China
Prior art keywords
wallboard
mounting groove
groove
hole
bolt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201822104642.2U
Other languages
Chinese (zh)
Inventor
佘金波
周豫
冯身强
傅毅
邱程
黄丽萍
任启富
闫洪坤
张稷明
苏波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chengdu Jiangong Industrialization Building Co Ltd
Original Assignee
Chengdu Jiangong Industrialization Building Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu Jiangong Industrialization Building Co Ltd filed Critical Chengdu Jiangong Industrialization Building Co Ltd
Priority to CN201822104642.2U priority Critical patent/CN209523311U/en
Application granted granted Critical
Publication of CN209523311U publication Critical patent/CN209523311U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model discloses a kind of low multi-story structures, including ready-made ground, floor, wall and roofing, the wall includes wallboard QB1, wallboard QB2, wallboard QB3, wallboard QB4, wallboard QB5, mounting post and bolt, and wallboard QB1, wallboard QB2, wallboard QB3, wallboard QB4, wallboard QB5 and mounting post are assembled by bolt;Floor between layers is connected by rood beam, L beam, T word beam with conventional beam, the roofing is affixed by the flooring of the roof of bolt multi-story structure low with this, and the roofing includes more steel columns and junction steel plate, the steel column split forms the mounting surface for installing junction steel plate, and junction steel plate is bolted in the mounting surface.The advantages of with being assembled by prefabricated prefabricated components, saving the construction time, while avoiding influence of the cast on-site to environment.

Description

Low multi-story structure
Technical field
The utility model relates to technical field of buildings, it particularly relates to a kind of low multi-story structure.
Background technique
Traditional low tier building, especially grange, mostly use greatly masonry structure, i.e. wall generally uses brick setting Wall, flooring and roofing use cast-in-situ reinforced concrete slab.This mode of construction situ wet operation is more, and speed of application is slow, and is easy Cause waste of material and environmental pollution.Currently, China just greatly develops assembled architecture, assembled building technology is applied to low Tier building can effectively solve a series of problems existing for conventional construction techniques.
For assembled architecture, China is studied at present and application is at most assembly concrete shear wall structure system, Upper and lower level prefabricated panel is mainly connected by modes such as sleeve grouting, slurry anchor overlap joints, and the contiguous prefabricated wallboard of same layer mainly passes through perpendicular Section connection is poured backward, so that structure meets the theory of " equivalent cast-in-place ", is belonged to cast in place and precast construction, is mainly used in high level and builds It builds.For low tier building, if still using the design concept and technology of skyscraper, it will cause cumbersome, higher costs of constructing The problems such as.
To sum up, relevant issues existing for conventional construction techniques and existing assembled technology are used to solve low tier building, Improve the mode of construction and energy-saving effect of low tier building, it is necessary to propose effectively building suitable for low tier building Make technical solution.
Utility model content
To solve problems of the prior art, the utility model provides a kind of low multi-story structure, has by pre- The advantages of prefabricated components made assemble, and save the construction time, while avoiding influence of the cast on-site to environment.
A kind of in order to achieve the above purposes, the technical solution adopted by the utility model is: low multi-story structure, including make in advance At ground, floor, wall and roofing, the wall include wallboard QB1, wallboard QB2, wallboard QB3, wallboard QB4, wallboard QB5, Mounting post and bolt, and wallboard QB1, wallboard QB2, wallboard QB3, wallboard QB4, wallboard QB5 and mounting post are assembled by bolt At;Floor between layers is connected by rood beam, L beam, T word beam with conventional beam, and the roofing is low with this more by bolt The flooring of the roof of layer building is affixed, and the roofing includes more steel columns and junction steel plate, and the steel column split formation is used for The mounting surface of junction steel plate is installed, junction steel plate is bolted in the mounting surface.
It is spliced to form low multi-story structure by pouring the prefabricated components being poured in advance, it is convenient and efficient;First by ground and ground Face fixes, and wallboard QB1, wallboard QB2, wallboard QB3, wallboard QB4 and wallboard QB5 are fixed by bolt and ground, installs simultaneously The intersection of the two blocks of wallboards of column installation on the corner, and fixed by two blocks of wallboards of bolt and this;Connection between layers After being connected by rood beam, L beam, T word beam with conventional beam, then the flooring by forming second floor after floor split, and between Liang Yuliang It is also linked together by junction steel plate, keeps its structure stronger, while using the roofing of steel construction, so that the use of roofing Life, while alleviating the weight of roofing;The low multi-story structure is assembled by prefabricated prefabricated components, is saved Construction time, while avoiding influence of the cast on-site to environment.
Preferably, the wallboard QB1 is integrally in rectangle, is successively arranged on the medial surface of the wallboard QB1 from bottom to up One groove, the second groove and third groove, and in first groove close to the wallboard QB1 bottom be equipped with the first mounting groove and Second mounting groove, the bottom of the wallboard QB1 is respectively equipped with the first through hole of connection the first mounting groove and the second mounting groove, described Wallboard QB1 is respectively equipped with the second through-hole for being connected to first mounting groove and the second mounting groove along its short transverse;Described second Third mounting groove and the 4th mounting groove are equipped in groove and close to the wallboard QB1 along the two sides of its short transverse, described the Three mounting grooves are located at the top of the 4th mounting groove, wallboard QB1 company of being respectively equipped with along the two sides of its short transverse The third through-hole of logical third mounting groove and the 4th mounting groove;Along its height side in the third groove and close to the wallboard QB1 To two sides be equipped with the 5th mounting groove and the 6th mounting groove, the wallboard QB1 is respectively equipped with along the two sides of its short transverse It is connected to the fourth hole of the 5th mounting groove and the 6th mounting groove.
The first groove, the second groove and third groove are set gradually on the medial surface of wallboard QB1, while in the groove It is provided with corresponding mounting groove, and is equipped with through-hole in the mounting groove, facilitates shank of bolt to pass through logical on two adjacent wallboards Wallboard is fixed in hole.
Preferably, the wallboard QB4 is in rectangle, and the inner wall surface of the wallboard QB4 is equipped with the 4th groove, and the described 4th is recessed It is equipped with the 7th mounting groove and the 8th mounting groove in slot, the 7th installation of connection is respectively equipped on the wherein one side of the wallboard QB4 The fifth hole of slot and the 8th mounting groove.
4th groove is set on wallboard QB4, while mounting groove is set in the 4th groove, through-hole, side are equipped in mounting groove Just shank of bolt pre-buried on conventional beam passes through through-hole and wallboard QB4 and conventional beam is fixed together, and is connected firmly, and structure letter It is single.
Preferably, the wallboard QB5 is integrally in rectangle, and the inner wall surface of the wallboard QB5 is equipped with the 5th groove, and described the It is equipped with the 9th mounting groove, the tenth mounting groove, the 11st mounting groove and the 12nd mounting groove in five grooves, the 9th mounting groove, Tenth mounting groove is oppositely arranged with the 11st mounting groove, the 12nd mounting groove, and on a wherein opposite flank of wallboard QB5 respectively Equipped with the 6th through-hole for being connected to the 9th mounting groove, the tenth mounting groove, the 11st mounting groove and the 12nd mounting groove.
5th groove is set on wallboard QB5, while mounting groove is set in the 5th groove, through-hole, side are equipped in mounting groove Just ground is fixed with wallboard QB5, is connected firmly, and structure is simple.
Preferably, the ground is equipped with several connection reinforcing bars, and the connection reinforcing bar is corresponding with the through-hole of wall bottom to be set It sets, and the wall is bolted with the ground, is bolted between the wallboard and wallboard.
Drawbar is set on ground and connects reinforcing bar, is to be put into corresponding wall for one end that connection reinforcing bar stretches out in assembly In the through-hole of body, and by nut check, it is more firm to make its connection structure, while solid by bolt between wallboard and wallboard Fixed, fixed structure is simple, and firm.
Preferably, the rood beam, L beam, T word beam and conventional beam are preset with reserved steel plate inside it in casting, and The reserved steel plate extends the outer body of beam.
It is to pass through between Liang Yuliang for convenience that reserved steel plate is preset on rood beam, L beam, T word beam and conventional beam When junction steel plate is fixed, it connect the reserved steel plate on beam with junction steel plate and is bolted, fixed form is simple It is convenient while also firm.
Preferably, the adjacent both sides in the bottom of the floor are equipped with baffle, and are laid with bolt hole on the baffle.
In the bottom of floor, adjacent both sides setting baffle is in order to facilitate the installation of, to pass through adjacent floor or floor and other When structure connects, linked together by the bolt hole being arranged on the baffle of floor.
Preferably, glue is filled at the connecting sewing of the low multi-story structure.In the connecting sewing of the low multi-story structure Place is that water is indoor from chain seam crossing infiltration in order to prevent filled with glue.
The beneficial effects of the utility model are:
(1) it is spliced to form low multi-story structure by pouring the prefabricated components being poured in advance, it is convenient and efficient;First by ground with Ground fixes, and wallboard QB1, wallboard QB2, wallboard QB3, wallboard QB4 and wallboard QB5 are fixed by bolt and ground, pacifies simultaneously The intersection of the two blocks of wallboards of column installation on the corner is filled, and is fixed by two blocks of wallboards of bolt and this;Company between layers Connected after rood beam, L beam, T word beam connect with conventional beam, then the flooring by forming second floor after floor split, and beam and beam it Between also linked together by junction steel plate, keep its structure stronger, at the same using steel construction roofing so that roofing makes With life, while alleviating the weight of roofing;The low multi-story structure is assembled by prefabricated prefabricated components, section The construction time is saved, while avoiding influence of the cast on-site to environment.
(2) the first groove, the second groove and third groove, while the groove are set gradually on the medial surface of wallboard QB1 It is inside provided with corresponding mounting groove, and is equipped with through-hole in the mounting groove, shank of bolt is facilitated to pass through on two adjacent wallboards Through-hole wallboard is fixed.
(3) the 4th groove is set on wallboard QB4, while mounting groove is set in the 4th groove, through-hole is equipped in mounting groove, Facilitate shank of bolt pre-buried on conventional beam to pass through through-hole wallboard QB4 and conventional beam are fixed together, be connected firmly, and structure letter It is single.
(4) the 5th groove is set on wallboard QB5, while mounting groove is set in the 5th groove, through-hole is equipped in mounting groove, Facilitate ground to fix with wallboard QB5, be connected firmly, and structure is simple.
(5) drawbar is set on ground and connects reinforcing bar, is to be put into correspondence for one end that connection reinforcing bar stretches out in assembly In the through-hole of wall, and by nut check, it is more firm to make its connection structure, while solid by bolt between wallboard and wallboard Fixed, fixed structure is simple, and firm.
(6) reserved steel plate is preset on rood beam, L beam, T word beam and conventional beam is for convenience between Liang Yuliang logical When crossing junction steel plate fixation, it connect the reserved steel plate on beam with junction steel plate and is bolted, fixed form letter Folk prescription just, while also consolidating.
(7) on the adjacent both sides in the bottom of floor setting baffle be in order to facilitate the installation of, by adjacent floor or floor with When other structures connect, linked together by the bolt hole being arranged on the baffle of floor.
(8) at the connecting sewing of the low multi-story structure filled with glue be in order to prevent water from the chain seam crossing penetrate into room It is interior.
Detailed description of the invention
Fig. 1 is the schematic perspective view of the two-layer structure of the embodiment of low multi-story structure described in the utility model;
Fig. 2 is the schematic perspective view of one layer of structure of the embodiment of low multi-story structure described in the utility model;
Fig. 3 is the structural schematic diagram of the wallboard QB1 of the embodiment of low multi-story structure described in the utility model;
Fig. 4 is corner wallboard QB1, the wallboard QB2 and peace of the embodiment of low multi-story structure described in the utility model Fill the attachment structure schematic diagram of column;
Fig. 5 is the corner wallboard QB1, wallboard QB2, installation of the embodiment of low multi-story structure described in the utility model The attachment structure schematic diagram of column and ground;
Fig. 6 is the partial enlargement structural representation in Fig. 1 at A;
Fig. 7 is the partial enlargement structural representation in Fig. 2 at B;
It is connected between the beam and two of the embodiment of Fig. 8 low multi-story structure described in the utility model by junction steel plate Structural schematic diagram;
Fig. 9 is the structural schematic diagram of the wallboard QB4 of the embodiment of low multi-story structure described in the utility model;
Figure 10 is the structural schematic diagram of the wallboard QB5 of the embodiment of low multi-story structure described in the utility model;
Figure 11 is the structural schematic diagram of the floor of the embodiment of low multi-story structure described in the utility model;
Figure 12 is that the floor of the embodiment of low multi-story structure described in the utility model and the connection structure of floor are illustrated Figure;
Figure 13 is the overall structure stereoscopic schematic diagram of the embodiment of low multi-story structure described in the utility model;
Figure 14 is the installation distributed architecture schematic diagram of the wallboard of the embodiment of low multi-story structure described in the utility model;
Figure 15 is the foundation structure schematic diagram of the embodiment of low multi-story structure described in the utility model;
Description of symbols:
1, ground;2, floor;3, wall;4, roofing;5, mounting post;7, bolt;8, rood beam;9, L beam;10, T word beam; 11, conventional beam;12, steel column;13, the first groove;14, the second groove;15, third groove;16, the first mounting groove;17, the second peace Tankage;18, first through hole;19, the second through-hole;20, third mounting groove;21, the 4th mounting groove;22, third through-hole;23, the 5th Mounting groove;24, the 6th mounting groove;25, fourth hole;26, the 4th groove;27, the 7th mounting groove;28, the 8th mounting groove;29, Fifth hole;30, the 5th groove;31, the 9th mounting groove;32, the tenth mounting groove;33, the 11st mounting groove;34, the 12nd peace Tankage;35, the 6th through-hole;36, junction steel plate;37, steel plate is reserved;38, baffle;39, bolt hole;40, roof panel.
Specific embodiment
The embodiments of the present invention are described in detail with reference to the accompanying drawing.
Embodiment 1:
As shown in figures 1-15, a kind of low multi-story structure, including ready-made ground 1, floor 2, wall 3 and roofing 4, The wall 3 includes wallboard QB1, wallboard QB2, wallboard QB3, wallboard QB4, wallboard QB5, mounting post 5 and bolt 7, and wallboard QB1, wallboard QB2, wallboard QB3, wallboard QB4, wallboard QB5 and mounting post 5 are assembled by bolt 7;Building between layers Plate 2 is connected by rood beam 8, L beam 9, T word beam 10 and conventional beam 11, and the roofing 4 passes through the multi-story structure low with this of bolt 7 Roof flooring it is affixed, and the roofing 4 includes more steel columns 12 and roof panel 40, and 12 split of steel column is formed for pacifying The mounting surface of roof panel 40 is filled, roof panel 40 is fixed in the mounting surface by bolt 7.
It is spliced to form low multi-story structure by pouring the prefabricated components being poured in advance, it is convenient and efficient;First by ground 1 and ground Face fixes, and wallboard QB1, wallboard QB2, wallboard QB3, wallboard QB4 and wallboard QB5 are fixed by bolt 7 and ground 1, wallboard QB1, wallboard QB2, wallboard QB3 are successively arranged side by side, and fixed by the bolt 7, and wallboard QB4 and wallboard QB5 are needed for installing Reserve the place of window, wallboard QB5 is installed on the top of wallboard QB4, and is in contact with ground 1 or floor 2, wallboard QB4 is then affixed by bolt 7 with beam and wallboard, while the intersection of the two blocks of wallboards of the installation of mounting post 5 on the corner, and passes through Two blocks of wallboards of bolt 7 and this are fixed;Connection between layers is connected by rood beam 8, L beam 9, T word beam 10 and conventional beam 11 Afterwards, wherein for L beam 9 used in the corner of wall 3, T word beam 10 is used in the corner for piecing together room, and rood beam 8 is used in phase next door Between intersection, conventional beam 11 be used in other Liang Yuliang between convenient for floor 2 carry out split fix, between floor 2 and floor 2 It is fixed by bolt 7, and floor 2 is also fixed by bolt 7 with beam, is formed the flooring of second floor after fixed, is made its structure more Add securely;Roofing 4 is formed by more steel columns 12 and roof panel 40 by the fixation of bolt 7 simultaneously, shape after more 12 splits of steel column At the multiple mounting surfaces for connecing steel plate for installing roofing 4, roof panel 40 is fixedly mounted in corresponding mounting surface by bolt 7 ?;It wherein fixes positioned at the steel column 12 of the low multi-story structure surrounding and the flooring of top layer, using the roofing 4 of steel construction, makes The service life for obtaining roofing 4 increases, while alleviating the weight of roofing 4;The low multi-story structure passes through prefabricated prefabricated structure Part assembles, and saves the construction time, while avoiding influence of the cast on-site to environment.
Embodiment 2:
As shown in figure 3, the present embodiment is on the basis of embodiment 1, the wallboard QB1 is integrally in rectangle, the wallboard QB1 Medial surface on be successively arranged the first groove 13, the second groove 14 and third groove 15 from bottom to up, and in first groove 13 It is equipped with the first mounting groove 16 and the second mounting groove 17 close to the bottom of the wallboard QB1, the bottom of the wallboard QB1 is respectively equipped with It is connected to the first through hole 18 of the first mounting groove 16 and the second mounting groove 17, the wallboard QB1 is respectively equipped with company along its short transverse Lead to the second through-hole 19 of first mounting groove 16 and the second mounting groove 17;In second groove 14 and close to the wallboard QB1 is equipped with third mounting groove 20 and the 4th mounting groove 21 along the two sides of its short transverse, and the third mounting groove 20 is located at institute The top of the 4th mounting groove 21 is stated, the wallboard QB1 is respectively equipped with connection third mounting groove along the two sides of its short transverse 20 and the 4th mounting groove 21 third through-hole 22;Along its short transverse in the third groove 15 and close to the wallboard QB1 Two sides are equipped with the 5th mounting groove 23 and the 6th mounting groove 24, and the wallboard QB1 is respectively equipped with along the two sides of its short transverse It is connected to the fourth hole 25 of the 5th mounting groove 23 and the 6th mounting groove 24.
The first groove 13, the second groove 14 and third groove 15 are set gradually on the medial surface of wallboard QB1, while this is recessed It is provided with corresponding mounting groove in slot, and is equipped with through-hole in the mounting groove, 7 bar of bolt is facilitated to pass through two adjacent wallboards On through-hole wallboard is fixed;Its deadlight QB1 and the structure of wallboard QB2 are symmetric, wallboard QB1 and wallboard QB3 Structure it is consistent.
Embodiment 3:
As shown in figure 9, the present embodiment is on the basis of embodiment 1, the wallboard QB4 is in rectangle, and the wallboard QB4's is interior Metope is equipped with the 4th groove 26, is equipped with the 7th mounting groove 27 and the 8th mounting groove 28, the wallboard in the 4th groove 26 The fifth hole 29 of the 7th mounting groove 27 and the 8th mounting groove 28 of connection is respectively equipped on a wherein adjacent two sides of QB4.
4th groove 26 is set on wallboard QB4, while mounting groove is set in the 4th groove 26, is equipped in mounting groove logical Hole facilitates 7 bar of bolt pre-buried on conventional beam 11 to pass through through-hole and wallboard QB4 and conventional beam 11 is fixed together, is connected firmly, And structure is simple.
Embodiment 4:
As shown in Figure 10, on the basis of embodiment 1, the wallboard QB5 is integrally in rectangle to the present embodiment, the wallboard The inner wall surface of QB5 is equipped with the 5th groove 30, and the 9th mounting groove 31, the tenth mounting groove 32, the are equipped in the 5th groove 30 11 mounting grooves 33 and the 12nd mounting groove 34, the 9th mounting groove 31, the tenth mounting groove 32 and the 11st mounting groove 33, 12 mounting grooves 34 are oppositely arranged, and be respectively provided on a wherein opposite flank of wallboard QB5 connection the 9th mounting groove 31, 6th through-hole 35 of the tenth mounting groove 32, the 11st mounting groove 33 and the 12nd mounting groove 34.
5th groove 30 is set on wallboard QB5, while mounting groove is set in the 5th groove 30, is equipped in mounting groove logical Hole facilitates ground 1 to fix with wallboard QB5, is connected firmly, and structure is simple.
Embodiment 5:
As shown in figure 15, on the basis of embodiment 1, the ground 1 is equipped with several connection reinforcing bars, the company to the present embodiment Reinforcing bar setting corresponding with the through-hole of 3 bottom of wall is connect, and the wall 3 and the ground 1 are fixed by bolt 7, the wallboard It is fixed by bolt 7 between wallboard.
Drawbar is set on ground 1 and connects reinforcing bar, is to be put into corresponding wall for one end that connection reinforcing bar stretches out in assembly In the through-hole of body 3, and by nut check, it is more firm to make its connection structure, while solid by bolt 7 between wallboard and wallboard Fixed, fixed structure is simple, and firm.
Embodiment 6:
As shown in figures 1-15, the present embodiment on the basis of embodiment 1, the rood beam 8, L beam 9, T word beam 10 and conventional Beam 11 is preset with reserved steel plate 37 in casting inside it, and the reserved steel plate 37 extends the outer body of beam.
Preset on rood beam 8, L beam 9, T word beam 10 and conventional beam 11 reserved steel plate 37 be for convenience Liang Yuliang it Between when fixed by junction steel plate 36, connect reserved steel plate 37 and junction steel plate 36 on beam and passes through bolt 7 and consolidate Fixed, fixed form is simple and convenient, while also firm.
Embodiment 7:
As shown in figure 11, on the basis of embodiment 1, the adjacent both sides in bottom of the floor 2 are equipped with baffle to the present embodiment 38, and bolt hole 38 is laid on the baffle 38.
In the bottom of floor 2, adjacent both sides setting baffle 38 is in order to facilitate the installation of, to pass through adjacent floor 2 or floor 2 When being connect with other structures, linked together by the bolt hole 38 being arranged on the baffle 38 of floor 2.
Embodiment 8:
As shown in figures 1-15, the present embodiment on the basis of embodiment 1, is filled at the connecting sewing of the low multi-story structure There is glue.It is that water penetrates into interior at the connecting sewing in order to prevent that glue is filled at the connecting sewing of the low multi-story structure.
Installation steps: as shown in figures 1-15,
S1: foundation built-in bolt 7 positions.When basic ground beam pours, it should bury in basic ground beam and be connected with prefabricated panel The bolt 7 connect.
S2: the installation of wallboard, mounting post 5;Wallboard, mounting post 5 select one jiao of house, according to clockwise (or counterclockwise) It successively installs, complete closure in direction (shown in Figure 14);
1, it after in prefabricated panel insertion pre-embedded bolt 7, is fastened with nut shim and nut, completes the peace of wallboard QB1 Dress.
2, the pre embedded bolt in next wallboard QB2 insertion ground 1 is vertically positioned, with matched bolt 7 with it is upper One good and sound wallboard QB1 is transversely attached to be connect, and so on complete place have the installment work of wallboard QB2.
3, the step in 1 and 2 is repeated, until first layer floor 2 is all installed.
The installation of S3, beam: first layer mounting post 5, wallboard are installed rear Liftable beam.Beam coincides with prefabricated panel Afterwards, it is aligned bolt hole 38 up and down, is fastened with nut shim and nut.
S4, after this layer of beam is installed, using junction steel plate 36 in each beam reserve steel plate be connected, make flood Collar tie beam forms a whole through beam.
The installation of S5, floor 2: the bolt hole 38 on floor 2 is corresponding with the bolt hole 38 that beam is reserved, when floor 2 is installed After in place, first floor 2 is corrected with crowbar, then with bolt 7 by beam with floor 2 is transversely attached connects.
The installation of S6, the S1-S5 that repeats the above steps the completion second layer.
S7, pre-assembled roofing 4 is mutually fixed with second layer structure.
Specific embodiment of the present utility model above described embodiment only expresses, the description thereof is more specific and detailed, But it should not be understood as limiting the scope of the patent of the utility model.It should be pointed out that for the common of this field For technical staff, without departing from the concept of the premise utility, various modifications and improvements can be made, these all belong to In the protection scope of the utility model.

Claims (8)

1. a kind of low multi-story structure, which is characterized in that including ready-made ground, floor, wall and roofing, the wall Including wallboard QB1, wallboard QB2, wallboard QB3, wallboard QB4, wallboard QB5, mounting post and bolt, and wallboard QB1, wallboard QB2, wall Plate QB3, wallboard QB4, wallboard QB5 and mounting post are assembled by bolt;Floor between layers by rood beam, L beam, T word beam is connected with conventional beam, and the roofing is affixed by the flooring of the roof of bolt multi-story structure low with this, and the roofing packet More steel columns and junction steel plate are included, the steel column split forms the mounting surface for installing junction steel plate, and junction steel plate passes through spiral shell Bolt is fixed in the mounting surface.
2. low multi-story structure according to claim 1, which is characterized in that the wallboard QB1 is integrally in rectangle, the wall The first groove, the second groove and third groove are successively arranged on the medial surface of plate QB1 from bottom to up, and close in first groove The bottom of the wallboard QB1 is equipped with the first mounting groove and the second mounting groove, and the bottom of the wallboard QB1 is respectively equipped with connection first The first through hole of mounting groove and the second mounting groove, the wallboard QB1 are respectively equipped with connection first installation along its short transverse Second through-hole of slot and the second mounting groove;Along the two sides of its short transverse in second groove and close to the wallboard QB1 Equipped with third mounting groove and the 4th mounting groove, the third mounting groove is located at the top of the 4th mounting groove, the wallboard QB1 The third through-hole of connection third mounting groove and the 4th mounting groove is respectively equipped with along the two sides of its short transverse;The third is recessed The 5th mounting groove and the 6th mounting groove, the wallboard are equipped in slot and close to the wallboard QB1 along the two sides of its short transverse QB1 is respectively equipped with the fourth hole of the 5th mounting groove and the 6th mounting groove of connection along the two sides of its short transverse.
3. low multi-story structure according to claim 1, which is characterized in that the wallboard QB4 is in rectangle, the wallboard The inner wall surface of QB4 is equipped with the 4th groove, is equipped with the 7th mounting groove and the 8th mounting groove, the wallboard in the 4th groove The fifth hole of the 7th mounting groove and the 8th mounting groove of connection is respectively equipped on the wherein one side of QB4.
4. low multi-story structure according to claim 1, which is characterized in that the wallboard QB5 is integrally in rectangle, the wall The inner wall surface of plate QB5 is equipped with the 5th groove, and the 9th mounting groove, the tenth mounting groove, the 11st peace are equipped in the 5th groove Tankage and the 12nd mounting groove, the 9th mounting groove, the tenth mounting groove and the 11st mounting groove, the 12nd mounting groove is opposite sets It sets, and is respectively provided with the 9th mounting groove of connection, the tenth mounting groove, the 11st peace on a wherein opposite flank of wallboard QB5 6th through-hole of tankage and the 12nd mounting groove.
5. low multi-story structure according to claim 1, which is characterized in that the ground is equipped with several connection reinforcing bars, Connection reinforcing bar setting corresponding with the through-hole of wall bottom, and the wall is bolted with the ground, the wallboard It is bolted between wallboard.
6. low multi-story structure according to claim 1, which is characterized in that the rood beam, L beam, T word beam and conventional beam Reserved steel plate is preset with inside it in casting, and the reserved steel plate extends the outer body of beam.
7. low multi-story structure according to claim 1, which is characterized in that the adjacent both sides in the bottom of the floor are equipped with gear Plate, and bolt hole is laid on the baffle.
8. low multi-story structure according to claim 1, which is characterized in that filled out at the connecting sewing of the low multi-story structure Filled with glue.
CN201822104642.2U 2018-12-14 2018-12-14 Low multi-story structure Active CN209523311U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201822104642.2U CN209523311U (en) 2018-12-14 2018-12-14 Low multi-story structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201822104642.2U CN209523311U (en) 2018-12-14 2018-12-14 Low multi-story structure

Publications (1)

Publication Number Publication Date
CN209523311U true CN209523311U (en) 2019-10-22

Family

ID=68226943

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201822104642.2U Active CN209523311U (en) 2018-12-14 2018-12-14 Low multi-story structure

Country Status (1)

Country Link
CN (1) CN209523311U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111549933A (en) * 2020-05-13 2020-08-18 中冶交投善筑成都装配式建筑科技发展有限公司 Low-rise prefabricated building structure adopting full-dry type connection and assembling method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111549933A (en) * 2020-05-13 2020-08-18 中冶交投善筑成都装配式建筑科技发展有限公司 Low-rise prefabricated building structure adopting full-dry type connection and assembling method

Similar Documents

Publication Publication Date Title
US8079189B2 (en) Structure system of concrete building for self-heat insulation
US7882669B2 (en) Composite concrete shear wall for heat insulation
CN203834739U (en) End steel board connection, positioning and assembly type shear wall structure
CN106436893A (en) Fully-prefabricated structure and construction method thereof
CN207582663U (en) Connecting elements between concrete folding plate and shear wall Side fascia
CN207700443U (en) Exterior wall plate level has muscle grouted joint structure at a kind of fabricated shear wall architecture storey
CN106149937B (en) Assembly concrete beam and its dry type connection method
CN107558603B (en) Assembled building structure system and construction method thereof
CN103993679B (en) Low layer assembling combined wall house bolt connection node structure
CN103711238A (en) Assembly-type concrete shear wall structure system buckled and anchored through ring ribs
CN207538322U (en) A kind of prefabricated PC concrete frame frame system
CN108005304A (en) A kind of prefabricated PC concrete frame frame system and its construction method
CN202324323U (en) Outer wall plate
CN204645253U (en) A kind of prefabricated house
CN101936074A (en) Fast building earthquake-resisting reinforcing method and device
CN205688576U (en) A kind of steel construction shaped pile frame Bracing Systems
CN215166634U (en) Assembly type building wallboard connecting structure
CN202466890U (en) Prefabricated concrete-filled steel tube lateral frame shear wall
CN113404170A (en) Waterproof structure at joint of prefabricated outer wall and cast-in-place floor slab and construction method thereof
CN209523311U (en) Low multi-story structure
CN113737936A (en) Connecting structure and construction method of prefabricated combined duplex balcony
CN207003673U (en) A kind of connecting node of beam and wallboard
CN105649259B (en) A kind of wallboard structural system of the dark framework of band of precast concrete wall panel and its structure
CN115807561B (en) Connection reinforcing structure of hollow decorative flower wall of ultra-high shale clear water brick and construction method thereof
CN208056126U (en) A kind of connecting node construction of steel pipe bundle concrete walls and Base isolation system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant