CN204825922U - Interlock stake envelope - Google Patents

Interlock stake envelope Download PDF

Info

Publication number
CN204825922U
CN204825922U CN201520508936.5U CN201520508936U CN204825922U CN 204825922 U CN204825922 U CN 204825922U CN 201520508936 U CN201520508936 U CN 201520508936U CN 204825922 U CN204825922 U CN 204825922U
Authority
CN
China
Prior art keywords
stake
concrete
wall
preface
pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520508936.5U
Other languages
Chinese (zh)
Inventor
朱涛
孙焱州
朱苏民
储如花
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI HYDRAULIC ENGINEERING GROUP Co Ltd
Original Assignee
SHANGHAI HYDRAULIC ENGINEERING GROUP Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI HYDRAULIC ENGINEERING GROUP Co Ltd filed Critical SHANGHAI HYDRAULIC ENGINEERING GROUP Co Ltd
Priority to CN201520508936.5U priority Critical patent/CN204825922U/en
Application granted granted Critical
Publication of CN204825922U publication Critical patent/CN204825922U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses an interlock stake envelope, include: locate the concrete guide wall of bottom, be equipped with a plurality of perforation on this concrete guide wall, the qieyu respectively be equipped with in the perforation and hug closely the sleeve pipe of perforation outer wall, at each pour preface stake of plain concrete stake B and the stake of reinforced concrete A preface in the sleeve, the order is B1 -B2 -A1 -B3 -A2 -B4... Bn -1 -An -1 is according to this at each form preface stake of plain concrete stake B and the reinforced concrete A preface pilework that the interval set up in the sleeve. The utility model discloses an interlock stake envelope can reach effective location through increasing the concrete guide wall lead to set up in the wall and perforate and increase the sleeve pipe, can be in the work progress construction position of effectual regulation plain concrete stake B preface and the stake of reinforced concrete A preface, the effectual control of ability is simultaneously subsided and is shifted.

Description

A kind of interlocking pile space enclosing structure
Technical field
The utility model relates to a kind of interlocking pile space enclosing structure.
Background technology
Interlocking pile absorbs the plurality of advantages of domestic and international widely used foundation pit enclosure structure form, meet the relevant policies of current national in energy-conserving and environment-protective industry, in today of city Fast Construction development, old town transformation is constantly accelerated, new construction underground obstacle situation becomes increasingly complex, under the background of city land used growing tension, interlocking pile because of its reliable in quality, speed of application is fast, ground adaptability is strong, plane type of attachment is various, construction environmental protection, save the neat feature of cost, outward appearance, its range of application is increasingly extensive.
Because the support form of various foundation ditch is widely different, and the feature of pattern foundation pit supporting structure is that application life is short, belong to a kind of measure structure of engineering construction, therefore the control of cost is generally only paid attention to when designing, deep foundation pit support collapses in recent years, supporting and protection structure displacement causes greatly the cases such as surrounding buildings destruction to happen occasionally, between the campshed that drilling pouring occlusion pile refers to layout, adjacent studs is engaged mutually---and stake circumference is mutually embedding and the steel concrete " piling wall " that formed, and it is used as the deep foundation pit supporting structure of building.Diaphragm wall utilizes various trench machine, by the retaining wall effect of mud, digs out narrow and dark groove, and transfer reinforcing cage in underground, fluid concrete and form one antiseepage, gear soil and the continuous underground wall body of weight-bearing function.
Interlocking pile and diaphragm wall functional advantage are mainly manifested in: (1) reinforcement ratio is lower.Interlocking pile normally adopts reinforced concrete pile and the spaced apart arrangement mode of wet concrete concrete stake, greatly reduces the reinforcement ratio of supporting and protection structure.If this engineering interlocking pile reinforcement ratio is 63.7Kg/m3, and ground-connecting-wall reinforcement ratio is 79.4Kg/m3.
(2) impermeability is strong.Hole-drilling interlocking pile is sequential production, there is not the cold seam of construction and be mingled with earth between stake, and the weak link of the cold seam of construction of diaphragm wall framing joint antiseepage often, once brush wall does not put in place can leave infiltration hidden danger.
(3) flexible during construction, due to modified line of can transferring as required when interlocking pile is constructed, so some planes that are more suitable for constructing changeable foundation ditch and circular arc foundation ditch etc.This engineering is sufficient proof this advantage of interlocking pile also, and because there are 5 protruding parts, place in foundation ditch east side, if use ground-connecting-wall supporting, can increase supporting area, cost increases.
(4) to enter rock efficiency higher for Spiral digging machine, especially constructs in strong-weathered rock and middle weathering lithosphere.In this engineering construction, after Spiral digging machine draws hole, ground-connecting-wall efficiency of construction improves greatly.
(5) slip consistency requires to require slightly lower than ground-connecting-wall, and according to circular characteristic own, self overarches, and has certain effect to preventing landslide.
Interlocking pile should be noted following problem in work progress:
(1) the part construction technology of ground-connecting-wall can being used for reference during construction, as led wall before construction, can effective location be reached.
(2) the front rig of controlling in time of construction is in this stratum work efficiency, lays rig position, rationally arranges the duration, ensure to construct in time both sides reinforced concrete pile after wet concrete forming pile.This is to ensureing that a key of pile body verticality and the rear stagnant water effect of later stage excavation is because of wet concrete.
(3) strict control pile body verticality, and ensure the occlusion size between adjacent studs.Being that shortening is as far as possible empty according to this engineering experience bores portion size, and utilizes rig to rectify a deviation in time in construction.Ensure that pile body is all engaged intact.
(4) once have wet concrete stake inside reinforced concrete pile, be engaged less, do not allow to cut part in steel girder erection process and mould stake, cause this place to mould stake and become " broken pile " phenomenon, bearing capacity reduction.
Utility model content
Because prior art also exists the problems referred to above, the utility model proposes a kind of interlocking pile space enclosing structure, it effectively can solve problems of the prior art.
The utility model solves the problem by the following technical programs:
A kind of interlocking pile space enclosing structure, comprising: the concrete guide wall being located at bottom, is provided with some perforation in this concrete guide wall, and is provided with the sleeve pipe being close to described perforation outer wall in each described perforation; In each described sleeve, build plain concrete pile B sequence stake and the stake of steel concrete A sequence, order is B1-B2-A1-B3-A2-B4 ... Bn-1-An-1, forms spaced plain concrete pile B sequence stake and steel concrete A sequence pilework according to this in each described sleeve.
Described outside of sleeve wall is provided with the spiral lamination that can connect second sleeve pipe.
The bottom of (n+1)th described plain concrete pile B sequence stake is passed through together with concrete coagulation with the bottom of the n-th steel concrete A sequence stake.
Interlocking pile space enclosing structure of the present utility model can reach effective location by increasing concrete guide wall, described lead to arrange within the walls bore a hole and increase sleeve pipe, the construction location of plain concrete pile B sequence and the stake of steel concrete A sequence effectively can be regulated in work progress, simultaneously can effective control settlement and displacement.
Accompanying drawing explanation
Fig. 1 is the structural representation of an embodiment of the present utility model.
Detailed description of the invention
Below in conjunction with detailed description of the invention, describe the utility model in detail.
Shown in Figure 1, the interlocking pile space enclosing structure of the present embodiment, comprising: the concrete guide wall 1 being located at bottom, is provided with some perforation 11 in this concrete guide wall, and in each described perforation, be provided with the sleeve pipe 2 being close to described perforation outer wall; In each described sleeve 2, build plain concrete pile B sequence stake and the stake of steel concrete A sequence, order is B1-B2-A1-B3-A2-B4 ... Bn-An-1, forms spaced plain concrete pile B sequence stake and steel concrete A sequence pilework according to this in each described sleeve.
Wherein, described outside of sleeve wall is provided with the length that the spiral lamination that can connect second sleeve pipe is convenient to adjust according to physical features situation sleeve pipe.
Pass through, together with concrete coagulation, can gain in strength in the bottom of (n+1)th described plain concrete pile B sequence stake and the bottom of the n-th steel concrete A sequence stake.
Should be understood that these embodiments are only not used in restriction scope of the present utility model for illustration of the utility model.In addition should be understood that those skilled in the art can make various changes or modifications the utility model, and these equivalent form of values fall within the application's appended claims limited range equally after the content of having read the utility model instruction.

Claims (3)

1. an interlocking pile space enclosing structure, is characterized in that, comprising:
Be located at the concrete guide wall of bottom, be provided with some perforation in this concrete guide wall, and be provided with the sleeve pipe being close to described perforation outer wall in each described perforation;
In each described sleeve, build plain concrete pile B sequence stake and the stake of steel concrete A sequence, order is B1-B2-A1-B3-A2-B4 ... Bn-1-An-1, forms spaced plain concrete pile B sequence stake and steel concrete A sequence pilework according to this in each described sleeve.
2. interlocking pile space enclosing structure according to claim 1, is characterized in that, described outside of sleeve wall is provided with the spiral lamination that can connect second sleeve pipe.
3. interlocking pile space enclosing structure according to claim 1, is characterized in that: the bottom of (n+1)th described plain concrete pile B sequence stake is passed through together with concrete coagulation with the bottom of the n-th steel concrete A sequence stake.
CN201520508936.5U 2015-07-14 2015-07-14 Interlock stake envelope Active CN204825922U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520508936.5U CN204825922U (en) 2015-07-14 2015-07-14 Interlock stake envelope

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520508936.5U CN204825922U (en) 2015-07-14 2015-07-14 Interlock stake envelope

Publications (1)

Publication Number Publication Date
CN204825922U true CN204825922U (en) 2015-12-02

Family

ID=54683538

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520508936.5U Active CN204825922U (en) 2015-07-14 2015-07-14 Interlock stake envelope

Country Status (1)

Country Link
CN (1) CN204825922U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107142952A (en) * 2017-06-19 2017-09-08 中国市政工程中南设计研究总院有限公司 Construction method of interlocking pile and the occlusion pipe applied to this method
CN107165447A (en) * 2017-04-24 2017-09-15 北京四季快安科技有限公司 The method of construction in underground cylinder garage
CN107989032A (en) * 2017-11-28 2018-05-04 深圳市工勘岩土技术有限公司 A kind of construction method of punching interlocking pile

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107165447A (en) * 2017-04-24 2017-09-15 北京四季快安科技有限公司 The method of construction in underground cylinder garage
CN107142952A (en) * 2017-06-19 2017-09-08 中国市政工程中南设计研究总院有限公司 Construction method of interlocking pile and the occlusion pipe applied to this method
CN107989032A (en) * 2017-11-28 2018-05-04 深圳市工勘岩土技术有限公司 A kind of construction method of punching interlocking pile

Similar Documents

Publication Publication Date Title
CN102286984A (en) Water-stop curtain and construction method thereof
CN104929136A (en) Urban complex underground obstacle working condition occlusive pile enclosure construction method
CN203213124U (en) Steel sheet pile and cement-mixed pile combined support
CN108532586A (en) A kind of construction method of garage parking diaphram wall
CN110438988A (en) A kind of prefabricated bulkhead and pore digging method
CN103114609A (en) Connection device of new and old underground diaphragm walls and construction method
CN204825922U (en) Interlock stake envelope
CN202194149U (en) Water-proof curtain
CN109944600A (en) Shield receiving end reinforced construction method
CN103485347A (en) Batter pile used for building foundation pit support and construction method thereof
CN204185845U (en) A kind of water-proof pile board wall supporting and protection structure
JP4712456B2 (en) Foundation reinforcement method
CN204311456U (en) Foundation ditch strengthening structure
CN102220764A (en) Deep foundation pit bracing system and construction method thereof
CN211008655U (en) Underpass subway supporting structure
CN105804090B (en) A kind of indoor piling wall supporting construction and its construction method
CN102268877A (en) Construction method for great-depth or large-diameter mechanical expanding caisson pile
CN203334288U (en) Novel vertical foundation pit space enclosing structure
CN201473955U (en) Manual hole pile digging device in shifting sand layers
CN206635766U (en) A kind of length interleaved formula Soil-cement piling wall construction equipment
CN114960715A (en) Underground engineering surge treatment device and control method
CN104652420A (en) Sinking pipe soil withdrawing and cast-in-place rectangular supporting pile diaphragm wall and construction method thereof
JP2008223437A (en) Underground wall structure, construction method of underground wall structure, method for constructing well in underground wall structure and method of utilizing the well constructed according to the method
CN210857242U (en) Side slope anti-skidding supporting construction
CN106223345A (en) A kind of length interleaved formula Soil-cement piling wall construction equipment and construction method

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant