CN205917701U - A sleeve pipe distributing device for elephant trunk transport concrete - Google Patents
A sleeve pipe distributing device for elephant trunk transport concrete Download PDFInfo
- Publication number
- CN205917701U CN205917701U CN201620709191.3U CN201620709191U CN205917701U CN 205917701 U CN205917701 U CN 205917701U CN 201620709191 U CN201620709191 U CN 201620709191U CN 205917701 U CN205917701 U CN 205917701U
- Authority
- CN
- China
- Prior art keywords
- pipe
- straight tube
- elephant trunk
- steel
- sleeve pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
The utility model discloses a sleeve pipe distributing device for elephant trunk transport concrete, the last a lesson straight tube of elephant trunk tail end passes through the flange and is connected with unloading pipe one end, the unloading pipe is plastics steel combination pipe, the inlayer is PE or PP plastics, the outer steel that are, nominal diameter is the same with the straight tube for unloading pipe inner layer plastic pipe, outer -layer steel pipe rolls up system size and inner layer plastic external diameter of pipe interference fit, unloading pipe outer -layer steel pipe goes up the welding has a lug, cloth cover pipe box is on the unloading pipe, the cloth sleeve pipe is the steel pipe, nominal diameter DN150mm DN400mm, length 3 9 rice, does the cloth sleeve pipe is opened along the axial have width 15mm the 30mm groove, length 2.8 8.8 rice. The utility model discloses the equipment investment is few, the working costs is low, save the construction investment, durable, the fault rate low, save the time limit for a project.
Description
Technical field
This utility model belongs to the realm of building construction, is related to a kind of sleeve pipe distribution device for elephant trunk delivering concrete.
Particularly under the slope such as box culvert, channel, inverted-siphon, aqueduct during field work such as water conservancy, electric power, mine, agricultural irrigation
The basis of concrete structures, underplate concrete, the pouring of short concrete structures.Equipment investment is few, operating cost is low, section
Save construction investment, durable, fault rate is low, saves the duration.
Background technology
At present when the construction such as water conservancy, electric power, mine industry pours basic under heavy grade and structures concrete, because
The gradient excessive (needs of stability of slope) is it is impossible to directly repair the roads (or expense is very big) to pouring location, water conservancy industry is generally adopted
Cheat lower or neighbouring method power industry with repairing the roads to then using the method for elephant trunk.During using the method repaired the roads, investment is significantly
Improve, sometimes even infeasible.Elephant trunk method because inner-walls of duct need slip send before moistening, slip and send the rear mortar of time length to exist
The solidification of above inner-walls of duct and left and right or the solidification that causes when higher of temperature lead to slip send fault, simultaneously as concrete is from stirring
Mix that the time slipping between sending is longer, lead to concrete slump loss exceeded specification regulation through when slump-loss value.
Also have using pump truck pumping, the method put in storage of material distributing machine cloth, but pumping method need to repair the roads, simultaneously need to concrete according to
The specification of pumping carries out mix Design, and the gel material content such as cement must reach 300kg/m3More than, increased
Construction investment, simultaneous pumping concrete pumping smoothly must increase water-cement ratio, causes the loss that concrete strength is larger, Er Qienai
Property is poor long.The investment of material distributing machine method is larger, and apart from remote when just inapplicable.The method now directly put in storage using chute is
Feasible also most economical, but current elephant trunk is usually used is steel pipe, easily to be not easy displacement, discharging opening fixing not for abrasion, heaviness
Beneficial to cloth, and water-wet pipeline must be used before using, now easily be spread to pour on face by eaves gutter, if earth foundation is just
Base surface can be caused unqualified.And steel pipe necessarily be in a kind of straight line angle, installation accuracy requirement is very high, is not otherwise to produce
Raw plugging is exactly to produce isolation.When producing concrete disintegration, the slump of concrete can only be adjusted, and the linearity from steel pipe
Adjust with angle, bother very much.
Utility model content
The purpose of this utility model is for above technical deficiency, provides a kind of sleeve pipe for elephant trunk delivering concrete
Distribution device.Equipment investment is few, operating cost is low, cost saving, durable, fault rate is low, save the duration.
For achieving the above object, adopt the following technical scheme that
A kind of sleeve pipe distribution device for elephant trunk delivering concrete, including hopper, under slip straight tube, bend pipe, straight tube, blanking
Pipe, 3-60 JIEMI length (nominal diameter dn125mm-dn350mm) straight tube, elephant trunk is connected into by flange, is fitted between flange
Leakproof rubber cushion, elephant trunk top first segment straight tube is provided with axial flow blower, and each section straight tube is provided with fog generator;
Flange bridge piece is passed through in elephant trunk top first segment straight tube upper end, and bend pipe diameter is identical with straight tube, bent arc radius
R300mm-r2000mm, arc length 400mm-3000mm;
Hopper discharging opening connect under slip straight tube, under slip straight tube nominal diameter dn100mm-dn300mm, length 500mm-
2000mm, under slip 60 degree -85 of straight tube horizontal sextant angle degree, under slip in straight tube insertion bend pipe;Hopper is erected on hopper base, hopper
Water tank is arranged on support, draws water pipe from water tank, water pipe is connected one by one with fog generator;
Elephant trunk tail end final section straight tube is connected with tremie pipe one end by flange, and tremie pipe is plastic-steel products compound tube,
Internal layer is pe or pp plastics, and outer layer is steel, and tremie pipe inner layer plastic tube nominal diameter is identical with straight tube, and outer layer pipe rolls chi
Very little one hanger is welded with tremie pipe outer layer pipe with inner layer plastic tube external diameter interference fit, cloth casing pipe sleeve on tremie pipe,
Cloth sleeve pipe is steel pipe, nominal diameter dn150mm-dn400mm, length 3-9 rice, and cloth sleeve pipe has width 15mm- vertically
30mm groove, length 2.8-8.8 rice.
Compared with prior art the beneficial effects of the utility model are as follows:
1, adopt fog long-term wet channels inwall in elephant trunk, reduce the frictional resistance slipping under material, reached low
In 300The effect of delivering concrete under slope, overcomes the drawbacks of can not directly add water compensation slump-loss simultaneously;
2, elephant trunk adopts plastic tube (pe, pp pipe etc.) or plastic tube to be combined with steel pipe, can be arranged to slight s during abrupt slope
Type pipe, solves the problems, such as aggregate segregation during abrupt slope, and lower end can be lifted and swing simultaneously, has both solved reduction discharging section
The problem of material speed, also achieves voluntarily cloth, solves the problems, such as that elephant trunk is unable to cloth;
3, construct the intermission, in 10h, be not required to wash pipe, pipe need not be moistened with water during beginning, both alleviate labor intensity, and also solved
Base surface can not have the problem of water;
4, trucd mixer can directly under expect hopper, hopper can voluntarily be adjusted with the height of bend pipe upper port, it is to avoid
Uneven road causes the problem that aggregate bin is higher than trucd mixer discharging opening;
5, during gentle slope, directly the place digging machine in side slope upper shed excavates out chain-wales, hopper and water tank, letter
Folk prescription just, is not necessary to when gentle slope fill or makes discharging platform, solves the problems, such as to improve initial velocity during gentle slope;
6, by the adjustment in step, cover 1:2-1:0.5(21.800-63.430) side slope in the case of elephant trunk mix
Solidifying soil conveying scope, have also been enlarged the range of elephant trunk technology;
7, during using plastic tube, overall weight is light, and on slope, pipeline manually can adjust and mobile, the water consumption of fog device
Also very little, will not be limited by field condition.
8, supporting trolley track is made using channel-section steel, is easy to manually move.
9, abrupt slope slips straight tube at present and tilts 700-850, material againsts tube wall when falling immediately, and smooths along bend pipe
Flow forward, it is to avoid fall behind the bounce-back segregation phenomenon that excessive velocities cause under straight line.
Brief description
Fig. 1 is this utility model structural representation
Wherein: slip straight tube under 1- hopper, 2-, 3- bend pipe, 4- flange, 5- axial flow blower, 6- straight tube, 7- fog generator,
8- joint steel pipe, 9- water tank, 10- water pipe, 11- supporting trolley, 12- hanger, 13- tremie pipe, 14- cloth sleeve pipe, the electronic calabash of 15-
Reed, 16- mobile roof support.
Specific embodiment
A kind of sleeve pipe distribution device for elephant trunk delivering concrete, including hopper 1, under slip straight tube 2, bend pipe 3, straight tube 6,
Tremie pipe 13,3-60 save 6 meters long (nominal diameter dn125mm-dn350mm) straight tubes 6, elephant trunk is connected into by flange, flange it
Between be fitted with leakproof rubber cushion, elephant trunk top first segment straight tube 6 is provided with axial flow blower 5, each section straight tube 6 is provided with fog
Generator 7;
Flange bridge piece 3 is passed through in elephant trunk top first segment straight tube 6 upper end, and bend pipe 3 diameter is identical with straight tube 6, curved arc half
Footpath r300mm-r2000mm, arc length 400mm-3000mm;
Hopper 1 discharging opening connect under slip straight tube 2, under slip straight tube 2 nominal diameter dn100mm-dn300mm, length 500mm-
2000mm, under slip 60 degree -85 of straight tube 2 horizontal sextant angle degree, under slip in straight tube 2 insertion bend pipe 3;Hopper 1 is erected on hopper base,
Water tank 9 is arranged on hopper base, draws water pipe 10 from water tank 9, water pipe 10 is connected one by one with fog generator 7;
Elephant trunk tail end final section straight tube 6 is connected with tremie pipe 13 one end by flange, and tremie pipe 13 is plastic-steel products group
Close pipe, internal layer is pe or pp plastics, outer layer is steel, tremie pipe 13 inner layer plastic tube nominal diameter is identical with straight tube 6, outer layer steel
Pipe rolls size and inner layer plastic tube external diameter interference fit, and tremie pipe 13 outer layer pipe is welded with a hanger 12, cloth sleeve pipe
14 are enclosed within tremie pipe 13, and cloth sleeve pipe 14 is steel pipe, nominal diameter dn150mm-dn400mm, length 3-9 rice, cloth sleeve pipe
14 have width 15mm-30mm groove, length 2.8-8.8 rice vertically.
Claims (1)
1. a kind of sleeve pipe distribution device for elephant trunk delivering concrete, including hopper (1), under slip straight tube (2), bend pipe (3), straight
Pipe (6), tremie pipe (13), 3-60 saves 6 meters of long straight tubes (6) and connects into elephant trunk by flange;Elephant trunk top first segment straight tube (6)
Flange bridge piece (3) is passed through in upper end;Hopper (1) discharging opening connect under slip straight tube (2), under slip straight tube (2) insertion bend pipe (3)
Interior;Hopper (1) is erected on hopper base;Elephant trunk tail end final section straight tube (6) passes through flange with tremie pipe (13) one end even
Connect;
It is characterized in that: tremie pipe (13) is plastic-steel products compound tube, and internal layer is pe or pp plastics, and outer layer is steel, tremie pipe
(13) inner layer plastic tube nominal diameter is identical with straight tube (6), and outer layer pipe rolls size and inner layer plastic tube external diameter interference fit,
One hanger (12) is welded with tremie pipe (13) outer layer pipe, cloth sleeve pipe (14) is enclosed within tremie pipe (13), cloth sleeve pipe
(14) it is steel pipe, nominal diameter dn150mm-dn400mm, length 3-9 rice, cloth sleeve pipe (14) has width 15mm- vertically
30mm groove, length 2.8-8.8 rice.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620709191.3U CN205917701U (en) | 2016-07-07 | 2016-07-07 | A sleeve pipe distributing device for elephant trunk transport concrete |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620709191.3U CN205917701U (en) | 2016-07-07 | 2016-07-07 | A sleeve pipe distributing device for elephant trunk transport concrete |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205917701U true CN205917701U (en) | 2017-02-01 |
Family
ID=57875131
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620709191.3U Expired - Fee Related CN205917701U (en) | 2016-07-07 | 2016-07-07 | A sleeve pipe distributing device for elephant trunk transport concrete |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205917701U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106917357A (en) * | 2017-04-25 | 2017-07-04 | 中铁五局集团有限公司 | A kind of drop high concrete conveyance tandem barrel device in abrupt slope high |
CN113463642A (en) * | 2021-07-15 | 2021-10-01 | 中国建筑第五工程局有限公司 | Deep basal pit raft board concrete placement device |
CN114809090A (en) * | 2022-05-06 | 2022-07-29 | 保利长大工程有限公司 | Self-compacting concrete pouring method for steel shell immersed tube tunnel wall |
-
2016
- 2016-07-07 CN CN201620709191.3U patent/CN205917701U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106917357A (en) * | 2017-04-25 | 2017-07-04 | 中铁五局集团有限公司 | A kind of drop high concrete conveyance tandem barrel device in abrupt slope high |
CN113463642A (en) * | 2021-07-15 | 2021-10-01 | 中国建筑第五工程局有限公司 | Deep basal pit raft board concrete placement device |
CN114809090A (en) * | 2022-05-06 | 2022-07-29 | 保利长大工程有限公司 | Self-compacting concrete pouring method for steel shell immersed tube tunnel wall |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205917701U (en) | A sleeve pipe distributing device for elephant trunk transport concrete | |
CN106192907A (en) | Set up the construction method of 150m~the 300m level high concrete panel rock-fill dams of cement sand and gravel structure sheaf | |
CN108625894A (en) | The waste filling solid grouting construction method of the flat working face of shortwall lane water acquisition | |
CN209323523U (en) | A kind of deep drilled shaft concrete pours device | |
CN206625254U (en) | The guidance system of cast-in-place piping lane sliding system | |
CN106065782A (en) | A kind of big flow high concentration structure stream full tail sand cemented filling technique | |
CN111021358A (en) | 360-degree rotating chute for caisson concrete pouring | |
CN106088097B (en) | Construction method and fog chute device for delivering concrete under gentle slope and abrupt slope | |
CN207847102U (en) | Appts. for transferring ready-mixed concrete | |
CN208309589U (en) | Large volume, deep basal pit bottom rotary type appts. for transferring ready-mixed concrete | |
CN206971224U (en) | Suitable for the concrete self-flowing pastefill pipe of deep basal pit | |
CN207671172U (en) | A kind of construction rail mounted dumper | |
CN205935686U (en) | A fog elephant trunk device that is used for carrying concrete under gentle slope and abrupt slope | |
CN211566328U (en) | Automatic maintenance device for highway engineering concrete member | |
CN207047829U (en) | Modified vibrosinking pile construction equipment | |
CN207110483U (en) | Thick-layer Self-leveling pours ground device | |
CN203403445U (en) | Steel sleeve used for plugging basement tube well | |
CN206924959U (en) | A kind of steel pipe inner wall fills paint device | |
CN207048796U (en) | A kind of special concrete wet shot chassis containing Simple mechanical arm | |
CN204663540U (en) | A kind of Metro Deep Excavation lid excavation construction agent structure cast pump line distribution device | |
CN206267871U (en) | A kind of porous pre-buried channel flow | |
CN206254310U (en) | A kind of irrigation device of prestressed concrete pipe | |
CN205907763U (en) | A location structure for underground piping | |
CN104214425A (en) | Sandblaster with improved working efficiency | |
CN205224043U (en) | Flow state soil cement preparation facilities |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20190802 Address after: 430000 Room 19, Room 21, Building 4, Mingshi 1, Shucheng Road, Hongshan District, Wuhan City, Hubei Province Co-patentee after: Zheng Chuying Patentee after: HUBEI 209 ENGINEERING Co.,Ltd. Address before: 430071 2 Units 1002, 2 Blocks, Xingyuan, Anshun, 115 North Road, Wuchang District, Wuhan City, Hubei Province Patentee before: Zheng Chuying |
|
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170201 |