CN205857750U - A kind of lifter bearing for large-scale component Synchronous lifting sliding - Google Patents

A kind of lifter bearing for large-scale component Synchronous lifting sliding Download PDF

Info

Publication number
CN205857750U
CN205857750U CN201620571648.9U CN201620571648U CN205857750U CN 205857750 U CN205857750 U CN 205857750U CN 201620571648 U CN201620571648 U CN 201620571648U CN 205857750 U CN205857750 U CN 205857750U
Authority
CN
China
Prior art keywords
support body
lifter
described support
sliding
scale component
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620571648.9U
Other languages
Chinese (zh)
Inventor
王晓东
郭颖
周建峰
吴小春
季忠原
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Sixth Engineering Division Co Ltd
Third Construction Engineering Co Ltd of China Construction Sixth Engineering Division Co Ltd
Original Assignee
China Construction Sixth Engineering Division Co Ltd
Third Construction Engineering Co Ltd of China Construction Sixth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Sixth Engineering Division Co Ltd, Third Construction Engineering Co Ltd of China Construction Sixth Engineering Division Co Ltd filed Critical China Construction Sixth Engineering Division Co Ltd
Priority to CN201620571648.9U priority Critical patent/CN205857750U/en
Application granted granted Critical
Publication of CN205857750U publication Critical patent/CN205857750U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a kind of lifter bearing for large-scale component Synchronous lifting sliding, including support body, described support body is provided with steel strand wires via, two clamps it are provided with in the bottom of described support body, the chute coincideing with sliding beam it is formed with between two described clamps, center of top in described support body is provided with multiple lifter base card pressing plate being evenly distributed, and is connected with two end plates of consigning on an end face of described support body.This utility model employing arranges two clamps bottom support body and forms the chute coincideing with sliding beam, and on the end face of support body affixed end plate of consigning for being connected with load push-pull, lifter bearing is made to be capable of sliding function while supporting lifter, to meet the needs of large-scale component Synchronous lifting sliding;By arranging lifter base card pressing plate, it is possible to protection lifter base is not damaged by;And this utility model simple in construction, stable and reliable operation, low cost.

Description

A kind of lifter bearing for large-scale component Synchronous lifting sliding
Technical field
This utility model relates to a kind of lifter bearing, a kind of lifting for large-scale component Synchronous lifting sliding Device bearing.
Background technology
Along with socioeconomic development, people are also being continuously increased for demand and the needs of building and are improving, and disjunctor is multiple Miscellaneous skyscraper emerges in multitude.Conjoined structure refers generally to be connected with each other by built on stilts connector between Building two or several buildings skyscraper, Meet architectural image and use the requirement of function.Arranging on the one hand for the requirement of building function of conjoined structure, can facilitate Contact between two high buildings.Current conjoined structure has good daylighting effect and wide visual field, due to conjoined structure Arrange, make in architectural appearance more characteristic.Large span high-altitude disjunctor Construction of Steel Structure method specifically includes that high altitude bulk at present Method, point bar (piecemeal) lift-on/lift-off system, Integral Lifting, whole hanging method, cantilever Method for Installation, aerial sliding methed, inverse make Method for Installation etc..
Steel superstructure that the Steel corridor of certain synthesis project is mainly formed by connecting by truss and lower extension layer steel construction Composition.Vestibule integral planar is rectangular, and including left and right two parts, left-hand component is connected with A high building, by the knot being positioned on floorboard Part and connected part composition of encorbelmenting in structure, right-hand component is suspending part A high building and B high building linked together Point, overhanging portion divides with inside configuration and part of encorbelmenting is docked simultaneously, and the overhanging portion of vestibule and part of encorbelmenting are at same plane Interior L-shaped.Above-mentioned Steel corridor belongs to tall abnormity to transfinite structure, and the maximum span of steel truss is 30m, highly 4.4m.Whole Body hoisting height is 68.63 meters, and the cantilever span of part of wherein encorbelmenting is 11.050m, and weight is 165 tons, promotes without reliable Point.Steel superstructure and the lower extension all construction weights of layer steel construction reach 425 tons, use existing large span high-altitude disjunctor steel construction Construction method can not complete the construction of above-mentioned Steel corridor, accordingly, it would be desirable to described steel vestibule first carries out construction cell division: The middle stick of the steel superstructure of part of part and described vestibule in described gallery structure being encorbelmented divides the first construction cell into, The remainder of part of being encorbelmented by described vestibule divides the second construction cell into, divides described vestibule overhanging portion into the 3rd work order Unit;Use high-altitude to dissipate spelling and cantilever Method for Installation on A high building floorboard, complete the construction of described first construction cell;Use whole Body promotes and after overall lifting, sliding completes described second construction cell and the construction of the 3rd construction cell.Therefore project needs to set Count a kind of lifter bearing for large-scale component Synchronous lifting sliding.
Summary of the invention
This utility model provides a kind of and synchronizes to carry for large-scale component for solving technical problem present in known technology Rise the lifter bearing of sliding, this lifter bearing disclosure satisfy that large-scale component Synchronous lifting and promote after the needs of sliding.
This utility model is adopted the technical scheme that by solving technical problem present in known technology: a kind of for greatly The lifter bearing of type component Synchronous lifting sliding, including support body, is provided with steel strand wires via in described support body, The bottom of described support body is provided with two clamps, the center of top in described support body be provided with multiple be evenly distributed carry Rise device base card pressing plate, between two described clamps, be formed with the chute coincideing with sliding beam, in the one of described support body Two end plates of consigning it are connected with on individual end face.
Described support body is made up of square tube, and the section of described square tube is rectangle, in described support body Portion's middle position is provided with reinforcing plate.
This utility model has the advantage that with good effect: employing arranges two clamps bottom support body and formed The chute coincideing with sliding beam, and affixed end plate of consigning, for being connected with load push-pull, makes lifter on the end face of support body Bearing is capable of sliding function while supporting lifter, to meet the needs of large-scale component Synchronous lifting sliding;Pass through Lifter base card pressing plate is set, it is possible to protection lifter base is not damaged by, and enables lifter to be firmly secured at On seat.And this utility model simple in construction, stable and reliable operation, low cost.
Accompanying drawing explanation
Fig. 1 is front view of the present utility model;
Fig. 2 is the side view of Fig. 1;
Fig. 3 is the top view of Fig. 1.
In figure: 1, support body;2, consign end plate;3, clamp;4, steel strand wires via;5, reinforcing plate;6, lifter base Card pressing plate.
Detailed description of the invention
For summary of the invention of the present utility model, feature and effect can be further appreciated that, hereby enumerate following example, and coordinate Accompanying drawing describes in detail as follows:
Referring to Fig. 1~Fig. 3, a kind of lifter bearing for large-scale component Synchronous lifting sliding, including support body 1, described support body 1 is provided with steel strand wires via 4, is provided with two clamps 3 in the bottom of described support body 1, at two Be formed between described clamp 3 with sliding beam coincide chute, the center of top in described support body 1 be provided with multiple circumferentially Uniform lifter base card pressing plate 6, is connected with two end plates 2 of consigning on an end face of described support body 1.
In the present embodiment, described support body 1 is made up of square tube, and the section of described square tube is rectangle, in institute The bosom position stating support body 1 is provided with reinforcing plate 5.
Although being described preferred embodiment of the present utility model above in conjunction with accompanying drawing, but this utility model is not Being confined to above-mentioned detailed description of the invention, above-mentioned detailed description of the invention is only schematically, is not restrictive, ability The those of ordinary skill in territory is under enlightenment of the present utility model, without departing from this utility model objective and claimed In the case of scope, it is also possible to make a lot of form, within these belong to protection domain of the present utility model.

Claims (2)

1. for a lifter bearing for large-scale component Synchronous lifting sliding, including support body, in described support body It is provided with steel strand wires via, it is characterised in that be provided with two clamps in the bottom of described support body, between two described clamps Being formed with the chute coincideing with sliding beam, the center of top in described support body is provided with at the bottom of multiple lifter being evenly distributed Seat card pressing plate, is connected with two end plates of consigning on an end face of described support body.
Lifter bearing for large-scale component Synchronous lifting sliding the most according to claim 1, it is characterised in that described Support body is made up of square tube, and the section of described square tube is rectangle, in the bosom position of described support body It is provided with reinforcing plate.
CN201620571648.9U 2016-06-13 2016-06-13 A kind of lifter bearing for large-scale component Synchronous lifting sliding Expired - Fee Related CN205857750U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620571648.9U CN205857750U (en) 2016-06-13 2016-06-13 A kind of lifter bearing for large-scale component Synchronous lifting sliding

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620571648.9U CN205857750U (en) 2016-06-13 2016-06-13 A kind of lifter bearing for large-scale component Synchronous lifting sliding

Publications (1)

Publication Number Publication Date
CN205857750U true CN205857750U (en) 2017-01-04

Family

ID=57639327

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620571648.9U Expired - Fee Related CN205857750U (en) 2016-06-13 2016-06-13 A kind of lifter bearing for large-scale component Synchronous lifting sliding

Country Status (1)

Country Link
CN (1) CN205857750U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109989588A (en) * 2019-03-15 2019-07-09 上海建工七建集团有限公司 The installation of steel vestibule is promoted and high-altitude translation device and its installation method with whole

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109989588A (en) * 2019-03-15 2019-07-09 上海建工七建集团有限公司 The installation of steel vestibule is promoted and high-altitude translation device and its installation method with whole

Similar Documents

Publication Publication Date Title
CN106065661A (en) Large span unsettled steel corridor construction engineering method
CN205857750U (en) A kind of lifter bearing for large-scale component Synchronous lifting sliding
CN106013453B (en) Long-span Cantilever transfinites structure construction engineering method
CN203877739U (en) Bracket for integrally lifting air ducts
CN205857397U (en) A kind of slip support abutment of the structural steel vestibule that transfinites for Long-span Cantilever abnormity
CN205857752U (en) A kind of progressively push-pull device at fixed in place for component distance sliding
CN205857729U (en) A kind of deflection is encorbelmented interior pull-type sliding and lifting device
CN205857751U (en) A kind of lifting sub for large-scale component Synchronous lifting
CN209397505U (en) One kind being used for loading test of half-through CFST arch bridge hoisting of deck beam mounting device
CN104098018A (en) Reusable multistage balance beam combination system
CN205857748U (en) A kind of haulback type sliding and lifting device for roof edge zone line
CN203878957U (en) Protective screen module unit
CN204162235U (en) Lift crosshead safety overhauling device
CN205857746U (en) One is vertically encorbelmented thick pillar push mode sliding and lifting device
CN107060347A (en) A kind of big encorbelmented across metal decorates prefabricated roof and air translation splicing structure
CN205857728U (en) A kind of haulback type sliding and lifting device for roof corner region
CN205444459U (en) Biconjugate position steel construction
CN205114881U (en) Gantry crane for shipbuilding
CN205857749U (en) A kind of overall sliding and lifting device of the structure that transfinites for Long-span Cantilever
CN205501820U (en) Easy bridge beam slab handling frame of adjusting
CN201142537Y (en) Large span cable bridge rack installation mold
CN203755623U (en) Load overhauling bent frame convenient to assemble and disassemble
CN203612816U (en) Lifting appliance
CN202880729U (en) Net rack lifting device for roof with stand
CN206088946U (en) A integrally lift up displacement device for unsettled steel gallery of large -span

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170104

Termination date: 20200613

CF01 Termination of patent right due to non-payment of annual fee