CN205875147U - A protect a section of thick bamboo for holing operation - Google Patents

A protect a section of thick bamboo for holing operation Download PDF

Info

Publication number
CN205875147U
CN205875147U CN201620561734.1U CN201620561734U CN205875147U CN 205875147 U CN205875147 U CN 205875147U CN 201620561734 U CN201620561734 U CN 201620561734U CN 205875147 U CN205875147 U CN 205875147U
Authority
CN
China
Prior art keywords
casing
section
thick bamboo
outer casing
bore operation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620561734.1U
Other languages
Chinese (zh)
Inventor
陈枝东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Hongyeji Geotechnical Technology Co Ltd
Original Assignee
Shenzhen Hongyeji Geotechnical Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Hongyeji Geotechnical Technology Co Ltd filed Critical Shenzhen Hongyeji Geotechnical Technology Co Ltd
Priority to CN201620561734.1U priority Critical patent/CN205875147U/en
Application granted granted Critical
Publication of CN205875147U publication Critical patent/CN205875147U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model provides a protect a section of thick bamboo for holing operation, include: a protect a section of thick bamboo in, for imbedding the outer section of thick bamboo that protects of hole upper end, and be used for imbedding tip under the hole. the internal diameter that protects a section of thick bamboo outward is greater than the interior external diameter that protects a section of thick bamboo. The utility model discloses a protect a section of thick bamboo for holing operation who provides through protect a section of thick bamboo outside the hole upper end is buried underground, protects a section of thick bamboo in lower tip is buried underground, can with the soil layer to the cohesive strength of protecting a section of thick bamboo decompose two protect a section of thick bamboo on, conveniently protect a section of thick bamboo and bury underground and extract, reduce the construction degree of difficulty.

Description

A kind of casing for bore operation
Technical field
The application relates to the equipment of bore operation in a kind of civil engineering, particularly relates to a kind of protecting for bore operation Cylinder.
Background technology
Rotary digging drilling hole is the form of construction work of pore-forming operation in a kind of applicable building foundation engineering, is primarily adapted for sand, viscosity The soil layer constructions such as soil, slity soil, in the multiple foundation basic constructions such as bored concrete pile, diaphragm wall, strengthening of foundation.Casing is in boring During filling pile construction, affect construction speed and salvo that is safe and that take for preventing hole wall collapse hole near aperture. Stable hole wall can be played, prevent the hole that collapses, it is also possible to isolation surface water, starter, spud pile position, wait effect.Due to geology bar The complexity of part, when there is mud for pile foundation bottom, the mud moulding shape in drilling process in stream can be constantly to hole Inside subside and be difficult to pore-forming, and ground local subsidence can be caused, jeopardize rig, neighbouring building structure and underground utilities safety.
There is the situation of mud for this pile foundation bottom, existing settling mode is to bury long casing underground, makes casing pass through Wear whole mud, thus avoid mud to subside in hole, and can effectively prevent ground local subsidence and the harm brought thereof.So And, the construction method of the whole mud in pile foundation bottom is run through for burying long casing underground, if mud is distributed shallower in bottom, long Casing can effectively solve the construction difficult problem brought because of mud.But be distributed relatively deep in the earth formation for mud, top exists relatively The situation of thick soil stratum, runs through the way of whole mud according to conventional long casing, because casing length is oversize, except casing needs customization Outward, overlength casing also will bring and bury and extract difficulty underground, and affect the normal construction of rotary drilling rig.
Utility model content
This utility model provides a kind of casing for bore operation, it is intended to solves existing long shield-tube embedment and extracts difficulty Problem.
A kind of casing for bore operation, including: for imbedding the outer casing of upper end, hole, and it is used for imbedding bottom, hole Interior casing, the internal diameter of described outer casing is more than the external diameter of described interior casing.
The described casing for bore operation, wherein, described interior casing top is by flexible piece and described outer casing top End is connected.
The described casing for bore operation, wherein, edge, described interior casing upper end is provided with for connecting described flexibility The locking mechanism of part.
The described casing for bore operation, wherein, described locking mechanism is snap close.
The described casing for bore operation, wherein, described flexible piece is steel wire rope or chain.
The described casing for bore operation, wherein, described flexible piece one end is fixed on described interior casing top, separately One end is fixed on the top of described outer casing, and described outer casing top is provided with the fixing device for fixing described flexible piece.
The described casing for bore operation, wherein, soft for connect between described outer casing and described interior casing Property its length of part less than described outer casing length.
The described casing for bore operation, wherein, soft for connect between described outer casing and described interior casing Property its length of part less than described outer casing length, and the two at least differs 1m.
The described casing for bore operation, wherein, described outer casing internal diameter at least differs with described interior casing external diameter 50cm。
The casing for bore operation given by this utility model, by burying outer casing, bottom underground in upper end, hole Bury interior casing underground, the cohesive strength of casing can be decomposed on two casings by soil layer, facilitate shield-tube embedment and extract, reduce construction Difficulty.
Accompanying drawing explanation
Fig. 1 is the structural representation of this utility model embodiment one;
Fig. 2 is the structural representation of this utility model embodiment two.
Detailed description of the invention
Combine accompanying drawing below by detailed description of the invention the application is described in further detail.
Embodiment one:
The casing for bore operation given by the present embodiment, as it is shown in figure 1, include for being embedded in outside upper end, hole Casing 1, and for being embedded in the interior casing 2 of bottom, hole.Wherein, the internal diameter of outer casing 1 is more than the external diameter of interior casing 2 so that Outer casing 1 is enclosed within the outside of interior casing 2.For guaranteeing that interior casing 2 passes through outer casing 1, outer casing 1 and interior casing can not be made again Excesssive gap between 2, in the present embodiment, the internal diameter of outer casing 1 is at least than the big 50cm of external diameter of interior casing 2.When boring machine drill After the pre-buried degree of depth of exit orifice, by outer casing 1 press-in hole, should ensure that casing center and pile center deviation must not be big in the process In 0.05m.Continue boring by drill bit again, after being drilled into the interior pre-buried degree of depth of casing 2, interior casing 2 is pressed in hole.Construct Bi Hou, it is ensured that outer casing 1 and interior casing 2 upper end above ground level 0.20~0.50m.
Casing given by the present embodiment is applicable to the hole depth operation less than interior casing 2 length, due to the upper end soil in hole Layer contacts with outer casing 1 surface, and bottom contacts with interior casing 2 surface so that soil layer decomposes two to the cohesive strength of casing On casing, thus reduce the frictional force between single casing and soil layer, it is simple to the embedment of casing with extract.
Embodiment two:
The present embodiment is to be improved on the basis of embodiment one, and the present embodiment is mainly relatively big in drilling depth, single protects In the case of tube length degree cannot meet, interior casing 2 and outer casing 1 are coupled together use.Specifically, as in figure 2 it is shown, this enforcement In example, the top of interior casing 2 sets locking mechanism, and this locking mechanism is at least two snap close 21, the top of outer casing 1 be provided with The fixing device 11 of correspondence.Snap close 21 is used for being connected with outer casing 1 by interior casing 2 by flexible piece with fixing device 11 Come.Wherein, flexible piece 3 is the rope of bent curling, can be steel wire rope 3, it is, of course, also possible to be chain etc..
In the present embodiment, the method for embedding of outer casing 1 is same as in Example 1, and its difference is, buries interior casing 2 underground Time, first steel wire rope 3 one end is fixed on the snap close 21 of interior casing 2 upper end, is then pressed into interior casing 2, when interior casing 2 reaches Behind precalculated position, the other end of steel wire rope 3 is fixed in the fixing device 11 of outer casing 1.For guaranteeing safety, protect in should ensure that Cylinder 2 top end faces are higher than the mud in hole, and should exceed outer casing 2 more than bottom end face 1m, i.e. connect outer casing 1 top And the steel wire rope 3 between interior casing 2 top is smaller than the length of outer casing 1, and both length at least differ 1m.So, mud Both will not cover interior casing 2 to be flowed between interior casing 2 and outer casing 1, also will not protect in causing due to the ductility of steel wire rope 3 Cylinder 2 sinks down into outside the bottom of outer casing 1, it is ensured that interior casing 2 can be extracted after grouting smoothly.
The casing for bore operation given by this utility model, by burying outer casing, bottom underground in upper end, hole Bury interior casing underground, the cohesive strength of casing can be decomposed on two casings by soil layer, facilitate shield-tube embedment and extract, reduce construction Difficulty.
Above content is to combine the further description that the application is made by specific embodiment, it is impossible to assert this Shen Being embodied as please is confined to these explanations.For the application person of an ordinary skill in the technical field, do not taking off On the premise of the present application is conceived, it is also possible to make some simple deduction or replace.

Claims (9)

1. the casing for bore operation, it is characterised in that including: for imbedding the outer casing of upper end, hole, and be used for burying The interior casing of hand-hole bottom, the internal diameter of described outer casing is more than the external diameter of described interior casing.
2. the casing for bore operation as claimed in claim 1, it is characterised in that flexible piece is passed through on described interior casing top It is connected with described outer casing top.
3. the casing for bore operation as claimed in claim 2, it is characterised in that edge, described interior casing upper end is provided with use In the locking mechanism connecting described flexible piece.
4. the casing for bore operation as claimed in claim 3, it is characterised in that described locking mechanism is snap close.
5. the casing for bore operation as described in claim 2-4 is arbitrary, it is characterised in that described flexible piece is steel wire rope Or chain.
6. the casing for bore operation as claimed in claim 5, it is characterised in that described flexible piece one end is fixed on described Interior casing top, the other end is fixed on the top of described outer casing, and described outer casing top is provided with for fixing described flexible piece Fixing device.
7. the casing for bore operation as claimed in claim 6, it is characterised in that be used for connecting described outer casing with described Its length of flexible piece between interior casing is less than described outer casing length.
8. the casing for bore operation as claimed in claim 7, it is characterised in that be used for connecting described outer casing with described Its length of flexible piece between interior casing is less than described outer casing length, and the two at least differs 1m.
9. the casing for bore operation as claimed in claim 1, it is characterised in that described outer casing internal diameter is at least with described Interior casing external diameter difference 50cm.
CN201620561734.1U 2016-06-08 2016-06-08 A protect a section of thick bamboo for holing operation Expired - Fee Related CN205875147U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620561734.1U CN205875147U (en) 2016-06-08 2016-06-08 A protect a section of thick bamboo for holing operation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620561734.1U CN205875147U (en) 2016-06-08 2016-06-08 A protect a section of thick bamboo for holing operation

Publications (1)

Publication Number Publication Date
CN205875147U true CN205875147U (en) 2017-01-11

Family

ID=57690458

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620561734.1U Expired - Fee Related CN205875147U (en) 2016-06-08 2016-06-08 A protect a section of thick bamboo for holing operation

Country Status (1)

Country Link
CN (1) CN205875147U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107646223A (en) * 2017-09-28 2018-02-02 新疆农业科学院土壤肥料与农业节水研究所(新疆维吾尔自治区新型肥料研究中心) A kind of original soil modification method and its device suitable for heavy salinized ground
CN110306547A (en) * 2019-08-06 2019-10-08 中交路桥华南工程有限公司 The anchoring process and anchor structure of steel pile casting

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107646223A (en) * 2017-09-28 2018-02-02 新疆农业科学院土壤肥料与农业节水研究所(新疆维吾尔自治区新型肥料研究中心) A kind of original soil modification method and its device suitable for heavy salinized ground
CN110306547A (en) * 2019-08-06 2019-10-08 中交路桥华南工程有限公司 The anchoring process and anchor structure of steel pile casting

Similar Documents

Publication Publication Date Title
CN104631438B (en) Long auger guncreting uplift pile construction method
CN103643918B (en) A kind of searching for Ordovician limestone mining area and the method preventing mine from seeping water
CN104612143B (en) Composite pile constructed in drilled hole structure under a kind of solution cavity/soil cave geological conditions
RU2439274C1 (en) Well construction method
CN106245626A (en) A kind of hard formation churning driven enters method
CN108331573A (en) The abandoned well administering method of bank
CN108756809B (en) Hole sealing method for shield tunnel geological exploration drilling
CN104790408A (en) Irregular foundation pit construction method
CN205875147U (en) A protect a section of thick bamboo for holing operation
CN106677166A (en) Flow construction method for forming cast-in-place bored pile for gravel-decomposed rock stratum in double-machine combined mode
Lande et al. Effects of drilling for tieback anchors on surrounding ground: Results from field tests
KR101191289B1 (en) The method of a dual helical pile according to the subsidence for decreasing negative friction
JP2009174178A (en) Method of constructing underground structure
CN104762970B (en) A kind of deep hole Karst grouting auxiliary pipe drawing device and construction method
CN203948028U (en) A kind of automatic expansion formula drill bit for rig
KR102076246B1 (en) Anchor hole boring method to emit the crushed slime and the injected water by forming the negative pressure on the slope of the cone-shaped bit
CN204825922U (en) Interlock stake envelope
CN205576957U (en) Stake end pilework
JP4252070B2 (en) Ground stabilization method
CN110206561A (en) Disease in Tunnel Base point processing method
CN212454359U (en) Coal mining ground slip casting structure
US3468131A (en) Retaining structures placed into the ground and their procedures of execution
JP2008223437A (en) Underground wall structure, construction method of underground wall structure, method for constructing well in underground wall structure and method of utilizing the well constructed according to the method
JP2008045352A (en) Landslide prevention construction method of valley-filling banking
CN210857242U (en) Side slope anti-skidding supporting construction

Legal Events

Date Code Title Description
GR01 Patent grant
CP02 Change in the address of a patent holder

Address after: 518000 Guangdong city of Shenzhen province Nanshan District Shenzhen Bay ecological science and Technology Park District Building 2 floor B block 9 room 9B03

Patentee after: Shenzhen Hongye Polytron Technologies Inc foundation soil

Address before: 518000 Nanshan District, Shenzhen, Shenzhen Bay science and technology ecological park, block B, building 9, floor 2, floor

Patentee before: Shenzhen Hongye Polytron Technologies Inc foundation soil

CP02 Change in the address of a patent holder
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170111

Termination date: 20200608

CF01 Termination of patent right due to non-payment of annual fee