CN105649074B - The squeezed concrete stiff composite pile of tubular pole and its construction method - Google Patents
The squeezed concrete stiff composite pile of tubular pole and its construction method Download PDFInfo
- Publication number
- CN105649074B CN105649074B CN201610163410.7A CN201610163410A CN105649074B CN 105649074 B CN105649074 B CN 105649074B CN 201610163410 A CN201610163410 A CN 201610163410A CN 105649074 B CN105649074 B CN 105649074B
- Authority
- CN
- China
- Prior art keywords
- tubular pole
- pile
- stake
- squeezed
- cast
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/50—Piles comprising both precast concrete portions and concrete portions cast in situ
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/34—Concrete or concrete-like piles cast in position ; Apparatus for making same
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/34—Concrete or concrete-like piles cast in position ; Apparatus for making same
- E02D5/38—Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds
- E02D5/385—Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds with removal of the outer mould-pipes
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2300/00—Materials
- E02D2300/0004—Synthetics
- E02D2300/0018—Cement used as binder
- E02D2300/002—Concrete
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Piles And Underground Anchors (AREA)
Abstract
The invention discloses a kind of squeezed concrete stiff composite pile of tubular pole and its construction methods, including peripheral cement earth pile, the squeezed molding Cast-in-place concrete stake of setting in peripheral cement earth pile, prefabricated tubular pile is set in squeezed molding Cast-in-place concrete stake, and the unidirectional valve that stake end seal is closed and can be opened downwards is arranged in the stake end of prefabricated tubular pile.The present invention is easy for construction, and resistance to compression with higher, resistance to plucking, horizontal force resistant performance, stability is good, and integrated degree is high.
Description
Technical field
The present invention relates to a kind of composite pile and its construction methods.
Background technique
There is the problems such as construction is inconvenient, and composite pile system working performance is undesirable in existing composite pile, need further to add
To improve.
Summary of the invention
The purpose of the present invention is to provide a kind of structurally reasonable, the squeezed concrete stiffness of tubular pole easy for construction, that effect is good is compound
Stake and its construction method.
The technical solution of the invention is as follows:
A kind of squeezed concrete stiff composite pile of tubular pole, it is characterized in that: including peripheral cement earth pile, setting in peripheral cement earth pile
Squeezed molding Cast-in-place concrete stake, squeezed molding Cast-in-place concrete stake is interior to be arranged prefabricated tubular pile, and the stake end of prefabricated tubular pile is arranged stake end
Closing and the unidirectional valve that can be opened downwards.
The length of prefabricated tubular pile is greater than, less than or equal to the length of peripheral cement earth pile.
A kind of construction method of the squeezed concrete stiff composite pile of tubular pole, it is characterized in that: including the following steps:
(1) the peripheral cement earth pile of construction,;
(2) unidirectional valve that stake end seal is closed and can be opened downwards is set at pipe pile end;
(3) tubular pole is pressed into peripheral cement earth pile;
(4) after tubular pole is forced into designed elevation, tubular pole is promoted;
(5) while promoting tubular pole, Cast-in-place concrete is perfused from tubular pole inner cavity to stake top absolute altitude, back-pressure tubular pole will be cast-in-place
Between squeezed to the peripheral cement earth pile of concrete and tubular pole, squeezed molding Cast-in-place concrete stake is formed;
Or be repeatedly lifted up tubular pole, back-pressure, and Cast-in-place concrete is perfused from tubular pole inner cavity simultaneously, Cast-in-place concrete is squeezed to peripheral
Between concrete stake and tubular pole, squeezed molding Cast-in-place concrete stake is formed;
When tubular pole is promoted, unidirectional valve is opened downwards;When tubular pole is downward, unidirectional valve closes pipe pile end seal.
The present invention is easy for construction, and resistance to compression with higher, resistance to plucking, horizontal force resistant performance, stability is good, integrated degree
It is high;Intensity is big, and frictional force is big.The bond stress between soil cement and Cast-in-place concrete, tubular pole, frictional force can be increased substantially and bonded strong
Degree is conducive to pile soil common action, or even integration.
Detailed description of the invention
Present invention will be further explained below with reference to the attached drawings and examples.
Fig. 1 is the structural schematic diagram of one embodiment of the invention.
Specific embodiment
A kind of construction method of the squeezed concrete stiff composite pile of tubular pole, including the following steps:
(1) the peripheral cement earth pile of construction,;
(2) pipe pile end setting stake end seal is closed and can open downwards unidirectional valve (flap valve provide hinge means with
The connection of pipe pile end or the connection of other suitable methods);
(3) tubular pole is pressed into peripheral cement earth pile;
(4) after tubular pole is forced into designed elevation, tubular pole is promoted;
(5) while promoting tubular pole, Cast-in-place concrete is perfused from tubular pole inner cavity to stake top absolute altitude, back-pressure tubular pole will be cast-in-place
Between squeezed to the peripheral cement earth pile of concrete and tubular pole, squeezed molding Cast-in-place concrete stake is formed;
Or be repeatedly lifted up tubular pole, back-pressure, and Cast-in-place concrete is perfused from tubular pole inner cavity simultaneously, Cast-in-place concrete is squeezed to peripheral
Between concrete stake and tubular pole, squeezed molding Cast-in-place concrete stake is formed;
When tubular pole is promoted, unidirectional valve is opened downwards;When tubular pole is downward, unidirectional valve closes pipe pile end seal.
The soil cement of formation, squeezed concrete, tubular pole composite pile, including peripheral cement earth pile 1, the interior setting of peripheral cement earth pile are squeezed
Expand molding Cast-in-place concrete stake 2, prefabricated tubular pile 3 is set in squeezed molding Cast-in-place concrete stake, the stake end of prefabricated tubular pile is arranged stake end
Closing and the unidirectional valve 4 that can be opened downwards.
The length of prefabricated tubular pile is greater than, less than or equal to the length of peripheral cement earth pile.
The tubular pole is high-intensitive or intensity adjustable steel pipe tubular pole or hollow square pile;It can be using top as steel pipe tubular pole, lower part
For common tubular pole;
Concrete core (when resistance to plucking requires high, filling out microdilatancy concrete and steel strand wires resistance to plucking) can be filled out inside tubular pole;Concrete in-core can also be into
One step puts steel pipe, steel reinforcement cage, fashioned iron.
Peripheral cement earth pile, Cast-in-place concrete stake, tubular pole three length can be different.
In addition to soil cement diameter is identical with tubular pole diameter, cast-in-place concrete layer can in stake top, stake, stake bottom it is expanding.
Claims (1)
1. a kind of construction method of the squeezed concrete stiff composite pile of tubular pole, it is characterized in that: including the following steps:
(1) the peripheral cement earth pile of construction;
(2) unidirectional valve that stake end seal is closed and can be opened downwards is set at pipe pile end;
(3) tubular pole is pressed into peripheral cement earth pile;
(4) after tubular pole is forced into designed elevation, tubular pole is promoted;
(5) while promoting tubular pole, Cast-in-place concrete is perfused from tubular pole inner cavity to designed elevation, back-pressure tubular pole squeezes Cast-in-place concrete
Expand between peripheral concrete stake and tubular pole, forms squeezed molding Cast-in-place concrete stake;
Or be repeatedly lifted up tubular pole, back-pressure, and Cast-in-place concrete is perfused from tubular pole inner cavity simultaneously, by squeezed to the peripheral cement of Cast-in-place concrete
Between native stake and tubular pole, squeezed molding Cast-in-place concrete stake is formed;
When tubular pole is promoted, unidirectional valve is opened downwards;When tubular pole pushes, unidirectional valve closes pipe pile end seal.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610163410.7A CN105649074B (en) | 2016-03-22 | 2016-03-22 | The squeezed concrete stiff composite pile of tubular pole and its construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610163410.7A CN105649074B (en) | 2016-03-22 | 2016-03-22 | The squeezed concrete stiff composite pile of tubular pole and its construction method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105649074A CN105649074A (en) | 2016-06-08 |
CN105649074B true CN105649074B (en) | 2019-09-03 |
Family
ID=56495045
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610163410.7A Active CN105649074B (en) | 2016-03-22 | 2016-03-22 | The squeezed concrete stiff composite pile of tubular pole and its construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105649074B (en) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107859027B (en) * | 2017-11-15 | 2020-03-06 | 广西瑞宇建筑科技有限公司 | Method for consolidating tailing pond by lime piles |
CN108978641A (en) * | 2018-08-17 | 2018-12-11 | 江苏劲桩基础工程有限公司 | The construction method of compound strength stake |
CN110847158B (en) * | 2019-11-19 | 2021-06-22 | 广东电网有限责任公司广州供电局 | Piling device and piling method |
CN113481979A (en) * | 2021-08-01 | 2021-10-08 | 尹杰 | Anti-pulling tubular pile |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1837505A (en) * | 2006-04-03 | 2006-09-27 | 梁毅 | Construction method of static extrusion concrete pile |
CN101126239A (en) * | 2007-09-14 | 2008-02-20 | 张立军 | Construction device and construction technique for concrete pipe base |
Family Cites Families (17)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1064722A (en) * | 1991-03-07 | 1992-09-23 | 谢莘南 | At the bottom of a kind of expansion/footpath castinplace pile forming method and stake tool thereof |
CN1104280A (en) * | 1993-10-19 | 1995-06-28 | 俞晓 | Pre-poured composite tube pile and pile-making technology and apparatus thereof |
CN1076064C (en) * | 1995-10-04 | 2001-12-12 | 司炳文 | Method for handling foundation |
CN2313959Y (en) * | 1996-05-24 | 1999-04-14 | 邹宗煊 | Cement-soil hard cored composite pile for fountain |
CN2353795Y (en) * | 1999-01-13 | 1999-12-15 | 中国建筑科学研究院地基基础研究所 | Prefabricated-tube composite pile of cement and soil |
JP2005256546A (en) * | 2004-03-15 | 2005-09-22 | Fujita Corp | Foundation structure of building and its construction method |
CN201007002Y (en) * | 2007-03-07 | 2008-01-16 | 山东省机械施工有限公司 | Fragmental stone composite pile and construction equipment thereof |
CN101148875A (en) * | 2007-11-05 | 2008-03-26 | 山东省机械施工有限公司 | Composite pile and construction method thereof |
CN101761074B (en) * | 2008-10-10 | 2012-01-25 | 上海强劲地基工程股份有限公司 | Method for improving bearing capacity and tensile capacity of tubular pile end |
CN101666086B (en) * | 2009-08-11 | 2011-08-03 | 上海建工(集团)总公司 | Cement cast-in-situ pile of prefabricated part and construction method thereof |
CN101858079B (en) * | 2010-06-02 | 2011-08-24 | 山东省建筑科学研究院 | Core filling tubular pile cement composite foundation pile and construction method |
CN102409667B (en) * | 2011-07-29 | 2014-06-18 | 张立军 | Construction device and construction process of extruded and expanded cast-in-place pile |
CN102383421A (en) * | 2011-08-30 | 2012-03-21 | 李征 | Earth discharging pile-forming device arranged at bottom end of synchronous earth-taking pouring pile body vibration sinking pipe and method |
CN110318394B (en) * | 2012-07-02 | 2020-10-20 | 朱建新 | Construction method of composite pile |
CN204676525U (en) * | 2015-03-30 | 2015-09-30 | 邓亚光 | High strength rigidity soil compaction composite pile |
CN204645027U (en) * | 2015-04-10 | 2015-09-16 | 沙焕焕 | Prose style free from parallelism grouting behind shaft or drift lining strength core composite pile |
CN205557510U (en) * | 2016-03-22 | 2016-09-07 | 沙焕焕 | Crowded concrete strength nature composite pile that expands of tubular pile |
-
2016
- 2016-03-22 CN CN201610163410.7A patent/CN105649074B/en active Active
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1837505A (en) * | 2006-04-03 | 2006-09-27 | 梁毅 | Construction method of static extrusion concrete pile |
CN101126239A (en) * | 2007-09-14 | 2008-02-20 | 张立军 | Construction device and construction technique for concrete pipe base |
Also Published As
Publication number | Publication date |
---|---|
CN105649074A (en) | 2016-06-08 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105649074B (en) | The squeezed concrete stiff composite pile of tubular pole and its construction method | |
CN104131556A (en) | Soft-and-hard interlayer alternation foundation drainage prestressed pipe pile and construction method | |
CN103603337B (en) | Slip casting prefabricated pile and grouting method | |
CN206448269U (en) | A kind of expansion bolt hollow anchor bar | |
CN104005406B (en) | The construction method and its stake barrel structure of a kind of stake | |
CN105804403B (en) | Big scale of construction special-shaped stiffness concrete column body slips ball concrete pouring structure and method on the ground | |
CN103603346A (en) | Construction method for drawing-resistant thorn-shaped pile | |
CN205501843U (en) | Consolidate rigid framed arch bridge | |
CN204000859U (en) | The mutual foundation drainage pile for prestressed pipe of a kind of soft or hard interlayer | |
CN204676525U (en) | High strength rigidity soil compaction composite pile | |
CN205557510U (en) | Crowded concrete strength nature composite pile that expands of tubular pile | |
CN204690734U (en) | A kind of pile body enlarged footing preformed pile | |
CN204753581U (en) | Stake end enlarged footing precast pile | |
CN103572756B (en) | Cast-in-place pile sleeve and construction method thereof | |
CN206279525U (en) | A kind of band edge of a wing variable cross-section prefabricated pile | |
CN206554082U (en) | A kind of screw-in strengthens soil nailing | |
CN205653821U (en) | Anti device that floats of soft soil foundation basement | |
CN204510222U (en) | A kind of long-spiral drilling machine soil sampler | |
CN106087958B (en) | The method of basement process device and basement process | |
CN205908089U (en) | Can resist novel frame construction of mud -rock flow | |
CN104831726A (en) | Barb grouting type anchor rod and construction method thereof | |
CN106013134B (en) | Diameter-expanding concrete pipe pile, diameter-expanding device and diameter-expanding method | |
CN205116154U (en) | Steel pipe concrete pile is strutted to side slope | |
CN204676541U (en) | A kind of cast-in-situ major diameter pipe pile flap valve shoe assisting in opening device | |
CN203977418U (en) | Prevent cast-in-place pile concrete loss device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |