer equipment according to claim 4 it is characterised in that:Described balancing weight mounting structure is hanging structure.
CN201620749861.4U 2016-07-15 2016-07-15 Vibration hammer equipment Active CN205934922U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620749861.4U CN205934922U (en) 2016-07-15 2016-07-15 Vibration hammer equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620749861.4U CN205934922U (en) 2016-07-15 2016-07-15 Vibration hammer equipment

Publications (1)

Publication Number Publication Date
CN205934922U true CN205934922U (en) 2017-02-08

Family

ID=57929086

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620749861.4U Active CN205934922U (en) 2016-07-15 2016-07-15 Vibration hammer equipment

Country Status (1)

Country Link
CN (1) CN205934922U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106168027A (en) * 2016-07-15 2016-11-30 刘献刚 Vibration hammer equipment and the pressure type pile body construction method of shaking of this vibration hammer equipment of employing

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106168027A (en) * 2016-07-15 2016-11-30 刘献刚 Vibration hammer equipment and the pressure type pile body construction method of shaking of this vibration hammer equipment of employing

Similar Documents

Publication Publication Date Title
CN106168027A (en) Vibration hammer equipment and the pressure type pile body construction method of shaking of this vibration hammer equipment of employing
CN101392527B (en) Method for processing soft foundation by earthwork fabric granular pile
CN102155009A (en) Crushed rock pile used for strengthening extremely soft soil foundation and construction method thereof
CN105350525A (en) Construction method for piles
CN107217910A (en) Supply line's electric pole plants lever apparatus and its plants bar method
CN106368616A (en) Pouring square pile drill bit
CN104563118B (en) The pre-poured built pile construction method of full-sleeve vibration soil taking
CN106049465A (en) Construction method for pile
CN105839638A (en) Convenient and efficient construction method for piles
CN103321474B (en) Hole-drilling pole-erecting vehicle
CN205934922U (en) Vibration hammer equipment
CN104631442A (en) Full casing pipe soil taking vibration construction method for squeezed and expanded cast-in-place pile
CN107938666A (en) Slip casting structure and technique are surveyed in hammer piling and synchronous end in band shoe pipe pile end
KR101051428B1 (en) Reinforcement structure for pile footing and fixed anchorage zone of tension members
CN106759332A (en) The construction method and construction equipment of stake
CN105649074B (en) The squeezed concrete stiff composite pile of tubular pole and its construction method
CN103938641A (en) Foundation construction technology of large-scale photovoltaic power station in desert
CN207739253U (en) Slip casting structure is surveyed at hammer piling and synchronous end in band shoe pipe pile end
DK2925934T3 (en) Process for making a pile
CN205934923U (en) Vibration hammer equipment
CN107476319A (en) Mountain area steep slope region Road Bridge Pile Foundation construction method
CN106759289A (en) The construction method and construction equipment of a kind of
CN107237322B (en) A kind of method that long auger rear inserting cage bored concrete pile is efficiently inserted into vibrating tube
CN207047834U (en) A kind of construction system of hollow preformed pile
CN206233232U (en) A kind of upper and lower part expansion type soil cement is combined pile tube

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20180408

Address after: 330200 Jiangxi city in Nanchang Province Economic Development Zone Shandong blue Fu Road No. 1211

Patentee after: Jiangxi Jiye Science & Technology Co., Ltd.

Address before: 330025 No. 1211 Fu Shandong Road, Xiaolan Economic Development Zone, Jiangxi, Nanchang

Patentee before: Liu Xiangang

CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 330200 Jiangxi city in Nanchang Province Economic Development Zone Shandong blue Fu Road No. 1211

Patentee after: Jiangxi Jiye Technology Group Co.,Ltd.

Address before: 330200 Jiangxi city in Nanchang Province Economic Development Zone Shandong blue Fu Road No. 1211

Patentee before: JIANGXI JIYE SCIENCE AND TECHNOLOGY Co.,Ltd.