CN205875139U CN201520793991.3U CN201520793991U CN205875139U CN 205875139 U CN205875139 U CN 205875139U CN 201520793991 U CN201520793991 U CN 201520793991U CN 205875139 U CN205875139 U CN 205875139U
Authority
CN
China
Prior art keywords
conduit
ring
joint
external diameter
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201520793991.3U
Other languages
Chinese (zh)
Inventor
禄苗苗
肖剑
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHINA METALLURGICAL (BEIJING) TRAFFIC TECHNOLOGY DEVELOPMENT Co Ltd
Mcc Communication Construction Group Co Ltd
Original Assignee
CHINA METALLURGICAL (BEIJING) TRAFFIC TECHNOLOGY DEVELOPMENT Co Ltd
Mcc Communication Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHINA METALLURGICAL (BEIJING) TRAFFIC TECHNOLOGY DEVELOPMENT Co Ltd, Mcc Communication Construction Group Co Ltd filed Critical CHINA METALLURGICAL (BEIJING) TRAFFIC TECHNOLOGY DEVELOPMENT Co Ltd
Priority to CN201520793991.3U priority Critical patent/CN205875139U/en
Application granted granted Critical
Publication of CN205875139U publication Critical patent/CN205875139U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model provides a bored concrete pile construction equipment, wherein, bored concrete pile construction equipment cup joints formation by the multisection pipe, and the pipe is rigidity hollow tube columnar structure, N festival pipe upper end is inboard has with N festival pipe connection's upper antiextrusion ring, and this upper antiextrusion ring's internal diameter is lighter than N and leads the bore of pipe festival, this upper antiextrusion ring's internal diameter with cup joint the N in N festival pipe 1 the festival external diameter of pipe is the same, the N festival pipe lower extreme outside has the lower check ring with N festival pipe connection, and this lower check ring's external diameter is greater than the external diameter of N festival pipe, this lower check ring's external diameter with cup joint N+1 outside N festival pipe and save that to lead the bore of pipe the same, the external diameter of N+1 festival pipe is greater than the external diameter of N festival pipe, is the upper antiextrusion ring casing pressure of N festival pipe at N 1 the lower check ring's of festival pipe upper portion, wherein, N is for being greater than 1 natural number. Through the utility model discloses, solve the drilling bored concrete pile and easily taken place broken pile at the deposit concrete in -process, remedied scheduling problem with high costs.

Description

Filling pile construction device
Technical field
This utility model relates to pile foundation engineering field, specifically, relating to a kind of filling pile construction device.
Background technology
At present, along with expanding economy, urban architecture is more and more higher, and highway bridge is repaiied more remote and more remote, foundation engineering Ask more and more higher.Cast-in-situ bored pile is widely used in building, building and traffic engineering, serves weight in pile foundation engineering The effect wanted.Bored pile construction includes boring, clear hole, lays steel reinforcement cage, cast concrete.But the brill in correlation technique Easily there is broken pile in hole pouring pile in cast Concrete, and after broken pile, remedial measure cost is high, stake of even giving up.General The reason of raw broken pile includes:
1, conduit pipe laying depth is made mistakes, and departs from concrete surface when conduit is extracted, and forms folder mud layer;
2, conduit blocks cause strength tube drawing, makes mud be mixed in concrete;
3, catheter adapter produces seepage, and mud enters;
4, concrete supply interrupts, it is impossible to pours into a mould continuously, causes plugging.The stake end, can inevitably produce sediment, makes stake The bearing capacity of end reduces.
Remedy after easily there is broken pile, and broken pile for the cast-in-situ bored pile in correlation technique in cast Concrete and arrange Execute cost high, the problems such as stake of even giving up, effective solution is not also proposed.
Utility model content
This utility model provides a kind of filling pile construction device, is watering at least solving cast-in-situ bored pile in correlation technique The problem that broken pile easily occurs in note Concrete.
According to an aspect of the present utility model, it is provided that a kind of filling pile construction device, it is socketed including by more piece conduit Conduit string together, wherein, described conduit is the hollow pipe column structure of rigidity;N joint has upper gear inside conduit upper end Circle, wherein, described upper back-up ring is connected with described N joint conduit, and the internal diameter of described upper back-up ring is less than described N joint conduit Internal diameter, the internal diameter of described upper back-up ring is identical with the external diameter of the N-1 joint conduit being socketed in described N joint conduit;Described N saves Conduit lower end outside has lower back-up ring, and wherein, described lower back-up ring is connected with described N joint conduit, and outside described lower back-up ring Footpath is led more than the external diameter of described N joint conduit, the external diameter of described lower back-up ring and the N+1 joint being socketed in outside described N joint conduit The internal diameter of pipe is identical;The external diameter of described N+1 joint conduit is more than the external diameter of described N joint conduit, the upper gear of described N joint conduit Circle and the lower back-up ring snapping of described N-1 joint conduit, the upper shield ring sleeve of described N joint conduit is pressed in described N-1 joint conduit The top of lower back-up ring;Wherein, N is the natural number more than 1.
Alternatively, the position of the upper back-up ring of M joint conduit and the lower back-up ring snapping of M-1 joint conduit is provided with packing ring, its In, M is the natural number less than or equal to N.
Alternatively, the outer circumference surface of the lower back-up ring often saving conduit in described conduit string having groove, described groove is used In installing described packing ring.
Alternatively, after forming conduit string, connect multiple inside the lower back-up ring of next the joint conduit in described conduit string Prominent block, described block is prominent to the inner side of described next joint conduit, and the axle center of described conduit string is to described block The distance of the end of ledge is less than the external diameter of the lower back-up ring going up most a joint conduit.
Alternatively, outside the upper back-up ring of next the joint conduit in described conduit string, uniformly it is fixed with multiple suspension member, Described suspension member be used for suspending in midair described in next joint conduit.
By this utility model, use filling pile construction device, including the conduit string being connected together by more piece sheathed catheter, its In, conduit is the hollow pipe column structure of rigidity;N joint has upper back-up ring inside conduit upper end, wherein, and back-up ring and N on this Saving conduit to connect, and on this, internal diameter of back-up ring is less than the internal diameter of N joint conduit, on this, the internal diameter of back-up ring saves with being socketed on N The external diameter of the N-1 joint conduit in conduit is identical;N joint conduit lower end outside has lower back-up ring, wherein, and this lower back-up ring and N Saving conduit to connect, and the external diameter of this lower back-up ring is more than the external diameter of N joint conduit, the external diameter of this lower back-up ring saves with being socketed in N The internal diameter of the N+1 joint conduit outside conduit is identical;The external diameter of N+1 joint conduit is more than the external diameter of N joint conduit, and N saves conduit Upper back-up ring and N-1 joint conduit lower back-up ring snapping, N joint conduit upper shield ring sleeve be pressed in N-1 joint conduit lower back-up ring Top;Wherein, N is the natural number more than 1.Conduit can be shortened and extract the time, make concrete reach continuously and pour into a mould, can be effective Reducing broken pile to occur, easily there is broken pile, and broken pile in the cast-in-situ bored pile solved in correlation technique in cast Concrete Rear remedial measure cost is high, the problems such as stake of even giving up.
Accompanying drawing explanation
Being described embodiment by combining accompanying drawings below, features described above of the present utility model and technological merit will Become more fully apparent with easy to understand.
Fig. 1 is the profile of the filling pile construction device according to this utility model embodiment;
Fig. 2 is the schematic diagram of the filling pile construction device according to this utility model embodiment;
Fig. 3 is the profile of the filling pile construction device according to this utility model embodiment.
Detailed description of the invention
The embodiment of filling pile construction device described in the utility model is described below with reference to the accompanying drawings.This area general Lead to and one of skill will recognize that, in the case of without departing from spirit and scope of the present utility model, can be with various different Described embodiment is modified by mode or a combination thereof.Therefore, accompanying drawing and describe inherently the most illustrative rather than For limiting scope of the claims.Additionally, in this manual, accompanying drawing draws not in scale, and identical accompanying drawing Labelling represents identical part.
Provide a kind of filling pile construction device in the present embodiment, filling pile construction device as shown in Figure 1, including by The conduit string that more piece sheathed catheter is connected together;Wherein, conduit is the hollow pipe column structure of rigidity;Inside N joint conduit upper end Having upper back-up ring, wherein, on this, back-up ring 101 is connected with N joint conduit, and on this, internal diameter of back-up ring 101 saves conduit less than N Internal diameter, on this internal diameter of back-up ring 101 be socketed on N joint conduit in N-1 joint conduit external diameter identical;This N joint is led Pipe lower end outside has lower back-up ring 103, and wherein, this lower back-up ring 103 is connected with N joint conduit, and the external diameter of this lower back-up ring 103 The internal diameter phase of conduit is saved more than the external diameter of N joint conduit, the external diameter of this lower back-up ring 103 and the N+1 being socketed in outside N joint conduit With;The external diameter of N+1 joint conduit is more than the external diameter of N joint conduit, under upper the back-up ring 101 and N-1 joint conduit of N joint conduit Back-up ring 103 snapping, upper back-up ring 101 set of N joint conduit is pressed in the top of the lower back-up ring 103 of N-1 joint conduit;Wherein, N is big In the natural number of 1.
By above-mentioned filling pile construction device, use rigid conduit, it is possible to reduce tubing string radial-play in construction and Bending.Use N joint conduit upper back-up ring 101 and N-1 joint conduit lower back-up ring 103 snapping form by N joint conduit and N-1 joint conduit socket, is connected into conduit string by more piece sheathed catheter successively, can either reduce the connection conduit time, can shorten again The time extracted by conduit, enables concrete to pour into a mould continuously, and then effectively reduces pile breaking phenomenon.
In one alternate embodiment, the upper back-up ring 101 and M-1 of M joint conduit saves lower back-up ring 103 snapping of conduit Position is provided with sealing packing ring 102, and wherein, M is the natural number less than or equal to N.Mud can be stoped to enter in conduit, It is also possible to prevent concrete and oozes out conduit.
In one alternate embodiment, the outer circumference surface of the lower back-up ring 103 often saving conduit in conduit string has groove, Groove is used for mounting gasket 102, prevents packing ring 102 play.
In one alternate embodiment, after forming conduit string, the lower back-up ring 103 of next the joint conduit in this conduit string Inner side connects multiple prominent blocks, and this block is prominent to the inner side of next joint conduit, and the axle center of conduit string is to this block The distance of the end of ledge is less than the external diameter of the lower back-up ring 103 going up most a joint conduit.Make to lead at lifting bottom N joint Guan Shi, when N joint conduit block touch N-1 joint conduit lower back-up ring after, N joint conduit drive N-1 joint conduit to Upper movement, thus, next joint conduit can utilize this block that each joint conduit is risen to the position in bored concrete pile aperture.
In one alternate embodiment, be uniformly fixed with outside the upper back-up ring 101 of next the joint conduit in conduit string many Individual suspension member, this suspension member is for suspention next joint conduit.Utilize this suspension member, can by next joint conduit upwards Lifting.
As in figure 2 it is shown, filling pile construction device includes the conduit string being socketed to form by more piece conduit 3.In this conduit string Often joint conduit 3 is suspended on operating platform 2 by suspension apparatus 1.
The profile of filling pile construction device as shown in Figure 3, this filling pile construction device has included 2~3 or many just Property conduit is formed by connecting, and number consecutively from top to bottom is mutually socketed between conduit.Have straight less than conduit inside each end of conduit The back-up ring in footpath, lateral tail has the back-up ring more than conduit diameter.The diameter of conduit becomes larger from top to bottom, above the tail of conduit Portion's back-up ring external diameter is consistent with following catheter diameter, above conduit diameter be consistent with following end of conduit back-up ring internal diameter.Conduit according to Diameter is descending to be socketed successively, above catheter tail and following end of conduit set due to the mutual buckle of back-up ring, card buckle There is back-up ring.After conduit socket, inside the lower back-up ring of next joint conduit, connect multiple block, the upper back-up ring of next joint conduit Outside is uniformly fixed with multiple link.
In sum, by filling pile construction device of the present utility model, it is achieved that techniques below effect:
1., relative to lifting, dismantle the complicated procedures of forming of conduit in the bored pile construction in correlation technique, this practicality is new Type need not conduit is promoted to ground every time and removes in whole casting process, it is possible to shortens conduit and extracts the time, makes to mix Solidifying soil reaches to pour into a mould continuously, can effectively reduce broken pile and occur.Solve the cast-in-situ bored pile in correlation technique at cast concrete During easily occur remedial measure cost after broken pile, and broken pile high, the problems such as stake of even giving up.
Conduit non-threaded the most of the present utility model connects, and coupling part is hardly damaged, and can change sealing ring as required.
Guide-tube structure the most of the present utility model is simple, installs, dismantles and constructs and be the most quick.
The foregoing is only preferred embodiment of the present utility model, be not limited to this utility model, for this area Technical staff for, this utility model can have various modifications and variations.It is all within spirit of the present utility model and principle, Any modification, equivalent substitution and improvement etc. made, within should be included in protection domain of the present utility model.

Claims (5)

1. a filling pile construction device, it is characterised in that include the conduit string being connected together by more piece sheathed catheter,
Wherein, described conduit is the hollow pipe column structure of rigidity;
N joint has upper back-up ring inside conduit upper end, and wherein, described upper back-up ring and described N save conduit and be connected, and described on The internal diameter of back-up ring less than the internal diameter of described N joint conduit, the internal diameter of described upper back-up ring and be socketed in described N joint conduit the The external diameter of N-1 joint conduit is identical;
Described N joint conduit lower end outside has lower back-up ring, and wherein, described lower back-up ring is connected with described N joint conduit, and institute Stating the external diameter external diameter more than described N joint conduit of lower back-up ring, the external diameter of described lower back-up ring saves outside conduit with being socketed in described N N+1 joint conduit internal diameter identical;
The external diameter of described N+1 joint conduit more than the external diameter of described N joint conduit, the described N joint upper back-up ring of conduit and described The lower back-up ring snapping of N-1 joint conduit, the upper shield ring sleeve of described N joint conduit is pressed in the lower back-up ring of described N-1 joint conduit Top;
Wherein, N is the natural number more than 1.
Filling pile construction device the most according to claim 1, it is characterised in that the upper back-up ring of M joint conduit and M-1 joint The position of the lower back-up ring snapping of conduit is provided with packing ring, and wherein, M is the natural number less than or equal to N.
Filling pile construction device the most according to claim 2, it is characterised in that under the often joint conduit in described conduit string Having groove on the outer circumference surface of back-up ring, described groove is used for installing described packing ring.
Filling pile construction device the most according to claim 1, it is characterised in that after forming conduit string, at described conduit string In next joint conduit lower back-up ring inside connect multiple prominent block, described block is in described next joint conduit Side highlights, and the distance in the axle center of described conduit string to the end of the ledge of described block is less than the lower block going up most a joint conduit The external diameter of circle.
Filling pile construction device the most according to claim 4, outside the upper back-up ring of next the joint conduit in described conduit string Side is uniformly fixed with multiple suspension member, described suspension member be used for suspending in midair described in next joint conduit.
CN201520793991.3U 2015-10-14 2015-10-14 Bored concrete pile construction equipment Withdrawn - After Issue CN205875139U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520793991.3U CN205875139U (en) 2015-10-14 2015-10-14 Bored concrete pile construction equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520793991.3U CN205875139U (en) 2015-10-14 2015-10-14 Bored concrete pile construction equipment

Publications (1)

Publication Number Publication Date
CN205875139U true CN205875139U (en) 2017-01-11

Family

ID=57686571

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520793991.3U Withdrawn - After Issue CN205875139U (en) 2015-10-14 2015-10-14 Bored concrete pile construction equipment

Country Status (1)

Country Link
CN (1) CN205875139U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105369801A (en) * 2015-10-14 2016-03-02 中冶交通建设集团有限公司 Cast-in-place pile construction device and method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105369801A (en) * 2015-10-14 2016-03-02 中冶交通建设集团有限公司 Cast-in-place pile construction device and method

Similar Documents

Publication Publication Date Title
CN102155016A (en) Drainage anchor rod, side slope protection engineering repairing and reinforcing structure and construction method
CN107130633A (en) A kind of steel tube concrete clay model bag stake is combined soil-baffling structure construction technology
CN104099946B (en) Inspection-pit between a kind of Novel top pipeline section
CN104563147B (en) Composite structure pile foundation applied to karst area and construction method of composite structure pile foundation
CN205875139U (en) Bored concrete pile construction equipment
CN103911993B (en) A kind of PHA anchor pole and construction method thereof
CN104278635B (en) The forward method of earth anchored suspension bridge cat road track cable
CN106088483A (en) A kind of grout sleeve and using method
CN104180077B (en) Pipeline runs through concrete floor waterproof construction
CN204327112U (en) Tunnel hole-exiting advance support system
CN103321214A (en) Cast-in-place pile later slip casting construction method
CN203188132U (en) Segmental precasting assembly structure of large bent cap cantilever
CN104452751A (en) Secondary pouring pile forming device and method for bored pile
CN208136954U (en) Precast splice type Pipe rack
CN204083520U (en) Pipeline runs through concrete floor waterproof construction
CN103882994B (en) Ring beam steel bar connecting structure and ring beam construction method
CN103437345A (en) Method for construction of diameter-expanding pile on pile top
CN109208586A (en) A kind of slope protection pile construction method
CN105369801B (en) Filling pile construction device and method
CN204326072U (en) A kind of anti-float anchor rod node
CN204080861U (en) Inspection-pit between a kind of Novel top pipeline section
CN104153461A (en) Precast concrete structural member and method for building construction longitudinal connection between structural members
CN103306277B (en) A kind of construction method utilizing rigid pile to embed Low Intensity Concrete Piles making compound water stop curtain
CN203961809U (en) Super large caliber Drilling Water mud collar structure
CN104895053A (en) Construction method of sectional type cavity grouting pile

Legal Events

Date Code Title Description
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20170111

Effective date of abandoning: 20170926

AV01 Patent right actively abandoned

Granted publication date: 20170111

Effective date of abandoning: 20170926

AV01 Patent right actively abandoned