CN106121707B - Underwater two-tube municipal administration and highway are grown up the ventilating system and method for ventilation of shield tunnel - Google Patents

Underwater two-tube municipal administration and highway are grown up the ventilating system and method for ventilation of shield tunnel Download PDF

Info

Publication number
CN106121707B
CN106121707B CN201610685662.6A CN201610685662A CN106121707B CN 106121707 B CN106121707 B CN 106121707B CN 201610685662 A CN201610685662 A CN 201610685662A CN 106121707 B CN106121707 B CN 106121707B
Authority
CN
China
Prior art keywords
shield
tunnel
civil engineering
section
sections
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610685662.6A
Other languages
Chinese (zh)
Other versions
CN106121707A (en
Inventor
梁艳
唐上明
范国刚
谢朝军
朱世友
贺维国
徐韬
姜宝臣
丁远见
褚凯
何潇剑
张瑞
魏雪
胡建国
曾亮
王东伟
曹楷
李金龙
魏志华
杨孝军
赖永进
廖荣
徐美智
余露茜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Liuyuan Group Co Ltd
Original Assignee
China Railway Liuyuan Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Liuyuan Group Co Ltd filed Critical China Railway Liuyuan Group Co Ltd
Priority to CN201610685662.6A priority Critical patent/CN106121707B/en
Publication of CN106121707A publication Critical patent/CN106121707A/en
Application granted granted Critical
Publication of CN106121707B publication Critical patent/CN106121707B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F1/00Ventilation of mines or tunnels; Distribution of ventilating currents
    • E21F1/003Ventilation of traffic tunnels

Abstract

The invention belongs to municipal administration and vcehicular tunnel technical fields, it grows up the ventilating system and method for ventilation of shield tunnel more particularly to a kind of underwater two-tube municipal administration and highway, it is characterized in that, civil engineering smoke duct is provided at the top of the shield tunnel, the both ends of the shield tunnel are provided with the smoke evacuation ventilating shaft being connected with civil engineering smoke duct, are provided with smoke exhaust fan and air-valve in the smoke evacuation ventilating shaft;The middle part of the shield tunnel is longitudinally successively divided into A sections of shield, B sections of shield, C sections of shield along tunnel, described shield A sections, C sections of shield of civil engineering smoke duct area equation, the shield B sections of civil engineerings smoke duct area is the 2/5-3/5 of shield A sections of civil engineering smoke duct area, and described shield B sections and the open cut of shield tunnel both ends secretly bury section and jet blower are respectively set.Size requirement The present invention reduces ventilation scheme to shield section of growing up, reduces engineering construction difficulty and construction risk, has saved engineering-built cost.

Description

Underwater two-tube municipal administration and highway are grown up the ventilating system and method for ventilation of shield tunnel
Technical field
The invention belongs to municipal administration and vcehicular tunnel technical fields, and in particular to a kind of underwater two-tube municipal administration and highway are grown up shield The ventilating system and method for ventilation in structure tunnel.
Background technique
The selection of submerged tunnel ventilation mode, with length of tunnel, the magnitude of traffic flow, running mode, hole environmental requirement, tunnel The many factors such as construction method are related.Currently used tunnel ventilation mode has complete lateral, half lateral, longitudinal ventilation mode and indulges To ventilation+emphasis smoke evacuation.
Complete that special air duct and Ventilator Room need to laterally be arranged with semi-transverse ventilation mode, civil engineering costs investment is big, later period ventilation Running cost is high, and when fire can effectively keep backlayering, but due to its air-flow provided be laterally, it is climing with flue gas in tunnel It is vertical to prolong direction, can not effectively control flue gas and longitudinally spread along tunnel.
Longitudinal ventilation mode can give full play to traffic boosting power (Piston Action Wind) of automobile, have good to upstream flue gas control Effect processed has good flue gas control effect for normal one-way traffic.But under traffic jam and two-direction road operating condition, The personnel of the upstream and downstream of fire source evacuation in need and vehicle, longitudinal direction is distinguished and admirable to be full of the entire Close Tunnel in fire source downstream for fire smoke Domain, personnel escape and fire suppression to downstream bring very big threat, thus longitudinal smoke evacuation system does not ensure that under fire source The safety of wind direction driver and conductor.
Longitudinal ventilation+emphasis fume exhausting type is arranged civil engineering smoke duct in tunnel upper, usually carries out longitudinal ventilation, can It is boosted power with giving full play to the traffic of automobile, emphasis smoke evacuation is carried out when fire, by opening multiple smoke outlets near fire source, just Vehicular tunnel closely is discharged via smokejack in flue gas, reduces the influence to staff in tunnel escape to greatest extent.
Based on this, many underwater two-tube shield tunnels domestic at present all use longitudinal ventilation+point type central exhaust substantially Scheme.Jet blower is divided to two sections of arrangements (arranging along tunnel both ends toward middle part), and civil engineering smoke duct is arranged simultaneously in shield section And jet blower, cause shield section larger.The increase of shield section will bring engineering construction difficulty, construction risk and engineering The increase of cost constrains application of the shield method in submerged tunnel of growing up to a certain extent.
Summary of the invention
To solve the above-mentioned problems, the present invention provides a kind of three sections of arrangements of jet blower point, jet blower position and soil Build the underwater shield tunnel ventilating system and method for ventilation that smoke duct position mutually staggers.
The technical scheme adopted by the invention is as follows:
A kind of underwater two-tube municipal administration and highway are grown up the ventilating system of shield tunnel, which is characterized in that including shield tunnel, Civil engineering smoke duct is provided at the top of the shield tunnel, the both ends of the shield tunnel are provided with and civil engineering smoke duct Connected smoke evacuation ventilating shaft is provided with smoke exhaust fan and air-valve in the smoke evacuation ventilating shaft;The middle part of the shield tunnel is vertical along tunnel To being successively divided into A sections of shield, B sections of shield, C sections of shield, described shield A sections, C sections of shield of civil engineering smoke duct area equation, The shield B sections of civil engineerings smoke duct area is the 2/5-3/5 of shield A sections of civil engineering smoke duct area, described shield B sections and shield The both ends open cut of structure tunnel secretly buries section and jet blower is respectively set.
The more excellent area of the shield B sections of civil engineering smoke ducts is the 1/2 of shield A sections of civil engineering smoke duct area.
It is mutually staggered positioned at described shield B sections of jet blower positions and civil engineering smoke duct position, described shield B sections Have on jet blower and C sections of A sections of shield, shield civil engineering smoke duct cross section projections overlapping.
A kind of underwater two-tube municipal administration and highway are grown up the method for ventilation of shield tunnel, comprising the following steps:
(1) longitudinal induced draught is carried out by setting jet blower to the shield tunnel;
(2) by the civil engineering smoke duct being arranged in the shield tunnel, and be connected with the civil engineering smoke duct The smoke evacuation of shield tunnel both ends ventilating shaft, smoke exhaust fan, air-valve carry out emphasis smoke evacuation when fire;
(3) the shield section of the shield tunnel is longitudinal whole equipped with mutually independent civil engineering smoke duct and vertical along tunnel To being divided into three sections;Three sections of civil engineering smoke duct area is unequal, when C sections of generation fire of A sections of shield or shield, selects from fire The closer jet blower in source carries out single-ended smoke evacuation;When B sections of generation fire of shield, the jet blower at shield tunnel both ends simultaneously into Row smoke evacuation.
The invention has the benefit that
1, submerged tunnel draft type of the invention is simple, on conventional longitudinal ventilation+emphasis smoke-discharging and ventilating mode basis On, the method mutually staggered by three sections of arrangements of jet blower point, jet blower position and civil engineering smoke duct position both guaranteed The functional effect of ventilation and smoke evacuation, and reduce the size requirement to shield section, reduce engineering construction difficulty and construction Risk has saved engineering-built cost;
2, the present invention is suitable for underwater two-tube municipal administration and highway shield tunnel, and there are open cuts secretly to bury section at tunnel both ends.
Detailed description of the invention
Fig. 1: Tunnel Ventilation System arrangement schematic diagram;
Fig. 2: Tunnel Ventilation System fire working discharges fume schematic diagram (fire is located at A sections or C sections of shield);
Fig. 3: Tunnel Ventilation System fire working discharges fume schematic diagram (fire is located at B sections of shield);
Fig. 4-Fig. 5: A sections of shield, C sections of schematic cross-sectional views of shield (shield Blower-free section);
Fig. 6-Fig. 7: B sections of schematic cross-sectional views of shield (shield has fan section).
Specific embodiment
In Fig. 1-7,1- jet blower, 2- discharges fume ventilating shaft, 3- runway, 4- civil engineering smoke duct, 5- smoke exhaust fan and wind Valve, 6- shield tunnel, A sections of 7- shield, B sections of 8- shield, C sections of 9- shield, section is secretly buried in 10- open cut, and the evacuation of the tunnel 11- lower layer is logical Road, the tunnel 12- bottom structure line, 13- airflow direction, 14- fire point, the tunnel 15- roof construction line.
Embodiment
A kind of underwater two-tube municipal administration and highway are grown up the ventilating system of shield tunnel, including shield tunnel 6, shield tunnel 6 Top be provided with civil engineering smoke duct 4, the both ends of shield tunnel 6 are provided with the Smoke being connected with civil engineering smoke duct 4 Well 2, discharge fume ventilating shaft 2 in be provided with smoke exhaust fan and air-valve 5;The middle part of shield tunnel 6 is longitudinally successively divided into A sections of shield along tunnel 7, shield B section 8, shield C section 9,4 area equation of civil engineering smoke duct of shield A section 7, shield C section 9, the civil engineering row of shield B section 8 4 area of cigarette air duct is the 2/5-3/5 of 4 area of civil engineering smoke duct of shield A section 7, the 6 both ends open cut of shield B section 8 and shield tunnel It secretly buries section 10 and jet blower 1 is respectively set.
The more excellent area of the civil engineering smoke duct 4 of shield B section 8 is the 1/2 of 4 area of civil engineering smoke duct of shield A section 7.
1 position of jet blower positioned at shield B section 8 is mutually staggered with 4 position of civil engineering smoke duct, the jet stream of shield B section 8 Have on blower 1 and shield A section 7, the projection of 9 civil engineering smoke duct of shield C section, 4 cross section overlapping.
A kind of underwater two-tube municipal administration and highway are grown up the method for ventilation of shield tunnel, comprising the following steps:
(1) longitudinal induced draught is carried out by the way that jet blower 1 is arranged to shield tunnel 6;
(2) pass through the civil engineering smoke duct 4 being arranged in shield tunnel 6, and the shield being connected with the civil engineering smoke duct 4 6 both ends of structure tunnel smoke evacuation ventilating shaft 2, smoke exhaust fan and air-valve 5 carry out emphasis smoke evacuation when fire;
(3) shield section is longitudinal whole equipped with mutually independent civil engineering smoke duct 4, and is divided longitudinally into three along shield tunnel 6 Section;Three sections of 4 area of civil engineering smoke duct is unequal, when fire occurs for shield A section 7 or shield C section 9, select from fire source compared with Close jet blower 1 carries out single-ended smoke evacuation;When B8 sections of generation fire of shield, the jet blower 1 at 6 both ends of shield tunnel simultaneously into Row smoke evacuation.
Below by conjunction with attached drawing, the present invention is described further.
The invention discloses a kind of jet blowers 1 to divide three sections of arrangements, 4 position of 1 position of jet blower and civil engineering smoke duct Underwater two-tube grow up shield tunnel ventilating system and the method for ventilation (being detailed in Fig. 1) mutually staggered, is specifically described as follows:
1) it to underwater two-tube shield tunnel of growing up, in every pipe tunnel runway 3, is indulged by the way that jet blower 1 is arranged To induced draught, direction of ventilation is consistent with garage direction, is aerated ventilation by vehicle Piston Action Wind when nominal situation, when obstruction It opens jet blower 1 and is aerated ventilation.
2) to underwater two-tube shield tunnel of growing up, in every pipe tunnel runway 3, by being arranged in shield tunnel 6 Civil engineering smoke duct 4, and the tunnel both ends smoke evacuation ventilating shaft 2, smoke exhaust fan and the air-valve 5 that are connected with the civil engineering smoke duct 4 etc. Component carries out emphasis smoke evacuation when fire.
3) two-tube shield section runway is longitudinal whole equipped with mutually independent civil engineering smoke duct 4, and longitudinally divides along tunnel At three sections (shield A section 6, shield B section 7, shield C sections 8).When fire occurs for shield A section 6 or shield C section 9, select from fire source Closer jet blower 1 carries out single-ended smoke evacuation (being detailed in Fig. 2);When fire occurs for shield B section 8, the jet blower 1 at tunnel both ends It is discharged fume simultaneously and (is detailed in Fig. 3).So three sections of 4 area of civil engineering smoke duct is designed as unequal, 7 He of shield A section Shield C section 9 is designed by required 4 area S of normal civil engineering smoke duct and (is detailed in Fig. 4), B sections of civil engineering smoke ducts 4 of shield Area is designed by about S/2.
4) selection of position is set about jet blower 1, and in order to reduce shield section, jet blower 1 divides three sections of arrangements, cloth Seated position correspond to shield B sections of 8(be detailed in Fig. 5) and the open cut of tunnel both ends secretly bury section 10.Wherein it is located at the jet stream wind of shield B section 6 Have on machine 1 and shield A section 7 and the projection of 9 civil engineering smoke duct of shield C section, 4 cross section overlapping.
Jet blower 1 is respectively set in shield B section 8 and 6 both ends open excavation section of shield tunnel, in shield A section 7 and shield C section 9 It is not provided with jet blower 1.Since position phase is arranged with the civil engineering smoke duct 4 of normal size in the setting position of jet blower 1 It is mutually staggered, reducing the size requirement to shield section reduces engineering construction difficulty with can reach the mesh for reducing shield diameter And construction risk, save engineering-built cost.
This method of ventilation is suitable for underwater two-tube municipal administration and highway shield tunnel, and there are open cuts secretly to bury section at tunnel both ends.
The part that the present invention carries out is changed in two-tube grow up shield tunnel ventilation form and details, without departing from this hair Bright claims limited range.
1 embodiment of the invention is described in detail above, but content is only presently preferred embodiments of the present invention, no It can be believed to be used to limit the scope of the invention.Any changes and modifications in accordance with the scope of the present application, It should still fall within the scope of the patent of the present invention.

Claims (2)

  1. The ventilating system of shield tunnel 1. a kind of underwater two-tube municipal administration and highway are grown up, which is characterized in that including shield tunnel, institute It states and is provided with civil engineering smoke duct at the top of shield tunnel, the both ends of the shield tunnel are provided with and civil engineering smoke duct phase Smoke evacuation ventilating shaft even is provided with smoke exhaust fan and air-valve in the smoke evacuation ventilating shaft;The middle part of the shield tunnel is along tunnel longitudinal direction Successively it is divided into shield Blower-free section A, shield has fan section B, shield Blower-free section C, shield Blower-free section A, shield Blower-free section C Civil engineering smoke duct area equation, shield have fan section B civil engineering smoke duct area be shield Blower-free section A civil engineering Smoke The 2/5-3/5 of road area, shield have fan section B and the open cut of shield tunnel both ends secretly to bury section jet blower is respectively set, and are located at shield Structure has the jet blower position of fan section B to mutually stagger with civil engineering smoke duct position, shield have the jet blower of fan section B with There is overlapping on shield Blower-free section A, the projection of the shield Blower-free civil engineering smoke duct cross section section C;
    When ventilation the following steps are included:
    (1) longitudinal induced draught is carried out by setting jet blower to the shield tunnel;
    (2) pass through the civil engineering smoke duct being arranged in the shield tunnel, and the shield being connected with the civil engineering smoke duct The smoke evacuation of tunnel both ends ventilating shaft, smoke exhaust fan, air-valve carry out emphasis smoke evacuation when fire;
    (3) the shield section of the shield tunnel is longitudinal whole equipped with mutually independent civil engineering smoke duct, and longitudinally divides along tunnel At three sections;Three sections of civil engineering smoke duct area is unequal, when fire occurs for shield Blower-free section A or shield Blower-free section C, It selects to carry out single-ended smoke evacuation from the closer jet blower of fire source;When shield has fan section B that fire occurs, shield tunnel both ends Jet blower is discharged fume simultaneously.
  2. The ventilating system of shield tunnel 2. a kind of underwater two-tube municipal administration according to claim 1 and highway are grown up, feature It is, the area that shield has fan section B civil engineering smoke duct is the 1/2 of shield Blower-free section A civil engineering smoke duct area.
CN201610685662.6A 2016-08-19 2016-08-19 Underwater two-tube municipal administration and highway are grown up the ventilating system and method for ventilation of shield tunnel Active CN106121707B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610685662.6A CN106121707B (en) 2016-08-19 2016-08-19 Underwater two-tube municipal administration and highway are grown up the ventilating system and method for ventilation of shield tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610685662.6A CN106121707B (en) 2016-08-19 2016-08-19 Underwater two-tube municipal administration and highway are grown up the ventilating system and method for ventilation of shield tunnel

Publications (2)

Publication Number Publication Date
CN106121707A CN106121707A (en) 2016-11-16
CN106121707B true CN106121707B (en) 2019-04-19

Family

ID=57278790

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610685662.6A Active CN106121707B (en) 2016-08-19 2016-08-19 Underwater two-tube municipal administration and highway are grown up the ventilating system and method for ventilation of shield tunnel

Country Status (1)

Country Link
CN (1) CN106121707B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110714795B (en) * 2019-10-17 2021-02-26 聊城大学 Ventilation device for underwater suspension tunnel
CN111720151B (en) * 2020-06-10 2021-10-22 中铁第五勘察设计院集团有限公司 Tunnel structure with rectangular cross section
CN113530590A (en) * 2021-07-30 2021-10-22 中铁第四勘察设计院集团有限公司 Double-hole one-way long and large underwater highway tunnel ventilation system and ventilation method thereof

Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1865662A (en) * 2006-06-20 2006-11-22 浙江省交通规划设计研究院 Smoke emission method in tunnel and tunnel ventilation system with separate smoke-emission device
DE102007040237A1 (en) * 2007-08-25 2009-02-26 Horst-Dieter Dipl.-Ing. Rector Air extraction system for active combating of fire in traffic tunnel creates oppositely-directed airflows from both directions after outbreak of fire and directs these to source of fire or smoke at calculated speed
CN101509392A (en) * 2009-03-13 2009-08-19 上海市隧道工程轨道交通设计研究院 Highway tunnel exhaust port opening method
CN202081896U (en) * 2011-06-01 2011-12-21 上海磁浮交通发展有限公司 Internal space arranging structure for magnetic levitation tunnel
CN202170803U (en) * 2011-08-01 2012-03-21 湖南省交通规划勘察设计院 Very long, deep-buried highway tunnel parallel adit ventilation operation system
CN102720519A (en) * 2012-06-21 2012-10-10 广州地铁设计研究院有限公司 Novel tunnel ventilation system for subway station
CN103939124A (en) * 2014-05-13 2014-07-23 武汉中交交通工程有限责任公司 Ventilation, smoke discharge and evacuation system for underwater single-tube double-layer shield traffic tunnel
CN104153805A (en) * 2014-07-31 2014-11-19 上海市城市建设设计研究总院 Intra-tunnel smoke discharge system and method
CN204002896U (en) * 2014-04-11 2014-12-10 中铁第四勘察设计院集团有限公司 One-tunnel one-track subway tunnel natural ventilating structure
CN104533498A (en) * 2014-12-18 2015-04-22 西南交通大学 Point exhaust type subway tunnel fire ventilation and smoke exhaust system
CN104675424A (en) * 2015-02-10 2015-06-03 招商局重庆交通科研设计院有限公司 Underwater tunnel ventilation system and ventilation method
CN204419226U (en) * 2014-12-18 2015-06-24 西南交通大学 Point row formula subway tunnel ventilation smoke extraction system
CN205895292U (en) * 2016-08-19 2017-01-18 中铁隧道勘测设计院有限公司 Double -barrelled municipal administration and highway shield tunnel's ventilation system that grows up under water

Patent Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1865662A (en) * 2006-06-20 2006-11-22 浙江省交通规划设计研究院 Smoke emission method in tunnel and tunnel ventilation system with separate smoke-emission device
DE102007040237A1 (en) * 2007-08-25 2009-02-26 Horst-Dieter Dipl.-Ing. Rector Air extraction system for active combating of fire in traffic tunnel creates oppositely-directed airflows from both directions after outbreak of fire and directs these to source of fire or smoke at calculated speed
CN101509392A (en) * 2009-03-13 2009-08-19 上海市隧道工程轨道交通设计研究院 Highway tunnel exhaust port opening method
CN202081896U (en) * 2011-06-01 2011-12-21 上海磁浮交通发展有限公司 Internal space arranging structure for magnetic levitation tunnel
CN202170803U (en) * 2011-08-01 2012-03-21 湖南省交通规划勘察设计院 Very long, deep-buried highway tunnel parallel adit ventilation operation system
CN102720519A (en) * 2012-06-21 2012-10-10 广州地铁设计研究院有限公司 Novel tunnel ventilation system for subway station
CN204002896U (en) * 2014-04-11 2014-12-10 中铁第四勘察设计院集团有限公司 One-tunnel one-track subway tunnel natural ventilating structure
CN103939124A (en) * 2014-05-13 2014-07-23 武汉中交交通工程有限责任公司 Ventilation, smoke discharge and evacuation system for underwater single-tube double-layer shield traffic tunnel
CN104153805A (en) * 2014-07-31 2014-11-19 上海市城市建设设计研究总院 Intra-tunnel smoke discharge system and method
CN104533498A (en) * 2014-12-18 2015-04-22 西南交通大学 Point exhaust type subway tunnel fire ventilation and smoke exhaust system
CN204419226U (en) * 2014-12-18 2015-06-24 西南交通大学 Point row formula subway tunnel ventilation smoke extraction system
CN104675424A (en) * 2015-02-10 2015-06-03 招商局重庆交通科研设计院有限公司 Underwater tunnel ventilation system and ventilation method
CN205895292U (en) * 2016-08-19 2017-01-18 中铁隧道勘测设计院有限公司 Double -barrelled municipal administration and highway shield tunnel's ventilation system that grows up under water

Also Published As

Publication number Publication date
CN106121707A (en) 2016-11-16

Similar Documents

Publication Publication Date Title
CN106121707B (en) Underwater two-tube municipal administration and highway are grown up the ventilating system and method for ventilation of shield tunnel
CN109252885B (en) A kind of subway underground station an island platform Fire Ventilation smoke evacuation system and method
CN100557192C (en) Improved tunnel smoke exhaust method and with the tunnel smoke evacuation system of independent fume extractor
CN103306702B (en) A kind of tunnel ventilation construction air filling type spacer assembly
CN106004896B (en) Track traffic vehicle drivers' cab wind channel structure
CN106168140B (en) Underwater single tube upper and lower level municipal administration and highway are grown up shield tunnel ventilating system and method
CN108343459A (en) It is a kind of can be to the ventilation inclined shaft of double track tunnel supply and exhaust
CN104675424A (en) Underwater tunnel ventilation system and ventilation method
CN205895292U (en) Double -barrelled municipal administration and highway shield tunnel's ventilation system that grows up under water
CN203347823U (en) Inflatable isolating device for tunnel ventilation construction
CN108561169A (en) The combined type Ventilating Design Method in Urban Underground interchange tunnel
CN104153805A (en) Intra-tunnel smoke discharge system and method
CN107477827A (en) A kind of wall hanging purification fresh air shares the installation method in air conditioner ventilation hole
CN208184769U (en) A kind of integrated tunnel air purification and smoke evacuation system
CN102425443B (en) Tunnel smoke control device for supplying air from parallel tunnels
CN205895293U (en) Lower floor's municipal administration and highway shield tunnel ventilation system that grows up is attend to single tube under water
CN103836758A (en) Ventilation system and control method thereof
CN102720520A (en) Method for ventilating drainage tunnel of extremely-long double-hole tunnel of expressway during construction
KR101191592B1 (en) Selective point extraction ventilation method applied to active control
CN209944682U (en) A controllable circulated air curtain cuts off purifier for subway station
CN101509392A (en) Highway tunnel exhaust port opening method
KR102353414B1 (en) Dust eliminator of fire detector
CN208416597U (en) The top shaft structure in gravity-flow ventilation tunnel
CN205477703U (en) Tunnel ventilation structure
CN110318799A (en) One kind greatly enhancing construction ventilation of tunnel method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20190211

Address after: 300000 Tianjin Free Trade Test Zone (Airport Economic Zone) No. 36 West Central Road

Applicant after: CHINA RAILWAY LIUYUAN GROUP CO., LTD.

Address before: 300000 Hongqiao District, Tianjin City, Bridge South East Road

Applicant before: Zhongtie Tunnel Survey and Design Inst., Ltd.

GR01 Patent grant
GR01 Patent grant