A kind of conveyor pallet structure being easy to operate
Technical field
This utility model is related to sheet material Palletizer technical field, more particularly, to a kind of conveyor pallet being easy to operate
Structure.
Background technology
In existing packaging produces, generally require for the sheet material processing to carry out stacking package, then will by fork truck
Packed sheet material transhipment.In existing packaging production, the packing area of usually staff's direct conveying mechanism end waits and beating
Bag, staff puts a pallet by artificial in packing area, waits the sheet material processing to fall directly into packing area, then by sheet material
It is stacked on pallet, heap is transported through by fork truck after folding again.In existing operation, staff need to not stop in equipment
Work in the state of machine, and need fork truck to transport packed sheet material in time, and fork truck nor timely enter packing area in,
Therefore often cause the situation that piling operation suspends, said method not only dangerous impact production efficiency again.
Utility model content
In order to overcome the deficiencies in the prior art, the purpose of this utility model is to provide a kind of pallet conveying be easy to and operate
Each operation can closely be linked up connecting, lift piling efficiency by mechanism.
The purpose of this utility model employs the following technical solutions realization:
A kind of conveyor pallet structure being easy to operate, including,
Frame;Frame is provided with the first working area, the second working area and Accreditation Waiting Area, and the first working area is used for placing empty support
Disk;Second working area is used for for sheet material being stacked to described empty pallet;Accreditation Waiting Area is used for the sheet material being stacked on pallet is carried out
Packing and transhipment;Accreditation Waiting Area is provided with the forklift groove of the pallet fork insertion for outside fork truck;
It is installed on the first conveying mechanism in frame, for the pallet of the second working area is delivered to Accreditation Waiting Area;
It is installed on the second conveyor structure in frame, for the pallet of the first working area is delivered to the second working area.
Preferably, the first conveying mechanism include positioned at the first transportation section of the second working area and be located at Accreditation Waiting Area multiple the
Two transportation sections, the initiating terminal of multiple second transportation sections is all connected in the end of the first transportation section, and two second adjacent transportation sections
Between form described forklift groove.
Preferably, the first transportation section includes multiple first rollers, and multiple first rollers are along the conveying side of the first conveying mechanism
To being spaced, the first chain syn-chro-step connection is passed through in the end of two first adjacent rollers;Wherein one first chain syn-chro-step connection
On the output shaft of one first motor.
Preferably, the second transportation section includes multiple second rollers, and multiple second rollers are along the conveying side of the first conveying mechanism
To being spaced, the second chain syn-chro-step connection is passed through in two second adjacent roller ends, and wherein one second chain syn-chro-step is connected in
On the output shaft of described first motor.
Preferably, frame includes the first frame and the second frame, and the second frame is articulated with the first machine by a jointed shaft
The side of frame;First working area is formed in the second frame, and the second working area is formed in the first frame.
Preferably, second conveyor structure includes the second motor, two the 3rd chains, two active chain wheels and two driven chains
Wheel, described jointed shaft is synchronously connected on the output shaft of the second motor, two active chain wheels be fixedly arranged on described jointed shaft and
Spaced apart, two driven chain wheels are articulated in the first frame and the second frame respectively;3rd chain syn-chro-step is set around wherein one
On active chain wheel and wherein one driven chain wheel.
Preferably, be installed with the first location-plate above described first frame, the first location-plate be located at the second working area away from
The side of the first working area, the first location-plate is used for preventing described empty pallet from dropping from the second working area.
Preferably, it is installed with the second location-plate above the second frame, the second location-plate is located at the side of the first working area, the
Two location-plates are used for preventing described empty pallet from dropping from the first working area.
Compared to existing technology, the beneficial effects of the utility model are:It can will be placed on by second conveyor structure
The empty pallet of one working area is delivered to the second working area, then stacks sheet material on the pallet of the second working area, piles with pallet
It is delivered at Accreditation Waiting Area by the first conveying mechanism after sheet material, packed by artificial plate and transport again, and Accreditation Waiting Area
It is provided with the forklift groove of the pallet fork insertion for outside fork truck, thus packed sheet material can directly be transported by fork truck, circulates successively,
Keep the seriality of whole piling operation, improve efficiency.And whole process is artificial and fork truck is not required to wait in real time, thus reducing each
The tonicity of working link;In addition staff only need to carry out tie and packing in Accreditation Waiting Area, improve operation safety and
Reliability.
Brief description
Fig. 1 is structural representation of the present utility model;
Fig. 2 is use state schematic diagram of the present utility model.
In figure:100th, frame;110th, the first working area;120th, the second working area;130th, Accreditation Waiting Area;131st, forklift groove;10、
First frame;20th, the first transportation section;21st, the first roller;22nd, the first motor;23rd, the first location-plate;30th, second conveyor structure;
31st, the 3rd chain;33rd, jointed shaft;34th, the second motor;35th, the second location-plate;40th, the second transportation section;41st, the second roller;50、
Second frame;200th, pallet;300th, sheet material.
Specific embodiment
Below, in conjunction with accompanying drawing and specific embodiment, this utility model is described further:
As shown in Figure 1 and Figure 2 a kind of is easy to the conveyor pallet structure operating, including frame 100 and be installed in
The first conveying mechanism in frame 100 and second conveyor structure 30;Frame 100 is provided with the first working area 110, the second working area
120 and Accreditation Waiting Area 130, the first working area 110 is used for placing empty pallet 200;Second working area 120 is used for sheet material 300 heap
It is stacked on described empty pallet 200;Accreditation Waiting Area 130 is used for the sheet material 300 being stacked on pallet 200 being packed and transporting;Deng
Treat that area 130 is provided with the forklift groove 131 of the pallet fork insertion for outside fork truck;And first conveying mechanism be used for will be placed on the second work
The pallet 200 in area 120 is delivered in Accreditation Waiting Area 130;Likewise, second conveyor structure 30 is used for being placed on the first working area
110 empty pallet 200 is delivered to the second working area 120.
So, on the basis of said structure, manually can place empty pallet 200 in the first working area 110, start second defeated
Send mechanism 30, the empty pallet 200 positioned at the first working area 110 be delivered to by the second working area 120 by second conveyor structure 30,
On pallet 200 in this place, the sheet material 300 processing is placed by external agency and carry out piling, after pallet 200 has been expired
Accreditation Waiting Area 130 is transported to by above-mentioned first conveying mechanism, manually the sheet material 300 on pallet 200 can be tied thereafter
Band and packing, and directly can insert in described forklift groove 131 pallet fork of fork truck thus being transported through.And in the full sheet material of stacking
It is idle state that pallet 200 after 300 is delivered to the second working area 120 during Accreditation Waiting Area 130;So can continue in the first work
Make area 110 to place empty pallet 200 and continue on to the second working area 120 stacking sheet material 300 by second conveyor structure 30;According to
Secondary circulation, thus improve piling speed.And whole process is artificial and fork truck is not required to wait in real time, thus reducing each working link
Tonicity;In addition staff only need to carry out tie and packing in Accreditation Waiting Area 130, improves the safety and reliability of operation.
Preferably, the first conveying mechanism includes the first transportation section 20 and multiple second transportation section 40, the first transportation section 20
In the second working area 120, the second transportation section 40 is located at Accreditation Waiting Area 130, and the initiating terminal of multiple second transportation sections 40 is all connected in the
Form described forklift groove 131, so in the second working area between the end of one transportation section 20, and two second adjacent transportation sections 40
Pallet 200 after the full sheet material 300 of 120 stackings transports to Accreditation Waiting Area 130 and also can continue to be conveyed, and is conveniently transported.
Preferably, in the present embodiment, the first conveying mechanism includes multiple first rollers 21, and multiple first rollers 21 are along
The conveying direction of one conveying mechanism is spaced, and the first chain syn-chro-step connection is passed through in the end of two first adjacent rollers 21;And
Wherein one first chain syn-chro-step is connected on the output shaft of one first motor 22, so can be driven by the rotation of the first motor 22
Multiple first rollers 21 rotate, and then convey sheet material 300.Further, the second transportation section 40 includes multiple second rollers 41, many
Individual second roller 41 is spaced along the conveying direction of the first conveying mechanism, and it is same that two second adjacent rollers 41 pass through the second chain
Step connection, wherein one second chain syn-chro-step is connected on the output shaft of described first motor 22, so can be by same motor belt motor
Dynamic two transportation section synchronous transport are so that the transporting velocity of the second working area 120 and Accreditation Waiting Area 130 is consistent.
Certainly, above-mentioned first conveying mechanism may also be and directly formed by a plurality of feed belt or transmission chain.
In the present embodiment, frame 100 specifically may include the first frame 10 and the second frame 50, and the second frame 50 is passed through
One jointed shaft 33 is articulated with the side of the first frame 10, and the first working area 110 is formed in the second frame 50, the second working area
120 and Accreditation Waiting Area 130 be formed in the first frame 10, on such first working area 110, empty pallet 200 can be from the first frame 10
Side conveys the second working area 120, and when working, the second frame 50 can be folded in the first frame 10, prevent
Frame 100 active channel.
In addition, on the basis of said structure, second conveyor structure 30 includes the second motor 34, two the 3rd chain 31, two master
Dynamic chain wheel and two driven chain wheels, above-mentioned jointed shaft 33 is synchronous to be connected on the output shaft of the second motor 34, two drive chains
Bar wheel is fixedly arranged on described jointed shaft 33 and spaced apart, and two driven chain wheels are articulated in the first frame 10 and the second machine respectively
On frame 50, the 3rd chain 31 is synchronous to be set around on wherein one active chain wheel and one of driven chain wheel, thus by upper
State the second motor 34 just can complete to drive two the 3rd chains 31 to operate.And when this conveyor pallet structure does not work, can be by turning
Dynamic second frame 50, so as to be folded in the first frame 10, is not take up passage;And when conveyor pallet structure works, put down
Two frames 50, start the second motor 34 synchronous drive two the 3rd chains 31 and operate, thus conveying empty pallet 200.And the second conveying
Mechanism 30 can facilitate the folding of the second frame 50 using the conveying of synchronous operated two the 3rd chain 31, it is to avoid rolls over using during a chain
It is pulled off when folded.
Certainly, described frame 100 be one overall when, above-mentioned second conveyor structure 30 can directly by a transmission chain or
Person's feed belt is formed.
Preferably, pallet 200 drops from the first working area 110 or the second working area 120 in transportation for convenience,
Fixed first location-plate 23 in top of described first frame 10, the first location-plate 23 is located at the second working area 120 away from the first work
Make the side in area 110;Same fixed second location-plate 35 above the second frame 50, the second location-plate 35 is located at the first work
The side in area 110, when placing empty pallet 200, abutting just can position to the second location-plate 35 can prevent it from falling simultaneously again
Fall.
It will be apparent to those skilled in the art that can technical scheme as described above and design, make other various
Corresponding change and deformation, and all these change and deformation all should belong to the protection of this utility model claim
Within the scope of.