CN207847102U CN201721774710.5U CN201721774710U CN207847102U CN 207847102 U CN207847102 U CN 207847102U CN 201721774710 U CN201721774710 U CN 201721774710U CN 207847102 U CN207847102 U CN 207847102U
Authority
CN
China
Prior art keywords
elephant trunk
appts
buffering section
concrete
mixed concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721774710.5U
Other languages
Chinese (zh)
Inventor
肖更华
陆永建
俞备
赵秋珺
施丽娜
张薇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Building Decoration Co Ltd
Shanghai Construction No 1 Group Co Ltd
Original Assignee
Shanghai Building Decoration Co Ltd
Shanghai Construction No 1 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Building Decoration Co Ltd, Shanghai Construction No 1 Group Co Ltd filed Critical Shanghai Building Decoration Co Ltd
Priority to CN201721774710.5U priority Critical patent/CN207847102U/en
Application granted granted Critical
Publication of CN207847102U publication Critical patent/CN207847102U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The utility model is related to a kind of appts. for transferring ready-mixed concrete.The appts. for transferring ready-mixed concrete includes the first elephant trunk, the first buffering section, the second elephant trunk, the second buffering section and fixed frame, one end of first elephant trunk is equipped with lower hopper, first buffering section connect with the first elephant trunk and is connected to the first elephant trunk, second elephant trunk is connected to the first buffering section connection and with the first buffering section, second buffering section one end is connected to the second elephant trunk, the other end is equipped with discharge port, and fixed frame is sheathed on the first elephant trunk or the second elephant trunk and is connect with the first elephant trunk or the second elephant trunk.The kinetic energy that above-mentioned appts. for transferring ready-mixed concrete makes full use of lazy flow concrete downward makes lazy flow concrete convey downwards, while can control concrete flow velocity again and prevent concrete from segregation phenomenon occur.Therefore, conveying and conveying effect of the above-mentioned appts. for transferring ready-mixed concrete suitable for lazy flow concrete are good.

Description

Appts. for transferring ready-mixed concrete
Technical field
The utility model is related to the realm of building construction, more particularly to appts. for transferring ready-mixed concrete.
Background technology
Concrete chute is mainly used for the downward delivering concrete under ground portion structure construction, and conveying speed can be with Reach average 150m per hour3.Dead weight and the mobility of concrete is utilized in the mode of movement of this concrete, has construction Conveniently, the advantages of low manufacture cost.
Common concrete chute is chiefly used in the under ground portion structure construction of new building, for example, being completed in excavation of foundation pit Elephant trunk is set up by way of setting up chute holder afterwards, the gradient can be selected 1:2 (depth is within 20m) or 1:3 (depth exists Between 20-30m).
However, when stating elephant trunk delivering concrete in use, to avoid causing plugging and improving transfer efficiency, it is desirable that coagulation The slump of soil is not less than 180mm, to ensure it with enough mobility.When the slump of concrete is less than 180mm, by It is relatively low in the mobility of concrete, it is easy to cause caking and blocks chute.Therefore, above-mentioned elephant trunk cannot be satisfied slump and be less than The conveying requirement of the concrete of 180mm.
Utility model content
Based on this, it is necessary to cannot be satisfied the conveying requirement of concrete of the slump less than 180mm for above-mentioned elephant trunk Problem provides a kind of appts. for transferring ready-mixed concrete that can be suitable for lazy flow concrete.
A kind of appts. for transferring ready-mixed concrete, including:
First elephant trunk, one end are equipped with lower hopper;
First buffering section, connect with first elephant trunk and is connected to first elephant trunk;
Second elephant trunk is connected to the first buffering section connection and with the first buffering section;
Second buffering section, one end are connected to and in communication with second elephant trunk, and the other end is equipped with discharge port;
Fixed frame, be sheathed on first elephant trunk or second elephant trunk and with first elephant trunk or second elephant trunk Connection.
In one embodiment, the size of first elephant trunk and the first buffering section, second elephant trunk and institute State the size matching of the second buffering section.
In one embodiment, the first buffering section is identical with the shape of the second buffering section, first buffering Section includes curved pipe and the straight tube positioned at the curved pipe both ends, the first buffering section pass through the straight tube at both ends respectively with First elephant trunk is connected with second elephant trunk.
In one embodiment, the inner radii of the curved pipe is 309.5mm, and the outer radii of the curved pipe is 509.5mm。
In one embodiment, the length of the discharge port is 1.5m, the gradient 1:4-1:6.
In one embodiment, first elephant trunk is close to the end of the first buffering section and first buffering The both ends of section, second elephant trunk and the second buffering section are equipped with ring flange.
In one embodiment, the quantity of the first buffering section and second elephant trunk has multiple, first buffering Section and second elephant trunk are arranged alternately.
In one embodiment, first elephant trunk and second elephant trunk are rectangular tube.
Above-mentioned appts. for transferring ready-mixed concrete is connect by fixed frame with completed structure, formed vertically to concrete conveyance Then concrete is flowed through the first elephant trunk, the first buffering section, the second elephant trunk and the second buffering section, most by device from lower hopper blanking It is flowed out by discharge port.The kinetic energy that above-mentioned appts. for transferring ready-mixed concrete makes full use of lazy flow concrete downward, makes lazy flow Concrete conveys downwards, and the first buffering section and the second buffering section can reduce the impact force brought when concrete freely falling body, rise To control concrete flow velocity and prevent concrete from the effect of segregation phenomenon occur.Therefore, above-mentioned appts. for transferring ready-mixed concrete is applicable in In the conveying of lazy flow concrete and conveying effect it is good.
Description of the drawings
Fig. 1 is the structural schematic diagram of the appts. for transferring ready-mixed concrete of an embodiment;
Fig. 2 is the stereoscopic schematic diagram of the first elephant trunk in appts. for transferring ready-mixed concrete shown in FIG. 1;
Fig. 3 is the stereoscopic schematic diagram of the first buffering section in appts. for transferring ready-mixed concrete shown in FIG. 1;
Fig. 4 is the stereoscopic schematic diagram of the second elephant trunk in appts. for transferring ready-mixed concrete shown in FIG. 1;
Fig. 5 is the stereoscopic schematic diagram of the discharge port in appts. for transferring ready-mixed concrete shown in 1;
Fig. 6 is the flow chart of the application construction method of the appts. for transferring ready-mixed concrete of an embodiment.
Specific implementation mode
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work The all other embodiment obtained, shall fall within the protection scope of the present invention.
It is slipped as shown in Figure 1, the appts. for transferring ready-mixed concrete 1 of an embodiment includes the first elephant trunk 10, first buffering section 20, second One end of the buffering of pipe 30, second section 40 and fixed frame 50, the first elephant trunk 10 is equipped with lower hopper 12, and the first buffering section 20 is slipped with first Pipe 10 is connected and is connected to the first elephant trunk 10, and the second elephant trunk 30 connect with the first buffering section 20 and is connected to the first buffering section 20, Second 40 one end of buffering section are connected to the second elephant trunk 30, and the other end is equipped with discharge port 60, and fixed frame 50 is sheathed on the first elephant trunk 10 Or second elephant trunk 30 and connect with the first elephant trunk 10 or the second elephant trunk 30.
Above-mentioned appts. for transferring ready-mixed concrete 1 is connect by fixed frame 50 with completed structure, formed vertically to concrete Then concrete is flowed through 30 and of the first elephant trunk 10, first buffering the 20, second elephant trunk of section by conveying device 1 from 12 blanking of lower hopper Second buffering section 40, most flows out through discharge port 60 afterwards.Above-mentioned appts. for transferring ready-mixed concrete 1 makes full use of lazy flow concrete downward Kinetic energy, so that lazy flow concrete is conveyed downwards, first buffering section 20 and second buffering section 40 can reduce concrete freedom The impact force brought when falling bodies, the effect for playing control concrete flow velocity and preventing concrete from segregation phenomenon occur.Therefore, on It is good to state conveying and conveying effect of the appts. for transferring ready-mixed concrete 1 suitable for lazy flow concrete.
As shown in Figure 1, entire appts. for transferring ready-mixed concrete 1 is in connected state so that concrete can enter through lower hopper 12 Then first elephant trunk 10 saves the 20, second elephant trunk 30 and second buffering section 40 through the first buffering, is most flowed out afterwards through discharge port 60.The One elephant trunk, 10 one end is equipped with lower hopper 12, and the other end is connect with the first buffering section 20.Wherein, lower hopper 12 is for concrete Blanking.In the present embodiment, lower hopper 12 is tapered, is made of wooden template.
In the present embodiment, the size of the first elephant trunk 10 saves the 20, second elephant trunk 30 and second buffering with the first buffering and saves 40 size matching.First elephant trunk 10 and the second elephant trunk 30 can make the concrete to flow downward have maximum kinetic energy, and the One buffering section 20 and the second buffering section 40 can play the effect of control concrete flow velocity, prevent what isolating from occurring in concrete to show As.The size matching that first elephant trunk 10, first is buffered to section the 20, second elephant trunk 30 and second buffering section 40, can make coagulation Flowing of the soil in appts. for transferring ready-mixed concrete 1 is more smooth, reduces obstruction of the junction to concrete, while can also simplify mixed The making and installation of solidifying soil conveying device 1.
As shown in figures 1 and 3, in the present embodiment, the first buffering section 20 is identical with the shape of the second buffering section 40, and first Buffering section 20 includes curved pipe 22 and the straight tube 24 positioned at the both ends of curved pipe 22, the first buffering 20 straight tubes 24 by both ends of section It is connect with the first elephant trunk 10 and the second elephant trunk 30.Further, the inner radii of curved pipe 22 is 309.5mm, curved pipe 22 Outer radii be 509.5mm.22 part of curved pipe of first buffering section 20 and the second buffering section 40 can reduce concrete and exist To the impact load of appts. for transferring ready-mixed concrete 1 in flow process.
Wherein, the first elephant trunk 10, first buffering section the 20, second elephant trunk 30, second buffering section 40 and discharge port 60 are all made of 2mm is thick, and long and width is that the galvanized iron sheet of 200mm is made.The galvanized iron sheet of 2mm thickness has good intensity, rigidity and durable Property, load when concrete transports downwards can be resisted using appts. for transferring ready-mixed concrete 1 made of above-mentioned galvanized iron sheet, extended mixed The service life of solidifying soil conveying device 1.As shown in Figure 2 and Figure 4, in the present embodiment, the first elephant trunk 10 and the second elephant trunk 30 are equal For rectangular tube.
As shown in Figure 1 and Figure 5, in the present embodiment, the length of discharge port 60 is 1.5m, the gradient 1:4-1:6.Discharge port 60 are made of the galvanized iron sheet of 2mm thickness, the gradient 1:4-1:6, to achieve the effect that buffering discharging.
Please refer to Fig. 1-Fig. 4, in the present embodiment, the first elephant trunk 10 is close to the end and the of the first buffering section 20 The both ends of one buffering section the 20, second elephant trunk 30 and second buffering section 40 are equipped with ring flange 70.First elephant trunk 10 and first buffers Between section 20, the first buffering section 20 and second is all made of between elephant trunk 30 and between the second elephant trunk 30 and second buffering section 40 It ring flange 70 and is bolted.In the present embodiment, the width of ring flange 70 is 50mm, and bolt is M8 bolts.Wherein, ring flange 70 buffer section the 20, second elephant trunk 30 and second buffering section 40 to be welded to connect with the first elephant trunk 10, first.In addition, such as Fig. 1 and figure Shown in 5, in the present embodiment, discharge port 60 also is provided with ring flange 70 close to the end of the second buffering section 40, then passes through bolt It is connect with the second buffering section 40.
The height of appts. for transferring ready-mixed concrete 1 can be configured according to the floor height of underground structure.In the present embodiment, first Buffering section 20 and second elephant trunk 30 quantity have it is multiple, first buffering section 20 and second elephant trunk 30 be arranged alternately.For example, working as underground When the floor height of structure is higher, multiple first buffering sections 20 and the second elephant trunk 30 can be set, to increase appts. for transferring ready-mixed concrete 1 Length.And when the floor height of underground structure is relatively low, less the first buffering section 20 and the second elephant trunk 30 can be set, so that coagulation The height of native conveying device 1 is matched with the floor height of underground structure.
In addition it is also possible to adjust appts. for transferring ready-mixed concrete 1 by adjusting the height of the first elephant trunk 10 and the second elephant trunk 30 Height.In the present embodiment, the first elephant trunk 10 and the second elephant trunk 30 may include standard knot and non-standard two kinds of section.Wherein, The length that standard knot often saves is 1.5m, and the non-standard length often saved that saves is 0.3m.Meanwhile the length of standard knot can be according to complete At the floor height of underground structure adjust.Standard knot is also to be welded by galvanized iron sheet, wherein is used between galvanized iron sheet Full weld is fixed, and level weld seam requirement is continuous, full, must not there is the defects of stomata, crackle, slag inclusion and overlap.Using standard knot and non- Standard knot forms the first elephant trunk 10 and the second elephant trunk 30 so that appts. for transferring ready-mixed concrete 1 can be adapted for the ground of different floor heights Lower structure expands the use scope of appts. for transferring ready-mixed concrete 1.
In the present embodiment, first buffering section 20 and second buffering section 40 length be 1.3m, first buffering section 20 or Second buffering section 40 preferably arranges one per 3.7m, is usually no more than 6m and arranges one, reduces concrete as much as possible and freely fall The impact force that body is brought.
Appts. for transferring ready-mixed concrete 1 is connect by fixed frame 50 with original structure, and in the present embodiment, fixed frame 50 is by angle bar It is made.After fixed frame 50 completes, fixed frame 50 is connect with completed structure using expansion bolt, required arrangement Space is smaller, without separately setting up appts. for transferring ready-mixed concrete holder, saves the construction period.In the present embodiment, the ruler of angle bar Very little is 50mm*50mm*5mm.
Above-mentioned appts. for transferring ready-mixed concrete 1 can the directly discharging at lower hopper 12 after concrete tank is marched into the arena, you can edge It the first elephant trunk 10, first buffering section the 20, second elephant trunk 30, second buffering section 40 and discharge port 60 conveys downwards, in concrete After floor needed for reaching, manual labor's vehicle or fixed pump is coordinated to complete horizontal feed.By being arranged vertically concrete conveyance dress 1 is set, increases the downward kinetic energy of concrete, reaches downward vertically transport of the lazy flow concrete without additionaling power, simultaneously because Without setting up holder, the space needed for arrangement appts. for transferring ready-mixed concrete 1, and easy access are saved.
In addition, use above-mentioned appts. for transferring ready-mixed concrete 1 successfully by slump for the lazy flow concrete of 130 ± 20mm from Ground (absolute altitude is -0.10m) is delivered to 14 layers of underground (absolute altitude is -48.78m), and concrete does not occur segregation phenomenon, can be direct For floor leveling, leads wall and the techniques such as pour.
The application construction method of above-mentioned appts. for transferring ready-mixed concrete 1 is illustrated below in conjunction with Fig. 1-Fig. 6.
As shown in fig. 6, the application construction method of the appts. for transferring ready-mixed concrete 1 of an embodiment includes the following steps:
Step S600, by lower hopper 12, the first elephant trunk 10, first buffering section the 20, second elephant trunk 30, second buffering section 40, Discharge port 60 and fixed frame 50 connect, and form appts. for transferring ready-mixed concrete 1.Lower hopper 12, the first elephant trunk 10, first buffering section 20, the second elephant trunk 30, second buffering section 40 and discharge port 60 are in connected state.
Appts. for transferring ready-mixed concrete 1 is arranged vertically on existing structure by step S610 by fixed frame 50.Concrete is defeated It send device 1 to be arranged using vertical mode, the potential energy of lazy flow concrete and dynamic transformation of energy can be maximally utilised, made Appts. for transferring ready-mixed concrete 1 transports lazy flow concrete and is possibly realized.In the present embodiment, using expansion bolt by fixed frame 50 It is connect with existing structure.
Step S620 buffers the 20, second elephant trunk of section by concrete from discharging from lower hopper 12 through the first elephant trunk 10, first 30 and second buffer section 40, are most flowed out afterwards through discharge port 60, complete the conveying of concrete.Concrete tank can directly exist after marching into the arena Discharging at lower hopper 12, you can achieve the effect that transport lazy flow concrete downwards.
The application construction method step of above-mentioned appts. for transferring ready-mixed concrete 1 is simple and convenient to operate, and is suitable for popularization and application.
Each technical characteristic of embodiment described above can be combined arbitrarily, to keep description succinct, not to above-mentioned reality It applies all possible combination of each technical characteristic in example to be all described, as long as however, the combination of these technical characteristics is not deposited In contradiction, it is all considered to be the range of this specification record.
Above-described embodiments merely represent several embodiments of the utility model, the description thereof is more specific and detailed, But therefore it can not be interpreted as the limitation to utility model patent range.It should be pointed out that for the common skill of this field For art personnel, without departing from the concept of the premise utility, various modifications and improvements can be made, these are belonged to The scope of protection of the utility model.Therefore, the protection domain of the utility model patent should be determined by the appended claims.

Claims (8)

1. a kind of appts. for transferring ready-mixed concrete, which is characterized in that including:
First elephant trunk, one end are equipped with lower hopper;
First buffering section, connect with first elephant trunk and is connected to first elephant trunk;
Second elephant trunk is connected to the first buffering section connection and with the first buffering section;
Second buffering section, one end are connected to and in communication with second elephant trunk, and the other end is equipped with discharge port;
Fixed frame is sheathed on first elephant trunk or second elephant trunk and connects with first elephant trunk or second elephant trunk It connects.
2. appts. for transferring ready-mixed concrete according to claim 1, which is characterized in that the size of first elephant trunk and described the The size matching of one buffering section, second elephant trunk and the second buffering section.
3. appts. for transferring ready-mixed concrete according to claim 1, which is characterized in that the first buffering section and described second delays The shape for rushing section is identical, and the first buffering section includes curved pipe and the straight tube positioned at the curved pipe both ends, and described first is slow Punching section is connect with first elephant trunk and second elephant trunk respectively by the straight tube at both ends.
4. appts. for transferring ready-mixed concrete according to claim 3, which is characterized in that the inner radii of the curved pipe is The outer radii of 309.5mm, the curved pipe are 509.5mm.
5. appts. for transferring ready-mixed concrete according to claim 1, which is characterized in that the length of the discharge port is 1.5m, slope Degree is 1:4-1:6.
6. appts. for transferring ready-mixed concrete according to claim 1, which is characterized in that first elephant trunk is slow close to described first The both ends of end and the first buffering section, second elephant trunk and the second buffering section that rush section are equipped with ring flange.
7. appts. for transferring ready-mixed concrete according to claim 1, which is characterized in that the first buffering section and described second slips The quantity of pipe have it is multiple, it is described first buffering section and second elephant trunk is arranged alternately.
8. appts. for transferring ready-mixed concrete according to claim 1, which is characterized in that first elephant trunk and second elephant trunk It is rectangular tube.
CN201721774710.5U 2017-12-19 2017-12-19 Appts. for transferring ready-mixed concrete Active CN207847102U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721774710.5U CN207847102U (en) 2017-12-19 2017-12-19 Appts. for transferring ready-mixed concrete

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721774710.5U CN207847102U (en) 2017-12-19 2017-12-19 Appts. for transferring ready-mixed concrete

Publications (1)

Publication Number Publication Date
CN207847102U true CN207847102U (en) 2018-09-11

Family

ID=63421143

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721774710.5U Active CN207847102U (en) 2017-12-19 2017-12-19 Appts. for transferring ready-mixed concrete

Country Status (1)

Country Link
CN (1) CN207847102U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108265982A (en) * 2017-12-19 2018-07-10 上海建工建集团有限公司 Appts. for transferring ready-mixed concrete and its application construction method
CN109624075A (en) * 2018-12-04 2019-04-16 金华送变电工程有限公司 A kind of Portable omni-directional concrete discharging conduit device
CN111364768A (en) * 2020-03-06 2020-07-03 南宁腾宁商品混凝土有限公司 Concrete pumping anti-blocking method and device

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108265982A (en) * 2017-12-19 2018-07-10 上海建工建集团有限公司 Appts. for transferring ready-mixed concrete and its application construction method
CN109624075A (en) * 2018-12-04 2019-04-16 金华送变电工程有限公司 A kind of Portable omni-directional concrete discharging conduit device
CN111364768A (en) * 2020-03-06 2020-07-03 南宁腾宁商品混凝土有限公司 Concrete pumping anti-blocking method and device

Similar Documents

Publication Publication Date Title
CN207847102U (en) Appts. for transferring ready-mixed concrete
CN206319543U (en) System is transported under skyscraper vertical garbage
CN206636567U (en) A kind of subway shield tunnel construction conveying system
CN104496321B (en) A kind of tapping pipe and preparation method thereof
CN106065782A (en) A kind of big flow high concentration structure stream full tail sand cemented filling technique
CN104234047A (en) Composite pile made by jointly embedding nodular pile and tubular pile into cement-soil mixed soil-nailed pile
CN103899091B (en) A kind of long distance gentle incline appts. for transferring ready-mixed concrete
CN206971224U (en) Suitable for the concrete self-flowing pastefill pipe of deep basal pit
CN205348186U (en) Flexible pipe of adjustable length
CN108265982A (en) Appts. for transferring ready-mixed concrete and its application construction method
CN203403420U (en) Concrete vertical conveying pouring system
CN108301416A (en) Large volume, deep basal pit bottom rotary type appts. for transferring ready-mixed concrete and its application process
CN207960846U (en) A kind of blower fan pylon structure
CN204491619U (en) A kind of overlength inclined shaft concrete conveyance slow descending device
CN204250673U (en) A kind of dry powder and mortar finished product silo
CN202148523U (en) Jet grouting soil-cement-pile strengthened pile
CN106088097B (en) Construction method and fog chute device for delivering concrete under gentle slope and abrupt slope
CN204703953U (en) A kind of goaf grouting aggregate jettison system
CN205502217U (en) Prefabricated corridor of prefabricated corridor component and air film ball storehouse reinforced concrete
CN103754589A (en) Method and system for transporting bulk materials through high-fall continuous shafts
CN209686397U (en) A kind of anti-dumping Pseudobulbus Bletillae (Rhizoma Bletillae)
CN103088826B (en) Concrete vertical conveying pouring system
CN205348185U (en) A structure that is used for pan feeding volume and blowing speed of conveyor control concrete
CN207072028U (en) Small-sized mixing station with enhanced feature
CN207512742U (en) A kind of pipe-line system for the downward pumping concrete of deep basal pit

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant