CN205895292U - Double -barrelled municipal administration and highway shield tunnel's ventilation system that grows up under water - Google Patents

Double -barrelled municipal administration and highway shield tunnel's ventilation system that grows up under water Download PDF

Info

Publication number
CN205895292U
CN205895292U CN201620900600.8U CN201620900600U CN205895292U CN 205895292 U CN205895292 U CN 205895292U CN 201620900600 U CN201620900600 U CN 201620900600U CN 205895292 U CN205895292 U CN 205895292U
Authority
CN
China
Prior art keywords
shield
section
tunnel
civil engineering
smoke duct
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620900600.8U
Other languages
Chinese (zh)
Inventor
梁艳
唐上明
范国刚
谢朝军
朱世友
贺维国
徐韬
姜宝臣
丁远见
褚凯
何潇剑
张瑞
魏雪
胡建国
曾亮
王东伟
曹楷
李金龙
魏志华
杨孝军
赖永进
廖荣
徐美智
余露茜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Liuyuan Group Co Ltd
Original Assignee
CRTG Survey and Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CRTG Survey and Design Institute Co Ltd filed Critical CRTG Survey and Design Institute Co Ltd
Priority to CN201620900600.8U priority Critical patent/CN205895292U/en
Application granted granted Critical
Publication of CN205895292U publication Critical patent/CN205895292U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Ventilation (AREA)

Abstract

This practicality belongs to municipal administration and highway tunnel technical field, concretely relates to double -barrelled municipal administration and highway shield tunnel's ventilation system that grows up under water, and its characterized in that, shield tunnel's top is provided with the civil engineering wind channel of discharging fume, shield tunnel's both ends all be provided with with the civil engineering ventilating shaft of discharging fume that the wind channel links to each other of discharging fume, it is provided with smoke exhaust fan and blast gate in the ventilating shaft to discharge fume, shield tunnel's middle part vertically falls into the shield in proper order along the tunnel and constructs A section, shield structure B section, shield structure C section, the shield constructs A section, shield and constructs the civil engineering of C section and discharge fume the wind channel area and equal, does the shield construct B section civil engineering and discharges fume the wind channel area for shield structure A section civil engineering 25 of the wind channel area of discharging fume 3 5, shield structure B section and the open cut of shield tunnel the both ends secretly section of burying set up jet fan respectively. The utility model discloses reduce ventilation scheme and constructed sectional dimensional requirement to the shield of growing up, reduced the engineering implementation degree of difficulty and construction risk, practiced thrift engineering construction cost.

Description

Two-tube municipal administration under water and highway are grown up the ventilating system of shield tunnel
Technical field
This utility model belongs to municipal administration and vcehicular tunnel technical field and in particular to one kind is two-tube municipal under water and highway is long The ventilating system of big shield tunnel.
Background technology
The selection of submerged tunnel air vent mode, with length of tunnel, traffic flow, running mode, hole environmental requirement, tunnel The many factors such as construction method are relevant.The tunnel ventilation mode commonly used at present have entirely laterally, half laterally, longitudinal ventilation mode and vertical To the smoke evacuation of ventilation+emphasis.
Entirely horizontal and semi-transverse ventilation mode need to arrange special air duct and Ventilator Room, and civil engineering costs investment is big, and the later stage divulges information Running cost is high, can effectively keep backlayering during fire, but because the air-flow that it provides is horizontal, climing with flue gas in tunnel Prolong direction vertically it is impossible to effective control flue gas is longitudinally spreading along tunnel.
The traffic that longitudinal ventilation mode can give full play to automobile rises pressure (Piston Action Wind), have good to upstream flue gas control Effect processed, has good flue gas control effect for normal one-way traffic.But under traffic jam and two-direction road operating mode, The personnel of the upstream and downstream of burning things which may cause a fire disaster evacuation all in need and vehicle, longitudinal direction is distinguished and admirable to be full of the whole Close Tunnel in burning things which may cause a fire disaster downstream by fire smoke Domain, the personnel escape to downstream and fire suppression bring very big threat, thus longitudinal smoke evacuation system does not ensure that under burning things which may cause a fire disaster The safety of wind direction driver and conductor.
Longitudinal ventilation+emphasis fume exhausting type, arranges civil engineering smoke duct in tunnel upper, carries out longitudinal ventilation at ordinary times, can Pressure is risen with the traffic giving full play to automobile, during fire, carries out emphasis smoke evacuation, by opening the multiple exhaust openings near burning things which may cause a fire disaster, just Nearly impact flue gas discharged vehicular tunnel via smokejack, reduces to staff in tunnel escape to greatest extent.
Based on this, domestic at present a lot of two-tube under water shield tunnels all employ longitudinal ventilation+point type central exhaust substantially Scheme.Jet blower divides two sections of arrangements (arranging along tunnel two ends) toward middle part, arranges civil engineering smoke duct in shield section simultaneously And jet blower, lead to shield section larger.The increase of shield section will bring engineering construction difficulty, construction risk and engineering The increase of cost, constrains application in submerged tunnel of growing up for the shield method to a certain extent.
Utility model content
In order to solve the above problems, this utility model provides a kind of jet blower and divides three sections of arrangements, jet blower positions The shield tunnel ventilating system under water mutually staggering with civil engineering smoke duct position.
The technical scheme that this utility model is adopted is:
A kind of under water two-tube municipal administration and highway grow up shield tunnel ventilating system it is characterised in that include shield tunnel, The top of described shield tunnel is provided with civil engineering smoke duct, and the two ends of described shield tunnel are provided with and civil engineering smoke duct Connected smoke evacuation ventilating shaft, is provided with smoke exhaust fan and air-valve in described smoke evacuation ventilating shaft;The middle part of described shield tunnel is indulged along tunnel To being divided into shield a section, shield b section, shield c section successively, described shield a section, the civil engineering smoke duct area equation of shield c section, Described shield b section civil engineering smoke duct area is 2/5-3/5, described shield b section and the shield of shield a section civil engineering smoke duct area The two ends open cut of structure tunnel is secretly buried section and is respectively provided with jet blower.
The more excellent area of described shield b section civil engineering smoke duct is the 1/2 of shield a section civil engineering smoke duct area.
Mutually stagger with civil engineering smoke duct position positioned at the jet blower position of described shield b section, described shield b section Have overlapping in jet blower and shield a section, the projection of shield c section civil engineering smoke duct transverse section.
The beneficial effects of the utility model are:
1st, submerged tunnel draft type of the present utility model is simple, in conventional longitudinal ventilation+emphasis smoke-discharging and ventilating mode On the basis of, divide, by jet blower, the method that three sections of arrangements, jet blower position and civil engineering smoke duct position mutually stagger, both Ensure that ventilation and smoke evacuation functional effect, decrease the dimensional requirement to shield section again, reduce engineering construction difficulty and Construction risk, has saved engineering-built cost;
2nd, this utility model is applied to two-tube municipal administration and highway shield tunnel under water, and tunnel two ends have open cut and secretly bury Section.
Brief description
Fig. 1: Tunnel Ventilation System arranges schematic diagram;
Fig. 2: Tunnel Ventilation System fire working smoke evacuation schematic diagram (fire is located at shield a section or c section);
Fig. 3: Tunnel Ventilation System fire working smoke evacuation schematic diagram (fire is located at shield b section);
Fig. 4-Fig. 5: shield a section, shield c section schematic cross-sectional view (shield Blower-free section);
Fig. 6-Fig. 7: shield b section schematic cross-sectional view (shield has fan section).
Specific embodiment
In Fig. 1-7,1- jet blower, 2- smoke evacuation ventilating shaft, 3- runway, 4- civil engineering smoke duct, 5- smoke exhaust fan and wind Valve, 6- shield tunnel, 7- shield a section, 8- shield b section, 9- shield c section, section is secretly buried in 10- open cut, and 11- tunnel lower floor evacuates logical Road, 12- tunnel bottom structure line, 13- airflow direction, 14- fire point, 15- tunnel roof construction line.
Embodiment
A kind of two-tube under water municipal administration and highway are grown up the ventilating system of shield tunnel, including shield tunnel 6, shield tunnel 6 Top be provided with civil engineering smoke duct 4, the two ends of shield tunnel 6 are provided with the Smoke being connected with civil engineering smoke duct 4 Well 2, is provided with smoke exhaust fan and air-valve 5 in smoke evacuation ventilating shaft 2;The middle part of shield tunnel 6 is longitudinally divided into shield a section successively along tunnel 7th, shield b section 8, shield c section 9, shield a section 7, civil engineering smoke duct 4 area equation of shield c section 9, the civil engineering row of shield b section 8 Cigarette air channel 4 area is 2/5-3/5, shield b section 8 and the shield tunnel 6 two ends open cut of civil engineering smoke duct 4 area of shield a section 7 Secretly bury section 10 and be respectively provided with jet blower 1.
The more excellent area of the civil engineering smoke duct 4 of shield b section 8 is the 1/2 of civil engineering smoke duct 4 area of shield a section 7.
Mutually stagger positioned at jet blower 1 position of shield b section 8 and civil engineering smoke duct 4 position, the jet of shield b section 8 Have overlapping in blower fan 1 and shield a section 7, the projection of shield c section 9 civil engineering smoke duct 4 transverse section.
Its method of ventilation, comprises the following steps:
(1) shield tunnel 6 is passed through with setting jet blower 1 and carry out longitudinal induced draught;
(2) the civil engineering smoke duct 4 by being arranged in shield tunnel 6, and the shield being connected with this civil engineering smoke duct 4 Structure tunnel 6 two ends smoke evacuation ventilating shaft 2, smoke exhaust fan and air-valve 5, carry out emphasis smoke evacuation during fire;
(3) shield section longitudinal direction whole process is provided with separate civil engineering smoke duct 4, and is divided longitudinally into three along shield tunnel 6 Section;Three sections of civil engineering smoke duct 4 area is unequal, when shield a section 7 or shield c section 9 occur fire, selects from burning things which may cause a fire disaster relatively Near jet blower 1 carries out single-ended smoke evacuation;When shield b8 section occurs fire, the jet blower 1 at shield tunnel 6 two ends enters simultaneously Row smoke evacuation.
Below by combining accompanying drawing, this utility model is described further.
The utility model discloses a kind of 1 point three sections arrangements of jet blower, jet blower 1 position and civil engineering smoke duct 4 Two-tube under water grow up shield tunnel ventilating system and the method for ventilation (referring to Fig. 1) that mutually stagger in position, are specifically described as follows:
1) to two-tube shield tunnel of growing up under water, in every pipe tunnel runway 3, indulged by arranging jet blower 1 To induced draught, direction of ventilation is consistent with garage direction, is aerated taking a breath by vehicle Piston Action Wind, during obstruction during nominal situation Open jet blower 1 to be aerated taking a breath.
2) to two-tube shield tunnel of growing up under water, in every pipe tunnel runway 3, by being arranged in shield tunnel 6 Civil engineering smoke duct 4, and tunnel two ends smoke evacuation ventilating shaft 2, smoke exhaust fan and the air-valve 5 being connected with this civil engineering smoke duct 4 etc. Assembly, carries out emphasis smoke evacuation during fire.
3) two-tube shield section runway longitudinal direction whole process is provided with separate civil engineering smoke duct 4, and longitudinally divides along tunnel Become three sections (shield a section 6, shield b section 7, shield c section 8).When shield a section 6 or shield c section 9 occur fire, select from burning things which may cause a fire disaster Nearer jet blower 1 carries out single-ended smoke evacuation (referring to Fig. 2);When there is fire in shield b section 8, the jet blower 1 at tunnel two ends Discharged fume (referring to Fig. 3) simultaneously.So, three sections of civil engineering smoke duct 4 area is designed as unequal, shield a section 7 He Shield c section 9 is designed (referring to Fig. 4) by required normal civil engineering smoke duct 4 area s, shield b section civil engineering smoke duct 4 Area is designed by about s/2.
4) with regard to the selection of jet blower 1 set location, in order to reduce shield section, 1 point three sections arrangements of jet blower, cloth Seated position refers to Fig. 5 corresponding to shield b section 8() and the open cut of tunnel two ends secretly bury section 10.Wherein it is located at the jet wind of shield b section 6 Have overlapping in machine 1 and shield a section 7 and the projection of shield c section 9 civil engineering smoke duct 4 transverse section.
It is respectively provided with jet blower 1 in shield b section 8 and shield tunnel 6 two ends open excavation section, in shield a section 7 and shield c section 9 It is not provided with jet blower 1.The civil engineering smoke duct 4 set location phase all with normal size for the set location due to jet blower 1 Mutually stagger, decrease the dimensional requirement to shield section, can reach the mesh ground reducing shield diameter, reduce engineering construction difficulty And construction risk, save engineering-built cost.
This method of ventilation is applied to two-tube municipal administration and highway shield tunnel under water, and tunnel two ends have open cut and secretly bury section.
The local in two-tube grow up shield tunnel ventilation form and details, this utility model being carried out changes, without departing from This utility model claims limited range.
Above 1 embodiment of the present utility model is described in detail, but content has been only of the present utility model preferable Embodiment is it is impossible to be considered for limiting practical range of the present utility model.All according to this utility model application range made equal Deng change and improvement etc., all should still belong within patent covering scope of the present utility model.

Claims (3)

1. a kind of under water two-tube municipal administration and highway grow up shield tunnel ventilating system it is characterised in that include shield tunnel, institute The top stating shield tunnel is provided with civil engineering smoke duct, and the two ends of described shield tunnel are provided with and civil engineering smoke duct phase Smoke evacuation ventilating shaft even, is provided with smoke exhaust fan and air-valve in described smoke evacuation ventilating shaft;The middle part of described shield tunnel is along tunnel longitudinally It is divided into shield a section, shield b section, shield c section, described shield a section, the civil engineering smoke duct area equation of shield c section, institute successively State 2/5-3/5, described shield b section and the shield that shield b section civil engineering smoke duct area is shield a section civil engineering smoke duct area The open cut of tunnel two ends is secretly buried section and is respectively provided with jet blower.
2. a kind of two-tube under water municipal administration according to claim 1 and highway are grown up the ventilating system of shield tunnel, its feature It is, the more excellent area of described shield b section civil engineering smoke duct is the 1/2 of shield a section civil engineering smoke duct area.
3. a kind of two-tube under water municipal administration according to claim 1 and highway are grown up the ventilating system of shield tunnel, its feature It is, mutually stagger with civil engineering smoke duct position positioned at the jet blower position of described shield b section, the penetrating of described shield b section Have overlapping in flow fan and shield a section, the projection of shield c section civil engineering smoke duct transverse section.
CN201620900600.8U 2016-08-19 2016-08-19 Double -barrelled municipal administration and highway shield tunnel's ventilation system that grows up under water Active CN205895292U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620900600.8U CN205895292U (en) 2016-08-19 2016-08-19 Double -barrelled municipal administration and highway shield tunnel's ventilation system that grows up under water

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620900600.8U CN205895292U (en) 2016-08-19 2016-08-19 Double -barrelled municipal administration and highway shield tunnel's ventilation system that grows up under water

Publications (1)

Publication Number Publication Date
CN205895292U true CN205895292U (en) 2017-01-18

Family

ID=57779840

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620900600.8U Active CN205895292U (en) 2016-08-19 2016-08-19 Double -barrelled municipal administration and highway shield tunnel's ventilation system that grows up under water

Country Status (1)

Country Link
CN (1) CN205895292U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106121707A (en) * 2016-08-19 2016-11-16 中铁隧道勘测设计院有限公司 The most two-tube municipal administration and highway are grown up the ventilating system of shield tunnel and method of ventilation
CN107630713A (en) * 2017-08-18 2018-01-26 中铁隧道勘测设计院有限公司 A kind of shield tunnel lower floor fire escape of growing up ensures the method for ventilation of malleation

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106121707A (en) * 2016-08-19 2016-11-16 中铁隧道勘测设计院有限公司 The most two-tube municipal administration and highway are grown up the ventilating system of shield tunnel and method of ventilation
CN106121707B (en) * 2016-08-19 2019-04-19 中铁第六勘察设计院集团有限公司 Underwater two-tube municipal administration and highway are grown up the ventilating system and method for ventilation of shield tunnel
CN107630713A (en) * 2017-08-18 2018-01-26 中铁隧道勘测设计院有限公司 A kind of shield tunnel lower floor fire escape of growing up ensures the method for ventilation of malleation

Similar Documents

Publication Publication Date Title
CN103939124B (en) One single-tube double-layer shield traffic tunnel ventilation smoke exhaust and evacuating system under water
CN108343459B (en) It is a kind of can ventilation inclined shaft to double track tunnel supply and exhaust
CN203452826U (en) Ventilating system used for city underground annular tunnel
CN205895292U (en) Double -barrelled municipal administration and highway shield tunnel's ventilation system that grows up under water
CN106121707B (en) Underwater two-tube municipal administration and highway are grown up the ventilating system and method for ventilation of shield tunnel
CN105318477B (en) A kind of no ventilation shaft induction type ventilation smoke extraction system and its ventilation smoke exhaust method
CN103306702B (en) A kind of tunnel ventilation construction air filling type spacer assembly
CN203347823U (en) Inflatable isolating device for tunnel ventilation construction
CN205895293U (en) Lower floor's municipal administration and highway shield tunnel ventilation system that grows up is attend to single tube under water
CN205858397U (en) Inclined shaft and positive hole ventilating system in constructing tunnel
CN102720520A (en) Method for ventilating drainage tunnel of extremely-long double-hole tunnel of expressway during construction
KR101191592B1 (en) Selective point extraction ventilation method applied to active control
CN106168140A (en) Single tube levels municipal administration under water and highway are grown up shield tunnel ventilating system and method
CN208546182U (en) Subway detour ventilating system with shield door
CN109707395A (en) Double-layer shield tunnel and smokejack setting method with upper and lower level smokejack
CN205477703U (en) Tunnel ventilation structure
CN108756990A (en) Subway detour ventilating system with shield door and its operation method
CN102513323B (en) Fume exhaust layout structure for subway platform and screen door system
CN204984471U (en) Tunnel ventilation structure for highway
CN204783084U (en) Compound ground runner band corridor firebreak device
CN202417562U (en) Novel tunnel ventilation device
CN104929672B (en) Compound underground ring corridor fire prevention isolation device and method
CN204754938U (en) Safety of easily discharging fume tunnel that is open to traffic
CN208502822U (en) A kind of subway tunnel ventilation smoke exhaust structure
CN208534524U (en) A kind of high-efficient ventilation system for tunnel

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20180608

Address after: 300000 Tianjin free trade zone (Airport Economic Zone), 2-3116 South Road 88.

Patentee after: CHINA RAILWAY LIUYUAN GROUP CO., LTD.

Address before: 300000 Hongqiao District, Tianjin City, Bridge South East Road

Patentee before: Zhongtie Tunnel Survey and Design Inst., Ltd.