CN206267871U - A kind of porous pre-buried channel flow - Google Patents

A kind of porous pre-buried channel flow Download PDF

Info

Publication number
CN206267871U
CN206267871U CN201621295327.7U CN201621295327U CN206267871U CN 206267871 U CN206267871 U CN 206267871U CN 201621295327 U CN201621295327 U CN 201621295327U CN 206267871 U CN206267871 U CN 206267871U
Authority
CN
China
Prior art keywords
channel flow
buried channel
square tube
bolt
strip
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621295327.7U
Other languages
Chinese (zh)
Inventor
熊光连
刘小沅
曾立
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Kuntang Gaoxin Technology Co., Ltd.
Original Assignee
Sichuan Road Traffic Source Thyssen Materials Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Road Traffic Source Thyssen Materials Co Ltd filed Critical Sichuan Road Traffic Source Thyssen Materials Co Ltd
Priority to CN201621295327.7U priority Critical patent/CN206267871U/en
Application granted granted Critical
Publication of CN206267871U publication Critical patent/CN206267871U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Laying Of Electric Cables Or Lines Outside (AREA)

Abstract

The utility model discloses a kind of porous pre-buried channel flow, including:Square tube and many anchor poles for being fixed on square tube upper surface, the bottom of square tube are provided with multiple strip through-holes, and strip through-hole is used to install T-bolt.The bottom of traditional pre-buried channel flow is provided with the groove being parallel to each other with conduit, it is appreciated that, bolt in groove can be moved in groove, in order to install miscellaneous equipment, but due to support of the groove without before and after, easily the front-rear side walls of groove are made mutually to draw close, therefore the intensity of pre-buried channel flow is reduced, the porous pre-buried channel flow that the utility model is provided, due to being to set multiple strip through-holes in the bottom of square tube, therefore can be moved in strip through-hole T-bolt is ensured, and then on the premise of the centre-to-centre spacing of adjacent T-bolt can be adjusted, by the junction of adjacent bar through hole, the intensity of pre-buried channel flow can be improved, simultaneously when T-bolt is along conduit axially loaded, mounted equipment will not be moved or drop.

Description

A kind of porous pre-buried channel flow
Technical field
The utility model is related to the realm of building construction, more particularly to a kind of porous pre-buried channel flow.
Background technology
City integrated piping lane is the municipal pipeline synthesis corridor of Urban Underground, i.e., in a kind of tunnel space of underground construction, By municipal administration, electric power, communication, combustion gas, plumbing, heating power, rubbish conveying etc., various pipelines are intensive is laid in tunnel space, It is a kind of municipal public use pipeline layout facility.
Pipe gallery is concrete structure, and multilayer bracket structure is set in piping lane, for supporting, fixes all kinds of pipelines. Fixation for support on concrete structure is more by the way of chemical anchor bolts or pre-buried band steel piece at present.Wherein chemical anchor bolts In the presence of destruction concrete structure, easy to fall off, fire line is poor the shortcomings of;The mode of pre-buried band steel piece has that reliability is low, the later stage needs Weld, trouble, the corrosion-resistant of constructing the shortcomings of, and the I-steel that is welded is needed before mounting bracket, therefore relatively costly.
Therefore, how to provide a kind of intensity pre-buried channel flow higher, easy for installation, be that those skilled in the art are badly in need of solving Technical problem.
Utility model content
The purpose of this utility model is to provide a kind of porous pre-buried channel flow, can effectively solve intensity deficiency and install other The problems such as equipment inconvenience.
In order to solve the above technical problems, the utility model provides following technical scheme:
A kind of porous pre-buried channel flow, including:Square tube and many anchor poles for being fixed on the square tube upper surface, the square tube Bottom is provided with multiple strip through-holes, and the strip through-hole is used to install T-bolt.
Preferably, the strip through-hole is that relative side is semicircular round edge rectangular opening.
Preferably, the round edge rectangular opening is uniformly distributed along the length direction of the square tube.
Preferably, the anchor pole is welded on the upper surface of the square tube vertically.
Preferably, the anchor pole is I-shaped steel anchor rod.
Preferably, the radius of the polished rod of the radius of the semicircle side of the round edge rectangular opening and the T-bolt is equal.
Compared with prior art, above-mentioned technical proposal has advantages below:
A kind of porous pre-buried channel flow provided by the utility model, including:Square tube and it is fixed on many of square tube upper surface Anchor pole, the bottom of square tube is provided with multiple strip through-holes, and strip through-hole is used to install T-bolt.
The bottom of traditional pre-buried channel flow is provided with the groove being parallel to each other with conduit, it is to be understood that installed in groove In bolt can be moved in groove, in order to install miscellaneous equipment, but the support due to groove without before and after, easily make The front-rear side walls of groove are mutually drawn close, therefore reduce the intensity of pre-buried channel flow, while when bolt is along conduit axially loaded, stress During more than frictional force, bolt can be slided, and cause mounted equipment to be moved or even drop.The utility model is provided A kind of porous pre-buried channel flow, due to being to set multiple strip through-holes in the bottom of square tube, therefore can exist T-bolt is ensured Moved in strip through-hole, and then on the premise of the centre-to-centre spacing of adjacent T-bolt can be adjusted, by the handing-over of adjacent bar through hole Place, can improve the intensity of pre-buried channel flow, while when T-bolt is along conduit axially loaded, mounted equipment will not be moved Move or drop.
Brief description of the drawings
In order to illustrate more clearly of the utility model or technical scheme of the prior art, below will be to embodiment or existing The accompanying drawing to be used needed for technology description is briefly described, it should be apparent that, drawings in the following description are new this practicalities Some embodiments of type, for those of ordinary skill in the art, on the premise of not paying creative work, can be with root Other accompanying drawings are obtained according to these accompanying drawings.
The front view structure of a kind of porous pre-buried channel flow that Fig. 1 is provided by a kind of specific embodiment of the utility model is illustrated Figure;
The side-looking structural representation of a kind of porous pre-buried channel flow that Fig. 2 is provided by a kind of specific embodiment of the utility model Figure;
A kind of porous pre-buried channel flow that Fig. 3 is provided by a kind of specific embodiment of the utility model looks up structural representation Figure.
Reference is as follows:
1 is square tube, and 2 is anchor pole, and 3 is strip through-hole.
Specific embodiment
Just as described in the background section, pre-buried channel flow traditional at present is due to ensureing that installation bolt centre-to-centre spacing is adjustable In the case of, conduit intensity is relatively low, and the risk for moving or even dropping in the presence of installation equipment when along conduit axially loaded.
On the basis of the studies above, the utility model embodiment provide a kind of porous pre-buried channel flow, due to be The bottom of square tube sets multiple strip through-holes, therefore can be moved in strip through-hole T-bolt is ensured, and then can adjust On the premise of the centre-to-centre spacing of adjacent T-bolt, by the junction of adjacent bar through hole, the intensity of pre-buried channel flow can be improved.
In order that above-mentioned purpose of the present utility model, feature and advantage can become apparent it is understandable, it is right below in conjunction with the accompanying drawings Specific embodiment of the present utility model is described in detail.
Elaborate detail in order to fully understand the utility model in the following description.But the utility model can Implemented different from other manner described here with various, those skilled in the art can be without prejudice to the utility model intension In the case of do similar popularization.Therefore the utility model is not limited by following public specific embodiment.
Refer to Fig. 1-Fig. 3, a kind of porous pre-buried channel flow that Fig. 1 is provided by a kind of specific embodiment of the utility model Main structure diagram;The side of a kind of porous pre-buried channel flow that Fig. 2 is provided by a kind of specific embodiment of the utility model Depending on structural representation;A kind of porous pre-buried channel flow that Fig. 3 is provided by a kind of specific embodiment of the utility model looks up knot Structure schematic diagram.
A kind of specific embodiment of the present utility model provides a kind of porous pre-buried channel flow, including:Square tube 1 and it is fixed on Many anchor poles 2 of the upper surface of square tube 1, the bottom of square tube 1 is provided with multiple strip through-holes 3, and strip through-hole 3 is used to install T-bolt.
In the present embodiment, the bottom of square tube 1 is provided with multiple strip through-holes 3, by the mutual cooperation with T-bolt, can It is fixed with the equipment being effectively mounted on pre-buried channel flow.The length of the wherein head of T-bolt should be greater than bar shaped The width of through hole 3 is not more than the length of strip through-hole 3, and the width of the head of T-bolt should be not more than the width of strip through-hole 3, When installing, by the head of T-bolt insertion strip through-hole 3, after being then rotated by 90 ° by be fixed in built-in groove In road.Wherein many anchor poles 2 need to be cast in concrete, you can be fixed pre-buried channel flow.Importantly, traditional is pre- The bottom for burying conduit is provided with the groove being parallel to each other with conduit, it is to be understood that the bolt in groove can be logical Moved in groove, in order to install miscellaneous equipment, but because groove is without front and rear support, easily make the front-rear side walls phase of groove Mutually draw close, therefore reduce the intensity of pre-buried channel flow, while when bolt is along conduit axially loaded, when stress is more than frictional force, spiral shell Bolt can be slided, and cause mounted equipment to be moved or even drop.A kind of pre-buried channel flow that the present embodiment is provided, by Then multiple strip through-holes 3 are set in the bottom of square tube 1, therefore can be moved in strip through-hole 3 T-bolt is ensured, enter And on the premise of the centre-to-centre spacing of adjacent T-bolt can be adjusted, by the junction of adjacent bar through hole 3, can improve pre-buried The intensity of conduit, while when T-bolt is along conduit axially loaded, T-bolt can be stopped by strip through-hole side wall, therefore Mounted equipment will not be moved or drop.
It should be noted that the square tube that square tube can be rectangle ring or square loop for section, wherein preferably section It is the square tube of rectangle ring, strip through-hole is arranged in the larger one side of area.In addition in order to improve the intensity of square tube, Ke Yi Square tube inside sets one or more reinforcement, and the two ends of reinforcement are separately fixed at the top of square tube inner chamber and front and rear side wall On, many reinforcements can be uniformly distributed along the length direction of conduit.
Further, strip through-hole 3 is that relative side is semicircular round edge rectangular opening.
Wherein in order to adjust the centre-to-centre spacing of adjacent T-bolt, semicircular side should be side adjacent in adjacent through-holes Answer big with the length of the side positioned at the end side of square tube 1, and the one side being located on round edge rectangular opening on the length direction of square tube 1 In the length on one side adjacent with its own.In addition stress concentration can be reduced by round edge rectangular opening, and then improves square tube 1 Intensity.
Further, round edge rectangular opening is uniformly distributed along the length direction of square tube 1.By equally distributed round edge rectangle Hole, is on the one hand easy to processing, is on the other hand easy to make pre-buried channel flow have versatility.Can certainly uneven distribution, specifically Depend on the circumstances, the present embodiment is not limited this.
Wherein, anchor pole 2 is welded on the upper surface of square tube 1 vertically.It is preferred by the upper surface that anchor pole 2 is welded on square tube 1 A kind of implementation method, naturally it is also possible to be bolted or other be fixedly connected mode, the present embodiment is not limited this It is fixed, specifically depend on the circumstances.Anchor pole 2 can also be inclined the upper surface for being fixed on square tube 1 in addition.
Further, anchor pole 2 is I-shaped steel anchor rod.Coagulating cement can be fastened on by the structure on I-shaped steel anchor rod top In soil, prevent I-shaped steel anchor rod from being dropped from cement concrete.
In order to improve the stability during T-bolt is fixed on round edge rectangular opening, the half of the semicircle side of round edge rectangular opening The radius of the polished rod of footpath and T-bolt is equal.It is understood that connection when T-bolt polished rod can and round edge The side wall of rectangular opening is closely contacted with each other, and then can reduce stress concentration, lifts connection reliability, makes to be installed on pre-buried channel flow Equipment more consolidate.
It should be noted that herein, such as first and second or the like relational terms are used merely to a reality Body makes a distinction with another entity, and not necessarily requires or imply between these entities there is any this actual relation Or order.
A kind of porous pre-buried channel flow provided by the utility model is described in detail above.Tool used herein Body example is set forth to principle of the present utility model and implementation method, and the explanation of above example is only intended to help and understands Core concept of the present utility model.It should be pointed out that for those skilled in the art, not departing from this practicality On the premise of new principle, some improvement and modification can also be carried out to the utility model, these are improved and modification also falls into this In the protection domain of utility model right requirement.

Claims (6)

1. a kind of porous pre-buried channel flow, it is characterised in that including:Square tube and many anchor poles for being fixed on the square tube upper surface, The bottom of the square tube is provided with multiple strip through-holes, and the strip through-hole is used to install T-bolt.
2. porous pre-buried channel flow according to claim 1, it is characterised in that the strip through-hole is that relative side is Semicircular round edge rectangular opening.
3. porous pre-buried channel flow according to claim 2, it is characterised in that the round edge rectangular opening along the square tube length Degree direction is uniformly distributed.
4. porous pre-buried channel flow according to claim 3, it is characterised in that the anchor pole is welded on the square tube vertically Upper surface.
5. porous pre-buried channel flow according to claim 4, it is characterised in that the anchor pole is I-shaped steel anchor rod.
6. porous pre-buried channel flow according to claim 5, it is characterised in that the semicircle side of the round edge rectangular opening The radius of the polished rod of radius and the T-bolt is equal.
CN201621295327.7U 2016-11-29 2016-11-29 A kind of porous pre-buried channel flow Expired - Fee Related CN206267871U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621295327.7U CN206267871U (en) 2016-11-29 2016-11-29 A kind of porous pre-buried channel flow

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621295327.7U CN206267871U (en) 2016-11-29 2016-11-29 A kind of porous pre-buried channel flow

Publications (1)

Publication Number Publication Date
CN206267871U true CN206267871U (en) 2017-06-20

Family

ID=59042249

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621295327.7U Expired - Fee Related CN206267871U (en) 2016-11-29 2016-11-29 A kind of porous pre-buried channel flow

Country Status (1)

Country Link
CN (1) CN206267871U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106401646A (en) * 2016-11-29 2017-02-15 四川蒂森道源轨道交通材料有限公司 Porous pre-buried channel and machining method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106401646A (en) * 2016-11-29 2017-02-15 四川蒂森道源轨道交通材料有限公司 Porous pre-buried channel and machining method thereof

Similar Documents

Publication Publication Date Title
CN205062838U (en) Combination cabin concrete structure is assembled to shallow utility tunnel of burying
CN102535519A (en) I-shaped steel joint structure for underground continuous wall and construction method for I-shaped steel joint structure
CN107460888A (en) A kind of mounting structure and method of concrete prefabricated piping lane
CN206829313U (en) It is a kind of can Quick drainage municipal administration water supply and sewerage pipeline
CN203977538U (en) Assembling heavy caliber drain pipe road
CN206267871U (en) A kind of porous pre-buried channel flow
CN106401646B (en) A kind of porous pre-buried channel flow and its processing method
CN202577363U (en) H-shaped steel joint structure of underground diaphragm wall
CN107542153A (en) A kind of method and pipe gallery for solving urban waterlogging
CN205776355U (en) There is the underground transfer passage of line holder
CN202228785U (en) Jack type pipe-jacking head for long transmission pipeline
CN206829183U (en) A kind of city piping lane using porous pre-buried channel flow mounting system
CN203099080U (en) Protecting device of buried gas pipeline
CN206396789U (en) A kind of comprehensive pipe gallery structure for being easy to sewage collecting to discharge
CN214695953U (en) Domestic sewage drainage pipe that municipal works were used
CN206110120U (en) A rectangle concrete pile for making up piping lane lateral wall
CN205134332U (en) Municipal administration delivery pipeline hole groove supporting construction
CN203684235U (en) Novel combined type groove excavation supporting device
CN211285692U (en) Corrugated steel pipe gallery based on prestressed tendons
CN203950935U (en) Jacking pipe joints ground structure
CN207003605U (en) Reinforced buried concrete pumping equipment
CN207760873U (en) Assembled steel pipe gallery sewage conduct maintenance structure
CN207830712U (en) A kind of support device of the socket joint connecting tube suitable for reorganization and expansion
CN206616590U (en) A kind of prestressing force point plus serial side storehouse drainage type underground pipe gallery
CN205776356U (en) Plug-in Pipe rack

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20191009

Address after: 624000 Sichuan Aba Tibetan and Qiang Autonomous Prefecture, No. 16, Jiangxi Road, Meixing Town, Xiaojin County

Patentee after: Sichuan Kuntang Gaoxin Technology Co., Ltd.

Address before: 610000, No. three, No. two, South Ring Road, Wuhou District, Sichuan, Chengdu, 7

Patentee before: Sichuan road traffic source Thyssen Materials Co. Ltd.

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170620

Termination date: 20201129

CF01 Termination of patent right due to non-payment of annual fee