CN210857431U - Rain sewage pipeline cross joint - Google Patents

Rain sewage pipeline cross joint Download PDF

Info

Publication number
CN210857431U
CN210857431U CN201920753611.1U CN201920753611U CN210857431U CN 210857431 U CN210857431 U CN 210857431U CN 201920753611 U CN201920753611 U CN 201920753611U CN 210857431 U CN210857431 U CN 210857431U
Authority
CN
China
Prior art keywords
pipe
rainwater
sewage
fixed
anchor ear
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920753611.1U
Other languages
Chinese (zh)
Inventor
王新泉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hangzhou Jiangrun Technology Co Ltd
Original Assignee
Hangzhou Jiangrun Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hangzhou Jiangrun Technology Co Ltd filed Critical Hangzhou Jiangrun Technology Co Ltd
Priority to CN201920753611.1U priority Critical patent/CN210857431U/en
Application granted granted Critical
Publication of CN210857431U publication Critical patent/CN210857431U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Sewage (AREA)

Abstract

The utility model relates to a rain sewage pipeline cross joint, which comprises a rain water pipe fixing and protecting hanger, a soil digging and supporting pipe penetrating mould, a rain water pipe, a sewage pipe, a precast concrete support and a hoop; the rainwater pipe fixing and protecting hanger comprises a support frame, a connecting rod and a profile steel groove, wherein the rainwater pipe is placed in the profile steel groove with the size matched with that of the rainwater pipe, and the profile steel groove is fixed with the support frame through the connecting rod; the soil digging and supporting pipe penetrating die is a block die with a circular pipe penetrating opening; cement mortar is injected between the sewage pipe and the surrounding filling soil; the anchor ear is pre-buried in the precast concrete support, and the sewage pipe passes through the anchor ear with precast concrete support is fixed together, and the anchor ear passes through the bolt and is fixed with the nut. The utility model has the advantages that: the utility model provides a rainwater pipeline that the construction was accomplished can be fixed to the fixed protection gallows of rainwater pipe, can prevent moreover that the rainwater pipeline that the construction was accomplished from receiving the effect of factors such as external force, has good technical benefit.

Description

Rain sewage pipeline cross joint
Technical Field
The utility model relates to a municipal works field, in particular to rain sewage pipeline intersection node.
Background
Rain and sewage diversion refers to a sewage discharge mode in which rain water and sewage are separated and are respectively conveyed by a pipeline for discharge or subsequent treatment. With the rapid development of the economy of China, various traditional living facilities of cities cannot meet the requirements of modern life rhythm, so that the traditional urban drainage system cannot meet the requirements of the development of modern urban facilities along with the rapid development of the economy in the past. Along with the reinforcing of environmental protection, in addition the water resource is more and more precious, in order to the various water resources of utilization that can be better, municipal administration rain sewage diversion pipeline emerges in each city.
Due to the immaturity of construction technology, the construction of the rain and sewage pipeline cross joint is always a big difficulty. At present, the existing construction technology is a construction method mentioned in the text of 'example exploring municipal drainage pipeline groove-closing construction and steel sheet pile support technology' issued in Fujian building materials by forest development: when the rainwater main line and the sewage branch line are crossed, the rainwater main line is constructed firstly, when a sewage pipeline is installed, the constructed rainwater main line can be supported by bricking firstly, then soil is drawn from the lower side of the rainwater main pipe to penetrate the pipe, a 180-degree concrete pipe seat is adopted, and after the sewage branch line is installed, concrete is poured into a groove of the bricking support to the base of the rainwater pipeline.
In order to solve the problems of the construction technology, it is very important to design a rainwater and sewage pipeline intersection node with high construction efficiency and good construction effect.
SUMMERY OF THE UTILITY MODEL
The utility model aims at overcoming not enough among the prior art, providing a rain sewage pipeline alternately node.
The rainwater and sewage pipeline cross joint comprises a rainwater pipe fixing and protecting hanger, a soil digging and supporting pipe penetrating mold, a rainwater pipe, a sewage pipe, a precast concrete support and a hoop; the rainwater pipe fixing and protecting hanger comprises a support frame, a connecting rod and a profile steel groove, wherein the rainwater pipe is placed in the profile steel groove with the size matched with that of the rainwater pipe, and the profile steel groove is fixed with the support frame through the connecting rod; the soil digging and supporting pipe penetrating die is a block die with a circular pipe penetrating opening; cement mortar is injected between the sewage pipe and the surrounding filling soil; the anchor ear is pre-buried in the precast concrete support, and the sewage pipe passes through the anchor ear with precast concrete support is fixed together, and the anchor ear passes through the bolt and is fixed with the nut.
Preferably, the method comprises the following steps: the soil digging support pipe penetrating die is made of concrete materials.
The utility model has the advantages that:
(1) the utility model provides a rainwater pipeline that the construction was accomplished can be fixed to the fixed protection gallows of rainwater pipe, can prevent moreover that the rainwater pipeline that the construction was accomplished from receiving the effect of factors such as external force, has good technical benefit.
(2) The utility model provides a draw native support poling mould can provide for the rainwater line of construction completion and strut, for drawing native poling under the rainwater pipe and providing the construction space, the mould structure is fairly simple moreover, easily preparation.
(3) The utility model provides a prefabricated assembled support and synchronous poling of sewage pipe have reduced the cast-in-place operation volume of concrete, and have reduced the construction procedure, and technical benefit is showing.
Drawings
FIG. 1 is a schematic view of a storm hose fixing protective hanger;
FIG. 2 is a schematic view of a soil excavation supporting pipe penetrating mold;
FIG. 3 is a schematic view of the compaction of the grouting around the sewer pipe;
fig. 4 is a schematic view of the prefabricated support saddle and a sewer pipe synchronously penetrating.
Description of reference numerals: 1-a rain pipe; 2, a support frame; 3-a connecting rod; 4-a steel channel; 5-groove bottom; 6-perforating the pipe orifice; 7, digging soil to support the pipe penetrating mold; 8, a sewage pipe; 9, prefabricating a concrete support; 10, hooping; 11-bolts and nuts; 12-cement mortar.
Detailed Description
The present invention will be further described with reference to the following examples. The following description of the embodiments is merely provided to aid in understanding the invention. It should be noted that, for those skilled in the art, without departing from the principle of the present invention, the present invention can be further modified and modified, and such modifications and modifications also fall within the protection scope of the appended claims.
The rainwater and sewage pipeline cross joint comprises a rainwater pipe fixing and protecting hanger, an earth digging and supporting pipe penetrating mold 7, a rainwater pipe 1, a sewage pipe 8, a precast concrete support 9 and an anchor ear 10; the rainwater pipe fixing and protecting hanger comprises a support frame 2, a connecting rod 3 and a section steel groove 4, wherein the rainwater pipe 1 is placed in the section steel groove 4 with the size matched with that of the rainwater pipe 1, and the section steel groove 4 is fixed with the support frame 2 through the connecting rod 3; the soil digging and supporting pipe penetrating mold 7 is a block mold with a circular pipe penetrating opening 6; after the sewage pipe 8 is installed, cement mortar 12 is injected between the sewage pipe 8 and the surrounding filling to fill the pores between the pipe wall and the filling, so that the pipeline is prevented from deviating and settling; an anchor ear 10 is embedded in the precast concrete support 9, the sewage pipe 8 and the precast concrete support 9 are fixed together through the anchor ear 10, and the anchor ear 10 is fixed with a nut 11 through a bolt.
The soil excavation supporting pipe penetrating die 7 can be made of concrete materials.
The construction method of the rainwater and sewage pipeline cross joint comprises the following steps:
(1) and constructing a rainwater pipeline. When the rainwater main line and the sewage branch line are crossed, the elevation of the rainwater main line is larger than that of the sewage branch line, and in order to improve the construction efficiency, the rainwater main line is constructed firstly.
(2) And constructing a rainwater pipe fixing protection frame. Firstly, a section steel groove 4 which is adaptive to the size of the rainwater pipe 1 is manufactured, the rainwater pipe 1 is placed in the section steel groove 4, and the section steel groove 4 is fixed with the support frame 2 through a steel connecting rod 3, as shown in figure 1.
(3) And manufacturing a soil digging and supporting pipe penetrating die. A concrete material is used to make a block-shaped mould with a circular perforated pipe orifice 6 in the middle, as shown in fig. 2.
(4) And performing synchronous pipe penetrating construction of the prefabricated support and the sewage pipe. When the precast concrete support 9 is manufactured, the anchor ear 10 is pre-embedded, the sewage pipe 8 and the precast concrete support 9 are fixed together by the anchor ear 10, and the anchor ear 10 is fixed by the bolt and the nut 11, as shown in fig. 4.
(5) And performing sewage pipe construction and grouting around the sewage pipe to be compact. And (3) synchronously penetrating the prefabricated support and the sewage pipe through the reserved pipe penetrating port 6, and after the prefabricated support and the sewage pipe are installed, injecting cement mortar 12 between the sewage pipe 8 and the surrounding filling soil to fill the pores between the pipe wall and the filling soil.

Claims (2)

1. Rain sewage pipeline crossing node, its characterized in that: comprises a rainwater pipe fixing and protecting hanger, a soil digging and supporting pipe penetrating mold (7), a rainwater pipe (1), a sewage pipe (8), a precast concrete support (9) and an anchor ear (10); the rainwater pipe fixing and protecting hanger comprises a support frame (2), a connecting rod (3) and a section steel groove (4), wherein the rainwater pipe (1) is placed in the section steel groove (4) which is adaptive to the size of the rainwater pipe (1), and the section steel groove (4) is fixed with the support frame (2) through the connecting rod (3); the soil digging and supporting pipe penetrating die (7) is a block die with a circular pipe penetrating opening (6); cement mortar (12) is injected between the sewage pipe (8) and the surrounding filling soil; an anchor ear (10) is embedded in the precast concrete support (9), the sewage pipe (8) and the precast concrete support (9) are fixed together through the anchor ear (10), and the anchor ear (10) is fixed with a nut (11) through a bolt.
2. The storm sewer cross node of claim 1, wherein: the soil digging supporting pipe penetrating die (7) is made of concrete materials.
CN201920753611.1U 2019-05-23 2019-05-23 Rain sewage pipeline cross joint Active CN210857431U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920753611.1U CN210857431U (en) 2019-05-23 2019-05-23 Rain sewage pipeline cross joint

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920753611.1U CN210857431U (en) 2019-05-23 2019-05-23 Rain sewage pipeline cross joint

Publications (1)

Publication Number Publication Date
CN210857431U true CN210857431U (en) 2020-06-26

Family

ID=71289698

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920753611.1U Active CN210857431U (en) 2019-05-23 2019-05-23 Rain sewage pipeline cross joint

Country Status (1)

Country Link
CN (1) CN210857431U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113062428A (en) * 2021-03-24 2021-07-02 鹏图建设有限公司 Sewage pipeline aspect processing node and process thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113062428A (en) * 2021-03-24 2021-07-02 鹏图建设有限公司 Sewage pipeline aspect processing node and process thereof

Similar Documents

Publication Publication Date Title
CN104947709A (en) Pre-assembled single-compartment municipal tunnel and construction method thereof
CN205276316U (en) Modular prefabricated piping lane
CN204690783U (en) A kind of prefabricated assembled single cabin municipal administration synthesis pipe gallery
CN108252329B (en) Assembly type comprehensive pipe gallery for bearing force of enclosure structure and construction method thereof
CN208136927U (en) A kind of soil cutting side slope supporting construction
CN109356173A (en) A kind of pin-connected panel anchor bolt frame girder construction and its construction method
CN205530344U (en) Utility tunnel is pour to split type no mould
CN102011410A (en) Prefabricated prestressed underground continuous wall and construction method thereof
CN109024870A (en) The connection structure and its construction method of assembled underground structure vertical member
CN109914644A (en) A kind of assembled heat insulation masonry wall and preparation method thereof
CN106088318A (en) The overlapping assembled integral basement that flat slab system is combined with post and lintel system
CN210857431U (en) Rain sewage pipeline cross joint
CN107326932B (en) Quasi-semi-reverse construction method for underground garage
CN206769200U (en) First wear formula post stretching vertical prestressing cast-in-place concrete rod structure
CN205894280U (en) Hollow superstructure beam -columns system's integral basement of coincide assembly
CN104594389A (en) Post-cast strip external wall plugging structure with elastic water stoppers
CN207484508U (en) A kind of ultra-high performance concrete precast assembly pipe gallery system
CN110130934A (en) The construction method of city tunnel bifurcation mouth with box top board structure
CN107023061B (en) Assembled plastic municipal drainage inspection well and construction method
CN212129204U (en) Precast pier foundation of slip casting type recycled concrete
CN205894278U (en) Solid superstructure beam -columns system's integral basement of coincide assembly
CN211113774U (en) Assembled PC basement lateral wall post-cast strip structure
CN110318419B (en) Construction method of one-lining door opening support of underpass type pipe gallery
CN209875164U (en) Box-type top plate structure of urban tunnel branch
CN209620049U (en) A kind of pin-connected panel anchor bolt frame girder construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant