CN205875139U - Bored concrete pile construction equipment - Google Patents
Bored concrete pile construction equipment Download PDFInfo
- Publication number
- CN205875139U CN205875139U CN201520793991.3U CN201520793991U CN205875139U CN 205875139 U CN205875139 U CN 205875139U CN 201520793991 U CN201520793991 U CN 201520793991U CN 205875139 U CN205875139 U CN 205875139U
- Authority
- CN
- China
- Prior art keywords
- conduit
- ring
- joint
- external diameter
- pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn - After Issue
Links
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
The utility model provides a bored concrete pile construction equipment, wherein, bored concrete pile construction equipment cup joints formation by the multisection pipe, and the pipe is rigidity hollow tube columnar structure, N festival pipe upper end is inboard has with N festival pipe connection's upper antiextrusion ring, and this upper antiextrusion ring's internal diameter is lighter than N and leads the bore of pipe festival, this upper antiextrusion ring's internal diameter with cup joint the N in N festival pipe 1 the festival external diameter of pipe is the same, the N festival pipe lower extreme outside has the lower check ring with N festival pipe connection, and this lower check ring's external diameter is greater than the external diameter of N festival pipe, this lower check ring's external diameter with cup joint N+1 outside N festival pipe and save that to lead the bore of pipe the same, the external diameter of N+1 festival pipe is greater than the external diameter of N festival pipe, is the upper antiextrusion ring casing pressure of N festival pipe at N 1 the lower check ring's of festival pipe upper portion, wherein, N is for being greater than 1 natural number. Through the utility model discloses, solve the drilling bored concrete pile and easily taken place broken pile at the deposit concrete in -process, remedied scheduling problem with high costs.
Description
Technical field
This utility model relates to pile foundation engineering field, specifically, relating to a kind of filling pile construction device.
Background technology
At present, along with expanding economy, urban architecture is more and more higher, and highway bridge is repaiied more remote and more remote, foundation engineering
Ask more and more higher.Cast-in-situ bored pile is widely used in building, building and traffic engineering, serves weight in pile foundation engineering
The effect wanted.Bored pile construction includes boring, clear hole, lays steel reinforcement cage, cast concrete.But the brill in correlation technique
Easily there is broken pile in hole pouring pile in cast Concrete, and after broken pile, remedial measure cost is high, stake of even giving up.General
The reason of raw broken pile includes:
1, conduit pipe laying depth is made mistakes, and departs from concrete surface when conduit is extracted, and forms folder mud layer;
2, conduit blocks cause strength tube drawing, makes mud be mixed in concrete;
3, catheter adapter produces seepage, and mud enters;
4, concrete supply interrupts, it is impossible to pours into a mould continuously, causes plugging.The stake end, can inevitably produce sediment, makes stake
The bearing capacity of end reduces.
Remedy after easily there is broken pile, and broken pile for the cast-in-situ bored pile in correlation technique in cast Concrete and arrange
Execute cost high, the problems such as stake of even giving up, effective solution is not also proposed.
Utility model content
This utility model provides a kind of filling pile construction device, is watering at least solving cast-in-situ bored pile in correlation technique
The problem that broken pile easily occurs in note Concrete.
According to an aspect of the present utility model, it is provided that a kind of filling pile construction device, it is socketed including by more piece conduit
Conduit string together, wherein, described conduit is the hollow pipe column structure of rigidity;N joint has upper gear inside conduit upper end
Circle, wherein, described upper back-up ring is connected with described N joint conduit, and the internal diameter of described upper back-up ring is less than described N joint conduit
Internal diameter, the internal diameter of described upper back-up ring is identical with the external diameter of the N-1 joint conduit being socketed in described N joint conduit;Described N saves
Conduit lower end outside has lower back-up ring, and wherein, described lower back-up ring is connected with described N joint conduit, and outside described lower back-up ring
Footpath is led more than the external diameter of described N joint conduit, the external diameter of described lower back-up ring and the N+1 joint being socketed in outside described N joint conduit
The internal diameter of pipe is identical;The external diameter of described N+1 joint conduit is more than the external diameter of described N joint conduit, the upper gear of described N joint conduit
Circle and the lower back-up ring snapping of described N-1 joint conduit, the upper shield ring sleeve of described N joint conduit is pressed in described N-1 joint conduit
The top of lower back-up ring;Wherein, N is the natural number more than 1.
Alternatively, the position of the upper back-up ring of M joint conduit and the lower back-up ring snapping of M-1 joint conduit is provided with packing ring, its
In, M is the natural number less than or equal to N.
Alternatively, the outer circumference surface of the lower back-up ring often saving conduit in described conduit string having groove, described groove is used
In installing described packing ring.
Alternatively, after forming conduit string, connect multiple inside the lower back-up ring of next the joint conduit in described conduit string
Prominent block, described block is prominent to the inner side of described next joint conduit, and the axle center of described conduit string is to described block
The distance of the end of ledge is less than the external diameter of the lower back-up ring going up most a joint conduit.
Alternatively, outside the upper back-up ring of next the joint conduit in described conduit string, uniformly it is fixed with multiple suspension member,
Described suspension member be used for suspending in midair described in next joint conduit.
By this utility model, use filling pile construction device, including the conduit string being connected together by more piece sheathed catheter, its
In, conduit is the hollow pipe column structure of rigidity;N joint has upper back-up ring inside conduit upper end, wherein, and back-up ring and N on this
Saving conduit to connect, and on this, internal diameter of back-up ring is less than the internal diameter of N joint conduit, on this, the internal diameter of back-up ring saves with being socketed on N
The external diameter of the N-1 joint conduit in conduit is identical;N joint conduit lower end outside has lower back-up ring, wherein, and this lower back-up ring and N
Saving conduit to connect, and the external diameter of this lower back-up ring is more than the external diameter of N joint conduit, the external diameter of this lower back-up ring saves with being socketed in N
The internal diameter of the N+1 joint conduit outside conduit is identical;The external diameter of N+1 joint conduit is more than the external diameter of N joint conduit, and N saves conduit
Upper back-up ring and N-1 joint conduit lower back-up ring snapping, N joint conduit upper shield ring sleeve be pressed in N-1 joint conduit lower back-up ring
Top;Wherein, N is the natural number more than 1.Conduit can be shortened and extract the time, make concrete reach continuously and pour into a mould, can be effective
Reducing broken pile to occur, easily there is broken pile, and broken pile in the cast-in-situ bored pile solved in correlation technique in cast Concrete
Rear remedial measure cost is high, the problems such as stake of even giving up.
Accompanying drawing explanation
Being described embodiment by combining accompanying drawings below, features described above of the present utility model and technological merit will
Become more fully apparent with easy to understand.
Fig. 1 is the profile of the filling pile construction device according to this utility model embodiment;
Fig. 2 is the schematic diagram of the filling pile construction device according to this utility model embodiment;
Fig. 3 is the profile of the filling pile construction device according to this utility model embodiment.
Detailed description of the invention
The embodiment of filling pile construction device described in the utility model is described below with reference to the accompanying drawings.This area general
Lead to and one of skill will recognize that, in the case of without departing from spirit and scope of the present utility model, can be with various different
Described embodiment is modified by mode or a combination thereof.Therefore, accompanying drawing and describe inherently the most illustrative rather than
For limiting scope of the claims.Additionally, in this manual, accompanying drawing draws not in scale, and identical accompanying drawing
Labelling represents identical part.
Provide a kind of filling pile construction device in the present embodiment, filling pile construction device as shown in Figure 1, including by
The conduit string that more piece sheathed catheter is connected together;Wherein, conduit is the hollow pipe column structure of rigidity;Inside N joint conduit upper end
Having upper back-up ring, wherein, on this, back-up ring 101 is connected with N joint conduit, and on this, internal diameter of back-up ring 101 saves conduit less than N
Internal diameter, on this internal diameter of back-up ring 101 be socketed on N joint conduit in N-1 joint conduit external diameter identical;This N joint is led
Pipe lower end outside has lower back-up ring 103, and wherein, this lower back-up ring 103 is connected with N joint conduit, and the external diameter of this lower back-up ring 103
The internal diameter phase of conduit is saved more than the external diameter of N joint conduit, the external diameter of this lower back-up ring 103 and the N+1 being socketed in outside N joint conduit
With;The external diameter of N+1 joint conduit is more than the external diameter of N joint conduit, under upper the back-up ring 101 and N-1 joint conduit of N joint conduit
Back-up ring 103 snapping, upper back-up ring 101 set of N joint conduit is pressed in the top of the lower back-up ring 103 of N-1 joint conduit;Wherein, N is big
In the natural number of 1.
By above-mentioned filling pile construction device, use rigid conduit, it is possible to reduce tubing string radial-play in construction and
Bending.Use N joint conduit upper back-up ring 101 and N-1 joint conduit lower back-up ring 103 snapping form by N joint conduit and
N-1 joint conduit socket, is connected into conduit string by more piece sheathed catheter successively, can either reduce the connection conduit time, can shorten again
The time extracted by conduit, enables concrete to pour into a mould continuously, and then effectively reduces pile breaking phenomenon.
In one alternate embodiment, the upper back-up ring 101 and M-1 of M joint conduit saves lower back-up ring 103 snapping of conduit
Position is provided with sealing packing ring 102, and wherein, M is the natural number less than or equal to N.Mud can be stoped to enter in conduit,
It is also possible to prevent concrete and oozes out conduit.
In one alternate embodiment, the outer circumference surface of the lower back-up ring 103 often saving conduit in conduit string has groove,
Groove is used for mounting gasket 102, prevents packing ring 102 play.
In one alternate embodiment, after forming conduit string, the lower back-up ring 103 of next the joint conduit in this conduit string
Inner side connects multiple prominent blocks, and this block is prominent to the inner side of next joint conduit, and the axle center of conduit string is to this block
The distance of the end of ledge is less than the external diameter of the lower back-up ring 103 going up most a joint conduit.Make to lead at lifting bottom N joint
Guan Shi, when N joint conduit block touch N-1 joint conduit lower back-up ring after, N joint conduit drive N-1 joint conduit to
Upper movement, thus, next joint conduit can utilize this block that each joint conduit is risen to the position in bored concrete pile aperture.
In one alternate embodiment, be uniformly fixed with outside the upper back-up ring 101 of next the joint conduit in conduit string many
Individual suspension member, this suspension member is for suspention next joint conduit.Utilize this suspension member, can by next joint conduit upwards
Lifting.
As in figure 2 it is shown, filling pile construction device includes the conduit string being socketed to form by more piece conduit 3.In this conduit string
Often joint conduit 3 is suspended on operating platform 2 by suspension apparatus 1.
The profile of filling pile construction device as shown in Figure 3, this filling pile construction device has included 2~3 or many just
Property conduit is formed by connecting, and number consecutively from top to bottom is mutually socketed between conduit.Have straight less than conduit inside each end of conduit
The back-up ring in footpath, lateral tail has the back-up ring more than conduit diameter.The diameter of conduit becomes larger from top to bottom, above the tail of conduit
Portion's back-up ring external diameter is consistent with following catheter diameter, above conduit diameter be consistent with following end of conduit back-up ring internal diameter.Conduit according to
Diameter is descending to be socketed successively, above catheter tail and following end of conduit set due to the mutual buckle of back-up ring, card buckle
There is back-up ring.After conduit socket, inside the lower back-up ring of next joint conduit, connect multiple block, the upper back-up ring of next joint conduit
Outside is uniformly fixed with multiple link.
In sum, by filling pile construction device of the present utility model, it is achieved that techniques below effect:
1., relative to lifting, dismantle the complicated procedures of forming of conduit in the bored pile construction in correlation technique, this practicality is new
Type need not conduit is promoted to ground every time and removes in whole casting process, it is possible to shortens conduit and extracts the time, makes to mix
Solidifying soil reaches to pour into a mould continuously, can effectively reduce broken pile and occur.Solve the cast-in-situ bored pile in correlation technique at cast concrete
During easily occur remedial measure cost after broken pile, and broken pile high, the problems such as stake of even giving up.
Conduit non-threaded the most of the present utility model connects, and coupling part is hardly damaged, and can change sealing ring as required.
Guide-tube structure the most of the present utility model is simple, installs, dismantles and constructs and be the most quick.
The foregoing is only preferred embodiment of the present utility model, be not limited to this utility model, for this area
Technical staff for, this utility model can have various modifications and variations.It is all within spirit of the present utility model and principle,
Any modification, equivalent substitution and improvement etc. made, within should be included in protection domain of the present utility model.
Claims (5)
1. a filling pile construction device, it is characterised in that include the conduit string being connected together by more piece sheathed catheter,
Wherein, described conduit is the hollow pipe column structure of rigidity;
N joint has upper back-up ring inside conduit upper end, and wherein, described upper back-up ring and described N save conduit and be connected, and described on
The internal diameter of back-up ring less than the internal diameter of described N joint conduit, the internal diameter of described upper back-up ring and be socketed in described N joint conduit the
The external diameter of N-1 joint conduit is identical;
Described N joint conduit lower end outside has lower back-up ring, and wherein, described lower back-up ring is connected with described N joint conduit, and institute
Stating the external diameter external diameter more than described N joint conduit of lower back-up ring, the external diameter of described lower back-up ring saves outside conduit with being socketed in described N
N+1 joint conduit internal diameter identical;
The external diameter of described N+1 joint conduit more than the external diameter of described N joint conduit, the described N joint upper back-up ring of conduit and described
The lower back-up ring snapping of N-1 joint conduit, the upper shield ring sleeve of described N joint conduit is pressed in the lower back-up ring of described N-1 joint conduit
Top;
Wherein, N is the natural number more than 1.
Filling pile construction device the most according to claim 1, it is characterised in that the upper back-up ring of M joint conduit and M-1 joint
The position of the lower back-up ring snapping of conduit is provided with packing ring, and wherein, M is the natural number less than or equal to N.
Filling pile construction device the most according to claim 2, it is characterised in that under the often joint conduit in described conduit string
Having groove on the outer circumference surface of back-up ring, described groove is used for installing described packing ring.
Filling pile construction device the most according to claim 1, it is characterised in that after forming conduit string, at described conduit string
In next joint conduit lower back-up ring inside connect multiple prominent block, described block is in described next joint conduit
Side highlights, and the distance in the axle center of described conduit string to the end of the ledge of described block is less than the lower block going up most a joint conduit
The external diameter of circle.
Filling pile construction device the most according to claim 4, outside the upper back-up ring of next the joint conduit in described conduit string
Side is uniformly fixed with multiple suspension member, described suspension member be used for suspending in midair described in next joint conduit.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520793991.3U CN205875139U (en) | 2015-10-14 | 2015-10-14 | Bored concrete pile construction equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520793991.3U CN205875139U (en) | 2015-10-14 | 2015-10-14 | Bored concrete pile construction equipment |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205875139U true CN205875139U (en) | 2017-01-11 |
Family
ID=57686571
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520793991.3U Withdrawn - After Issue CN205875139U (en) | 2015-10-14 | 2015-10-14 | Bored concrete pile construction equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205875139U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105369801A (en) * | 2015-10-14 | 2016-03-02 | 中冶交通建设集团有限公司 | Cast-in-place pile construction device and method |
-
2015
- 2015-10-14 CN CN201520793991.3U patent/CN205875139U/en not_active Withdrawn - After Issue
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105369801A (en) * | 2015-10-14 | 2016-03-02 | 中冶交通建设集团有限公司 | Cast-in-place pile construction device and method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102155016A (en) | Drainage anchor rod, side slope protection engineering repairing and reinforcing structure and construction method | |
CN107130633A (en) | A kind of steel tube concrete clay model bag stake is combined soil-baffling structure construction technology | |
CN104099946B (en) | Inspection-pit between a kind of Novel top pipeline section | |
CN104563147B (en) | Composite structure pile foundation applied to karst area and construction method of composite structure pile foundation | |
CN205875139U (en) | Bored concrete pile construction equipment | |
CN103911993B (en) | A kind of PHA anchor pole and construction method thereof | |
CN104278635B (en) | The forward method of earth anchored suspension bridge cat road track cable | |
CN106088483A (en) | A kind of grout sleeve and using method | |
CN104180077B (en) | Pipeline runs through concrete floor waterproof construction | |
CN204327112U (en) | Tunnel hole-exiting advance support system | |
CN103321214A (en) | Cast-in-place pile later slip casting construction method | |
CN203188132U (en) | Segmental precasting assembly structure of large bent cap cantilever | |
CN104452751A (en) | Secondary pouring pile forming device and method for bored pile | |
CN208136954U (en) | Precast splice type Pipe rack | |
CN204083520U (en) | Pipeline runs through concrete floor waterproof construction | |
CN103882994B (en) | Ring beam steel bar connecting structure and ring beam construction method | |
CN103437345A (en) | Method for construction of diameter-expanding pile on pile top | |
CN109208586A (en) | A kind of slope protection pile construction method | |
CN105369801B (en) | Filling pile construction device and method | |
CN204326072U (en) | A kind of anti-float anchor rod node | |
CN204080861U (en) | Inspection-pit between a kind of Novel top pipeline section | |
CN104153461A (en) | Precast concrete structural member and method for building construction longitudinal connection between structural members | |
CN103306277B (en) | A kind of construction method utilizing rigid pile to embed Low Intensity Concrete Piles making compound water stop curtain | |
CN203961809U (en) | Super large caliber Drilling Water mud collar structure | |
CN104895053A (en) | Construction method of sectional type cavity grouting pile |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
AV01 | Patent right actively abandoned |
Granted publication date: 20170111 Effective date of abandoning: 20170926 |
|
AV01 | Patent right actively abandoned |
Granted publication date: 20170111 Effective date of abandoning: 20170926 |
|
AV01 | Patent right actively abandoned | ||
AV01 | Patent right actively abandoned |