CN205857374U - A kind of prefabricated assembled regeneration concrete vertical greening balcony - Google Patents
A kind of prefabricated assembled regeneration concrete vertical greening balcony Download PDFInfo
- Publication number
- CN205857374U CN205857374U CN201620473129.9U CN201620473129U CN205857374U CN 205857374 U CN205857374 U CN 205857374U CN 201620473129 U CN201620473129 U CN 201620473129U CN 205857374 U CN205857374 U CN 205857374U
- Authority
- CN
- China
- Prior art keywords
- balcony
- vertical greening
- regeneration concrete
- slab
- planting groove
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Steps, Ramps, And Handrails (AREA)
Abstract
This utility model is a kind of prefabricated assembled regeneration concrete vertical greening balcony, for solving the technical problem of balcony prefabrication and assembly construction, vertical greening and concrete regenerating in architectural engineering.Mainly it is made up of balcony slab, handrail, safety glass, planting technique groove.It is characterized in that: utilize regeneration concrete to be prefabricated in the factory balcony slab;In balcony slab end, U-shaped planting groove is set;Balcony slab steel bar stress is reserved certain length;At balcony slab with beam connecting node, reserved reinforcing bar anchoring into composite beam or Cast-in-situ Beam, then poured in place concrete makes balcony and beam connect into an entirety.Prefabricated assembled regeneration concrete vertical greening balcony of the present utility model is reliable with Vierendeel girder attachment security, regeneration concrete is utilized to pour balcony, building waste recycling can be realized, balcony slab is prefabricated in the factory can shorten the construction and installation duration, reduce city environmental pollution, balcony end arranges vertical greening planting groove can beautify facade effectively, increasing urban green coverage rate, this balcony is attractive in appearance, practical, convenient.
Description
Technical field:
This utility model relate to one in architectural engineering how to utilize regeneration concrete make balcony carry out prefabrication and assembly construction and
The technical problem of vertical greening.
Background technology:
Along with the aggravation of Chinese population aging degree, the human resources of labor service enterprises will be increasingly shorter so that executes
The work scene less prefabrication of labor service operation seems more and more important.It addition, conventional construction method is at the construction field (site)
Airborne dust, noise, the damage ratio such as sewage more serious." national novel urbanization planning (2014~2020) " proposes, and cities and towns are green
Building accounts for new building and rises to the 50% of the year two thousand twenty than important from 2% in 2012, energy-conserving and environment-protective comfortable for this health green
Color strategy has become the important content of the sustainable development architecture.At present, prefabricated assembling type reinforced concrete building more considers
Prefabricated components in the prefabricated of factory and connection at the construction field (site), but for how to make full use of original building waste, as
What increases the green coverage built, thus the livable property improving building on the basis of building industrialization and energy-saving and environment friendly is ground
Study carefully less.
Summary of the invention:
Technical problem to be solved in the utility model there is provided a kind of prefabricated assembled regeneration coagulation in architectural engineering
Soil vertical greening balcony, solves how in above-mentioned existing problems problem utilizes regeneration concrete making balcony to enter
Row prefabrication and assembly construction and the technical problem of vertical greening.Technical problem to be solved in the utility model is by the following technical programs
Realize:
In architectural engineering, a kind of prefabricated assembled regeneration concrete vertical greening balcony, is characterized in that: utilize building waste
Regeneration concrete carries out the prefabricated of balcony slab in factory, balcony slab width B, chooses length L outward and is determined by building according to design drawing;
Balcony slab end is stayed and is set vertical greening planting groove, planting groove axis width 350mm;Balcony slab root meets reserved for steel bar stress
The length that anchoring requires.After lifting prefabricated balcony, by reserved reinforcing bar is anchored into composite beam or Cast-in-situ Beam, then cast in situs
Concrete makes balcony and flooring Vierendeel girder connect into an entirety.Prefabricated assembled regeneration concrete of the present utility model is the greenest
Change balcony, practical and convenient, make simple, make use of building waste, meet the requirement of building industrialization and green building, can meet
The functional requirement of facade balcony vertical greening.
Described balcony mainly includes regeneration concrete balcony beam, balcony slab, reserved steel bar, planting groove base plate, planting groove side
Plate, railing, balcony slab width B, choose length L outward and determined by building according to design drawing.
Described regeneration concrete be by building waste reclaim, after crushing and screening, according to certain mix-design,
Pour, condense the concrete of hardening.
Described vertical greening planting groove is made up of base plate and side plate, all thick 120mm of base plate and side plate, planting groove axis width
350mm。
Accompanying drawing illustrates:
Fig. 1 is the plane graph of a kind of prefabricated assembled regeneration concrete vertical greening balcony way;
Fig. 2 be in a kind of prefabricated assembled regeneration concrete vertical greening balcony way with the 1-1 section corresponding to Fig. 1
Figure;
Fig. 3 be in a kind of prefabricated assembled regeneration concrete vertical greening balcony way with the 2-2 section corresponding to Fig. 1
Figure;
In figure: 1 downpipe preformed hole;2 floor drain preformed holes;3 rosettees;4 planting groove drainings are pre-
Box out;5 green plantss;6 watershed lines;7 200mm height concrete flange;8 planting groove side plates;9 railings;
10 planting soils;11 balcony beams;12 balcony slabs;13 floor girder and boards;14 planting groove base plates;15——
Balcony door and window.
Detailed description of the invention:
Below in conjunction with Figure of description, the utility model is described in further detail:
As shown in Figures 1 to 3, a kind of prefabricated assembled regeneration concrete vertical greening balcony, it is characterized in that: described balcony
Mainly include regeneration concrete balcony beam, balcony slab, reserved steel bar, planting groove base plate, planting groove side plate, railing, balcony slab width
Degree B, choose length L outward and determined by building according to design drawing.Described regeneration concrete is to be reclaimed by building waste, through broken sieve
After Fen, according to certain mix-design, pour, condense hardening concrete.Described vertical greening planting groove is the end of by
Plate and side plate composition, all thick 120mm of base plate and side plate, planting groove axis width 350mm, planting groove base plate stays the draining setting 1%
The gradient, carries out in factory and carries out filtration treatment at waterproof, osculum.
When specifically constructing, first determine the concrete arrangement of reinforcement of balcony according to actually used load, then in element precast factory
Molding utilizes regeneration concrete to carry out structure manufacture, reserves anchor bar in prefabricated balcony end, and maintenance reaches Concrete Design
After the 100% of strength standard value, transport is to job site;Utilize lifting appliance to carry out lifting in place, reserved steel bar is anchored into building
In the beam slab of face, anchorage length must meet construction standards requirement, then by balcony reserved steel bar one-piece casting together with floor girder and board
Concrete;After concrete curing hardening reaches the 100% of design strength standard value, prefabricated assembled regeneration concrete vertical greening
Balcony and agent structure connect into an entirety, it is ensured that the reliability of prefabricated assembled regeneration concrete vertical greening balcony meets
National regulation requirement;In planting groove, backfill planting soil, plant green plants.This balcony can accelerate speed of application;Reduce
The environmental pollutions such as the dust of job site, noise, sewage;Add facade vertical greening, beautifying urban environment.
Claims (1)
1. a prefabricated assembled regeneration concrete vertical greening balcony, is characterized in that: prefabricated assembled regeneration concrete is vertical
Greening balcony composition component includes regeneration concrete balcony beam, balcony slab, reserved steel bar, planting groove base plate, planting groove side plate, hurdle
Bar;Utilize construction refuse regenerated concrete prefabricated balcony slab, balcony slab width B, choose length L according to design drawing by building really outward
Fixed;Balcony slab end is stayed and is set vertical greening planting groove, planting groove base plate and side plate all thick 120mm, axis width 350mm, plantation
Trough floor stays the drainage grade setting 1%;Balcony slab root reserves steel bar stress, for connecting into one with composite beam or Cast-in-situ Beam
Overall.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620473129.9U CN205857374U (en) | 2016-05-18 | 2016-05-18 | A kind of prefabricated assembled regeneration concrete vertical greening balcony |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620473129.9U CN205857374U (en) | 2016-05-18 | 2016-05-18 | A kind of prefabricated assembled regeneration concrete vertical greening balcony |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205857374U true CN205857374U (en) | 2017-01-04 |
Family
ID=57643708
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620473129.9U Expired - Fee Related CN205857374U (en) | 2016-05-18 | 2016-05-18 | A kind of prefabricated assembled regeneration concrete vertical greening balcony |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205857374U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107816126A (en) * | 2017-10-26 | 2018-03-20 | 沈阳建筑大学 | A kind of embedded prefabricated post of assembly concrete and prefabricated balcony |
-
2016
- 2016-05-18 CN CN201620473129.9U patent/CN205857374U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107816126A (en) * | 2017-10-26 | 2018-03-20 | 沈阳建筑大学 | A kind of embedded prefabricated post of assembly concrete and prefabricated balcony |
CN107816126B (en) * | 2017-10-26 | 2023-10-03 | 张延年 | Assembled concrete embedded prefabricated column and prefabricated balcony |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106121107B (en) | Assemble type concrete slab and its plate dry type connection method | |
CN107313517B (en) | Connecting node for laminated wall and laminated floor slab in middle layer | |
CN106522359B (en) | Fully-assembled village and town dwelling type composite wall structure system and construction method thereof | |
CN105089178B (en) | A kind of pre-splicing Standard formula building of prefabricated steel reinforced concrete shear walls | |
CN108612315A (en) | A kind of assembled mixed structure Frame-Shear Wall building system and construction method | |
CN112695794A (en) | Precast concrete L shape post rim of a cup basis | |
CN108775084A (en) | Steel-concrete combines precast beam and prefabricated post connection structure and construction method | |
CN1888344B (en) | Composite thermal insulation concrete load-bearing wall | |
CN205224332U (en) | Prefabricated wall body and prefabricated wallboard | |
CN208502068U (en) | A kind of partial precast assembly prestress girder with rolled steel section en cased in concrete | |
CN100441793C (en) | Composite thermal insulation concrete shear wall | |
KR20140139217A (en) | Concrete protection wall with linear drainage functions and construction method thereof | |
CN205857374U (en) | A kind of prefabricated assembled regeneration concrete vertical greening balcony | |
CN105888281A (en) | Method for utilizing jacking storey-adding technique to promote integrated function of community | |
CN108756038A (en) | Assembly concrete shear wall and floor support plate rigid connection node and construction method | |
CN106320601B (en) | Assembly concrete is whole without heat bridge board wall and its vertical connection method | |
CN211115052U (en) | Shaft type underground stereo garage structure | |
CN205224271U (en) | Mortise type concrete superposed beam cross connection structure | |
CN105649259B (en) | A kind of wallboard structural system of the dark framework of band of precast concrete wall panel and its structure | |
CN208803649U (en) | Light steel grating concrete folding stair | |
CN208056513U (en) | A kind of structural system of assembly concrete stair | |
CN108360685B (en) | Monoblock type jack-up construction method | |
CN110359612A (en) | A kind of novel two-way ribs profiled steel sheet combination floor of assembled | |
CN211200460U (en) | Assembled integral underground space foundation member | |
CN209523311U (en) | Low multi-story structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170104 Termination date: 20170518 |
|
CF01 | Termination of patent right due to non-payment of annual fee |