CN101392527B - Method for processing soft foundation by earthwork fabric granular pile - Google Patents

Method for processing soft foundation by earthwork fabric granular pile Download PDF

Info

Publication number
CN101392527B
CN101392527B CN200810197321XA CN200810197321A CN101392527B CN 101392527 B CN101392527 B CN 101392527B CN 200810197321X A CN200810197321X A CN 200810197321XA CN 200810197321 A CN200810197321 A CN 200810197321A CN 101392527 B CN101392527 B CN 101392527B
Authority
CN
China
Prior art keywords
steel sleeve
outer steel
sleeve pipe
geotextile
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN200810197321XA
Other languages
Chinese (zh)
Other versions
CN101392527A (en
Inventor
冯守中
闫澍旺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Guangyi Traffic Technology Co., Ltd.
Original Assignee
冯守中
闫澍旺
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 冯守中, 闫澍旺 filed Critical 冯守中
Priority to CN200810197321XA priority Critical patent/CN101392527B/en
Publication of CN101392527A publication Critical patent/CN101392527A/en
Application granted granted Critical
Publication of CN101392527B publication Critical patent/CN101392527B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention belongs to the field of civil engineering construction, and particularly relates to a method for reinforcing soft foundation. A method for treating soft foundation with civil engineering fabric discrete material piles is characterized by comprising the following steps: 1) preparing civil engineering fabric pile cylinders and pile pipes; 2) hitting outer steel sleeves to a designed depth by a pile hammer; 3) sleeving the civil engineering fabric pile cylinders on the lower parts of inner steel sleeves and the civil engineering fabric pile cylinders into pipe holes of the outer steel sleeves; 4) pouring discrete material into pipe holes of the inner steel sleeves to form the discrete material piles; 5) hoisting the outer steel sleeves which lift the inner steel sleeves from soft foundation, with the civil engineering fabric pile cylinders and the discrete material piles staying at original places under the action of gravity and the civil engineering fabric pile cylinders wrapping the discrete material piles to form the civil engineering fabric discrete material piles, and then pulling the inner steel sleeves out of the outer steel sleeves and preparing for the next cycle; 6) repeating the step 2) to 5) till the end of the soft foundation treatment. The method has excellent reinforcement effect.

Description

The method of processing soft foundation by earthwork fabric granular pile
Technical field
The invention belongs to the civil engineering construction field, be specifically related to a kind of method of soft base being carried out consolidation process.
Background technology
In civil engineering construction, soft base general reference soft foundation and soft soil foundation.Soft base has bigger harmfulness, and it can cause in various degree destruction to structure, and severe patient not only influences use, even causes thoroughly scrapping of building.From ancient times to the present, many buildings are destroyed, and most reasons are not at building itself, the soft often base of zombie.
Treatment of soft foundation utilize exactly change fill out, the whole bag of tricks such as fixed, compacted, pile foundation load, the weak foundation soil that bearing capacity is not reached requirement is reinforced.The main purpose of treatment of soft foundation is: improve the shear strength of ground, guarantee the stability of ground; Reduce the compressibilty of unfavorable foundation, reduce sedimentation, the especially differential settlement on basis; Prevent that ground is subjected to vibration and makes time spent generation liquefaction phenomenon, improve the dynamic characteristics of ground.
Granular pile is meant that discrete materials such as adopting rubble, gravel, copper smelter slag or building waste carries out ground as pile body and handles, and it handles the advantage of soft base: the one, have the effect that part is replaced weak soil; The 2nd, loose ground is had compacted effect; The 3rd, because of discrete material can form drainage channel, it has the discharging consolidation effect to soft subgrade soil.
But engineering practice proof granular pile is handled soft base and is had certain limitation, the radial constraint power that the need of work of granular pile is certain, if foundation soil strength is low excessively, enough radial constraint power just can not be provided, at this moment one is that the pile body construction time may occur caving in can not the moulding phenomenon, or promptly enable the pile type but lateral deformation takes place when stressed to destroy, thereby do not reach the purpose of consolidated subsoil in work.
Geotextiles or geo-grid claim geotextile again, and geotextiles generally forms (for water permeability geotechnique material) by macromolecular materials such as fibers by acupuncture or braiding.Geotextiles has advantages such as outstanding filtration, isolation, reinforcement protection effect, tensile strength height, good penetrability.
Summary of the invention
The object of the present invention is to provide a kind of method of processing soft foundation by earthwork fabric granular pile, this method consolidation effect is good.
To achieve these goals, technical scheme of the present invention is: the method for processing soft foundation by earthwork fabric granular pile is characterized in that it comprises the steps:
1) preparation of geotextile stake tube and stake pipe: the 1. preparation of geotextile stake tube: be processed into tubular with geotextile, obtain geotextile stake tube;
2. the preparation of stake pipe: the stake pipe is made up of outer steel sleeve pipe and interior steel sleeve; The pore footpath of outer steel sleeve pipe is greater than the external diameter of interior steel sleeve, and when interior steel sleeve inserted the outer steel sleeve pipe, the gap that interior steel sleeve and outer steel sleeve pipe bottom form was for placing the space of geotextile stake tube;
2) by pile hammer with the outer steel sleeve pipe projected depth of driving piles;
3) remove pile hammer from the outer steel sleeve pipe, interior steel sleeve is sling, geotextile stake jacket casing in the bottom of interior steel sleeve, is inserted interior steel sleeve and geotextile stake tube in the pore of outer steel sleeve pipe then together;
4) inwardly irritate discrete material in the pore of steel sleeve, form granular pile;
5) the outer steel sleeve pipe is played rising, steel sleeve rose together and leaves soft base in the outer steel sleeve pipe racks was moving; Geotextile stake tube and granular pile are stayed original position under the weight effect, geotextile stake tube parcel granular pile forms the geotextile granular pile; In the outer steel sleeve pipe, extract interior steel sleeve then, prepare next circulation;
6) from multiple step 2)-5), dispose to reinforcing soft foundation.
The invention has the beneficial effects as follows: adopt granular pile overcoat geotextile stake tube to form the geotextile granular pile, geotextile stake tube plays the effect of radial constraint in the geotextile granular pile to granular pile (being made of discrete material).So both can guarantee foundation soil strength than the situation at the end under geotextile granular pile construction the phenomenon of caving in of discrete material can not appear, geotextile granular pile (being pile foundation) can play the effect of load again simultaneously, thereby consolidation effect good (having stopped the defective of existing granular pile fully), and further improved the Measures for Making Ground and Foundation work efficiency.The present invention says that from mechanism it possesses the multiple function of holding power transmission to the displacement of part weak soil, to loose ground ground extruding, discharging consolidation and pile foundation simultaneously.Stake of the present invention pipe can be easily with geotextile stake jacket casing on granular pile.
The geotextile granular pile is appropriate to the land-based area and the Underwater Engineering treatment of soft foundation of the different soil properties of civil engineering construction.
Description of drawings
Fig. 1 is the structural representation of geotextile granular pile of the present invention;
Fig. 2 is the sectional view of Fig. 1 along the A-A line;
Fig. 3 is the structural representation of outer steel sleeve pipe of the present invention;
Fig. 4 is the structural representation of interior steel sleeve of the present invention;
Fig. 5 is the C portion enlarged drawing of Fig. 3;
Fig. 6 a is outer steel sleeve pipe, pile hammer state diagram in place;
Fig. 6 b is the driven piles state diagram of projected depth of outer steel sleeve pipe;
Fig. 6 c is that interior steel sleeve is prepared the state diagram of outside steel sleeve under inserting;
Fig. 6 d is the state diagram that interior steel sleeve inserts the outer steel sleeve pipe;
Fig. 6 e is that the outer steel sleeve pipe is to the state diagram of rising;
Fig. 6 f is the state diagram that outer steel sleeve pipe, interior steel sleeve are all extracted ground;
Number in the figure: 1-geotextile stake tube, 2-granular pile (constituting) by discrete material, 3-outer steel sleeve pipe, 4-manages bottom door, 5-first hanger, 6-enlarged head, steel sleeve in the 7-, 8-second hanger, 9-pile hammer (or claiming vibration hammer), 10-geotextile granular pile.
The specific embodiment
The method of processing soft foundation by earthwork fabric granular pile, it comprises the steps:
1) preparation of geotextile stake tube and stake pipe: the 1. preparation of geotextile stake tube: be processed into tubular with geotextile, obtain geotextile stake tube 1;
2. the preparation of stake pipe: the stake pipe is made up of outer steel sleeve pipe 3 and interior steel sleeve 7; As shown in Figure 3, Figure 4, the top of outer steel sleeve pipe 3 is enlarged head 6, the pore footpath of enlarged head 6 is greater than the pore footpath of outer steel sleeve pipe 3 bottoms, the pore footpath of enlarged head 6 is greater than the external diameter (promptly can slide in the pore of enlarged head 6 in the upper end of steel sleeve 7) of interior steel sleeve 7 upper end projection flanges, the pore footpath of outer steel sleeve pipe 3 bottoms is less than the external diameter (upper end of steel sleeve 7 can only be slided in the pore of enlarged head 6 promptly, can not slide into the pore of outer steel sleeve pipe 3 bottoms) of interior steel sleeve 7 upper end projection flanges; The pore footpath of outer steel sleeve pipe 3 bottoms is greater than the external diameter of interior steel sleeve 7, and when interior steel sleeve 7 inserted outer steel sleeve pipe 3, interior steel sleeve 7 was the space of placing geotextile stake tube with the gap that outer steel sleeve pipe 3 bottoms form; The lateral surface of the enlarged head 6 of outer steel sleeve pipe 3 is interval with (as welding) 2 first hanger, 5, the first hangers 5 and is provided with lifting hole(eyelet) (being used for outer steel sleeve pipe 3 is hung liter); The bottom-hinged pipe bottom door 4 of outer steel sleeve pipe 3, pipe bottom door 4 has 2 fans at least; Interior steel sleeve 7 upper ends are provided with the projection flange, are interval with (as welding) 2 second hanger, 8, the second hangers on the projection flange and are provided with lifting hole(eyelet) (being used for interior steel sleeve 7 is sling);
2) shown in Fig. 6 a, the pipe bottom door 4 of outer steel sleeve pipe 3 bottoms closes up, and outer steel sleeve pipe and pile hammer 9 are in place; Shown in Fig. 6 b, by pile hammer 9 with outer steel sleeve pipe 3 projected depth (squeezing into soft base) of driving piles to projected depth;
3) shown in Fig. 6 c, remove pile hammer 9 from the outer steel sleeve pipe, interior steel sleeve 7 to be sling, the bottom of steel sleeve 7 in geotextile stake tube 1 is enclosed within prepares to insert down; Shown in Fig. 6 d, then interior steel sleeve 7 and geotextile stake tube 1 are inserted in the pore of outer steel sleeve pipe 3 together; The second hanger hook of steel sleeve in taking off;
4) inwardly irritate discrete material in the pore of steel sleeve 7,, form granular pile 2 up to filling;
5) shown in Fig. 6 e, with outer steel sleeve pipe 3 rising of playing, pipe bottom door 4 on the outer steel sleeve pipe 3 is opened under the effect of weight, outer steel sleeve pipe 3 continues to rise, interior steel sleeve 7 is motionless, projection flange up to outer steel sleeve pipe 3 and interior steel sleeve 7 contacts, and the interior steel sleeve 7 of outer steel sleeve pipe 3 drives rises together and leaves soft base; Shown in Fig. 6 f, geotextile stake tube 1 and granular pile 2 are stayed original position under the weight effect, and geotextile stake tube 1 parcel granular pile 2 forms 10 (as shown in Figure 1 and Figure 2) of geotextile granular pile; Externally steel sleeve 3 vibrates (vibrator keeps vibration) in the process that rises; In outer steel sleeve pipe 3, extract interior steel sleeve 7 then, prepare next circulation;
6) from multiple step 2)-5), dispose to reinforcing soft foundation.
Described geotextile can be produced by macromolecular materials such as waste or used plastics, is geo-grid or geotextiles.
Described discrete material is rubble, gravel, copper smelter slag or building waste etc.

Claims (2)

1. the method for processing soft foundation by earthwork fabric granular pile is characterized in that it comprises the steps:
1) preparation of geotextile stake tube and stake pipe: the 1. preparation of geotextile stake tube: be processed into tubular with geotextile, obtain geotextile stake tube;
2. the preparation of stake pipe: the stake pipe is made up of outer steel sleeve pipe and interior steel sleeve; The pore footpath of outer steel sleeve pipe is greater than the external diameter of interior steel sleeve, and when interior steel sleeve inserted the outer steel sleeve pipe, the gap that interior steel sleeve and outer steel sleeve pipe bottom form was for placing the space of geotextile stake tube;
2) by pile hammer with the outer steel sleeve pipe projected depth of driving piles;
3) remove pile hammer from the outer steel sleeve pipe, interior steel sleeve is sling, geotextile stake jacket casing in the bottom of interior steel sleeve, is inserted interior steel sleeve and geotextile stake tube in the pore of outer steel sleeve pipe then together;
4) inwardly irritate discrete material in the pore of steel sleeve, form granular pile;
Described discrete material is rubble, gravel, copper smelter slag or building waste;
5) the outer steel sleeve pipe is played rising, steel sleeve rose together and leaves soft base in the outer steel sleeve pipe racks was moving; Geotextile stake tube and granular pile are stayed original position under the weight effect, geotextile stake tube parcel granular pile forms the geotextile granular pile; In the outer steel sleeve pipe, extract interior steel sleeve then, prepare next circulation;
6) repeating step 2)-5), dispose to reinforcing soft foundation.
2. the method for processing soft foundation by earthwork fabric granular pile according to claim 1, it is characterized in that: the top of outer steel sleeve pipe (3) is enlarged head (6), the pore footpath of enlarged head (6) is greater than the pore footpath of outer steel sleeve pipe (3) bottom, the pore footpath of enlarged head (6) is greater than the external diameter of interior steel sleeve (7) upper end projection flange, and the pore footpath of outer steel sleeve pipe (3) bottom is less than the external diameter of interior steel sleeve (7) upper end projection flange; The pore footpath of outer steel sleeve pipe (3) bottom is greater than the external diameter of interior steel sleeve (7); The lateral surface of the enlarged head (6) of outer steel sleeve pipe (3) is interval with 2 first hangers (5), and first hanger (5) is provided with lifting hole(eyelet); The bottom-hinged pipe bottom door (4) of outer steel sleeve pipe (3), pipe bottom door (4) have 2 fans at least; Interior steel sleeve (7) upper end is provided with the projection flange, is interval with 2 second hangers (8) on the projection flange, and second hanger (8) is provided with lifting hole(eyelet).
CN200810197321XA 2008-10-21 2008-10-21 Method for processing soft foundation by earthwork fabric granular pile Active CN101392527B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200810197321XA CN101392527B (en) 2008-10-21 2008-10-21 Method for processing soft foundation by earthwork fabric granular pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200810197321XA CN101392527B (en) 2008-10-21 2008-10-21 Method for processing soft foundation by earthwork fabric granular pile

Publications (2)

Publication Number Publication Date
CN101392527A CN101392527A (en) 2009-03-25
CN101392527B true CN101392527B (en) 2010-10-06

Family

ID=40493022

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200810197321XA Active CN101392527B (en) 2008-10-21 2008-10-21 Method for processing soft foundation by earthwork fabric granular pile

Country Status (1)

Country Link
CN (1) CN101392527B (en)

Families Citing this family (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101608457B (en) * 2009-07-27 2012-06-06 冯守中 Method for processing wharf foundation by geotextile granular material pile
CN102465524B (en) * 2010-11-11 2016-05-25 上海市政工程设计研究总院 Double radial mesh-cage sand-gravel pile and construction technology thereof
CN102168420B (en) * 2011-03-15 2012-12-19 冯守中 Method for processing soft soil base by geotextile light active material piles
CN104234032B (en) * 2014-09-01 2015-11-18 德州市公路工程总公司 The construction method of a kind of Y shape three-dimensional band drain strength core discrete material composite pile
CN104652407B (en) * 2015-01-05 2016-08-24 同济大学 A kind of band stirrup collapsible geosynthetics abnormity granular pile and construction method thereof
CN104988896B (en) * 2015-05-13 2017-01-25 刘闯 Minitype friction short tubular pile composite foundation structure and constructing method thereof
CN105780753B (en) * 2016-03-28 2018-08-10 北京中岩大地科技股份有限公司 The construction method of solidified earth stake
CN108385651B (en) * 2018-03-23 2020-12-29 重庆大学 Design and construction method for reinforcing soft foundation by using composite geotextile
CN108661038A (en) * 2018-06-20 2018-10-16 西南交通大学 A kind of three-dimensional geogrid composite earthwork cloth encapsulation steel slag pile and its construction method
CN113605356A (en) * 2021-08-11 2021-11-05 中建路桥集团有限公司 Pile pipe structure suitable for wrapping gravel pile construction and construction method
CN114908731A (en) * 2022-06-30 2022-08-16 天津城建大学 Geotextile-wrapped solid waste particle solidified soil pile and construction method thereof

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1273713A2 (en) * 2001-07-07 2003-01-08 KELLER GRUNDBAU GmbH Method for constructing material columns to improve soil consolidation
CN2876184Y (en) * 2006-03-29 2007-03-07 河海大学 Internal filling type pressure reducing well pipe
CN1928250A (en) * 2006-07-25 2007-03-14 兰州理工大学 Method for reinforcing dispersive materials pile
CN200946265Y (en) * 2006-06-26 2007-09-12 河海大学 Vertical tube type grating reinforced stone column

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1273713A2 (en) * 2001-07-07 2003-01-08 KELLER GRUNDBAU GmbH Method for constructing material columns to improve soil consolidation
CN2876184Y (en) * 2006-03-29 2007-03-07 河海大学 Internal filling type pressure reducing well pipe
CN200946265Y (en) * 2006-06-26 2007-09-12 河海大学 Vertical tube type grating reinforced stone column
CN1928250A (en) * 2006-07-25 2007-03-14 兰州理工大学 Method for reinforcing dispersive materials pile

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
EP 1273713 A2,全文.

Also Published As

Publication number Publication date
CN101392527A (en) 2009-03-25

Similar Documents

Publication Publication Date Title
CN101392527B (en) Method for processing soft foundation by earthwork fabric granular pile
JP4392453B2 (en) Method for suppressing levitation of underground buried object and buried structure
US8221033B2 (en) Extensible shells and related methods for constructing a support pier
CN101705683B (en) Use method of flapper pile tip of sinking pipe cast-in-place pile
JP5932124B1 (en) Steel pipe pile construction method
CN203924036U (en) A kind of pile for prestressed pipe of outsourcing active material pile body
CN203403404U (en) High-efficiency cast-in-place pile device
JP5427285B1 (en) Ground strengthening system and ground strengthening method
JP5011456B1 (en) Ground liquefaction prevention and strengthening method
KR101008478B1 (en) Geogrid structure preventing bulging failure of stone column and method constructing the stone column by the geogrid structure
CN112359815A (en) Dry-type vibroflotation gravel pile for soft foundation treatment and construction method thereof
CN104196013A (en) Composite Y-shaped pile and construction method of composite Y-shaped pile
CN201770982U (en) Geotextile granular pile construction piling machine
CN208472717U (en) A kind of depth back filled region bored concrete pile steel pile casting retaining wall
CN201473947U (en) Full-tampering pile-expanding vibro-densification device of multi-head expanded bore pile
CN201581398U (en) Valve pile toe of filling pile of immersed tube
CA3119524C (en) Methods and apparatuses for compacting soil and granular materials
CN205999887U (en) Boring steel reinforcement cage hoop slip casting broken stone pile
CN1137311C (en) Vibration compacted galet pile resisting pull-up and floatation, and its forming method
RU2181410C2 (en) Method for manufacture of cast-in-place reinforced piles
CN107386276A (en) A kind of construction method of soft layer super-long and large-diameter bored piles
CN208136910U (en) A kind of built pile
CN207362864U (en) A kind of basis for electric power pylon
CN216948203U (en) Ground treatment structure for deep earth filling field
CN107700516A (en) A kind of power transmission line iron tower foundation and method of construction

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract

Assignee: Wuhan Guangyi Engineering Consultation Co., Ltd.

Assignor: Feng Shouzhong|Yan Shu Wang

Contract record no.: 2011420000260

Denomination of invention: Method for processing soft foundation by earthwork fabric granular pile

Granted publication date: 20101006

License type: Exclusive License

Open date: 20090325

Record date: 20111208

ASS Succession or assignment of patent right

Owner name: WUHAN GUANGYI ENGINEERING CONSULTATION CO., LTD.

Free format text: FORMER OWNER: FENG SHOUZHONG

Effective date: 20120312

Free format text: FORMER OWNER: YAN SHUWANG

Effective date: 20120312

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 200437 HONGKOU, SHANGHAI TO: 430074 WUHAN, HUBEI PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20120312

Address after: 430074 A, block 2502 and 10, building 03, Pioneer Street, East Lake New Technology Development Zone, Wuhan, Hubei, Optics Valley

Patentee after: Wuhan Guangyi Engineering Consultation Co., Ltd.

Address before: 200437, room 1, building 992, Lane 1403, East Sports Union Road, Shanghai, Hongkou District

Co-patentee before: Yan Shuwang

Patentee before: Feng Shouzhong

C56 Change in the name or address of the patentee

Owner name: WUHAN GUANGYI TRANSPORTATION SCIENCE AND TECHNOLOG

Free format text: FORMER NAME: WUHAN GUANGYI ENGINEERING CONSULTATION CO., LTD.

CP01 Change in the name or title of a patent holder

Address after: 430074 A, block 2502 and 10, building 03, Pioneer Street, East Lake New Technology Development Zone, Wuhan, Hubei, Optics Valley

Patentee after: Wuhan Guangyi Traffic Technology Co., Ltd.

Address before: 430074 A, block 2502 and 10, building 03, Pioneer Street, East Lake New Technology Development Zone, Wuhan, Hubei, Optics Valley

Patentee before: Wuhan Guangyi Engineering Consultation Co., Ltd.