CN105649074A - Tubular pile expansion concrete stiffened composite pile and construction method thereof - Google Patents
Tubular pile expansion concrete stiffened composite pile and construction method thereof Download PDFInfo
- Publication number
- CN105649074A CN105649074A CN201610163410.7A CN201610163410A CN105649074A CN 105649074 A CN105649074 A CN 105649074A CN 201610163410 A CN201610163410 A CN 201610163410A CN 105649074 A CN105649074 A CN 105649074A
- Authority
- CN
- China
- Prior art keywords
- pile
- cast
- pile tube
- squeezed
- place concrete
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/50—Piles comprising both precast concrete portions and concrete portions cast in situ
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/34—Concrete or concrete-like piles cast in position ; Apparatus for making same
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/34—Concrete or concrete-like piles cast in position ; Apparatus for making same
- E02D5/38—Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds
- E02D5/385—Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds with removal of the outer mould-pipes
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2300/00—Materials
- E02D2300/0004—Synthetics
- E02D2300/0018—Cement used as binder
- E02D2300/002—Concrete
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Piles And Underground Anchors (AREA)
Abstract
The invention discloses a tubular pile expansion concrete stiffened composite pile and a construction method thereof. The tubular pile expansion concrete stiffened composite pile comprises a peripheral cement soil pile; a cast-in-place concrete pile molded through extrusion is arranged in the peripheral cement soil pile; a prefabricated tubular pile is arranged in the cast-in-place concrete pile molded through extrusion; and a one-way valve for closing the pile end and capable of being downwards opened is arranged at the pile end of the prefabricated tubular pile. The tubular pile expansion concrete stiffened composite pile is convenient for construction, higher in pressure resistance, drawing resistance and horizontal force resistance, excellent in stability and high in integration degree.
Description
Technical field
The present invention relates to a kind of composite pile and construction method thereof.
Background technology
, there is construction inconvenience, the problems such as composite pile system service behaviour is undesirable, it is necessary to improved further in existing composite pile.
Summary of the invention
It is an object of the invention to provide a kind of rational in infrastructure, easy construction, the squeezed concrete stiff composite pile of effective pile tube and construction method thereof.
The technical solution of the present invention is:
A kind of squeezed concrete stiff composite pile of pile tube, it is characterized in that: include peripheral cement earth pile, arranging the Cast-in-place concrete stake of squeezed molding in peripheral cement earth pile, arrange prefabricated tubular pile in the Cast-in-place concrete stake of squeezed molding, the stake end of prefabricated tubular pile arranges the unidirectional valve closed by stake end and can open downwards.
The length of prefabricated tubular pile more than, less than or equal to the length of peripheral cement earth pile.
The construction method of the squeezed concrete stiff composite pile of a kind of pile tube, is characterized in that: comprise the following steps:
(1) the peripheral cement earth pile of construction;
(2) unidirectional valve closed by stake end and can open downwards is set at pipe pile end;
(3) press-in pile tube in peripheral cement earth pile;
(4) after pile tube is forced into designed elevation, pile tube is promoted;
(5) while promoting pile tube, from pile tube inner chamber, Cast-in-place concrete is irrigated high to stake top mark, back-pressure pile tube, between squeezed to peripheral for Cast-in-place concrete cement earth pile and pile tube, the Cast-in-place concrete stake of squeezed molding will be formed;
Or pile tube is repeatedly lifted up, back-pressure, and from pile tube inner chamber, irrigate Cast-in-place concrete simultaneously, between squeezed to peripheral for Cast-in-place concrete concrete stake and pile tube, the Cast-in-place concrete stake of squeezed molding will be formed;
When pile tube promotes, unidirectional valve is opened downwards; When pile tube is downward, pipe pile end is closed by unidirectional valve.
Easy construction of the present invention, has higher resistance to compression, resistance to plucking, horizontal force resistant performance, good stability, and integrated degree is high; Intensity is big, and frictional force is big. The bond stress between soil cement and Cast-in-place concrete, pile tube, frictional force and adhesion strength can be increased substantially, be conducive to pile soil common action, even integration.
Accompanying drawing explanation
Below in conjunction with drawings and Examples, the invention will be further described.
Fig. 1 is the structural representation of one embodiment of the invention.
Detailed description of the invention
The construction method of the squeezed concrete stiff composite pile of a kind of pile tube, comprises the following steps:
(1) the peripheral cement earth pile of construction;
(2) unidirectional valve (flap valve provides hinge means to be connected with pipe pile end or other suitable methods connect) closed by stake end and can open downwards is set at pipe pile end;
(3) press-in pile tube in peripheral cement earth pile;
(4) after pile tube is forced into designed elevation, pile tube is promoted;
(5) while promoting pile tube, from pile tube inner chamber, Cast-in-place concrete is irrigated high to stake top mark, back-pressure pile tube, between squeezed to peripheral for Cast-in-place concrete cement earth pile and pile tube, the Cast-in-place concrete stake of squeezed molding will be formed;
Or pile tube is repeatedly lifted up, back-pressure, and from pile tube inner chamber, irrigate Cast-in-place concrete simultaneously, between squeezed to peripheral for Cast-in-place concrete concrete stake and pile tube, the Cast-in-place concrete stake of squeezed molding will be formed;
When pile tube promotes, unidirectional valve is opened downwards; When pile tube is downward, pipe pile end is closed by unidirectional valve.
The soil cement formed, squeezed concrete, pile tube composite pile, including peripheral cement earth pile 1, arranging the Cast-in-place concrete stake 2 of squeezed molding in peripheral cement earth pile, arrange prefabricated tubular pile 3 in the Cast-in-place concrete stake of squeezed molding, the stake end of prefabricated tubular pile arranges the unidirectional valve 4 closed by stake end and can open downwards.
The length of prefabricated tubular pile more than, less than or equal to the length of peripheral cement earth pile.
Described pile tube is steel pipe pile tube or the hollow square pile of high intensity or intensity adjustable; Can top being steel pipe pile tube, bottom be common pile tube;
Concrete core (when resistance to plucking requires high, fill out microdilatancy concrete and steel strand wires resistance to plucking) can be filled out inside pile tube; Concrete in-core also can put steel pipe, steel reinforcement cage, shaped steel further.
Peripheral cement earth pile, Cast-in-place concrete stake, pile tube three length can be different.
Outside the earth diameter that dewaters is identical with pile tube diameter, Cast-in-place concrete layer can push up in stake, in stake, expanding at the bottom of stake.
Claims (3)
1. the squeezed concrete stiff composite pile of pile tube, it is characterized in that: include peripheral cement earth pile, arranging the Cast-in-place concrete stake of squeezed molding in peripheral cement earth pile, arrange prefabricated tubular pile in the Cast-in-place concrete stake of squeezed molding, the stake end of prefabricated tubular pile arranges the unidirectional valve closed by stake end and can open downwards.
2. the squeezed concrete stiff composite pile of pile tube according to claim 1, is characterized in that: the length of prefabricated tubular pile more than, less than or equal to the length of peripheral cement earth pile.
3. a construction method for the squeezed concrete stiff composite pile of pile tube described in claim 1, is characterized in that: comprise the following steps:
(1) the peripheral cement earth pile of construction;
(2) unidirectional valve closed by stake end and can open downwards is set at pipe pile end;
(3) press-in pile tube in peripheral cement earth pile;
(4) after pile tube is forced into designed elevation, pile tube is promoted;
(5) while promoting pile tube, from pile tube inner chamber, irrigate Cast-in-place concrete to designed elevation, back-pressure pile tube, between squeezed to peripheral for Cast-in-place concrete concrete stake and pile tube, the Cast-in-place concrete stake of squeezed molding will be formed;
Or pile tube is repeatedly lifted up, back-pressure, and from pile tube inner chamber, irrigate Cast-in-place concrete simultaneously, between squeezed to peripheral for Cast-in-place concrete cement earth pile and pile tube, the Cast-in-place concrete stake of squeezed molding will be formed;
When pile tube promotes, unidirectional valve is opened downwards; When pressing under pile tube, pipe pile end is closed by unidirectional valve.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610163410.7A CN105649074B (en) | 2016-03-22 | 2016-03-22 | The squeezed concrete stiff composite pile of tubular pole and its construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610163410.7A CN105649074B (en) | 2016-03-22 | 2016-03-22 | The squeezed concrete stiff composite pile of tubular pole and its construction method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105649074A true CN105649074A (en) | 2016-06-08 |
CN105649074B CN105649074B (en) | 2019-09-03 |
Family
ID=56495045
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610163410.7A Active CN105649074B (en) | 2016-03-22 | 2016-03-22 | The squeezed concrete stiff composite pile of tubular pole and its construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105649074B (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107859027A (en) * | 2017-11-15 | 2018-03-30 | 广西瑞宇建筑科技有限公司 | A kind of method of lime pile consolidation Tailings Dam |
CN108978641A (en) * | 2018-08-17 | 2018-12-11 | 江苏劲桩基础工程有限公司 | The construction method of compound strength stake |
CN110847158A (en) * | 2019-11-19 | 2020-02-28 | 广州供电局有限公司 | Piling device and piling method |
CN113481979A (en) * | 2021-08-01 | 2021-10-08 | 尹杰 | Anti-pulling tubular pile |
Citations (19)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1064722A (en) * | 1991-03-07 | 1992-09-23 | 谢莘南 | At the bottom of a kind of expansion/footpath castinplace pile forming method and stake tool thereof |
CN1104280A (en) * | 1993-10-19 | 1995-06-28 | 俞晓 | Pre-poured composite tube pile and pile-making technology and apparatus thereof |
CN1116674A (en) * | 1995-10-04 | 1996-02-14 | 司炳文 | Method for handling foundation |
CN2313959Y (en) * | 1996-05-24 | 1999-04-14 | 邹宗煊 | Cement-soil hard cored composite pile for fountain |
CN2353795Y (en) * | 1999-01-13 | 1999-12-15 | 中国建筑科学研究院地基基础研究所 | Prefabricated-tube composite pile of cement and soil |
JP2005256546A (en) * | 2004-03-15 | 2005-09-22 | Fujita Corp | Foundation structure of building and its construction method |
CN1837505A (en) * | 2006-04-03 | 2006-09-27 | 梁毅 | Construction method for concrete pile by static extrusion |
CN201007002Y (en) * | 2007-03-07 | 2008-01-16 | 山东省机械施工有限公司 | Fragmental stone composite pile and construction equipment thereof |
CN101126239A (en) * | 2007-09-14 | 2008-02-20 | 张立军 | Construction device and construction technique for concrete pipe base |
CN101148875A (en) * | 2007-11-05 | 2008-03-26 | 山东省机械施工有限公司 | Composite pile and construction method thereof |
CN101666086A (en) * | 2009-08-11 | 2010-03-10 | 上海建工(集团)总公司 | Cement cast-in-situ pile of prefabricated part and construction method thereof |
CN101761074A (en) * | 2008-10-10 | 2010-06-30 | 上海强劲基础工程有限公司 | Method for improving bearing capacity and tensile capacity of tubular pile end |
CN101858079A (en) * | 2010-06-02 | 2010-10-13 | 山东省建筑科学研究院 | Core filling tubular pile cement composite foundation pile and construction method |
CN102383421A (en) * | 2011-08-30 | 2012-03-21 | 李征 | Earth discharging pile-forming device arranged at bottom end of synchronous earth-taking pouring pile body vibration sinking pipe and method |
CN102409667A (en) * | 2011-07-29 | 2012-04-11 | 张立军 | Construction device and construction process of extruded and expanded cast-in-place pile |
CN102733376A (en) * | 2012-07-02 | 2012-10-17 | 朱建新 | Composite pile and construction method thereof |
CN204645027U (en) * | 2015-04-10 | 2015-09-16 | 沙焕焕 | Prose style free from parallelism grouting behind shaft or drift lining strength core composite pile |
CN204676525U (en) * | 2015-03-30 | 2015-09-30 | 邓亚光 | High strength rigidity soil compaction composite pile |
CN205557510U (en) * | 2016-03-22 | 2016-09-07 | 沙焕焕 | Crowded concrete strength nature composite pile that expands of tubular pile |
-
2016
- 2016-03-22 CN CN201610163410.7A patent/CN105649074B/en active Active
Patent Citations (19)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1064722A (en) * | 1991-03-07 | 1992-09-23 | 谢莘南 | At the bottom of a kind of expansion/footpath castinplace pile forming method and stake tool thereof |
CN1104280A (en) * | 1993-10-19 | 1995-06-28 | 俞晓 | Pre-poured composite tube pile and pile-making technology and apparatus thereof |
CN1116674A (en) * | 1995-10-04 | 1996-02-14 | 司炳文 | Method for handling foundation |
CN2313959Y (en) * | 1996-05-24 | 1999-04-14 | 邹宗煊 | Cement-soil hard cored composite pile for fountain |
CN2353795Y (en) * | 1999-01-13 | 1999-12-15 | 中国建筑科学研究院地基基础研究所 | Prefabricated-tube composite pile of cement and soil |
JP2005256546A (en) * | 2004-03-15 | 2005-09-22 | Fujita Corp | Foundation structure of building and its construction method |
CN1837505A (en) * | 2006-04-03 | 2006-09-27 | 梁毅 | Construction method for concrete pile by static extrusion |
CN201007002Y (en) * | 2007-03-07 | 2008-01-16 | 山东省机械施工有限公司 | Fragmental stone composite pile and construction equipment thereof |
CN101126239A (en) * | 2007-09-14 | 2008-02-20 | 张立军 | Construction device and construction technique for concrete pipe base |
CN101148875A (en) * | 2007-11-05 | 2008-03-26 | 山东省机械施工有限公司 | Composite pile and construction method thereof |
CN101761074A (en) * | 2008-10-10 | 2010-06-30 | 上海强劲基础工程有限公司 | Method for improving bearing capacity and tensile capacity of tubular pile end |
CN101666086A (en) * | 2009-08-11 | 2010-03-10 | 上海建工(集团)总公司 | Cement cast-in-situ pile of prefabricated part and construction method thereof |
CN101858079A (en) * | 2010-06-02 | 2010-10-13 | 山东省建筑科学研究院 | Core filling tubular pile cement composite foundation pile and construction method |
CN102409667A (en) * | 2011-07-29 | 2012-04-11 | 张立军 | Construction device and construction process of extruded and expanded cast-in-place pile |
CN102383421A (en) * | 2011-08-30 | 2012-03-21 | 李征 | Earth discharging pile-forming device arranged at bottom end of synchronous earth-taking pouring pile body vibration sinking pipe and method |
CN102733376A (en) * | 2012-07-02 | 2012-10-17 | 朱建新 | Composite pile and construction method thereof |
CN204676525U (en) * | 2015-03-30 | 2015-09-30 | 邓亚光 | High strength rigidity soil compaction composite pile |
CN204645027U (en) * | 2015-04-10 | 2015-09-16 | 沙焕焕 | Prose style free from parallelism grouting behind shaft or drift lining strength core composite pile |
CN205557510U (en) * | 2016-03-22 | 2016-09-07 | 沙焕焕 | Crowded concrete strength nature composite pile that expands of tubular pile |
Non-Patent Citations (1)
Title |
---|
北京土木建筑学会: "《地基与基础工程施工技术与资料表格对照手册》", 31 January 2008, 北京:冶金工业出版社 * |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107859027A (en) * | 2017-11-15 | 2018-03-30 | 广西瑞宇建筑科技有限公司 | A kind of method of lime pile consolidation Tailings Dam |
CN107859027B (en) * | 2017-11-15 | 2020-03-06 | 广西瑞宇建筑科技有限公司 | Method for consolidating tailing pond by lime piles |
CN108978641A (en) * | 2018-08-17 | 2018-12-11 | 江苏劲桩基础工程有限公司 | The construction method of compound strength stake |
CN110847158A (en) * | 2019-11-19 | 2020-02-28 | 广州供电局有限公司 | Piling device and piling method |
CN110847158B (en) * | 2019-11-19 | 2021-06-22 | 广东电网有限责任公司广州供电局 | Piling device and piling method |
CN113481979A (en) * | 2021-08-01 | 2021-10-08 | 尹杰 | Anti-pulling tubular pile |
Also Published As
Publication number | Publication date |
---|---|
CN105649074B (en) | 2019-09-03 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105649074A (en) | Tubular pile expansion concrete stiffened composite pile and construction method thereof | |
CN101435269B (en) | Prestress pipe anti-blocking method | |
CN109162199A (en) | Assembling-type precast pier connection structure and its construction method | |
CN105386440A (en) | Bottom-expanded pipe pile with unfolded blades and pile driving method thereof | |
CN206204937U (en) | A kind of pile tube connector easy to install | |
CN102345292B (en) | A kind of composite prestressed uplift pile with enlarged footing | |
CN204676525U (en) | High strength rigidity soil compaction composite pile | |
CN203188968U (en) | Cable-passing well-washable packer | |
CN101936004A (en) | Precast expanding pile as well as construction method and construction mechanical equipment thereof | |
CN103741673B (en) | A kind of self-anchoring type steel strand pre-tensioning system centrifugal concrete pile and manufacture method thereof | |
CN205557510U (en) | Crowded concrete strength nature composite pile that expands of tubular pile | |
CN201225246Y (en) | Water well water-drawing apparatus without diversion | |
CN204753581U (en) | Stake end enlarged footing precast pile | |
CN203188202U (en) | Pressure type high bearing capacity composite uplift pile | |
CN202194130U (en) | Compound pre-stressed anti-pulling pile with enlarged head | |
CN204000859U (en) | The mutual foundation drainage pile for prestressed pipe of a kind of soft or hard interlayer | |
CN204690734U (en) | A kind of pile body enlarged footing preformed pile | |
CN204960140U (en) | Splice of stamping forming straight thread grout sleeve | |
CN201567719U (en) | Inner casing pipe type armoured concrete hollow beam | |
CN204311443U (en) | A kind of cone-cylindricality combination pile tube | |
CN108842759B (en) | Combined pile of prefabricated pipe pile and cast-in-place pile and construction process thereof | |
CN106013134B (en) | Diameter-expanding concrete pipe pile, diameter-expanding device and diameter-expanding method | |
CN204225360U (en) | A kind of prefabricated post and the syndeton with precast beam | |
CN210857431U (en) | Rain sewage pipeline cross joint | |
CN206570799U (en) | A kind of grouting behind shaft or drift lining end cone formula bored concrete pile |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |